FOREWORD
This final report documents the ET thermal environment generation work per-
formed under the ET Aerothermal Design Criteria Verification study (NAS8-36946).
The work was performed for the Thermal Environments Branch (ED-33) of the
George C. Marshall Space Flight Center (MSFC).
During the course of the work, significant results and progress were documented
in the progress reports submitted each month. The purpose of this report is to
summarize the thermal environment generation methodology and to present a
comparison with the Rockwell IVBC-3 environments. The report is presented in
two volumes. Volume I contains the methodology and environment summaries.
Volume II contains the plotted timewise environments comparing the REMTECH
results to the Rockwell IVBC-3 results.
I==_I_: r,_ "r" ==" C i--4 RTR 174-01
Contents
VOLUME I
1 INTRODUCTION 1
2 BODY POINT DESCRIPTION 2
3 TRAJECTORY 3
4 HEATING METHODOLOGY
4.1 General Discussion ...........................
4.2 Undisturbed Heating ..........................
4.2.1 ET Nose Spike .........................
4.2.2 LO2 Tank, Intertank and LH2 Tank .............
4.2.2.1 Shock Shape ......................
4.2.2.2 Surface Pressure ....................
4.2.2.3 Laminar/Turbulent Heat Transfer ..........
4.2.2.4 Boundary Layer Transition ..............
4.2.2.5 Rarefied Heating ....................
4.3 Disturbed Acreage Environment Methodology ............
4.3.1 Proximity Amplification Factor (Hi/Hu) ...........
4.3.2 Surface Roughness [_o_h_\ H. oo,h/ .................
4.3.3 Intertank Stringer/Waviness Factor /'_'_\ H,,,,ooth ) ........
H_i ht
4.3.4 Flight/Wind Tunnel Scale Factors (_)
4
4
4
4
5
6
6
7
8
8
9
10
11
11
12
ii
5
6
AS CENT ENVIRONMENTS
5.1 Timewise Environments ........................
5.2 Environment Presentation .......................
REMTECH/ROCKWELL IVBC-3 ENVIRONMENT COMPAR-ISON
6.1 40 ° Cone .................................
6.2 L02 Tank ................................
6.3 Intertank ................................
6.4 LH2 Tank ................................
7 CONCLUSIONS
REFERENCES
14
14
15
16
16
17
17
18
19
2O
eoe
111
i_ E M"r" _ C I---! RTR 174-01
Contents
VOLUME II
TABLES 1
1 Maximum Design Heating Rate and Load Summary for ET Acreage
Body Point Locations 2
2 Aeroheating and Plume Convection Max Heating Rate Summary
for Body Point Locations XT >__1872 18
PLOTTED DATA 2O
1 Timewise Comparison of REMTECH/Rockwell IVBC-3 Ascent
Design Heating Rates (TW=460°R) 21
iY
F=__" r,_'T" _" C _--4 RTR 174-01
TABLES
I. MAXIMUM DESIGN HEATING KATE AND LOAD SUMMARY FOR ET
ACREAGE BODY POINT LOCATIONS
2. AEROHEATING AND PLUME CONVECTION MAX HEATING RATE
SUMMARY FOR BODY POINT LOCATIONS XT >_ 1872
1
F:_ _" M-r- _" C }--4 RTR 174-01
0O_
ra_
Z
¢/1
o
O_
= N
Z0
o0
Z
0
2:
0
0
o
N
• • • • • • • • • • • • • , • • • • • o • • • • •
U
0
o
,.0
0
o_
_J
F:_ _=- r,,,._ -r- _- _ i--.i RTR 174-01
r..)
Z
0rJ_
0
Z0
o0
0 N ._0
0
0
t_D
0
0
.$
0
_o"&
A¢",1
•_ _
_-_ ,_._
0z
5
F:_ _" M"T- _" C P--! RTR 174-01
<
O<
2_
0
Z
<
Z0
o0
I,,,,,4
00o
Zk,,,,,¢0
0
o
"o
_0<d¢J
U
<
0
¢>
o¢>
¢1O¢J
_j
o vl -'_ _
• #=
N N_
_- _.'=
• _ _ __
0
6
0
0OK
r_
X
Z0
o0
000
Z
0
0
0
oleeloollltoll.oool
0
_0
o
0
0
4_
_v,_._
e_4_
• _
"el .
_'_ _._
.== fin
0
"Z"
F=__" rvl "T" _" C i--_ RTR 174-01
¢)_0¢J¢)
U
_J
¢)
¢I
,.¢1
o
,J=l
O,.m
¢1OcJ
¢,
>:.,....,
O
¢,)
_o
o
cl¢)
,,.m
"o__""O
..=.__
;i °
_J
9
l=:e ".==-rvl -r- I_: _ i--i RTR 174-01
0!BBZO__0
Z
0_. ¸
_._ o
g
0_ "0_:=,
E_
0
I-I
'4o
I=I
o
I=1o1,1
4
o vl%_
•_ __4._
• .o
_o_
o
Sz
10
F:_ _" r,,_ "r- _" C }---I RTR 174-01
<_
0,=
1,--4
v
I-N
Z;
2:OI,-,,,4
00
OQ
z
• i
0
Z
0
Z;
2_),-,¢
¢J
_J
_J
_0
,¢1o
¢1O
¢3
_ °_°_
=1 0 .,-_
_ _' _ _d •
2_0
_ _- r,,_-r "_" C l--..l RTR 174-01
Z.<
o0
Z
0
0
_3
o
..el
0u
o o
o w-_
._ _ ,_
• _
_'_ _'ii_ _:Et_,o
0 _
13 _
F=_"M-r-_'C _ RTR 174-01
ae6Joleooo •
I ,..-.e *¢t_ _ • • • • • • • •
ol
O0
Z
0
00
0
Z
0
0
u
°_°°_°°°_°°°°°_°°_°°_°
¢,)
o
o
ou
_v,_._o VI_
•_ _ o _
_,_
!i•
o
1,.1
i=_ _:: r,,_ "!- E_::C I.--.I RTR 174-01
O0O_
;>Z
Z;
c_
'x=
Z0
..<0iOb-1
0
0
¢J
0
0
Ol
o v_-_
. =_,u I._
N N_
_'_ _._"'._ E"_ _._
_J
15
1=_ IE:: r,,.,,1-r- i_:: C I.--I RTR 174-01
TABLE 2 : AEROHEATING AND PLUME CONVECTION MAX HEATING
RATE SUMMARY FOR BODY POINT LOCATIONS XT >_ 1872
Body X T 8T
Point
7830 1872.20 0.0
7839 1872.20 180.0
7837 1872.20 225.0
7836 1872.20 247.5
7835 "1872.20 270.0
7834 1872.20 292.5
7832 1872.20 315.0
7831 1872.20 337.5
7850 1898.04 0.0
7859 1898.04 180.0
7855 1898.04 270.0
7852 1898.04 315.0
1406 1914.65 304.0
1409 1914.65 315.0
51308 1916.00 30.9
51309 1916.00 30.9
51311 1916.00 30.9
1414 1936.79 330.2
6632 1955.30 23.5
6633 1962.78 23.5
6634 1968.39 23.5
6637 1971.66 23.5
6638 1976.81 23.5
6639 1980.31 23.5
6640 1984.05 23.5
6909 1999.54 19.0
51608 2028.00 30.9
Aeroheating*-REMTECH
Max Heating
Rate
2.42
1.38
1.30
1.32
1.46
1.94
1.85
1.27
1.70
1.23
1.88
1.79
5.47
2.97
2.17
2.36
1.63
3.74
1.96
2.03
2.08
2.11
1.07
1.07
1.07
2.27
6.50
RI
Max HeatingRate
1.99
1.34
1.38
1.13
3.15
4.24
1.75
1.55
2.77
1.53
1.98
2.40
5.39
3.07
2.08
2.24
1.57
3.5I
I.II
1.39
1.75
2.96
0.81
0.93
0.91
2.32
6.05
Plume Cony.
RI
Max Heating
Rate
3.91
3.65
3.65
3.91
3.91
3.91
3.91
3.91
3.91
3.65
3.65
3.65
3.91
3.91
3.91
3.91
3.91
3.gl
3.91
3.91
3.91
3.91
3.91
3.91
3.91
3.91
Method to use when
96 sec < t < 126 sec
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Aeroheating
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Aeroheating
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
AeroheatingPlume Convection
18
I=_ I_: I,,_--I- IE:: C I--I RTR 174-01
TABLE 2 CONC:
AEROHEATING AND PLUME CONVECTION MAX HEATING
RATE SUMMARY FOR BODY POINT LOCATIONS XT >_ 1872
Aeroheating*
REMTECH
Body XT 8r Max Heating
Point Rate
51609 2028.00 30.9 7.07
51611 2028.00 30.9 4.80
1021 2031.65 289.5 4.55
1300 2032.00 355.0 7.86
6647 2033.00 23.5 7.47
6929 2036.45 19.0 10.60
7920 2036.46 0.0 5.49
7929 2036.46 180.0 1.38
7925 2036.46 270.0 3.57
7922 2036.46 315.0 1.92
7921 2036.46 337.5 2.87
1041 2040.76 250.5 2.65
1023 2048.45 289.5 5.46
1043 2048.75 250.5 3.43
1025 2052.65 289.5 9.14
1205 2053.50 312.6 7.08
1303 2053.50 355.0 9.68
1046 2053.75 250.5 6.76
7930 2058.00 0.0 3.52
7939 2058.00 180.0 1.06
7937 2058.00 225.0 1.24
1054 2058.00 247.0 6.51
7935 2058.00 270.0 6.96
1032 2058.00 283.9 7.00
1211 2058.00 319.4 6.96
7931 2058.00 337.5 6.72
1307 2058.00 357.1 9.41
1309 2058.00 358.8 9.01
RI
Max Heating
Rate
6.38
5.02
5.26
8.42
7.62
11.14
Plume Cony.
5.88
1.41
3.62
2.00
3.51
3.26
5.21
4.39
9.09
6.97
9.24
6.92
3.02
1.00
1.05
6.49
3.50
8.39
7.99
1.98
9.21
9.34
RI
Max Heating
Rate
3.91
3.91
3.91
3.91
3.91
3.91
3.91
3.65
3.91
3.91
3.91
3.91
3.91
3.91
3.91
3.91
3.91
3.91
3.91
3.65
3.65
3.91
3.91
3.91
3.91
3.91
3.91
3.91
Method to use when
96 sec < t < 126 sec
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
Plume Convection
* Note: The aeroheating max. heating rates are for time _< 95 seconds.
19
F_:P,,A"_-_:C H RTR 174-01
PLOTTED DATA TIMEWISE COMPARISON OF REMTECH/ROCKWELL
IVBC-3 ASCENT DESIGN HEATING RATES (TW = 460°R)
Note: The tabulated heat loads include plume convection for body
point locations at XT >_ 1871.
20
_ _: r,_-I- IE::C F.-4RTR 174-01
ASCENT DESIGN ENVIRONMENTS FOR THE ET NOSE SPIKE
AND 40 DEG CONE ACREAGE BODY POINTS
21
_EPv_q-EC h-4 RTR 174-0]
BOOY POLNT 60101
30 OEG CONICAL NOSE TIP XT- 32B.00 IN.. THETA T- 0.0 0EG.
UJ_o1
u.
D
p-<
coZP_
o
J II ,
I
tl" IJl!lfJ!_lll[11_||lll!
5G
\
100
!
I50 200
SYMBOL DESCRIPTION
RI
_ffECH
HEAT LOAD?
B_J/FT -
1593
1390
IIIf_! L [ llI tiLL '''''''_ I _l"_'_f t I ,_ ,
aN0 4_0 _50 500 _0300 350
T!HE {SEC}
llJl_llll
60G 650
Agreement is acceptable; no TPS impact.
22
F_ _ r',,_ "r _" C I---I RTR 174-01
I,IC0I
I,-h\ --,
2on
F.-
0
Z
),.,..
tN
40 OEG CONE
BOOY POINT 60111
XT- 34q.00 IN.. THETA T- 14.0 OEG.
O
I I I 1
DESCRIPTION
RI
R&_TECH
I I
1574.2
1305.0
Agreement is acceptable; no TPS impact.
23
F::__ r,,,_ "r" _" C P.-._ RTR 174-01
ID
40 OEG CONE
BODY POINT 60112
X'F- 357.00 IN., THETA T- 8.0 DEG.
0N
(JIll
II--IL ¢1
DI--
i,iI-
rr0
t.9 ",_ZI--,I
t-
0
' !'1'
111 Ill| |IIiIIIII lllllJIf! I|tllflll!lI_.'_'-_.::
0 50 I00 150 200 _-.._0
I I I f I I
HF____TLOAD
DESCRI?TION 8TU/FT2.
1365.0
!176.0
300 350 400 450 '_00
TIME ( SEC}
550 SO0 6.50
Agreement is acceptable; no TPS impact.
24
F=_"Pv't"T-_" C H RTR 174-01
Lq
5LUm_1
I-LL
D
rn
_JI.-,<_r
ZI--I
<
o
30 DEG CONICAL NOSE TIP
At
\tt
1_!trt_+,!re1_Tt+,_i tl+_ItT_+
BDDY POINT 60122
XT- 329.00 IN.. THETA T-- 180.0 DEG.
I
i l I l
I-I_%T LOAD
SYMBOL DESCRIPTION B_/FT 2
RI 1349RDfPECH !205
6 _=b iO0 200 250 300 350 400
TIME (SEC)
1_o 4so s6o
Agreement is acceptable; no TPS impact.
25
i=_ =" r',,,,d"T" EE C P--'l RTR 174-01
LLIor}t
I-
D
{=
LUI,-
rr
H
I.--
W
II0 OEG NOSE CONE
BOOY POINT 50130
XT- 335.00 IN.. THETA T- 0.0 OEG.
I I I I I
SYMBOL DESCRIPTION
RI
REMTECH
HEAT LOAD
_rU/FT2
467
411
i
o
I00 150 250 450 500
Agreement:; is acceptable; no TPS impact.
26
I:::_ _-" r,,/1 "r" E_::C I-.-! RTR 174-01
u.I
1
LL
Dk-O
LUI,-<
0ZI--i
BOOY POINT 60133
30 OEG CONICAL NOSE TIP XT- 327.56 IN.. THETA T- 0.0 OEG.
SYMBOL
i I
DESCRIPTION
RI
RD_ECH
HEAT LOAD
BTU/FT 2
1840
1698
i
Agreement is acceptable; no TPS impact.
2?
i=_ ='- r,,,A "F =" _ F----I RTR 174-01
[D
Lq
LU03 "¢I
i-LL
DI.--m
(11tUt-.,<n"
(3ZH
I-. N<
o
\
\\
\\\,
.\
BOOY POINT 7000
t FT SPHE:P,E STAGNATION POINT
I I
SYMBOL
I
\\
\Illllllll
1 I I I
D_I_I_
RI
REMTECH
HEAT LOAD
BTU/FT2-SEC
715.6
920.8
ii
>i.J
Y
/
I/t /
/
//
IIIIIIIIL IIIIllll|llllll|ll| |llllllll Illllllll
\
Iltllllll II|lftlll I|lll||ll I|l|ll|ll Ill||llll |tll|ll|l
50 100 150 200 250 300 350 400 450 500 550 600 650
TTHE (SEC)
COMMENTS
• Acceptable agreement between RI and REfEECH heating rates during
first stage flight
• Difference between RI and _[YECH during second stage flight is
unacceptable
• Problem analyzed and conlusion was that RI values are incorrectly
low during second stage flight
28
F::_ _-" r',,_ "T" _" C I--4 RTR 174-01
fn
rJt.d_o(
t.u
D
_D
_J
rr
Z
.6,.
BOOY POINT 70_00
30 OEG CONICAL NOSE TIP XT- 32q.00 IN.. TI.-_E"FA T-- 0.0 D_G.
00
: \
1 i I I
SYMBOL DESCRIPTION
RI 1329
RDffECH 1090
HEAT LOAD
_[%T/PT2
Agreement is acceptable; no TPS impact.
29
t:=__" r,,,A "-l- E_: C t.--! RTR 174-01
o
cO
wc_t
f-._- u3
F-
WF.-
r3 _Z
I,-
O
30 DEG CONICAL NOSE TIP
A' f 1
f
tttt I_f_ttl!
