Fletcher builds careers.
1
The Fletcher Construction Company Limited
FLETCHER CONSTRUCTION IS THE PRE-EMINENT GENERAL CONTRACTOR IN NEW ZEALAND.
Fletcher Construction is a leading New Zealand and Pacific islands construction company offering a full range of construction services across civil engineering, commercial and interior projects.
For more than a century, Fletcher has established industry leadership through its focus on delivering more than simply achieving the agreed time, cost, and quality parameters for clients.
Its focus on client objectives and its clients’ clients has created a strong and enduring culture that adds value beyond the delivery of construction.
Fletcher Construction is the ‘go to’ contractor for large, complex and high profile projects for institutional, Government and commercial projects in New Zealand and the South Pacific.
ALMOST
3,000EMPLOYEES
THE FLETCHER CONSTRUCTION COMPANY2
Part of a strong company
www.fletcherbuilding.com
FLETCHER BUILDING IS A WORLD CLASS NEW ZEALAND-BASED BUSINESS, OPERATING IN MORE THAN 40 COUNTRIES, EMPLOYING OVER 19,000 PEOPLE, AND MANUFACTURING AND DISTRIBUTING WORLD-LEADING BUILDING AND CONSTRUCTION PRODUCTS.
TURNOVER
NZD9BILLION #1 NZX19,000
EMPLOYEES
Distribution I Building Products I Laminates & Panels I Construction Group I Infrastructure Products
Fletcher Building’s strong balance sheet makes Fletcher Construction an attractive construction partner for a range of project financial structures:
We are a highly attractive partner in Public Private Partnerships (PPPs) for organisations wishing to invest debt and equity in infrastructure. Fletcher Construction has worked closely with appropriately skilled financial advisors to raise debt
and equity finance for proposals for infrastructure projects to be delivered as PPP projects including prisons and highways. One such project is the Auckland South Correctional Facility recently completed by Fletcher.
Our strong balance sheet means we are able to act in a funding role ourselves. We are currently jointly developing the new head office for Fonterra, New Zealand’s largest
company, in conjunction with a local property company. We are also a major residential developer, with our largest project to date (Stonefields) including over 2,500 dwellings when completed. We have strong existing relationships with financial institutions and are confident we can secure funding under any project financing model.
3
Seovic
Internal Joint Ventures
Papua New Guinea
American Samoa
Vanuatu
Samoa
Solo
mon
Isla
nds
Tong
a
Fiji
Piletech
PipeWorks
Brian Perry CivilAlliance &
Joint Ventures
Meg
a Pr
ojec
ts
Auck
land
Auckland In
terio
rs
Waikato
Fletcher Branded
Major Projects
Wellington Build
ing
& Interiors
Christchurch
& South Island
SOUTH PACIFIC
INFRASTRUCTURE
EARTHQUAKE RECOVER
Y
BUILDING + INTERIORS
The Fletcher Construction Company Limited
HOUSING
Fletcher Residential Limited
Heavy BuildingProducts
DistributionLaminates& Panels
ConstructionGroup
Light BuildingProducts
THE FLETCHER CONSTRUCTION COMPANY4
A wide range of challenging roles
5
A STRONG FOUNDATION
HONEST IN OUR WORK
• TRUSTED• SCALE• SAFEHANDS
StrengthIntegrityExpertise
Our character
PEOPLE + BENEFIT FOCUSED
WORKING TOWARDS A HIGHER PURPOSE AND A NEW STANDARD
Our character
StrengthIntegrityExpertise
Our culture
HAVING A LONG HISTORY OF EXPERIENCE WITH ALLIANCES AND SIMILAR TYPES OF COLLABORATIVE CONTRACTS, OUR WORKFORCE IS USED TO COOPERATING WITH OTHER ORGANISATIONS AND IS WELL-ALIGNED TO THE ALLIANCE FOCUS ON HIGH PERFORMANCE CULTURE AND STAKEHOLDER MANAGEMENT.
Our shared culture is one of:• Mutual respect;• Open communication
between levels;• A focus on high performance
delivery;• Development of skills; and• A strong sense of pride
nurtured within the workforce, further developed through alliances.
