C-11
Figure C-17. ARA-02 Standard Army Maintenance System (SAMS) survey.
Figure C-18. ARA-02 SAMS survey.
C-12
Figure C-19. ARA-07 aboveground structure.
Figure C-20. ARA-07 aboveground structure removal.
C-13
Figure C-21. ARA-07 seepage pit.
Figure C-22. ARA-07 seepage pit block removal.
C-14
Figure C-23. ARA-07 seepage pit backfill.
Figure C-24. ARA-08 excavation.