0 50
\
800Y POINT 70350
XT- 32Q.00 IN..
1 I
THETA T-- 180.0 BEG.
i i I IHEAT LOAD
DESCRIPTION BTU/FT 2
RI 1147
Rk-MTECH 962
tel
I00 150 200 25(
\
T[Jtl_L_!
3oo 350 400 450 5oo 5&o eoo sso
TIME _SEC)
Agreement is acceptable; no TPS impact.
3O
;=:_ _" r,,,,n -r- _ C P-._ RTR 174-01
in
{JI,imol
lu.
lLIl"-
Z
o
B00Y POINT 70375
30 QEG CONICAL NCS£ TIP XT- 22q.00 IN.. THETA T- 270.0 0£S.
Jp.¢
iLTII?II! IIITIT[L!
0 50
I '. I I i I I 1
HEAT LOAD
DESCRIPTION BTU/FT 2
RI 1380
REMFECH I158
SYMBOL
L
\
\\
fllllll_l I _+_'rf'Ti tt||tlgf+l p+Ifttl!
100 150 200 250 300 350 400 450
TIME { SEC]
JI
tlt_l+tlt
/
/I
J
50O
p _
tfllltll! |lllttl([
550 600 650
Agreement is acceptable; no TPS impact.
31
F=__" M-T" _" C P-4 RTR 174-01
5
I)-
rn
W
NZ
I-
N
,rl
o
II0 0EG NOSE CONE
8COY POINT 70400
XT- 335.00 IN.. THET_ T- 0.0 OEG.
I i I _ I I I
S_30L DESCRIPTION
RI
REMTECH
HEAT LOAD
BTU/FT 2
499439
_iI,II ItllllFfl
6 _o ioo !_o 260 _oo _o 40o 4_o
TIME (SEC]
500 550 S00 $50
Agreement is acceptable; no TPS impact.
32
p:_ E D,,._'m-E C h-4 RTR 174-01
LU
I
LL _'1\ .D
m
I"
rr
OJZ
o
iO 0EG NOSE CONE
BODY POINT 70450
XT= 335.00 IN,. THETA T- IeO.O DEG.
I
: J
I!fll_tlt T;TIlYlII IIItllll
i
SYMBOL DESCRIPTION
HEAT LOAD
BTU/FT 2
415
370
I
• _,.er,ee ,_tl_t,ef T'T_''I'"
I
t°
ft_Ttll_l
50 !O0 50 200 250 300 350
TIME {SEC}
400 450 560 550 r:_o 5"5-0
Agreement is acceptable; no TPS impact.
33
I:::_ _-" r,,._ "-r- _- C _..-I RTR 174-01
LLJ
II'-
\
n"
Z
,<W
O
I0 OEG NOSE CONE
0
BCOY POINT 70475
XT- 335.00 IN..
I i 1
THETA T- 270.00EG.
SYMBOL DESCRIPTION
RI
RL_fECH
BTU/FT 2
576
503
/i
,\
5O I00 150 200 R50 300 350 400 450 500
TZHE ( SEC]
tfttlt_l_
5.50 SO0 S50
Agreement is acceptable; no TPS impact.
34
i=z _" M'T" EZ: C H RTR 174-01
o
LU01I
I-.,, In
i--
ito
z
o
40 DEC CONE
/'1
II II 1
!
: I
J t.4" t "_J
, \lllf f. [ltlllllt
BODY POINT 70500
XT- 342.24 IN.. THETA T- 0.00EG.
i I i I I [ I I'
, I
SYMBOL DESCRIPTION
. . , '_, ,
[f[llllllilli I|III lllltll[[ .... ,.1;..| lilt. L.. = P + itl_
O =;0 100 1=;0 200 9.50 300 :3_0 400 ,,_0
TIME (SEC}
HEAT LOAD
m_j/FT 2
1434.4
!568.0
i/_-- .
=;OO 5SO
I-- ]
""'-'qll
600 SSO
COMMENTS
• _W_-'_TECHenvironment includes nose spike interference effects
that were based on six sets of flight data measured at one
location (XT = 350, @T = !B0-)
• Wind tunnel data ,_as laminar/transitional whereas flight data
appeared to be transitional/turbulent
• I%_MTECH environments ass u_ed that the heating smplificationfactor over the entire 40 cone surface is constant
RI environments based on wind turu-.e! distributions which
measured low heating levels for. XT< 350
Difference between RI and _.q_ECH enviror_ents should noc
impact carrent TPS design
35
i=_zE r,,,,,'t-r"E C v---4 RTR 174-01
(U
oN
OU.l03lI-LL
Dl-rn
U..li.-<[n-
o
ZIll
I.-.,(
','I
o
4O OEG CONE
BOOY POINT 70_0
XT- 342.24 IN.. TI-_TA T- %80.0 OEG.
I
I
/
I/
/.,/
11 ,
4_lttlltll tlllttt
J
0 50 lO0
/
l
%
SY_HOL
\\
Illlllllll _ :
l
t50 200 _-_50
1 lI l
DESCRIPTION
RI 1!22.1
REvFfECH 1518.0
i
300 _0 400 _,_0 500 _0
TI,_E C .._C}
L
i i
600 _0
HEAT LOAD
BTU/FT 2
_CH environment includes nose spike interference effects
that were based on six sets _f flight data measured at one
location (XT = 350, g_ = !80 _)
Wind tunnel data ,_as laminar/transitional whereas flight data
appeared to be transitional/turbulent
• Rk-MTE.-C_enviror_ents assumed that the hea ....g a_mlificationfactor over the entire 40 ° cone surface is constant
RI environments based on wind tunnel distributions which
measured low heating levels for XT< 350
Difference bet_,_en RI and P_._.-C4 environments should not
imzact c_rrent TPS design
36
I=_ _-" r,,,_ "7- _" C H RTR 174-01
ON
6L_
I
D
m
I/J
<rr
Or3ZH
I-
W
o
tt
5O
BCOY POINT 70575
XT- 342.24 IN..
[ [
iSYMBOL I
THETA T- 270.0 OEG.
T---q T I [
HF__T LOADDESCRIPTION BTU/FI;2
RI I 1297.6R_.rMTECH !603.0
-- \
I00 150 200 250 300 350 _00
TIME (SEC)
I
450 500 550 600 650"
cc_s
• .:L_EC_ environment includes nose spike interference effects
that were based on six sets _f flight data measured at one
location (XT = 350, 8T = 180 _)
• Wind tunnel data %_s laminar/transitional whereas flight data
appeared to be transitional/turbulent
• R&MTECg environments ass u_ed that the heating amplificationfactor over the entire 40 cone surface is constant
• R! environments based on wind tunnel distributions which
measured low heating levels for XT< 350
• Difference between RZ and _.=_ffE_Cgenvironments should not
impact carrent TPS design
37
;=_ E r'v'l"n- E C _-.--_ RTR 174-01
Lr}0J
ON
i,i
Il-
.,_
l-
l.IJl.-
n-o
ZI-'I
I.-
,,iI
- I
- II '-
. i i-- i
- I -
" ' I- i I- i
. , |
. 1_- i
li,- i
IILIIIIIIIII_LII_II
0 50
40 DEG CO_E
L
Ii
i I
rI
BO0¥ POINT 70600
XT- 345.50 IN. . THETA T- 0.0 OEG.
I i I l i II-___T LOAD
SYMBOL DESCRIFfION Bq_J/FT 2
I
\I
t\\I \
llllltltl lllttlltl Itlttlttt It_:_+_+++ .........
100 1_0 200
1593.5
1405.0
I
I
++ ....... +_:,"_r_T'l'rTl|].llllt _llll+ltll tlllllllllllltlllltE
250 300 3NO 400 _O 5OO _O _K30 _O
TIHE ( SEC]
CO_NTS
• L._C4 environment includes nose spike interference effects
that were based on six sets of flight data measured at one
iccation (XT = 350, 8T = 180-)
• Wind tunnel data was laminar/transitional whereas flight data
appeared to be transitional/turbulent
• R_tTECH environments ass u_ed that the heating amplification_ac_or over .he en_i+e "+0 cone surfac_ is constant
• RI environments based on wind t_nne! distributions which
measured low heating levels for XT< 350
• Difference bet_;een RI and R_-MTEC4 environments should not
impact current TPS design
38
N
0
0iii0"IIF-b. _'l
Dl-_n
rr0
Z
I-
o
#J
J
t I
!
Y
- i_llllill_llllll
0 50
•40 DES CC_E
tt
\
|III II
lO0
\
I1 III111111
150 200
800Y POINT 70650
XT- 345.50 IN.. THETA T- iBO.O OEG.
i I I I i I I
SYI_:_OL DESCRIPTION
F/AT LOAD
BTU/FT2
1250.!
1370.0
I
300 350
TIME (SEC)
,,fj f :' lllllllll lllllll
I
450 500 550 800 650
CCM_NTS
• Rh-MTECH environment includes nose spike interference effects
that were based on six sets of flight data measured at one
location (XT = 350, 8T = 180-)
• Wind tunnel data was laminar/transitional whereas flight data
appeared to be transitional/turbulent
• REMq_.CH environments ass u_ed t,hat the heating amplificationfactor over the entire 40 cone surface is constant
• RI enviror_ents based on wind tunnel distributions which
measured low heating levels for XT< 350
• Difference between RI and ._[FEC4 environments should not
impact current TPS design
39
i=_ =" r-vlT=" C H RTR 174-01
In04
u,jj(ni
i--
oN
i.-m
LUF-<In-
o(9 ,-,ZI,-4
P<{
/
---ij
U
40 DES
II
: i
I
I
CONE
BODY POINT 70675
X'r- 3.4.5.50 IN.. THETA T-- 270.0 mEG.
i I I t 1
SYMBOL DESCRIPTION B_U/FT 2
"111111111
_0
1435.6
!429.0
bI
O 50 _OO 150 200 a50 300 350
TIME ( BEC]
400
--°--
II
I
Illllllll 'tflltllll Itllllttl
5oo sso 600 _o
COMMENTS
• ,o_-MTEC4 environment includes nose spike interference effects
that were based on six sets of flight data measured at one
location (XT = 350, 8T = 180 v)
• Wind tunnel data was larainar/transitional whereas flight data
appeared to be transitional/turbulent
• RSMTECH environments assu_ned that the heating amplificationfactor over the entire 40 ° cone surface is constant
• RI environments based on wind tunnel distributions which
measured low heating levels for XT< 350
• Difference between RI and P_,.=_4TEC4environments should not
impac= c_rrent TPS design
4O
I=_ E_: r',,_ -T" _" C I--4 RTR 174-01
o
O
It--h Ill
DI-tll
I-"
n-O
ZI-4
t--<
o
L
40 OEG CONE
50 I00
I
I |
I
I
Ji
II
II
f
\
tlllltllt It_'_l l t 1 tl
eooY POINT 70700XT-- 354.50 IN.. ll-IETA T- 0.0 OEG.
J i i i t
SYMBOL DESCRIPTION
• RI- _CH
i
HEAT LOAD
BTU/FT 2
1863.21207.0
150 200 250 300 350 400 450 500
T:M£ (SEC]
550 500 550
CONMECFS
O R_MTECH environment includes nose spike interference effectsthat were 'cased on six sets of flight data measured at one
location (XT = 350, 8T = 180-)
Wind tunnel data ,_as laminar/transitional whereas flight data
appeared to be t__nszt_ona_/_ur_ul_.t
• R_MTECH environments assumed that the heating amplificationfactor over the entire 40° cone is constant
• During first stage flight R_ has higher amplification factorsthanRSMTE_
• During first stage flight RZ has lower undisturbed heatingthan _-NTEC4
• Differences between RI and ?_-.=_CSCHenvironments should not
impact current TPS design
41
F=_ E r,,.,,1-r _" C b--I RTR 174-01
N
ON
L)ILl
II-
,,-=
I---In
I.LI1--,<Cn"
O(.9 ,HZ1"4
I--
00 50
SYMBOL DESCRIPTIONI
H_T LOAD
BTU/FT 2
1436.5
i184.0
Ill
iO0 150 R00 R50 300 350 400 450 500
TIHE (SEC)
550
!
5OO
Agreement is acceptable; no TPS impact.
42
F=_ E _._q "r- _" C I-.--I RTR 174-01
N
O
O
I
111
illI.-
11:0
Z
<
40 OEG
__m.
-_llttllttl
1
0 5O
I!
i._^
I
/
llttttttt!
I
CONE
BOOY POINT 70775
SYN_OL i
THETA T- 270.0 OEG.
I 1
DESCRIPTION
HF_%T LOAD
B'rU/FT2
1643.11224.0
Ir
I00 150 200 250 300 350 400 450
TZ_E (SEC)
II11111111 IllltltlLIItltllltl
500 550 600 650
Agreement is acceptable; no TPS impact.
43
F:_E h,,,'l'T"_="C F.._ RTR 174-01
m
oN _
- /
I
#
o //tl
0 ,
(3l.LIf.ll1
I-LL lil
DI'-
tLIi'"
IT0,,.,I
ZH
I-
40 QEG CCII_E
M
r(I
i
IIII
tl
Itlllllll Illtllitl
[
BOOY POINT 70800
XT-- 364.50 ZN.. TI-IETA T- 0.0 OEG.
I I I I
SYMBOL DESCRIPTION
R!
_CH
H_%T LOAD
BTU/FT 2
1542.7
1108.0
Iiiilllll"'l'l,l,,ll_:;
,, _ ,,
0 50 iO0 i50 200
I250 300 350 400 4_._0 500 NO _=00 650
T_ME (SEC)
Agreement is acceptable; no TPS impact.
44
I=_ _" r,,,.,,'l"t- _" C t-.-I RTR 174-01
o
Ur_i
I-
D
LLII.-
O
ZI-I
I-,<
40 OEG CONE
800Y POZNT 70850
X'F-- 364.50 ZN.. THETA T-- 180.0 OEG.
I I
SYMBOL
! | I i
DESCRIPTION! -, _/_T2"
RI !217.8
R_fECH 1086.0
gltltll I
; a
Agreement is acceptable; no TPS impact.
45
_ :" r',,_ "r- _" C P---I RTR 174-01
LflN
ON
Ih-LL LO\ ,H
m
mb-
Eo
ZH
q
o
40 OEG CONE
m
- H
: //- If
_ ii
H
: Hq- .
]IIIIII111 I III
0 50 iO0
i
l
I
t
\
800Y POINT 70875
XT- 364.50 IN.. THETA T- 270.0 OES.
a u i ] _ i
SYP_30L DESCRIPTION
,,,,,_
RI
RSMTECH
|.
HIL_T LOAD IBTU/FT2
1379.4
1123.0
!
:'_:::_:_: :::::::__ _,_1 tllltltal lllll[llllttttlltltJ
250 300 350 400 450 500 550 500 650
TIME CSEC}
150 200
Agreement is acceptable; no TPS impact.
46
i=_ ,..,.,.,.,.,.,.,.=_M -r- I:_-..C I.--!RTR 174-01
ASCENT DESIGN ENVIRONMENTS FOR THE ET LO2 TANK
ACREAGE BODY POINTS
47
F=__" P,_'l- _" C P--_ RTR 174-01
O
O"
oE
I?I--ID r-
li'l F-
I-
H IE
K -Ii/)
L02 ACREAGE DISTURBED
A
BOOY POINT 60,400
XT- 402.5 IN..
I .... I ....
b'YH_L
THETA T", 357.,4 DEG.
1 I____1 ..... l ....
ItF.AT LO_J_
DESCRIPtiON B'IV_-S_C
RI 750. O755.0
0 50
II
/
//
,,°,,,o,, ooJl.oo,. °,,o,°,, ,,,,°,,,, °°°,,°.,°1,,°,,,°°,
100 t50 200 _ 300 3150 ,400 450 500 =;50 600 6=;0
TIM8_ (SEC)
Fig. 1 C_parison of RI and _ £nvlronments for Body Point 60400
Agreement is acceptable; no TPS impact.
8 ....
F:_ =" r,,,A -r =" C _--.I RTR 174-01
BOOY POINT 60405
XT-- 402.@ IN., THETA T-- t6.g DEG.
