Page 1: FEBRUARY (1) –Groundworks & Substructure 7

Site Fencing

Managed / Secured Vehicle Gate

Pedestrian Access

Construction Traffic Movement

Site Welfare and Accommodation

Materials Storage Area

Waste Separation & Recycling

Demolition

Construction of Building

Scaffold

Hoist

Site Traffic / Plant Hardstandings

Site Gate Manned by Banksmen

Key / Legend

Notes

• To be read in conjunction with Master Programme

FEBRUARY (1) – Groundworks & Substructure

PROJECT: Dover Court, Blocks D, E & G

Date:

Drawn By:

7

Site Fencing

Managed / Secured Vehicle Gate

Pedestrian Access

Construction Traffic Movement

Site Welfare and Accommodation

Materials Storage Area

Waste Separation & Recycling

Demolition

Construction of Building

Scaffold

Hoist

Site Traffic / Plant Hardstandings

Site Gate Manned by Banksmen

Temporary Safe Escape Route

November 2018

Robert Rundle

To be read in conjunction with Contract Programme (PH2 CP00001) dated 07 November 2018

Spaces Required by Residents

Spaces Suspended

Spaces Available

25 53 34

Site Fencing

Managed / Secured Vehicle Gate

Operative Access

Construction Traffic Movement

Site Welfare and Accommodation

Materials / Plant Storage Area

Waste Separation & Recycling

Demolition

Construction of Building

Scaffold

Hoist

Site Traffic / Plant Hardstandings

Site Gate Manned by Banksmen

Temporary Safe Escape Route

Temporary Bin Store

AkinkunmiB
Polygon
AkinkunmiB
Polygon
AkinkunmiB
Polygon
AkinkunmiB
Polygon
AkinkunmiB
Line
AkinkunmiB
Polygon
AkinkunmiB
Line
AkinkunmiB
Line
AkinkunmiB
Sticky Note
Unmarked set by AkinkunmiB
AkinkunmiB
Text Box
BLOCK G
AkinkunmiB
Text Box
BLOCK E
AkinkunmiB
Text Box
BLOCK D

Top Related