THE FLETCHER CONSTRUCTION COMPANY6
Courageous leaders
Problem solvers
Backing ourselves
Have a go without being rash
Transparent
Honest
Fair minded
Respectful and inclusive
Progressive
Continuous improvement
A passion for excellence
Champion of safety
Expert partner
Creative
Insightful
Building for a greater good
7
WATERVIEW CONNECTION
LOCATION: Auckland VALUE: $1.2 billion COMPLETION: Under construction
THE FLETCHER CONSTRUCTION COMPANY8
MACKAYS TO PEKA PEKA
LOCATION: Lower North Island VALUE: $650 million COMPLETION: Under construction
9
CHRISTCHURCH JUSTICE AND EMERGENCY SERVICES PRECINCTLOCATION: Christchurch VALUE: $230 million COMPLETION: Under construction
THE FLETCHER CONSTRUCTION COMPANY10
FONTERRA HEAD OFFICE
LOCATION: Auckland VALUE: $56 million COMPLETION: Under construction
11
AUCKLAND SOUTH CORRECTIONAL FACILITYLOCATION: Auckland VALUE: $300 million COMPLETION: January 2015
THE FLETCHER CONSTRUCTION COMPANY12
ASB NORTH WHARF
LOCATION: Auckland VALUE: $105 million COMPLETION: July 2013
13
Covered tunnelRob Roy r
elocation
Northbound tunnel exit
Saint Marys Bay shoulder
widening and Westhaven
Drive retaining wall
Jacob’s Ladder footbridge
North Shore No. 1
water main relocation
Saint Marys Bay shoulder widening and acoustic barrier
Northbound tunnel entrance
VICTORIA PARK ALLIANCE
LOCATION: Auckland VALUE: $406 million COMPLETION: June 2012
THE FLETCHER CONSTRUCTION COMPANY14
AUT SIR PAUL REEVES BUILDING
AUT SIR PAUL REEVES BUILDING
LOCATION: Auckland VALUE: $70 million COMPLETION: November 2012
LOCATION: Auckland VALUE: $70 million COMPLETION: November 2012
ANZ CENTRE
LOCATION: Auckland VALUE: $65 million COMPLETION: January 2013
15
TAURANGA HARBOUR LINK
MANUKAU HARBOUR CROSSING
LOCATION: Tauranga VALUE: $180 million COMPLETION: 2009
LOCATION: Auckland VALUE: $211 million COMPLETION: November 2010
THE FLETCHER CONSTRUCTION COMPANY16
EDEN PARK REDEVELOPMENT
LOCATION: Auckland VALUE: $150 million COMPLETION: October 2010
17
GRAFTON GULLY + CENTRAL MOTORWAY JUNCTION STAGE 1
CENTRAL MOTORWAY JUNCTION STAGE 2
NORTHERN BUSWAY
LOCATION: Auckland VALUE: $130 million COMPLETION: 2004
LOCATION: Auckland VALUE: $140 million COMPLETION: 2006
LOCATION: Auckland VALUE: $252 million COMPLETION: 2008
THE FLETCHER CONSTRUCTION COMPANY18
MANAPOURI SECOND TAILRACE TUNNEL
LOCATION: Southland VALUE: $212 million COMPLETION: February 2002
19
SKY CITYCASINO+HOTEL TOWER CONVENTION CENTRE GRAND HOTELLOCATION: Auckland VALUE: $469 million
THE FLETCHER CONSTRUCTION COMPANY20
21
WESTPAC STADIUM
LOCATION: Wellington VALUE: $98 million COMPLETION: November 1999
TE PAPA MUSEUM OF NEW ZEALANDLOCATION: Wellington VALUE: $130 million COMPLETION: June 1996
GETTY CENTERLOCATION: Los Angeles, California VALUE: $1.2 billion COMPLETION: November 1997
THE FLETCHER CONSTRUCTION COMPANY22
JACKSON’S AIRPORT
LOCATION: Papua New Guinea VALUE: PGK $100 million COMPLETION: 1997
GRAND PAPUA HOTEL AND APARTMENTSLOCATION: Papua New Guinea VALUE: PGK $130 million COMPLETION: November 2011
23
REWA BRIDGE
LOCATION: Fiji VALUE: FJD 29.7 million COMPLETION: August 2006
THE FLETCHER CONSTRUCTION COMPANY24
www.pipeworks.co.nz www.piletech.co.nz www.seovic.co.nzwww.brianperrycivil.co.nz25
The Christchurch Earthquake caused significant damage, so the EQC established the Earthquake Recover (EQR) Project Management Office and appointed Fletcher Construction to run it.