. i ........ ! ...... I...... i .... i. ___1 . _.
SYMBOL DESCRIPTION BTO/FT2 SEC
-- RI 875.0...... _ 833.8
JIIIIIIIII IIIIIIIIl
I
i
JILt HIIIIlU
t50 RSO
dlll,l,ll||lll|[lll
200 300
_LL Illllllll I I I II I I I[ I I_J, JLI I I I
t00 350 400 450 500 550 600 650
TIME_ (SEC)Fig. 2 Comparison of RI and REMTECH Envlronmencs for Body Point 60405
• The difference in maximum heating rate between Rockwell and
REMTECH generates into a difference of _ 0.3 inches of CPR.
This is within the uncertainty allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
49 -;-
i:_ t_ M'T _ C 1,4 RTR 174-01
L02 ACREAGE DIS'r_c_ED
,r-m
m I
° _- j
m o _I "-
I'- "
IL O" -_ ll
2m __ m Fm _ = I
< =l'r
Z
I.-.-
4 E i
_- IIZ
0 5O
i
.LI
.00
80_3Y POINT 60407
XT- 402.5 IN..
[
I
I
i
I
t
t!%
t
I
i
.I
I
l
I
I
11111 IIIII.LII/ _
150 200 260
THETA T- 24.3 DEG.
I .. I ........ I .... i .... , -+ - r ....
HEAT
SYMBOL DESCRIPTION _/FT2_SECI
.... im6.o...... m<rm. B93.s
I
,. 4 [
I
l
I
ilI
I
ltI
l
,_ L_ i ua..,.._,._._ t_ ""'"1
t
III+!IIII I!IIII!+|
300 350 400 450 500 550
TIHE (SEC)
l
l
l
ILLLLLLLL
600 660
Fig. 3 Comparison on RI and PJ94TECH Environments for Body Point 60407
• The difference in maximum heating rate between Rockwell and
REMTECH generates into a difference of _ 0.3 inches of CPR.
This is within the uncertainty allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
0 ....
F=z _-" i,,,,4 "-F"_- C I.--I RTR 174-01
BODY POINT 604Oq
LO2 ACREAGE DISTL4qBED XT- 402.5 IN. .
_3
01
°iu
,= - tlff . '
m In :
<
H
,el
_TA T- 31.5 OEG.
HEAT LOAD
SYMBOL DESCRIPTION B..Fj/FT2_SEC
RI 909.2
...... _ 983.1
o0 50 t00 t50 200 250 300 350
TIME ( SEC}
____-J.... ..,,, ,,,,,,ll, ,,|,l,, ,,,,e,,,|, |,.,,,,,,
400 450 500 550 600 650
Fig. 4 Comparison of RI and RE_TE_ Environments for Body Point 6040g.
Agreement is acceptable; no TPS impact.
51 --.__
F_ _" r,,,_ -'r- _" _ J...-_ RTR 174-01
o
BOOY POINT 60411
L02 ACREAGE OISTL_BED XT- 402.5 IN..
I\I
THETA T- 38.7 DEG.
SYMBOL DESCRIPTION
RI
_T
I_I_/'FT2-SEC
753.0850.5
Fig. 5
\
100 150 200 250 300 350 400 450 500 550
TIME (SHC)
C_nparison of RI and Pdg_fECH for Body Point 60411
6OO 650
Agreement is acceptable; no TPS impact.
52
F_ _-- r,v1"T" _" C P-J RTR 174-01
O
0"
_J h-UJ
I
rr
ZHI-
=jL'_ II
0
0 5O
BOOY POINT 60413
LO2 ACREAGE DISTURBED XT- 402.5 IN.,
SYMBOL
THETA T- 46. i OEG.
I
_J,T LO,_D iDESCRIPTION I_IJ/FT2_SEC :
RI 764.6
744.5
iO0 150 200 250 300 350 400 450 500 550 600
TIHE (SEC)
Fig. 6 Comparison of RI and REMTECH Environments for Body Point 60413
6SO
• The difference in maximum heating rate between Rockwell and
REMTECH generates into a difference of < 0.3 inches of CPR.
This is within the uncertainty allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
53
F:_ _" r',,,A -r- _" C J-.--4 RTR 174-01
o,,H --
0" =
m
I I-,I-LL-%
m :
tt/
< Xff :
I-. :
0
BODY POINT 60418
L02 ACREAGE DISTURBED XT- 402.5 IN..
)
t ! .....
SYMBOL
"I-H_TA T-- 65.6 DEG.
L--------- _. I .... !
HEAT LOAD
DESCRIPTION ByJ/FT2_SEC
RI 760.3
713.6
o
\1
II
/
Hh.::: '_! ...... Illltlalt dllflllDll II|llllll rllllltll
,'50 tOO :t,'F30 200 2_50 300 350 ,400 4.'50 ,'500 _ 600 _50
TIHE (SEC)
Fig. 7 Comparison of RI and _ Enviror_ents for Body Point 60418
$The difference in maximum heating rate between Rockwell and
REMTECH generates into a difference of _--- 0.3 inches of CPR.
This is within the uncertainty allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
54 - _-
F_ EMTE C I---IRTR 174-01
O
0"
II-
LL\DI-ra
LnUJ
.¢rr
L_ _ZH
0
BOOY POINT 60500
L02 ACREAGE DISTURBED XT- 40q.q IN. .
1
1 I
: IJ. m
I/IIII
°
i
/,. /
: 'I
i/i ,_/:1/
rllltl[[[ IIIIIII II
0 50 iOO
I
IIII IIIllllllllllllllll
t50 200
THETA T-- O. t DEG.
SYMBOLHEAT LOAD
DESCRIPTION B,_/pT2_SEC
RI 706.2'755.2
II--
i !i d ..1
I ,1 . .
J_ It111|111
i
!i
250 300 350 ,400TIME { SEC)
r-- // •
Illlll[ll tlllll[ll |llllllll |11111111
450 500 550 500 650
Fig. 8 Comparison of RI and REMTECH Environments for Body Point 60500
Agreement is acceptable; no TPS impact.
5_ .....
i=_ E r,,/1-r =- C P--_ RTR 174-01
ID
IIJ
El
I p.I-lL
DI-- rnEl
uJI-- Ill
rr
{.9
Z _rH
I-
1iI
0 I"
0
a" _
- I l- ! I
". ! /1
! I//i JI__/I/=-_____.
::iiij.............o 5o
L02 ACREAGE DISTURBED
|
t
|
II
i
i
I
BOOY POINT 60507
XT-- 40q.q IN.. THETA T- 24.q DEG.
I
I
t!
I
I
o
I
I
i
t
IR
i
I
J-_\ ,,
IIIIIIII1! It1111111
i
!lllllllll
_---.,._IllllllJl
I --I [ i-- LI_ I I ..... I + -- p I I I
I-IF_TLOAD
SY_3OL DESCRIPTION Bq_/FT2_SEC
RI 819.7...... RDEEClt 811.5
Ioo
I
' i
i
iii
IIIL[Illl IIIIIIII1'
, ,I
J
IIIIIIIIIIi
150 200 250 300 350 400 450 500 550 500 650
TTHE [ SEC}
Fig. 9 Comparison of RI and PdDffECH environments for Body Point 60507
• The difference in max heating rate between Rockwell and REMTECH
generates_0.3 inches of CPR. This is within the uncertainty
allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
6 --.
Fa Erv_-r-_-C P_ RTR 174-01
O
O"
"_ p..
uJ01
I
I-"
DI-
ra
I.LI
I-.
<[
IT.
*¢1.9
zI-4
I--
U.I
r
0
.
.
o
o
°
1
1
1
o
-ii.11-Jl
L02 ACREAGE DISTURBED
I|
I
,. ]
{I
• flU'
'1II
• J-- I
II
i/H II
,,,i/
rllllllll IIIIlllll ||:
0 50 tO0
Fig. 10
l
l
ll
i ....
i
!\
t . J
BODY POINT 6050q
x'r- 40q.cl IN.. THETA T-- 3t.5 DEG.
PEAT LOAD
SYHBOL DF_3CRIPTION _1.¢/_2_SEC,..I ,. i ,1
RI 648.6...... R_HTECX 706.6
• . I -
JII|llllll tlllillll
!
!
i
I
IIlllllllllllllllll |llllllll
650li|li iJiliilll!llllllill _,,_l, .......... [,i,[1_
_50 200 _0 300 150 400 450 500 550 SO0TIHE ( SEC}
Comparison of RI and Iu_r_cH Environments for Body Point 60509
Agreement is acceptable; no TPS impact.
I_ _ M ?',=" _: I-,-I RTR 174-01
bLUmI
I-I_ rn
2m
w
tdI-.<OC
ZHl.-,<
o
-- I
=_ ! .
-I/-hI
_llllllt
0
BOOY POINT B0510
L02 ACREAGE OI-RTURBEO XT- 40q.q IN. .
SYMBOLI .. ,.
t
I
i
/I
t/; i ........
THETA T" 38. i DEG.
DESCRIPTION
RI
BqU/FT2-SECI .....
653.8701.8
. i
I
!
II
i " "II ;
[ I ,L ....... t _
" l .....
• ,,."
Itlllltll l|l IIIII llli 11|,1,',1, ,,,,llll_ IIIIIIIII lllllllll lllllllll IlIIIIIIIIIIIIILlll
50 100 150 200 250 300 350 400 450 500 550 600 650
TTHE (SEC)
Fig. Ii Comparison of RI and RDflY/_ Environments for Body Point 60510
Agreement is acceptable; no TPS impact.
58 --'i
F=_E r,,,_ -T- _" <_ P.--_ RTR 174-01
IIJmI
I..-.
2m
wI.-
rr
3,H
I.--<
,el
o
L02 ACREAGE OISTURBEO
1
I/J/
- ill: I I
ill
TI||IIII||tI|IIII
O 50
l .,
J
i
%
Ii
I1
BODY POINT 60517'
X-F- 40q. q TN., THI=TA T-62.q DEG;.
HEATLOAD
SYMBOL DESCRIPTION B,._/FT2 SEC
-- RI 734.2
...... _ 686.9
III1
IIIl!lllll|llll _, ...... ;;,,,_;,,1111|! IIIIIIIit IIIllllll!lllllllll III111|1!_1] Ifllllllll
t00 t50 200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Fig. 12 Comparison of RI and REITrECH Environments for Body Point 60517
• The difference in max heating rate between Rockwell and REMTECH
generates _ 0.3 inches of CPR. This is within the uncertainty
allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
59
F:_ _-- r,v_ -r- _.. C i--.i RTR 174-01
O
0"
m
I.U
IF-
b. {D
Dl.-rn
W
n_
ZH
_ m
N
0
o 50
BOOY POINT 606Ot
L02 ACREAGE DISTUF_BED XT-- 422.3 IN..
| w
THETA T- 3.2 OEG.
L = i - = _
_.AT LOAD
DESCRIPTION BTU/FT2_SEC
RI 648.8RI_ 682.8
SY_L
'\
,I/
i
II
I'
f
,[._l|ll IIIItlltl I|lllltll [llllllllllllllltl IIIIIllll
600 850
Fig. 13
IIIIIIIII
L_
IIIIIIIII Illlllll|llllll[|ll ,lJl,llll
I00 150 200 250 300 350 400 450 500 550
TIME (SEC)
Comparison of RI and REMTECHEnvironments for BodyPoint 60601
Agreement is acceptable; no TPS impact.
60 -;--
i:_ E r,,,A "T =" C F-I RTR 174-01
GuJ
II-lL
Di-
U.II.-.
E
ZHI-
b.
tO
p- , i
- I
: It
: //: /I
! ,
i//: _
_llllllll IIIII
O 50 IOO
Fig. 14
LO2 ACREAGE DISTURBED
L
\\
I
BODY POINT 60607
XT-- 422.3 TN.. THETA T-- 25.B DEG.
1 EXTs_ _scRIFrIoNI _/._.___=
R, ' I '699.0...... RETTE3 I 736.7
I
\llll lllllll_l lllllllll lllllllllJ I IIII_II Illl]l lII
_50 200 250 300 350 400 450 500 550
TIHE [ SEC)
Comparison of RI and R394TECH Environments for Body Point 60607
Iiiiiiiii i 1|11111|1111111111| IiIIIIIll iiiiiiii
600 650
Agreement is acceptable; no TPS impact.
61 -;_-
I_ t=__ M T _: C I---! RTR 174-01
O
0"
iI.-
I-rn
U.Ih-<{rr
(.9 _ :ZH
}1 m :
0
L02 ACBEAGE DISTUF_BEO
l
,Il
,'/
,m,i,,,H
5O
BOOY POINT 6060q
XT- 422.3 IN..
I . _ I
THETA T- :3t.5 DEG.
__ . I ..... | .... I .... i. ._
SYHE)L
HEAT LOAD
DESCRIPTION Bq_J/I=T2SEC
RI 614.7723.3
I |
100 150 200 250 300 350 400 450 500 550 800 550
TIHE (SEC)
Fig. 15 Comparison of RI and _ Environments for Body Point 60609
Agreement is acceptable; no TPS impact.
62
F:_ _-- r,v'; -r" _" C P--4 RTR 174-01
II--
"1
m
ulI-
rr
ZH
<
o
r-or
=
m
h,
(D
113
*t
¢q
('U
O0
L02 ACREAGE OISTURBEO
BOOY POINT 60610
XT-- ,422.3 IN.. THETA T-- 37.2 OEG.
HEAT lOAD
SYMBOL DF-SCRZPTZON B?U/_q,2_SEC
RI 670.3...... PJEH1"ECH 674.1
/
_llllllllll
V
lllllllll IIIIIIIIII llllllll _ =llllll ill ]i lllll III iiiiiiiii Iiiiiiii iiiiiiiii lllllll
iO0 150 200 250 300 350 400 ,450 500 550 600 650
TIME (SEC)
Fig. 16 Comparison of RI and REHTECH Environments for Body Point 60610
5O
Agreement is acceptable; no TPS impact.
3 .... -
RTR 174-01I_ E M-r- i:__ _ F.-I
O_ '"W
z
,,*,l,, llllHll
o
L02 ACREAGE DISTURBED
J
\
5O
\
BODY POINT 6O617
X-F- 4;_2.3 IN. . THETA T- 5Q.B DEG.
HEAT [DAD
SYMBOL DESCRIPTION _,m/FT2 SECII
RI 665.2
...... REMTIX}{ 646.9
I I
HJlllll* Hg,IH|J ...... ,Hi,° J,,I,l,,I I,,I,,*,, ,,I,HI,
t00 150 200 2,50 300 350 ,400 450 ,500 550 600 650
TIME (SEC)
Fig. 17 Comparison of RI and R_MTECH Environments for Body POint 60617
Agreement is acceptable; no TPS impact.
64----
L.
F:_ E:: _ -F" _" C _.,..I RTR 174-01
LU
I-lL (0
2rn
WI.--<_n"
(9 '_"ZHI--
N
o
L02 AC-.JREA_ DISTURBED
L
z=
=
=
: ij- i
: I.tI!
i 'JI
:fl i-J! i
_llllllll!llllllJ
0
II till IIIIIIII1
II
I|
!
iJ
I
BOOY POINT 6070i
XT- .432. t IN.. TFETA T- 5.0 DEG.
HEAT LOAD
SYMBOL DESCRI PTZON B,IIj/Fr 2
AI 628.5
...... _ 649,3
I
i
i
i
F
I
I
I
t
!
I
IIIIIIIIIIIIIIIII111 IIII11111
t00 t50 200 250 300 3SO 400 ,450 500 _._0 600
TIME ( SEC}
Agreement is acceptable; no TPS impact.
i_ r,-,-,-,-,-,-,-,-,:-M ,-r- F_, O I--.I
RTR 174-01
6lU
II.--IL\
2m
u/
<rr
zH
I-.<
gl
o
iO::' ACF::IEAGE DISTUFIBEO
- 1
- II
: Ii: II- II- II
IIIIIIIII IIIIIII II
0 50 tOO
%
i
'-k.--.-.,_.
IIIII lllllllll III111111
150 200
BCMDY POINT 60707
XT- 432. t IN. ,
I
I
Ir
THETA T- 23.7 DEG.
i . i ....... i--- _ . i . i
SYMBOL DESCRIPTION
HEAT LOAD
I
I
It
I!
I
I
Ii
IJt
B?d/FT 2'I
940.0
982.1
[
I I
I!
It
!
I
I
!
Ii
I
II
I I
I-_[_:::J, .... )1 "'_ ;:4::;;;; ,l[,[Inl_ Illllltll Illllllll
I
IIIIIIIII! IIIIIIIIII
300 350 400 450 500 550 500 650
TIME (SEC)
250
Agreement is acceptable; no TPS impact.
6O
_=_ _- r,,,,_ T E C I--.-_ RTR 174-01
w
I
it
2II1
mt-
rr
ZI-4
I-
Ill
N
(0
0
BODY POINT 6070q
L02 ACREAGE DISTURBED XT- 432. i TN.. THETA T- 3i.5 DEG.
SYMBOLHEAT LOAD
DESCRIPTION BTU/_2
RI 940.1
RJ_MTECH 878.9
/j \0 50 iO0 t50 200 250 300 350 400 450 500
TIME (SEC)
550 600 650
Agreement is acceptable; no TPS impact.
6_ .....
t=_ =" M'-F =" C F---4 RTR 174-01
6uJolI
en
uJF-,<m
ZH
F-,<
N,el
o
BODY POINT 607ii
L02 ACREAeE DTSTUFIBED XT- 432. :!. TN.. THETA T- 3q.4 DEe.
°
o
.
. I
H• 3t
• II
:/
[lll|llll!lllll!
0 50
\ 'I
°II Illll Illllllll IIIIIIITI*_----"]'I_,;;_.:
i
iO0 t50 200 250
HEAT LOAD
SYMBOL DESCRIPTION BTU/TT 2
RI
REMTECH
821.6
834.2
::::._:::: )£::::::; _,,.1_ III1111111111111111 |11111111 [11111111
300 350 400 450 500 550 500 650
T'rHE (SEC)
Agreement is acceptable; no TPS impact.
8 ....
i::_ _ M T =" O i,---I RTR 174-01
o
0"
19
I
m
"q'ZHI--<[
o
E
r-
LO2 ACREAGE DISTURBED
BODY POINT 6O718
XT- 432.t IN..
SYMBOL
TI-ETA T- _.0 DEG.
DESCRIPTION
RI 626.2
RI_ECH 617.4
I • I
=-= i/i '- 'F'
=
50 tOO .16O 200 250 :300 3.'50
TIHE (SEC)
..... H,, I,,_HJH ,Jmm,,J,, JJJ,J,,,,
,400 45O 5O0 _gSO BOO
Agreement is acceptable; no TPS impact.
I:_ E MTEC I---i RTR 174-01
O
E=
=
W
!
P
2 E
E =
H --
_ma
O _11111111
o
LO2 ACREAGE OISTL_qBEO
i
i
I
1
l/#t
//r
BODY POINT 60BO_
i' ' '
I
I
I, !
i
I
I
!
XT- 437.6 IN.. THETA T- 5.q DEG.
! . _ i .. i ........ i . __ | . - ,
SYMBOL DESCR lPTION
...... R£M_CH
IIIItll II IIIII IIIIIIIII]111111111 IIIIIlliJ i
50 t00 t50 250
II
I
• i
!
I
i
I
200
i
I
I
II
I;
II
I!
liltLILII I;LIIJJI[ I|LLLUJl I IJJ.LIIIII]IIJILII!
m'V/TT 2
615.4633.6
A
300 350 400 450 500TIME (SEC)
I11111111 IIIIIIIIL
550 600 650
Agreement is acceptable; no TPS impact.
0 ....
t
;=_ _" M"r" =" C I--t RTR 174-01
BOOY POINT 60806
L02 ACREAGE OISTL_BEO XT- 437.6 IN.. THETA T- 21.5 OEG.
_L ........ I ___1___. I ..... I .... I -
HEAT
s,,_oL _i_i_ _ru/r,r 2
RI 747.7
...... _ 733.4
Illllllllllllllllll I I I I I I I IT _I--_'T_;,,,
I00
I
I
I
lll
!!
l
l
i 1I
I
;;;;,;;;. ;;;i;;;ii ,lllil--_T IIIUIIII IIIIIIIIlltllllllllllllllllll
150 200 250 300 350 400 450 500 550 600 650
TIME [ SEC)
Agreement is acceptable; no TPS impact.
71
I:::_ l_--' M ,-,i- E C I.._IRTR 174-01
Oo_
wF-<{n"
H
I-
g],rl
O"
ID
o1
o
BOOY POINT 6OB07
LOT ACF:_EAGE: DISTURBED XT-- 437.6 ZN. .
1tIili
t
S_
k\
IIIrlllll IIIIIIIII!IIIIIIIR
iOO 150
°
°
°
°
i /,
i i 7! i//
l
" rfi_ ))I i i
i/t/-.o
tlilllllllllllll
0 50
i
I
2OO _
• I
: =*::::;;:
3O0 350
TIME [ SEC)
_TA T-- 26.5 _(_.
HFAT LOAD
DESCRI F'_ION B,IU/FT 2
RI 937.5
...... _ 994 . 9
.... I , , I
II
J, = i _ ,,_i lllllllll • Illllll
400 45O 5O0 550 6O0
Agreement is acceptable; no TPS impact.
F=_EP_I"I-_"C P_ RTR 174-01
¢l,rl
!I--.b. Cr
rn
tLI
n"
(.9 (OZHI-
O
LO2 ACREAC_ OZSTLF_ED
- i
" A
: : 1- ' t/" ' II
. , I {
: : . !. , ! J
,, , I
" ' L!
- i l� ,- J
: :/I.: ,11t' ,,- i
: /I ' i_," ' I Ii
III1|! II I|l
0 50 100
\\
i|||l]llllllalt1 IIIIIII1"1"
1,50
BODY POINT 60BOq
XT-- ,437._ IN. , THETA T- 3t.5 DEG.
I [ . I JHEAT
5YHBOr. DESCRIPTION B,IV/FT 2
RI 931. I
...... RI_'ITECH 992.8
I
4I
!
,' I
i
I!
i
I
,,,lu_ |llllllll Illllllll!|llllllll4
I
I' '/
......... i
200 250 300 350 400 450 500 550
TIHE (SEC)
Illlllllt
BOO 650
Agreement is acceptable; no TPS impact.
7S
F=__" r-,_'T" _" C _-_ RTR 174-01
o¢1
O"
II-
w
2in
hiI--<{IT
ZHI.--<{
N
00
BOOY POINT 608"10
L02 ACREABE DISTURBED XT- 437.6 IN. .
--T 1
SYHBOI., DESCRI PTION
iO0 150 200 250 300 350 400 450 500 550 600 650
TT_E (.SEC)
Agreement is acceptable; no TPS impact.
T4
o,,H
o"
Io
I_,LUmI
I-LL (0
m
LQ
tr
ZH
p-
BODY POINT 60816
L0;2 ACREAGE DTSTUF:IBEn XT- 437.6 TN.. THETA T- 57. t BEG.
J
IIif
' I
_,/_..,i
_tllllllll|lJ|lll
0
%
tl II1|
I
Ii
I%
HEAT LOAD
SYMBOL DESCRIPTION _I//FT2
RI
...... REMTECH
i
Ii
ii
I
706.9
743.2
J
Illllllll ::.'::;;;_ :;_ .... i] ill IIIlllllll I IIIIIIll !lllllllllI I I
100 _50 200 250 300 350 400 450 500 550 500 650
TIHE [ SEC]
Agreement is acceptable; no TPS impact.
?5
i_ _. M"I- E ¢ !"-4 RTR 174-01
LO2 ACREAGE DISTI.F:_ED
BODY POINT BOg07
XT- 474.2 IN.. THETA T- 23.7 DEG.
HEAT LOAD
SYHBOL DESCRIPTION BIIJ/FT 2
R] 617.5
...... REMTECH 688 . 1
o
0 50 100 150 200 250 300 350 400 450 500 550 BOO 650
TIME (SEC]
Agreement is acceptable; no TPS impact.
6 ....
r::_ _-" r,,_ -T" _" C }.--4 R T R 174-01
ILl
m
n"
ZH
I-
I0%,4
fll
to
o
LO2 ACREAGE DISTURBED
L
: i
H
//:/
[11111111 LIIlll
0 _
i
! I
I
k
IIIIIIIII I I I I ['11"1" i"rrl-..: : : :
BOOY POINT SOgoq
XT- 474.2 TN..
i J 'I
SYMBOL
TI-_TA T- 3t.5 DE c` .
! i
HEAT LOAD
DESCRIPTION BIU/FT 2
RI 755.9
REMTECH 839. i
. [...... ri
li
iIi
lIIIIIIIII :llllllll III111111
t00 i50 ;200 250 300 350 400 450 500 550 600 65<
TIHE (SEC)
Agreement is acceptable; no TPS impact.
7T - 7-
i:_ =" M T =" O !-"1 RTR 174-01
o
L02 A_ABE OIS_
BODY POINT 60Cllt
XT- 474.2 IN..
' ,L !
S'/MBOL
THETA T- 34.3 OE8.
HEAT LOAD
DESCRIPTION B,FJIFT 2
RI 661.1
REMTECH 729.2
2
11
H
o
- I
" I
i= I==
: i=
-- j
-_:/
L,,,,,,°, ,li,,,,Hl ,l,llill J|li_"_ll., _,_._-
0 5O t00 t50 200 250
L_.,.,._
300 350
TIME ( SEC}
..... _'_/ IIH.,IHI|ilHH,l I,Hi,i ,HIIlll
400 450 500 550 600 650
Agreement is acceptable; no TPS impact.
;::_ E_: _ TEE C J--.J RTR 174-01
O
II.--_..m :F-ro =
glIsl -p. -< -ff :
ZH =I--4 -
0
LO2 ACREAGE DISTURBEDBODY POINT 60q15
XT- 474.2 IN.. THETA T- 53.5 DEG.
I I I l I I
HEAT I._lAI)
SYHBOL BF-SCRIPTION BTU/_3
RI 5Z1.3...... _ 514.3
0 50
l
JI,iih|,iit
_oo
i,l,l,t|l alt|,,lll
t_o
,i,Hit,i ill|lllll i|
a00 a50 300 350 400 450 500 550 600 650TIME (SEC)
Agreement is acceptable; no TPS impact.
79
I_ IZ M T IZ _ i,,,,-!RTR 174-01
O
_-4 ,-
0"
0_Z
r
5_Ld "-
m --I 7-
(D ..
2m
In
I.U
i-.-
< "
rr _-
Z
H --.
k"
<
z -
m .-
''' ' I
I
!
I
'i
' A,,
L02 ACREAGE DISTLIRBEO
I
k_
.... 1;
o,_
II,, , b ,
#tl
II ,
II '
/I ,I
'' ''
I
i
i.
0 IIIIIIIlllll IIIIIIIIIIIIIII /;;
0 _ I00 I_ 200 250
BODY POINT 6100q
XT-- 512.1 IN..
;l(;:;l; ,,;,;;;,,
THETA T- 3t.5 OES.
' ~' I ', ' I I '
I ' j .... I H_TLo_ Il s'_'l D_ImON I _/"2 I....I --- I RI I" 641.s I
/ ...... I R_EcH j 659.4 Ij ,
I
-I, II
I .
I 4i
I
II ' '1
I
i
!
II
I 1I
i
i
I
300 350 400 450
TIHE ( SEC}
I
' ! I
lllllllll I lllllll
500 550 600 65C
Agreement is acceptable; no TPS impact.
8O
F:_ :" r,,_ -r- _" C P--I RTR 174-01
L02 ACREAGE OISTURBEO
or
m
ft'-
T
\
............ , ,,,°0,,,0 ,,,°0,,,, ,,,,ll,
o0 50 lO0 150 200
BOOY POINT 6110q
XT-- 512.6 IN..
i I
infl_Ol,
THETA T- 3t.5 DEG.
L ,I _ ,
I BEAT IOADDII_'PJI_'ION _ I
...._...,.... Itl........ PJD41"EC_ I$'tJI
I I
250 3O0 350 ,400
TIME (SEC)
7. •_-11_11_Ti i i _ IIIlil
.450 500 550 600 650
Agreement is acceptable; no TPS impact.
1 ....
i::::_ I=" M T _::... O i._,. !RTR 174-01
O
E0"
oiI".
UJU]I
I-h ID
2t9
inILlI--
rr
Z1.4I-
0
L02 ACREAGE OISTUtqBED
BODY POINT 61tli
XT-- 55t.3 IN.. THETA T." 37.3 DEG.
' i ...... I L..- ...... L..... I ..... I
H_'r L_ '
SYMBOL DESCRIPTION _pFT 2
RI 518.8...... P._ 461.3
' i , !
0 50 t00 t50 ;ZOO 250 300 350 ,400 ,450 500 _560 600 650
TIME [ SEC)
• The difference in max heating rate between Rockwell and KEMTECH
generates < 0.3 inches of CPR. This is within the uncertainty
allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
83
I_' E M T E C !--,,,I RTR 174-01
to
L02 ACREAGE DISTURBED
IN
ID
46uJ -'-
¢q
/
g'l
_111 itl iiiiiiiIi 0111lllll
o0 50 100
BODY POINT 61114
XT- 551.3 IN., THETA T- 4q.0 IDEG.
1 i -- . !.I -
DF.3CRI PTION
P,_EE3
HEATLOAD
E_J/_-r 2
320.'9 "
378.9
*l*llllll _T_'r_..;:: .......... ;.,,_TrV'I_ llIHlll* Jlll*l*l I*lfHJ*
:1.50 ,200 250 300 350 ,400 450 500 550 500 650
TT_HE (SEC)
Agreement is acceptable; no TPS impact.
83
t:::_,_- t,,,_- F _==-C _ .i RTR 174-01
L_
_r
5u_ 'q"t
i.-b.\_4F-ro
oltlJk-
E _
ZH
I.--,<
in
Ill
0
L02 ACREAGE DISTURBED
BODY POINT 6120q
XT- 5ql.4 IN.. THETA T- 3t.5 DEG,
HEAT LOAD
SYMBOL DESCRIPTION _f,U/£,.£2
RI 409,7"
REHTECH 338.5
Illllnlll Illllllll lllllllal
t00 150 200 250 300 350 400 450 500 550 600 650
TIE ( SEC}
O 50
• The difference in maximum heating rate between Rockwell and
REMTECH generates into a difference of _ 0.3 inches of CPR.
This is within the uncertainty allowed in applying the TPS.
Agreement is acceptable; no TPS impact.
4 _..
I:=e=" rv1 -r" I='" C I---I RTR 174-01
5uJ
I/-.IL
m
UI
Z
I-<
L02 ACREAGE OISTURBEO
_O
El =
=
t11 :
/
/%
" i///El
o0 50 1OO t50 200
BODY POINT 6130q
XT-- 532.3 IN..
i I
SYMBOL
THETA T- 3t.5 DEG.
I I l _HEAT LOAD
DESCR I PTI ON BTU/ET2
RI 332.4
REMTECI I 326.2
_50 300 350 400 450 500 550 600 650
TIME (SEC)
Agreemen_ is acceptable; no TPS impact.
5 ....
r=_ _" r',,._ "r" _" C P--I RTR 174-01
DE
I-
_. ==
(q
,,, !,<
Z -H :
0o
L02 ACREAGE OISTU;::_BED
BODY POINT 61311
XT- 632.3 IN.,
I l l. I
S'_'BOL
THETA T- 36.4 OEG.
_. I .... I
DESCR IPTIONHEAT LOAD
BTU/FT 2
338.3322.2
/
50
iiiiIi|l
ioo
!
...................__ ............ .._,m-_
_so 200 250 4o0 450 soo300 350
TIHE ( SEC]
,_,,_.......550 800 650
Agreement is acceptable; no TPS impact.
6 ..... -
RTR 17441
{0 "--
6 -:LUI =
F_- _ =
•7 _i "I.-- -
mm "
< ._
Z = ,H -I- N '= " _
_- I /k!
0 _IIIIIIII
o
LO2 ACREAGE DISTURBED
%.
,\L._llllllllIllllllllllt IIIIIIIII _lh,,, , t_ :t _
50 'tOO 150 250
BODY POINT 6%3t3
XT-- 632.3 IN..
i l
!