Fletcher Construction together with City Care, Fulton Hogan, Downer and MacDow have formed an Alliance to repair and reconstruct streets and services for Christchurch City Council in an agreement valued at approx $2.5 billion.
Trusted by Government to rebuild Christchurch
EQR is operated from a central office based in Christchurch, with localised Hub office construction teams based in the community.EQR is managing repairs to houses where the damage has been assessed at between $10,000 and $100,000 plus GST.
This is a major undertaking, with work expected to continue for five years.
HELPING THE RECOVERY IN CANTERBURY REBUILDING A STRONGER CHRISTCHURCH
THE FLETCHER CONSTRUCTION COMPANY26
Winning mega projects and new contractual forms
Waterview Connection Tunnels and Great North Road Interchange
Volume 1Non Price Attributes General
1WV_TenderCovers(f).indd 1
13/06/11 9:46 PM
Department of CorrectionsExpression of Interest for PPP at Wiri Prison Tender Number
Department of CorrectionsExpression of Interest for PPP at Wiri Prison Tender Number
The Well-Connected Consortium for the Waterview Alliance
SecureFuture for Auckland South Correctional Facility PPP
27
THERE IS A STRONG COMMITMENT TO THE PRINCIPLE OF ZERO HARM TO EMPLOYEES AND VISITORS. WE PRIDE OURSELVES IN THE HIGH SAFETY STANDARDS WE SET AND ACHIEVE.
Commitment to Health & Safety
Date:
TIme
area observed hazard identification
St Marys Bay
Victoria Park North
Victoria Park
Birdcage
Southern Entrance trench
Other:
near miss
This record will be used to help identify any safety trends.
Observer:
Description of hazard / near miss:
Take immediate action Place in Drop Box
Please take completed records to the drop boxes located in the site offices and smoko huts. Thanks.
Hazard and Near Miss Card
Oct 22, 201010.30am
Tommy Temple
Fencing around work site to stop falls
Safety is its own rewardBut it doesn’t hurt to receive a little PRAISE for effort
Fill out a PRAISE card if you see: someone on site performing a safety action that goes beyond minimum expectations
a near miss new hazards
Date: Time:
area observed hazard identification
safety reward
near miss
St Marys Bay Victoria Park North Victoria Park Birdcage
Southern Entrance trench Other __________________
This record will be used to help identify any safety trends.
Observer:
Recipient:
Description of hazard / near miss or reason for reward:
Take immediate action Place in Drop Box Feedback to ObserverPlease take completed records to the drop boxes located in the site offices and smoko huts. Thanks.
PRAISE Card
Oct 22, 2010 10.30am
Tommy TempleJezreel Solomana
Always works safe, never has to be told about PPE
Personnel are encouraged to question safety issues in their working environment and to consider the impact of an accident on their personal life and families.
THE FLETCHER CONSTRUCTION COMPANY28
FLETCHER CONSTRUCTION IS CERTIFIED TO AS/NZS ISO 9001 FOR THE SUPPLY OF CONSTRUCTION SERVICES FOR BUILDINGS AND STRUCTURES, INCLUDING DESIGN MANAGEMENT.
Commitment to Quality
Date: May 2015
Quality Policy We are committed to always meeting or exceeding the expectations of our customers.
We will:
Identify key areas of risk and control them effectively.
Work collaboratively to deliver high standards of workmanship and service.
Comply with the requirements of our quality management system and continually improve its effectiveness.
Set and review measurable quality objectives and targets.
Promote a culture of quality, awareness and commitment.
Mark Adamson Graham Darlow Chief Executive Officer Chief Executive – Construction Group Fletcher Building Limited Fletcher Building Limited
Greg Pritchard General Manager Building + Interiors
Andrew Stevens General Manager Infrastructure
Alan BrownGeneral Manager South Pacific
Walt Friedel Head of Earthquake Recovery
Fletcher management has the highest expectations for the quality of delivery, and our systems of QA, checking, sign-offs, permit systems, document control, and workface implementation are proven to deliver high quality products and fuel an environment for continual improvement.
29
Building careers for more than a century.