I
i
i
200 300 3_0 ,400 450 500TIME (BEC)
THETA T- 4B.3 DEB.
I }EAT LO+IE)
SYMBOL I DESCRIPTION BTUP:_2,,,
I RI 236.3
....... RD4TECH 254.4
i
,, . I - - -I
i
lllllllll
55O
llllllll
600 650
Agreement is acceptable; no TPS impact.
87
_ =" r,,,A -'r" =" c _---! RTR 174-01
m =
liJ
i In :I-u_ ai -N Z2 -
NI,LI --I.--- _
rr --
Z
I--4UlI
BODY POINT B140g
L02 ACREAGE DISTURBED XT- 673.g IN..
t
i
/
////
I/i// "
n
-/--- , A ,
o7/
o minI iiiiiiii0 50 lO0
i
t\
i
II Itlll /1111111 iiiiiiiir
THETA T-- 3i.5 DEG.
I I I i
SYI'BOL DESCR IPTION Im
I
HEAT LOAD
BTU/FT 2
RI I 239.7
REHTECH I 306.0
I I I I I
'150 200 ;>50 300 350 400 450 500 550
TIME (SEC)
600 650
Agreement is acceptable; no TPS impact.
88
LO2 ACAEAGE DISTURBED
Lq
Iq
ioEl
I I I III I I I I I I I II I _ I1_1 III
o0 50 t00 150
BODY POINT 6150q
XT-- 715.B IN.. THETA T-- 3i.5 DEG.
I I I v I I
HEAT LOAD
SYMBOL DESCRIPTION Bq_/FT 2
RI
...... REMTECH
215.6
301.6
200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
F:_ E r,v,l-r' E C I--I RTR 174-01
L02 ACREAGE DISTL_BED
Lq
_q
! r
i _ I
i ..................
50 100 150 200 250O
BOOY POINT 6160q
XT- 75q.2 IN.,
I I
SYMBOL
THETA T-- 3t.5 DEG.
I | i
DESCRIPTION B.IX]/FT2
RI 186. I
241.8
--- ---- •
300 350 .400 450 500 550 600 650
TTHE (SEC)
Agreement is acceptable; no TPS impact.
0 ....
F:_ =" r,_ "-r- =" C I---4 RTR 174-01
in
F)
m
5i,iu}! Lq
I-
O
NWI--
rr
o ¢)zH ,I..I
I.--
"I"
L02 ACREAGE OISTLIFIBEO
-/
II
I
fI
I
I
, /// ,
I i° I
, \/
II|llllll! Ill
V
Illll Illlillll _::_'YT;_, ;
BOOY POINT Sl610
XT-- 75q.2 IN..
0 50 iO0
sY_oL II
......
THETA T- 33.80EG.
DESCRIPTION
RI
!
i
I
i
FIT-ATLOAD
ITnJ/FT2
263.7
235. I
!i
==--" I
150 200 250 300 350 400 d50 500 550
TIHE (SEC)
i,lllll
600 650
Agreement is acceptable; no TPS impact.
91
El
F1 -
5U.I{8
I--LL N
D --
N ..II.-
n"
_' =- /
o0
LO2 ACREAGE DZSTURBEO
Illllllll ill I
BODY POINT 51611
XT- 75q.2 IN,, THETA T- 36.0 DEG.
i
HEAT LOAD
SY_3OL DESCRIPTION BTU/FT 2
RI 181.4
...... REHTECH 212.8
I I
50 t00 150 RO0
4
250 300 350 ,400 450 500 550
TIHE (SEC)
600 650
Agreement is acceptable; no TPS impact.
92
'¢ ;...
Z
W
I_
_N
m :
w _
_ 2
z _ /H_
I
Illlll
00
BOOY POINT 61613
L02 ACREAGE DISTURBED XT- 75q.2 IN.. THETA T- 45. i OEG.
i i i i i i
HEAT LOAD
SYMBOL DESCRIPTION BTU/FT 2
|,i _ _ ....... l|Dp ....|.. ..... ,.t.... t.,_--_t .,,,t.l'_, ..H_--
50 iO0 t50 200 250 ,400 ,450 500
147.8
202.2
300 350
TIHE (SEC)
__,,I,o,,
550 600 650
Agreement is acceptable; no TPS impact.
93---T
F:_ =" rv1"-r- =" C t--! RTR 174-01
L02 ACREAGE DISTL_qBEO
BODY POINT 6170q
XT-- 762.2 IN..
wI-<n"
(.9ZH
I-.,:[
_'- SYt'_OL
THETA T-- 3i.5 DEG.
| i [ I
DESCRIPTION
HEAT LOAD
BTU/FT2
150.6
187.2
io
f "-.
¢1
/
.................... _ .................................... _,,, _,.,._ ...._-. .......o
0 50 100 _50 200 250 300 350 400 450 500 550 600 650
TIME { SEC)
Agreement is acceptable; no TPS impact.
94
F_ E r,,/1-r" E C P-4 RTR 174-01
L02 ACREAGE DISTURBEO
-!¢1
o0 50 100 150 200 250
BODY POINT 6180q
XT- 773.7 IN.. THETA T- 3t.5 BEG.
HEAT LOAD
SYMBOL DESCRIPTION BTU/FT 2
RI 169.6
...... REMFECH 260. I
300 350 400 450 500 550 600 650
TIHE (SEC)
Agreement is acceptable; no TPS impact.
5 ....
F:_ _--" M-r- _=" C _..4 RTR 174-01
N
u
I
2m
tlJ ,-_
E
(.9zH
o
L02 TANK ACREAGE
-" I
o
L
/ f'II
-l.V
i//_. i
"ft
:ll.°
_A
I \
\ ,
800Y POINT 71875
XT- 84t.50 IN..
, |
I
SYMBOL
I
TI_TA T-- 270.0 OEG.
I-EAT I.DAD
DESCRIPTION B_J/FT 2
R'I 191.7
RI_EECH 164. I
I
III
II
_11111111 [lllll II IIIIIIII 111111111 II'I'_H;,;: ;/;.::::!! ,,,,,i,l,
0 50 iO0 150 25O
i
II
I
I III1' L "1 lit .... I! _1 _-- .." : ; ;, ;,,, l i i i i i h I I I I I'11Iii i
200 300 350 400 450 500 550
TIME (SEe)
lldlllllli
800 650
Agreement is acceptable; no TPS impact.
6 .....
F:_ _" r,,,_'r- _- C }---I RTR 174-01
.q.
to
UJ0_I K3i-U_ f_
}-
LUF-
E
C9 tOZH _r4I-
0
800Y POINT 61qOq
L02 ACREAGE OISTURBEO XT- 786.2 IN..
m
0 50 100 150 200 250
SYMBOL
THETA T- 3t.5 OEG.
1 i i
HEAT LOAD
DESCR IFT ION BTU/FT 2
RI 191.7REMTECH 225.1
I I
I
..... .., ....... ,,- -_o,,_ _-,,,H,,, ,,, .... __l,aHil
300 350 400 450 500 550 600 650TIME (SEC)
Agreement is acceptable; no TPS impact.
97
F:_ =" h.,_ T _ C F--_ RTR 174-01
xr
Lq
o")
uJo_
IIDI.-b_ oJx
l.-m
uJ1-<IT
zHI--<
,rl
In
0
Z
r-
7
/
/
0
L02 ACREAGE OISTL_qBEO
,
/
B0 100 150 200 250
BODY POINT 6200q
XT- 7q3.t IN..
] I _r
THETA T-- 3t.5 DEG.
i i 1
SYMBOL DESCR I PTION
HEAT LOAD
BTU/FT2
RI 216.5
REP_ECH 258.9
300 350 400 450 500 550
TIME (SEC)
600 650
Agreement is acceptable; no TPS impact.
F:_ E r,,._ -'1- ,_="C I.-.-g RTR 174-01
BODY POINT 62t0q
L02 ACREAGE OISTUABEO XT-- 827.t IN..
iocy
i" r
In
0 50 100
THETA T- 3t.5 0_8.
SYMBOL DF_3CRI PTION
RI
i I I
HEAT LOAD
BTU/FT 2
215.6
259.1
t50 200 250 300 350 ,400 ,450 500
TIME (SEC)
........... ,,llln,
550 600 650
Agreement is acceptable; no TPS impact.
99
F:=zE r,,,.,,,1-r" E C i.--.i RTR 174-01
O,wd
00
UJ
II-
ra
2m
Ni-
rr
ZH;....
L02 TANK ACREAGE
- !- I- i
.
- I/
: II. i
.
- Ii- |
- // :" Ii //: I
/Io
"" _. I/- II
" [LJ|[J|JJl llllll|l |11 ill| liill|il|
O 50 100 150 200
llllll|l_l
BOOY POINT 70qO0
XT- 375.10 IN.. THETA T-- 0.0 DEG.
DESCRI PTI ON
RI
RDfrEL'H
BqUIFT 2
817.2 1846.2
S_BOL I
I
...... i
fIIIIII lllll||i iI|llllll IIIiiii
250 300 350
TIME [ SEC)
400 450 500 550 500 550
Agreement is acceptable; no TPS impact.
100
I=_ _" rvl"t- _" C i--4 RTR 174-01
O
5UJ(,'1I
I-I, U)
m
IJJI-<(rr
'qrZHI-"
N
LO2 TANK ACREAGE
BODY POINT 70q50
XT- 375. 10 IN. . THETA T- _BO.O DEG.
J
HT_T LOAD
SYMBOL DESCRIPTION BTU/FT 2
RI 825.5
...... RENTECH 839.5
o
J
I1E• l
lllllllll IIIllllll Illllllll Illllllll _ _ _Rff1-r-_ i|1111111 i Ill ill i l Ill , .I,
50 t00 t50 200 250 300 350 400 ,450 500 550 600 650
TIHE (SEC)
Agreement is acceptable; no TPS impact.
101
_=_=" r,,,A "-r- _'- c J--_ RTR 174-01
LO2 TANK ACREAGE
BOOY _OINT 70q56
XT- 375.10 IN.. THETA T- 202.5 OEG.
5
II,-
2m
ulF--<n-
zHI-.
0 50 iO0 150 200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
102
i=_ _--" r-,,._ "-'F"_-- C I----4 RTR 174-01
O
uLI..I01I
I-ra
WI-<
ZH
I-.<
0
LO2 TANK ACREAGE
Er /L- I
I
/IJ
_IIIIIIIII
50
BODY POINT 70q63
XT- 375. t0 IN..
II
I
THETA T- 225.0 OEG.
l I
SYMBOL DESCRIPTION
RI
REMTECH
HEAT LOAD
BTU/FT 2
845.5
845.4
1lllllllll
_o _oo _o _oo _o _oo _o _oo _o _oo _oTIME (SEC)
IO0
Agreement is acceptable; no TPS impact.
103 - 7-
0
O0
IJJInI
I,-
Ii to
I-0
wt-<IT
Z
I-
W"r
o
L02 TANK ACREAGE
!
BODY POINT 70q6q
XT- 375. t0 IN.. THETA T- 247.5 DEG.
J
H_AT LOAD
SYMBOL DESCRIPTION BTU/FT2
RI
...... R_'_ECH
849.1
848.6
_ iiiIilllll! IIIIIIIII
/ _-.-.
/
jJIIIIIIIII III1|1111 11117Tm Illiltll [ i] lil_ II1|11111 II1|11111 IIIIIIIII IIIIIIII
t50 200 250 300 350 400 450 500 550 500 650
TIHE (SEC)
0 50 iO0
Agreement is acceptable; no TPS impact.
104 ....
F::_ _" r',,,_ "r _" C _--4 RTR 174-01
O
- s
- I
- l
- I
- I
- i
- s
- i
- i
- i
- i
- i
- i
- i
- i
- i
- i
- i
- i
- i
. ,
- ,
- i
- i
i
- ,, _
i i/t
ru - "]_'!- / I-
_|JJl
0 50
5WC)')I
F-
F-
wi--
or
Z)-iI--<WT
BODY POINT 70q75
L02 TANK ACREAGE XT- 375._0 IN.. THETA T- 270.0 OEG.
i _ _ _ I .... 1__ i .... n , -
i ttF_ATi SYMBOL DESCRIPTION BE//
i[J i RI 846.8
i ...... _ 850.3//
r/i
i
L
It
r
/
\ //
III II li|l| /lllillJl |IIIIIIII;II|III||1 llllnlllltllllillll |fllll|/l l|||l|l[J| |ll|lllll| |lll||lll
100 150 200 250 300 350 ,400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
105 ....
REMTECI---IRTR 174-01
L02 TANK ACREAGE
•
_- iIt\
2 " fl£
zH jF-
_l_llll|lJ IIIlllll| IIIIIIJl|l
o
BOOY POINT 70q81
XT- 375.t0 IN..
O 50
THETA T- 2g2.5 DEG.
T_ ' i I ..... I .
_L DESCRI PTION
RI
m_J/rT 2
807.9
851.3
I I I I III I I I I I I I I III 11I1_1 _ "l'fl"Trl'_Ti _ i i i I i i i I !111111 iii Iiiiitllll ilflllll
t00 150 ;200 250 :300 350 4OO 450 500 550 600 650
T_:HE (SEC)
Agreement is acceptable; no TPS impact.
106
i_ _-.-. M T I:" C I--.IRTR 174-01
O
5,ii/)I
F
m
I11
<n-
ZH
<
0
L02 TANK ACREAGE
ii,
I,ii/ !
i/ I
://
BODY POINT 70q88
XT- 375, t0 IN..
I
I
I
J
SYMBOL
THETA T-- 315.0 OEG.
D£SCRI FrION
RI
! I I
i
! i ,
i J
_1111111| IIIIIII11111
0 50 100
IIIIIIII1_ lllllllll_lll!
111111111 IIIllllll IIIIIIIII Illllllll
tEAT
EnJ/PT 2
829.8850.1
/
,%
t50 200 250 300 350 400 450 500 550TIME ( SEO}
IIIIIIIII
500 650
Agreement is acceptable; no TPS impact.
107
oIllu_I
F--tL
Dl--m
td
n-
(.9ZH
I-<wT
0
I%1
0 50 100
LO2 TANK ACREAGE
BOOY POINT 70qq4
XT- 375. i0 IN.. "rHETA T- 337.5 BEG.
i50 200 250 300 350 400 450 500 550 600 650
TIME (SEC}
Agreement is acceptable; no TPS impact.
108 .... _
5IJJu_t
t-
Dk-rn
w
n-
C9Z
<_UJI
*T
8J
BODY POINT 71000
L02 TANK ACREAGE XT- ,42t.30 TN. .
!I/ll
,
i///
I
III
0 50 :l.O0 t50
THETA T-- 0.0 DEG.
Jlllll/LI/LUlLLIZL l
i
J " J t l ]
HEAT LOAD
SYMBOL DKSCR IPT ION B_J/FT 2
-- - RI 594.4
REMrECH 687.0
I
;
iII;
I
200 250
_l*llf ,,llllll[ Iltlllltl IIIllllll Illlllllllllll[llll,llllllltt
300 350 400 450 500 550 600 650
TIHE (SEC)
Agreement is acceptable; no TPS impact.
109
i=_ t==" M T E _ !.-... ! RTR 174-01
uttl¢nI
I-
2m
W)-<rr
3"_-4
<Ul1-
0
,14
:/
:Y_llllllfl
0
L02 TANK ACREAGE
Ill
II !
i k
illlllllll IIiiiiiii I11111111
50 100
BODY POINT 71050
XT-- 42t.30 IN..
SYMBOL
.q.b--_
!i
it
i
i
TI-ETA T-- 180.0 OEG.
HEAT LOAD
DESCRIPTION E.[,U/ET2
RI .598.0
647.9
r
! •
//
P.._::;=;:;_._'--'_,.;_JI::::;:: :_ IIIIIlill tllllllll IIIIIIIII
t50 200 L:_O 300 :350 400 450 500 550 600 550
TIHE (SEC)
Agreement is acceptable; no TPS impact.
110
RTR 174-01
tO_' TANK ACREAGE
BODY POINT 71056
XT- 42t.30 _N. . THETA T-- 202.5 DEG.
| ..... I._ I. __I ........ I -. l
}EAT I.,OADSYMBOL DESCR I PT ION E[_j/FT 2
RI 597.7
...... RDffECH 668.3
0
H
E
"i I: .]
Illll_lllltllBI
o0 _ t00
\
_111111111 _--'ll .... ,.1_
t50 200 250 300 _50
TIME ( SEC}
..., I :_..-;l_r_, i,ii, ii ,|111,111 ,1111111, IIIIIJH
400 450 500 550 600 650
Agreement is acceptable; no TPS impact.
III -
F=__" r,,,4 "r" _: C h.-.4 RTR 174-01
o,r_
CD
II-
I-
W1'--
IT
ZI-4
Wr
-/
://_llllllll
0
LD2 TANK ACREAGE
/
tlI
/l
//I/
/
I
!
II
\,
IIIIIIIII IIIIIIIII
50 to0
L
:lllllllll
t50
BODY POINT 71063
XT- 421.30 IN..
I
I
II
I
I
I
II
I
200 250
SYMBOL
THETA T- 225.0 DEG.
DESCRIFTION
RI
I_T I.L)AD
604.4
693.4
I I
I I
IIIIIIIII
450 500 550 600 650
| I
IIIIIIlll!llllllll!
40O300 350
TIME (SEC)
Agreement is acceptable; no TPS impact.
112
o,
I:_E:MTEO H RTR 174-01
o
6]
5uJElI
I-
ra
m
IT
ZH
F
UlT
0
i
:/
_lllllll I[|1111
0 50
L02 TANK ACREAGE
i
,Vi
/ i
I
I iI
I .
I
J! \\V
LI"-
I
BODY POINT 71061::1
XT-- 42i.30 IN.,
Illllllltllltllllll
150 200
SYMBOL
I
' II!
I
i
I
• l!
i I
L
t
iI
II Illll
100 250 300 350 400 450
TIME (SEC)
THETA T-' 2,47.5 DE6.
i_ ..... "1_: ..... t - I.
DESCRIPTION
681.1
719.4
k _
, I!
! !
I
i I
i
I, I
i
Ii
llllltlll IIIIII111! lllllllll! II1111111
500 550 600 850
Agreement is acceptable; no TPS impact:.
113 ---_
i:::_ =" M T =" O I--- ! RTR 174-01
o
uLU
II-
2m
W
E
Z
I--
nl
0
BODY POINT 71075
L02 TANK ACREAGE XT- 42t.30 IN.. TI"IETA T-- 270.0 DEG,
iII
I
//_ I
Iii i
//1_ r
I Jl [i
// !I 'i
[ i ....
0
, I
I SYNBOL
!
I
HEAT LOADDESC_ I PTION B,IU/FT 2
RI # 683.4REMTECH , 734.0
!
"IJ
i_rrllzzl |1111111_- ]llllllll III]IIIJP|I
50 100 150 200 250 300 350 +400 450 500 550 BOO B50
TIME ( SEC}
i
IIIIIIII1: l/IJIIIII i IIIIllllJ
Agreemen5 is acceptable; no TPS impact.
114 --:_
I=_ E r,,,,d "-r =" C: F.-d RTR 174-01
w
i
(ll
WI-
fr
(.9 '_Z
I-,t
I.-
LO2 TANK ACREAGE
0
m -,1 ......
II
gl
O 50 100
BODY POINT 7108i
XT- 421.30 IN.. THETA T- 2q2.5 DEG.
-- , , __-r__".! ..... i.'. i __
SYMBOL D_ I_I ON _/_2
RI 606,6
...... IE_E£CH 743. I
• t .... i" "--I
iIi
I ,
I a I t
i ' [
i I ,
' I I t, o
.,.
i II I Z
***s[l*ll tlll**llll|ll**lll|lltlll|llt I
350 400 450 500 550 BOO 650
7 !
i
!J
i
I l
150 200 250 300
TIME ( SEC}
Agreement is acceptable; no TPS impact.
11,5 -;
l=_=--r,_'T'_'C H RTR 174-01
5u,J
II-h
I'--
lUI--
I1"
ZI-I
I-<llJ1"
o
to
,¢
o0
L02 TANK ACREAGE
BODY POINT 71088
×T- 42t.30 IN.,
SYMBOL
THETA T- 315.0 DEG.
FEATDESCRIPTION _B_T/_L_
RI 599.8
735.2
i
50 100 t50 200 250 300 350 400 450 500 550
TIHE ( SEC}
600 65O
Agreement is acceptable; no TPS impact.
116 ....
i_ I_" M T I=" C I-,- I RTR 174-01
O
I
D
m
11/I--
rr
Z
I-
U/I
LO2 TANK ACREAGE
BODY POINT 710q4
XT- 42t.30 IN.. THETA T- 337.5 OEG.
DESCRI PTION
HEAT LOAD
_/FT 2
594.9716.1
0
5O 100 150 200 _NSO 300 350 400 450 500
TIME (SEC)
55O 6OO 650
Agreement is acceptable; no TPS impact.
117 ---
F:_ _-.. r,,,_ -F- _-.- C F...t RTR 174-01
0 ,
I-D-
e-
F-r-r-
I-co .!
FEuJ
u_ h"! F
I.- .,-IL LO
m r-
bW .,-b D.-
fr ,_
_ '_ 'iZ r"M
F"r"r"
L02 TANK ACREAGE
I
, |4
|
//J/
' kN
iL-0 I|IIAIIII IIIIIIIAI I-||llll|l IILllilJl T'_T. II
0 50 100 t50 200 250
BOOY POINT 71100
X-I'- 453.60 ZN.. 0.0 OEG.
i !
THETA T-
i i i
SYMBOL DESCRIPTION
RI
...... RI_TECH
HEAT LOAD
BqIJ/FT _
532.8
599.1
i ;
=..¢t,.-= ..i..nil411t.LIl| 11|1.11111 |IIUIiI||IIIIII|II
300 350 400 450 500 _O
TIME (SEC)
III|IILIL
600 650
Agreement is acceptable; no TPS impact.
118
;;_ :" MT:- O HRTR 174-01
o" L
mr
u
I,Lm r
I.--
l.r
Z ,..H ,
E
I
L02 TA_ ACF_EAGE
i!J
!,
BOOY POINT 71150
XT-- 453.60 IN.. THETA T- 180.0 DE6.
-. , . , • . . •
SYMBOL DESCR I PTION
F:
RI
...... _H
539.7
557.4
0
5O 100 i50 200 2.50 300 350 400 450 ._30 550 600 650
TIME ( SEC]
Agreement is acceptable; no TPS impact.
119
o,irl
LllU_II--IL {0
II1
ZH
I--
LO2 TANK ACREAGE
BOOY POINT 71175
XT- 453.60 IN.. THETA T- 270.0 O_G.
o
.
°
: /
: /
: I/
: ]/
i
t
-JJ!--ii
--ii
r_llllllll I|l|lllll I|llllll
0 50
I HEAT LOAD
SYMBOL DESCRIPTION I BTU/FT2
I
RI 1 557.2...... RIHTECH 645.6
I
J
• !
I1|111111 iill|llil _[[] .;;,;Jl;; ,;;;,,ll]l _ Illllllll Ilillll |llllllll
iO0 150 200 250 300 350 400 450 500 550 600 6.50
TIHE (SEC)
Agreement is acceptable; no TPS impact.
120 -
i=_ _- M ""1"-_"" C I--iRTR 174-01
ILl
DI-ra
ml--
rr
L_ZHI-
o
ID
10
o
L02 TANK ACREAGE
>0 50
BOOY POINT 71200
XT- 457.40 IN.,
100 150 200 250 300 350
TZH£ (SEC)
"I-I-ETA T- 0.0 DEG.
[SYMBOL DESCRIPTION:
i
i ,
r ...... _
i •
=--[_ " II
I
400
486.,I
566.(,' I
1!I
i
F
.........450 500 550 600
Agreement is acceptable; no TPS impact.
121
0¢i
(JW01I
I'-h
DI-rn
ILlI--4n"
ZHI-.<{
N
0
L02 TANK ACFEAGE
.... i
I
I
!
Ii
I|
II
II
.......... i
¢
• i
4 _
t
t
I
i /I
- \
II1| Illlllr !
0 50 200
BODY POINT 71250
XT- 457.40 IN.. THETA T-- t80.0 DEG.
Illllllll TIIIIII,]
_oo
• ,---- i ' "-'r
SYMBOL DESCRIPTION
RI...... RE_TE_
T f
HEAT LOAD
B_J/FT 2
521.7
524.3
.... T
I["111 I | I I I
250 500
._7,,, "/5_*,ffl-M-_ .I4[_t_t_ l_"[*_':: :..A[ till| IIIIIHII Iltllllll
150 300 350 400 450 550 500 650TIHE (see)
Agreement is acceptable; no TPS impact.
123 --
F:_ E r,,_-r- E C l---_ RTR 174-01
O
6IiiInI
I'-'-
mI--
rr
ZHF-<
N
O
LO2 TANK ACREAGEBODY POINT 71263XT- 467.40 IN.. THETA T- 225.0 OEG.
sYMBOL DESCRIPTION B'I'd/6T"
_'i 5_2.3...... _ s7o.4
t00 t50 200 250 300 350 400 ,450 500 550
TIHE (SEC)
Agreement is acceptable; no TPS impact.
123 -':-
F:__" M -r- E C l-.-._ RTR 174-01
LO2 TANK ACREAGE
BODY POINT 71275
XT- 467.40 IN.. THETA T- 270.0 OEG.
l ; i i
HEAT LOAD
SYMBOL DESCRIPTION _j/ET 2
514.4
612.6
uJu_I
b. m\
2II1
ulI-
rr
ZH
F-
N
0
f
't,tt
,lllllllll IIIIII1|1
50 iO0 150
_: ......... ,,ll ,,,,,,o ,oo,,,o, i..... °,,. ,,,.,,.,°
200 250 300 350 400 450 500 550 600 850
TIME ( SEC}
Agreement is acceptable; no TPS impact.
124 -"_-
F=_=" r,,A"T _" C P-_ RTR 174-01
0_rl
L02 TANK ACREAGE
BOOY POINT 712B8XT- 467.40 IN..
SYI,g30L
THETA T- 315.0 DEG.
DESCRIPTION
RI
HEAT LOAD
509.0615.8
i,i
I
\
2
toi-
n-
zH
N
f
- / I
0 50 100 250 200 250 300 3.50TIHE (SEC)
.... ilill*ll fill ! Illllllll Illllllll
400 450 500 550 600 650
Agreement is acceptable; no TPS impact.
125
I_ _: M T IE C i--i RTR 174-01
O
U1
I
t--
I11
Ult-
E
Z
I-4
)-
0
L02 TA_I< ACREAGE
: fl
: /(: II.
" o,,_1/
i
/1
%,
BOOY POINT 71300XT- 513.60 IN,,
: !
r
LI
!
i
I
ii
i
SYMBOL
THETA T- 0.0 DEG.
_ * .i _f
DESCRIFTION
=
!II
I
!
.....i
i
I
i!
' " i
I
LI.ILI.III/ l|£1¢!1J1 LIILLJlttt|UJJ.tLI! JLIJJ.IJ_.L_._t_ ILL;._';;;;;_; ..... ,,,_i, !!tJl!llJ I
0 _;0 100 _50 200 250 300 350 400 450
TIME (SEC)
EAT
B_/_ 2
410.4470.5
I
I
i
Ii
i
I
JJJJtJJl_ IJiJ.IJJ.U_
500 550 600 650
Agreement is acceptable; no TPS impact.
126 -
5wr_I
I-03
2mw
tgI-.<n-
L_ NZ
H
I-
1-02 TANK ACREAGE
. I
- i
- i
. !
- I
- I
* I
" I. , /- I
- I
- i
- i
: ! //- i
" 'll- i
- I
- I
- i
- 'll- i
I I
- i
- ._JI
" / I
"-/I
-It
-II
-,
0 50 t00
i
|
\,
\\
150
THETA T- t80.0 DEG.
i ..... * ..... t
J J EAT LOADNL DESCRIPTION BqU/FT 2
I '428. i
"1i
/
, !
_ ,|II|I'PY'T'_ I|1_1"_'_1 IJlllllll II11111| IIIIll|i illJllll
300 350 400 450 500 550 600 650
TIME (SEC)
BOOY POINT 71350
XT- 513.60 IN..
l"rCl i I i _ ffllll_
200 250
Agreement is acceptable; no TPS impact.
127
F:_ =" r_/l'r" _" C _--! RTR 174-01
in
,,¢
II-h
Cq7I--
tl.II--4rr
ZH
i-
,el
o
L02 TANK ACREAGE
I
I
/I
"1/
I111( LIlIIIIII IIIIlUL _
0 50 t00 150 200 250
BODY POINT 71356
XT- 513.60 TN.. THETA T- 202.5 OEG.
+ . -- i - . .i .....
_T LOAD
SYMBOL DESCRIPTION BTU/FT 2
RI 366.8
...... _ 447.6
300 350
TINE (SEC)
J_::_111 IIIIIiiii iiiiiilil i iiiiii
,400 450 500 550 SO0 650
Agreement is acceptable; no TPS impact.
128 -._+
I=Z _" r,vl -r" =" C I---I RTR 174-01
tuu)I
I--LL R
Dt'-In
tl,It-<(n"
L_ NZH
I-
uJT
L02 TANK ACREAGE
- o
: //J
- _.J[
_j /...1
-ii
-iI
_ULLIJ.I I I I&llltll I1
0 50 100
ii
t50 200 250
BODY POINT 71363
XT- 513.60 IN.. THETA T- 225.0 DEG.
• • , .... , . . =
S_BOr. DESCRIPTION ]_U/FT"
RI 362.0
Pd_HTECH 472.0
1I I
I
I
I
q
I I
/f
''_''! '_.': _ IJLUJJLIJ.! IIIlLI-IIIIUIIIUII
300 350
TIHE (SEC)
I I LLLILLL
400 450 500 550 600 650
• The difference in max heating rate amounts to _0.I inches of
TPS, well within the allowable application uncertainty of
0.38 inches of CPR.
Agreement is acceptable; no TPS impact.
129
i:=_ E r,,_-r" E C P--I RTR 174-01
(D
LO2 TANK ACREAGE
: I I
o
/\
BODY POINT 7136q
XT- 513.60 IN..
i
\
Hill I LLLII II 1
t50 200 250
THETA T- 247.5 DES.
I ..... I .... I_ i
...... LR_TECH
0 50 I00 300 350 400
TIME { SEC}
I I
EATLOpBTU/_ _
, I
358.2 I
497.9 I
450 500 550 600 650
• The difference in maximum heating rate amounts to a difference
of _ 0.i inches of TPS, well within the allowable application
uncertainty of± 0.38 inches of CPR.
Agreement is acceptable; no TPS impact.
180 --_
F:__--- r,,,_ T E C_ F--I RTR 174-01
0tlJu}I
\
2{I1
I.---<IT
ZH
LO2 TA_< ACREAGE
//i r
/
i/o
0 50 100
BOOY POINT 71375
XT- 5t3.60 IN.. THETA T- 270.0 DEG.
I I | . [ __1 [ ....
H_T LOAD
SYMBOL DESCRI PTION Bq-J/FT 2
RI 440.7
...... _ 513.0
t50 200 250 300 350 400 450 500 550 600 650
TINE (SEC)
Agreement is acceptable; no TPS impact.
131
F:_=- r,,A "r =" C kH RTR 174-01
ID
L,)LLIIn "_I
I-LL\
2m
FIUlF-
rr
ZH
I- N
L02 TANK ACREAGE
" I
] I \
- /J- II I- i) i
] /I LI
- i
-,J-lJ-a# \ \
i
_LLIULLll ILLI|ULt |l LLLIII LilllLlLI _.._,._._..;
0 50 100 150 200 250
BODY POINT 7138t
XT- 513.60 IN..
L ..... ! ,
SYMBOL
"T'I-ETA T- 2q2.5 OEG.
.... i .... I ....... I. I .....
J HEAT
DESCRIPTION B,_/FT 2
RI 361.9
REMTECH 523.7
' i
iii
JLI£1JA I l t ; IILIJ.LI l I
I
300 350 400 4,50 500 550
TIME (SEC)
ILLLtLJ
P_30 650
• The difference in max heating rate amounts to_-0.1 inches of
TPS, well within the allowable application uncertainty of
0.38 inches of CPK.
Agreement is acceptable; no TPS impact.
132
i=_ _" r,,,_ -F" _-- C i.--_ RTR 174-01
ID
Lo2 TANK ACREAGE
In
5ILlCn _rI
I-
,, . /jI-ra
m lJ t<
ZH . / - I
<
"_ "P" 'iX
iU i!\\
0 hllLl£ll ll.IJ+|llll III .ll+Inl IILILLLLII IIiILLLLII _LiJ.4_l,
0 50 100 450 200 250
/\
BOOY POINT 71388
XT- 513.S0 IN.. THETA T- 3t5.0 DEG.
I .... I . . I ..... I. _ I ...... I
SYMBOL D_._"Rt_+ON _Ulm.2 •
RI 369.6
...... _ 517.6
fu. Li..i,',',_ 'L_uUU_L_ L_ LLLitlLIJ IIUUI.LI II.IIUIII
,,....
300 350 400 450 500 5_0
TIHE (SEC)
IllJ.III|L
500 650
• The difference in max heating rate amounts to _0.i inches of
TPS, well within the allowable application uncertainty of
0.38 inches of CPR.
Agreement is acceptable; no TPS impact.
133
L02 TAHK ACREAGE
CD
" i
- [
: II_ /'_
" I
i /\u
_ " ! / 1I
F- !
" Itm
tl/I- "
z J
e il
i//
o
i ,
% 'q
\I\! :
I
I\\
BOOY POINT 713q4
XT- 513.60 IN.. THETA T-" 337.5 I_G.
! ..... I _._ I " I. l ........ I .
I s,cneoL I _.__J_'r_I_I_. I ,_'_# _ RI I • 376.9
...... REMTECH I 499.4
//
J
Inlxnllll LIJ-LI.IIJI LILLIJJJI ILILLLLIJ.I LLIJIII
250 300 350 400 450 500 550 600
TIME (SEC)
[IIjI_LIJI LLIILIILI ILl 111111 llLLILIII _ILli_i ILILi.LII.II IJUI.I.I,.LLLI
0 50 iO0 150 200 ;50
• The difference in max heating rate amounts to < 0.i inches of
TPS, well within the allowable application uncertainty of
0.38 inches of CPR.
Agreement is acceptable; no TPS impact.
134
_=_ _" r'_ "T" _" C I--._ RTR 174-01
03
El
N
uJN
I
I1)
rr
t_ZI..4
" I
J
//
i-I
;
:1-- !
- . ,, -.
- ! |- I I
-I!-- n
- i
-I tI
- i
-i
-i
-a
.kktU.lUl _
0 50
LQ2 TANK ACREAGE
l
/'
%
11 LLLI I II HIJJJ
I00 150
IIIIlIIIIIIIIIHI|I I|[[NIIL[
BOOY POINT 71400
AT- 506.00 IN.. THETA T- O.0 OEG.
SYMBOL DESCRIPTION
HEAT LOAD
B-_/FT 2
280.8
316.1
i
, i
l
P
[H,i,,ll {,dH,i,!,,,,,,,,_ini.,,,_,uJuJJ_
200 250 300 350 ,400 ,450 500 550
TIHE (SEC)
UJJJ.LLU
BOO 650
Agreement is acceptable; no TPS impact.
135
F;_EMTECH RTR 174-01
O
i
,r2m
I-,<ft"
ZHF'.,<
In
o
-- '] ,
- !
- i
- i
- j
" I- i
- i
- I
- I
- I
- i
" I
511
_.t.ULIIJ. IIJJ.
0 50
L02 TANK ACREAGE
I'i
!
1t !
i
! \I
.l u ,LU uauu_
:_00 'tSO
BOOY POINT 71450
XT- 606.00 IN.. THETA T- i80.0 OEG.
= ..... i .... I ....... I_ _,__£_ ....... I ___
- HEAT I..OAD
...._.
i
I
i
DESCR]'PTZON
RI
i ,
m'U/FT 2
265.7
279.9
7
IU/JJJJJ
&_O 2'50 300 350 400 450 500
TIME [SEC)
550
LL£11LL_
600 650
Agreement is acceptable; no TPS impact.
136 __.
I:_ I:" M T I:" 0 !,,._ ! RTR 174-01
ouJ
2w
LLI ..tp.
rr
ZP4
.<
L02 TANK A_AGE
'IN " 11
- If\
I/ ,
+_'J i
"iIIt I lit I'I l III 111|I(111
o0 SO 100
BODY POINT 7'1-456
XT- 606.00 ZN. . THETA T- 202.5 DEG.
HEAT LOAD
SYMBOL DESCRI PTION BTU/FT 2
RI 252.0
...... _ 295.2
/-/lll|llfIlt Iflll|llll (llil|t||
\
t':;0 ;200 2+50 300 350 400 450 .500
TIHE (SEC)
55O 6OO 650
Agreement is acceptable; no TPS impact.
13T
F_ =- r,,_'T" E C _--_ RTR 174-01
w
I
tl
2m
m
rr
ZH
F-
i i
/J//
- ///,/t
:1
I
0 LUL LU.LUJ.II H
0 50 100
LO2 TAt',#< ACREAGE
BOOY POINT 71463
\\
b
XT- 606.00 IN..
I,
I
!I
150 200 250
THETA T-- 225.0 OEG.
t ....... I .... I ........ Lk I ' 1. -
SYHBOL DESCRIPTION
RI
HEAT LOAD
BTU/FT 2
246.6
313.9
Ii I
300 350 400
TIHE (SEC)
!
, I
i !
460 600 660 600 660
Agreement is acceptable; no TPS impact.
138 _
F:_ =" r',,.,'l"_ _" C I--.-I RTR 174-01
uJulI
DI--G3
ILlI-",,(n"
(3ZH
I-.,<
LO2 TAt_'K ACREAGE
/
,'fI
IA
| _ll|llo|l
BODY POINT 7146q
XT- 606.00 IN. . THETA T-- 247.5 DEe.
SYMBOL DESCRIPTION
RI
I I I
0
m_d/Fr _
241 ._)"
334.4
II I iiiVll_ll _;%....% :'---:C}* ..... Ill ..... iI i ._l'l'_m_l.llm i ,* l 'l Ill* I ,llllllll
100 t50 200 250 300 350 400 450 500 550 BOO 650
TIME (SEC)
5O
Agreement is acceptable; no TPS impact.
139
,1:::_ =" M T =" C !.. 4 RTR 174-01
W
It--
al
ulk-
iT
z
I-
,H
o0
L02 TANK ACFIEAGE
/ \
BOOY POINT 71,475
XT- 605.00 IN..
SYMBOL
THETA T- 270.0 D_6.
IEATDESCRIPTION B_d/__D
RI 311.8
346.8
I I I
,-,/ 1/1
............................... 0 ........
50 t00 150 200 _50 300 350
TIME { SEC)
4,00 ,450 500 550 600 $50
Agreement is acceptable; no TPS impact.
140
ll:_ E: M T I:" C I--.! RTR 174-01
ULUElt
}.-IL
2rn
IJJI..-
E
Z1"4
L02 TANK ACREAGE
_r
: /
r/
r
0 .__LJ.I t U LU JJ LLLIll I
0 50
4
i, i
I
\
100 150
BODY POINT 714Bi
XT- 606.00 _N.. THETA T-- 2q2.5 DEG.
, ! T
s_oL DL_I_ION _/_2.... .j
RI 248.7
...... _ 356.5
t
I
,L_...- ....... L .............. | ....
i
I
bt
- I
i
_ILIIIII
200 250 300 350 400 450 500 550 600 650
TIHE ( ._EC}
Agreement is acceptable; no TPS impact.
141
i:=_ =" r-,A "_ _" C }--I RTR 174-01
.iUlI
p.b.\DI-rn
U.I
.<[E
L0ZI-4
01
o
LO2 TANK ACREAGE
,.,.
L
N
/
,I"
f
/_j
IIIWlIIIlilIII Illllttl
0
BOOY POINT 714B8
XT- 606.00 IN..
i L
SYHBOL
I
i\\ i ........
50 100 150 200 250 300 3=_0
TIHE ( SEC]
THETA T- 3i5.0 OEG.
|. I _ --I
DESCRIPTION
RI
_T
B'I_J/FT 2
258.2
352.8
ll _::...':TTT..O1''''O°''O ......
,400 450 500 550 SO0 650
Agreement is acceptable; no TPS impact.
143 - .
_M-r_C_-_RTR 174-01
o.i
I
h
2[I1
IIJI.-
rr
ZH
I-
ITI
N
o
L02 T_J',L4_Ar--I:IEAGE
.h
:i III
I
-I I
" I All r i.I " - "t_
- \
:11 ' ,L- a
-r
.a k_
_IULII]UUJ.L[ Ll LLLUJ I.LL.IILLLI_JILIILLL U_U_ ,, ....... I
O 50 tO0 t50 200
BOOY POINT 714q4
XT- 606.00 IN..
SYMBOL I
TI_TA T- 337.5 DEG.
D_R IPT ION
R1
I o a* n IH t _IlJLLnl a I
_T LOAD
BTU/FT 2
266.6
338.9
fLu/Ill/
250 300 350
TIME (SEC)
LILU£1LL
,400 ,450 500 550 BOO 650
Agreement is acceptable# no TPS impact.
143
i=_ ==..r,,,_ -.r.-_.- <_ i....i RTR 174-01
o!EL<.I/.F-it
oIf/I,-
0 __111Ltu
0
LU
I
LL
2
I11 ,_
rr
Zi,,4
LO2 TANK ACREAGE
_ kl ]
j ,,i 1
_\V1
I ,, \i
\\|IIIIU LI J[LI[UU] IIIULII I
50 :150
BOOY POINT 71500
XT- 6q8.00 TN. . THETA T- 0.0 DEG.
, . i . = . ._ i [
HEAT LOAD
SYFE30[, DESCR IPTION B,I-d/FT 2
I RI 208.7...... RD4TECM 215.5
I
I00 200 250 300 350
T]:ME (SEC)
/
iJiULli/.-illllllll IIIIIIIIlilIIILLI.JJ IILLLIL|U400 450 500 550 600 650
Agreement is acceptable; no TPS impact.
144 --!-
F_ _ r,,A-r" _ C I--! RTR 174-01
uLUg}I
I.-u.
ILlI-
rr
121ZI-4
Io
-I
,o...o
0 _
L02 TANK ACREAGE
BOOY POIHTTtS.._3
XT- 6qB.OO IN..
' • I m
SYMBOL
_A T- iBO.O DEG.
HEAT LOAD
D F_'_RIPTION _/FT_ •
RI 180.4
RE_'ECH 186.9I
V
==otHeee ._._1, ..... =re L=*HeZl, =,=|#==_entk_-_ ,,__._ [IIIZlLUl Illllllll tllltllll
100 _50 200 250 300 3_0 400 A50 500 _50 800 650
TIHE (SEC)
Agreement is acceptable; no T2S impact.
145
i::_ I_ M T -,=:" C I..--! RTR 174-01
u.ImI
Z
o
L02 TANK ACI_AGE
- " i
" I
- i
- I .,
: ! "
: { /\": ^ B
. l A
- i I
" ! I-- ! Ai
:.1/- i
- i
:11-II
- i
.,
-x
.J
11/111111
o
I%
II11111II IIUUlI_I I_ ,}tt:..:..;::'!t,_,,
BOI::IY F_INT 71.'55t]
XT-- 6q8,00 IN. . THETA T- 202.5 DEG.
1___: .... I ...... I .- l
HEAT LOAD
SYMBOL DESCRI PTION B,'PU/FT 2
R, i7o.6...... RD_F_2H 197.7
Illllllll
-- f
Illllllll *l Illqlll ..... 'lit I"1' _ -_:.":i['" _'_LIILIII] lllllllll
50 100 150 200 250 300 350 400 450 500 550 800 550
TIHE { SEC)
Agreement is acceptable; no TPS impact.
146 --
F:_ _" r'vd "r" _" C J--_ RTR 174-01
It)
N
03 NI
m
ul ,.i-
zH
<
¢)
o
LO2 TANK ACFIEAC-._
BOOY POINT 71563
XT- 6q8.00 IN. . THETA T- P_.2_;.O DEG.
I I I I . I |
HEAT LOAD
SYMBOL DESCRIPTION B_J/FT 2
RI 167.8
...... _ 210.4
I
I
Agreement is acceptable; no TPS impacC.
F=_Ervq'T" E C _-_ RTR 174-01
_'] , ,
k"] -
N "
WBI ''
t zF-u. Z"_
:/,m I(I -
- -E-:-,A:f/
:1/-II
.I
0
L02 T_J'4< A_AGE
/I
I/ ,
J
LLL_ FLL LLL_
I
I
III
I
I!!
' I!
I
I
5O
800Y POINT 7i56q
XT- Sc18.00 ZN.. "n-IETA T- 247.5 BEG.
I I I_. I.. I I
F[_'I' LOAD
SYMBOL DBS_IPTION BTU/FT2.
RI 165.1
" ' - ..... REMTECH 225.0
::_,t! .... II| ..... If! ..... _ tL_.;':..*I I_JLIl_'._-. -l'rl]lllll.|lllllllll IIIIii111
I00 150 200 250 300 350 ,400 450 _SO0 550 _00 650
TZHE ( SEC}
Agreement is acceptable; no TPS impact.
148
F=_ _" r,,,_ "l- _ C i-.-I RTR 174-01
t'q
i
k'3 -
N -I
I
2
(.9ZH
O
L02 TANK ACREAGE
t
11
[
/ l/ _
I0 50 t00 t_=O _30 250
BOOY POINT 71575XT- 6q8.00 IN.. _A T- 270.0 OEG.
SYHBOL DESCRI VFION
RI
HEAT LOAD
BIU/FT 2
210.8
234.5
....... o, .........
300 3_50 400
TIHE (SEC)
_0 _0 _ _0
Agreement is acceptable; no TPS impact.
149 -
i::_ EM T E C I--IRTR 174-01
F)
IN
"6
I
r,
rr
H
0
1
" _It
_f
.il ._ i"l 4
il/ . ,/
I
t
0 50 'zOO
L02 TANK ACREAGE
- "i
IJI
I I
I
I
, ,I, J
iI
!
\\.
t50
BOOY POINT 71581
XT,,, 6q8.00 _N..
, - _ l
SYMBOl.
I
I
THETA T- 2q2.5 OEG.
i
DESCRIPTION
_T zx_
m,u/m ,2• ,, , ,,
168.0
242.6
I
200 250 .300 350 ,400 450 _K)O 550TIME (sEc)
i1111LlJ,i
600 650
Agreement is acceptable; no TPS impact.
150
F:_ _-- r,,,_ "i- _" C i---I RTR 174-01
UJ
I
2n_
L02 TANK ACREAGE
N -
- li
_- #' ,Si/x
-- I
-IH -- A
2'/\.i
.,
.,
%
0 BO 100
BODY POINT 71588
XT- 6qB.O0 IN..
[
SYMBOL
TI-IL=TA T- 315.0 DE(3.
DESCRIPTION
RI 175.3
241.0 I
illllllll Itilllili.ll___o| 1.;,;;_,_;;.,_ "'- -_L- :_ .... ,:3.1/l/._l.iJ Illillill ,iiliaili
150 200 250 300 Z1150 .400 450 500 550 500 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
151
F:;_ =" r,,,_ T =" C }---I RTR 174-01
FI
IO
UI,I01 NI
,t;
01
I--<E
oZ
M
o
_ 1 "
-I.:1_ A- i I
- I I
-* r
-I |
. •
L02 TANK ACREAGE
ii
IJII
L// \1
! L
_1 I
-i
-I
=a
$
t
\%
IIIIIIII!1!1111 I
II_lkllllll ]111!11! !
0 5O iO0 i50 20O 2"30
BOOY POINT 7t5q4
XT,., 6qa.oo IN.. THETA T- 337.5 DEG.
i = | ." i
FE._T
SYHBOL DESCRIPTION EII//FT 2
RI 183.0
...... _ 231,6
!
i
I11111111
!
I
ll_illllll
3O0 35(
TIHE (SEC)
4O0 45O 500 550
|iIIlllll
600 BSO
Agreement is acceptable; no TPS impact.
152 -
F:_ _" r,,,_ "1- ='- _ J-.-.I RTR 174-01
pl
uLLIIn {1/I
fll
F-
ZH
L02 TANK A_:_E[AGE
BOOY POINT 71600
X'T- 751._0 IN..
' i
!f
. /\
|l!llll!lllllllll
0 50
i
i
\\
,H!HI,!I a,i,,H,, _ ..... ...:.::
TF,IETA T" 0.0 DEG.
SYI_OT. DESCRIPTION Z_Fd/FT_
RI 160.0
...... _ 182.6
.,,...---
::::.:.., ]alll
"tOO 150 200 2_0 300 350 .400 _ _500
TIME (S1EC)
_0 600 6.'50
Agreement is acceptable; no TPS impact.
153 ....
_ EM"r'Ec _-4 RTR 174-01
{11 "; ....
k'l -
. J
" J A
- , n
-! !
-!!
-I/
.,
Q
I
m
_j ,,4
<n"
H
0
L02 TANK ACREAGE
,A
t/,
V
BODY PO'rNT 71550
XT- 75_..50 ZN.. THETA T- _.1_.0 DEe.
L • , t
HEAT LO,%DSYMBOL DESCRI P'iqON _EU/'FT _
R_ 148.5
...... KEMTECH 164,2
i
\i
\
_LI.I_IJ.. IJJJJJJ4! JLLLLLLLI-Lt JlI__*"I"IIT;._ ;;;;;_'!' u'_'lll{ _;;_111''
0 '30 _.00 tSO 200 250
i
I|ll|ll]I LIIIP__ .... II I I_'f'I"P___ ' _ Itlllllll :_
300 :3_0 400 450 ,'500 550 600 6_50
TZME (SEC)
Agreement is acceptable; no TPS impact.
154 -
F_ _-Pvl"I-_C H RTR 174-01
01
N
U
m
<nr
I-I
_- ,,.,<
K_
0
L02 TANK ACREAGE
I'r!
i
I
If
" I A _ :
. /_.,,j
_ ILLU.UJ-U
I
JJJ.LLll LI
i
i
r
BOOY POINT 71675
XT- 751.50 7N.. TH_TA T- 270.0 DES.
...... | . _1 .__' J..... ! "- J _'"
DESCRIPTION
J
RI
HEAT LOAD
• HTU/FT2
172.6
198.3
50 100 i50 200 250 300 350 400 450 _00 550
TIHE (SEC)
I"I'11111
800 6_0
Agreement is acceptable; no TPS impact.
155 --+
F:_ E_: r,,,,,,,l"T"_=::",C p....I RTR 174-01
N
LI.J
l
2m
N ,-4D--,4E
zH
<
In
0
°
°
: \
-@_--. ---4.---
i,/'+- J r
. .
-II
lllllllll |till!
0 50
L02 TANK ACREAGE
N
\\
\
lllllllll
I
t00
BODY POINT 71700
XT- 7q6.50 ZN..
\IIII l,,;;.. _: :: :::::'"
i50 200 250
THETA T-
i ..... i1,
300 350
TIHE (SEC)
0.0 DEG.
r ...... +...... I" ..... 1 ....... 1----
SYH_L DESCRIPTION
RI
R_
, r • •
550
EAT t.Z)E)
m"U/FT 2 ,
160.7
154.0
400 45O 5O0 BOO
_:111111
_5O
Agreement is acceptable; no TPS impact.
156 -:-
P_ EM'T'EC P-_ RTR 174-0]
-- I
\ : I
J
: , ,7'-- IJ
-- It,
-- ,
-- ,1
-IIJ
--a
--n
--t
_llllllll IIIILIIII
0 •0 50
L02 TANK ACREAGE
u --m
: .. I ..
\\ I\\
IIIl!!lll i,,, ;:;:_'
t00 I,'50
BOOY POINT 71750
XT- 7q6.50 IN..
i
L
J
l
°'IIIIII' IUltlpl,
200 2'30
$?HBOL
|,111,1,,
THETA T- 180.0 DEG.
DESCRIPTION
RI
HEAT LOAD
164.1
138.5
I--
• Ill* .... II * #, -:1111 lllllll
400 450 500 550 600 650300 350
TIHE [SEC}
Agreement is acceptable; no TPS impact.
157 ---_
F::e_: M -r" I=- _ I,--IRTR 174-01
o
II--.IL
ILlI-
Z1-4
o
L02 TANK ACREAGE
!
!
I
] ] --,J
II
I
f
d .
I
- !
--_A _ I, ,
\
-II \ \
\Piil||lflll i YIIIII ill I11111111
BODY POINT 71756
XT- 7cl6.50 IN.. THETA T" 202.5 DEe.
L_. i -'" ' [:--i - I " 'n". ''-]'''-_ "_'T_-''-'_:'''-"
S'Y'MBC)L _RtrP'rION B,IV/FT 2
'RI ' ' 162.8
...... _ 145.3
0
• 'I
i
50
;:::: .... 1__11111111 ii|lli|lllll|l.lllll I'll[Ullik_-':--t'l[ It -'k'tfl'_ 11|111111 Illlll
100 150 _00 ESO 300 350 400 450 500 550 800 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
158
F_ =" r,,,.,4-r" =" c h-4 RTR 174-01
t11
1!1
oJ
iii_j (%11
I.--h
¢r
zH
_-#
i
-//
I
LO2 TAM< ACREAGE
I
f/III
I
__. p.,,--
J
'V
II
\\
iIIIIIIIIII illlilll IIIIISTlllllllllllllll_h ;::Y:-'- "-1
I
O
BODY POINT 71763
XT- 7q8.50 IN.. THETA T- 225.0 DEG.
i-EAT
SYMBOL DESCRIPTION BTU/ET 2
RI 161.6
...... RIg_I'ECH 162.2
i
!I
l
iI
--a --
50
f
N--
I
IIIIIIIII lllllllll
100 t50 ' 200 250 300 350 ,400 450 500 550 600 BSO
TIHE ( SEC}
Agreement is acceptable; no TPS impact.
159
I=_ _" r,,_-r- _ C P..-I RTR 174-01
In
N
uJu) NI
I'-LL
?
ff
ZH
L02 TAI'_ ACREAGE
i
i
Er,/- ; X/-- I #
-- I I
-- J f
-- I
--it
--ll
--!
\\\\
BOOY POINT 71769
XT- 7q6.50 IN..
SYMBOL
-I
--I
* i
0 _O 1OO
THETA T- 247.50EG.
I _ "T , J
!-I_'/" LOAD
DESCRIPTION t_U/F-_ 2
RI 160.2
162.2
I
|
I
i
Iii
I
I
i
_ I I 'I I ..... :-;/ • llII _1111111I
:150 200 250 300 3!50 ,400 450 500 _150 600 650
TIHE (SEC)
Agreement is acceptable; no TPS impact.
160 -
I=_ E: r,,,A "T" EE C I--.i RTR 174-01
I11
FJ
utlJu} {M1
1,
2mw IN
I--
H
<_
¢1
o
LO2 TANK ACREAGE
I
ii
11
I
I .
.... --'_ T--i --_" ....
- !
.:I/
..................! \l_llJillJli||ll/lllll
0 50 t00 "-50 200
; 1/1
I \
I'ITT,I,,,.. : I
BODY POINT 71775
XT- 7q6,50 IN..
SYMBOL
THETA T- 270.0 DEG.
H_.AT LOAD
D,E3CRZ PTZON B'IV/FT 2
RI 192.4
R_fI_O{ 167.5
.... ,--"
. ..-.-"
;:::_,.:I ,.oi,*,** II,,,.LfL r .... .,, T_::::: _.,,,||ll!Z|]Illllllr111illl|
250 300 350 400 450 500 550 600 650
TTHE { SEC)
Agreement is acceptable; no TPS impact.
161 --
in
c_
uILlIn NI
I-
ra
Ill _
rr
Zi-I
.q
o
L02 TAHK ACREAGE
I
....... ttll [ I
- ! [
_,lllili[ll IIlUIlilIIUIIIII tillS,=::: :,:.I_.,P_.
BODY POINT 717Bt
XT- 7q6.50 IN. . THETA T- 2q2.5 DEG.
........ _ . _I . _I_.-'T'1".":.__.2._1._ _..___t'-:" -'_'- --"-- -_
SYMBOL DESCRIPTION BTrj/FT 2 I
II
iill ..... i I
q.... .--_i-i I
RI 139.3
171.6
!
i
I
I
r '
ii
50 100 :1.50 200 250 300 350 ,400 450 500 ,_50
TZHE (SEC)
iII
iill!ilii
600 650
Agreement is acceptable; no TPS impact.
162 -:-
I:=eEE rvl"T" EE C I---I RTR ]74-01
ill('4
II-lL-_.
Rm
i-
ii-
zH
Ill
o
": \A2 _-Jr-jj
- i
-II
- ,
- ,
-i
-i
llllllli IIIIIllll
LO2 TANK ACREAGE
!
)
"%.
I
IIJ IIl|ll
J
I
i ....
BODY POINT 71788
XT- 7qB.50 IN.. THETA T- 3t5,0 DEG.
_AkT LOADSYMBOL DF..SCRIPTION BTU/FT 2
RI 144.7
...... RDfTECH 169.8
-- I ,
!
,,'_- .,1*-....... 7;;)111:! _Jllll|l.|llll*-.L_ II;[,_[;,_•1
I
I_lll
' ' I '
5O 100 t50 200 250 300 350 400 450 500 550 BOO BSO
TIHE (SEC)
Agreement is acceptable; no TPS impact.
163 -
5lU(/} (11t
b.
2m
Wp.,(tr
oZ
L02 TAi',_, ACREAGE
I
• II
: J1• i i
. !!a
i' ,?t,
:" \- i
-i
-r
- \\
0 50 CO0 150
BODY POINT 717g4
XT- 7q6.50 IN..
[ "--
--- : i
T1-ETA T-- 337.5 DEG.
J• ,,, , i .... '."f • ,
I HEAT LOADSYMBOL DESCRIPTION BTU/FT 2
153.3
163.8
i
t*L_111 :__-+_alJ, ,_,,,JiiT
i
200 250 300 350 400 450 500 550 600 650
TIHE (SEC)
Agreement is acceptable; no TPS impact.
--°.
164
I:_ fE: M T _ C !--I RTR 174-01
m
Lq
,4
ILlm NI
b-
?m
rr
ZM
<IllI
0
L.O2 TANK ACREAGE
_- !
._ I
- t
-- !
- r-:___, I ,A
i/';2-__° _ i.
UX.ULZ..LZlI I| t I *z..il
o 50
BODY' POI,"IT 71800
XT- B4i.50 IN.. TFETA T- 0.0 D£G.
SYMBOL DESCRIPTION
IIi
I ""
HEAT LOAD
BTU/FT 2
168.7
151.1 .
"[', •,, ..... :=lllllll
iO0 "150 200 2_0 300 350 400 _ 500 550 600 6SOTIME (SEC)
Agreement is acceptable; no TPS impact.
165 --
F_ r_- M--T' _=" O I.-4RTR 174-01
L)LU
IF--U.
2m
I-.<er
Z
o
L02 TANK ACREAGE
II
,(I
I e
/- ,.\/._
--I/_J/ I \\
lllllllll II|llllll IIIIIIIII
|
0 50 t00
800Y POINT 7iB50
XT-- 841.50 IN..
--------------1 _--_ !
llll'T1"i'T]i,i i:::;: "_t "LLt|tql_lll||lllll llllllll|
THETA T- 150,0 DEG.
._ . • ...... J '..|
1;'EAT LOAD
• D£SC_IF_ION BIU/FT 2
R_r 161.5
135.7
150 200 250 300 350 400 4150
TXHE (SEC)
I
IIIIlllll lllllllll
500 550 6OO 650
Agreement is acceptable; no TPS impact.
166 -:-
I=_E_:P,,,._-I-=="C F-I RTR 174-01
GILl
II-I,\
I--m
WI--
rr
¢9ZI,.4
I-
25
20
15
10
INTERTANK ACREAGE
dh,
q
0 ---
0 100 200
BODY POINT i002
XT-- q65.22 IN.. THETA T-270.0 DEG.
! ,I ,[, i i I I [
SYMBOL
i
DF.,SCR.ITTION HEAT LOAD
BTU/lrr 2
RI 953.6
REMTECH I1M.5
300 400 500 600
TIHE (SEC)
Agreement is acceptable; no TPS impact.
168
wu)I
I--IL
61
UII--,<E
(.9ZH
p.
25
2O
15
10
INTERTANK ACREAGEB00Y POINT t005
XT- q71.22 IN., THETA T-270,0 DES.
,,,,,,,,,
r, k
dl
- 5',I....
5
00 100 200
I I I I ! I I I
SYMBOL DESCRIPTION HEAT LOAD
BTU/Fr 2
•"O- RI 889.4
RE,'WrECH 1134.5
Ii llll iii
300
TTHE (SEC)
400 500 600
Agreement is acceptable; no TPS impact.
169
F_Z_" rvl'r" _" C _-_ RTR 174-01
25
INTERTANK ACREAGE
BODY POINT t007
XT- q65.22 IN., THETA T-270.5 DEG.
.iu)I
I-lL
I--
hit--
ZH
I-
20
15
10
SYMBOL DESCRIFrlON HEAT LOAD
BTU/FT 2
RI
REMTECH
0 100 200 300 400 500
887.4
1135.2
600
TIME (SEC)
Agreement is acceptable; no TPS impact.
170
F:_ =" r,,,.A T _" C l---i RTR 174-01
6LUmI
l-b.
ID
W
ZH
I-
tUI
25
20
15
10
INTERTANK ACREAGE
BODY POINT lOOq
XT- q70.22 IN., THETA T-271.0 DEG.
IA
I_
I ! ! I 1SYMBOL DESCRIPTION
-0-- RI
REMTECH
IHEAT LOAD
BTU/Fr 2
876.9
1135.8
_fi. • .5
0 100 200
ii i ,i
3OO 4OO 5OO 600
TIHE (SEC)
Agreement is acceptable, no TPS Impact.
171
I=_ _:: r,,_ "1- ,=" C P--! RTR 174-01
25
2O
lUU)I
i-lL-- 15I.-
u/p.<
zM
I-
INTERTANK ACREAGE
/['4_
(d_ "
l'r "
0
BODY POINT t01t
XT-- W71.22 IN.. THETA T-271.S OEG.
i..i I i i I I ISYMBOL DESCRIPTION
RI
REMTECH
I
100 200 300 400 500
HEAT LOAD
BTU/FT 2
_63
1136.$
600
TIME (SEC}
Agreement is acceptable; no TPS impact.
172
;=_ _" r,,.d -;- _" C v--4 RTR 174-01
t'tl
0OJ
INTF3qTANK ACREAGE
6U.I
II-
::::)l,--
hlI--,<
0
Zi....Il-
I
800Y POINT iOi2
XT- qqi.07 IN. , THETA T-270.0 OEG.
I ISYMBOL DESCRIPTION HEAT LOAD
BT U/F'F 2
RIRE_rI'ECH
5].2.2$19.0
......LiiliI_l
00 5O
_ II _ltlltltl[ Itlllllll IIIIIllt!ltltlllll I]lltllll IIIIIIII IIIlltt_l|ll_l Iltftllll
lO0 150 200 250 300 350 400 ,450 500 550 600 650
TIME (SEC)
Agreemen_ is acceptable; no TPS impact.
173
F:_ E r,v_ "r" _" <_ I-.-I RTR 174-01
ULU(flI
I'-
Di-ra
tOI.-<[n"
ZHI-.<
o
/
//
INTERTANK ACREAGE
BODY POINT t100
XT-t111.85 IN.. THETA T-343.0 DEG.
SYMBOL DESCRIPTION
RI
REMTECH
HEAT LOAD
BTU/FT 2
321.6
411.6
/%
o 50
I......................... ,.......... ,,,,,,, ,.......... ,l,,,,i
t00 t50 200 250 300 350 400 ,450 500 550 600 650
TIME (SEt)
• Difference in heating results in <0.i inch of TPS.
Agreement is acceptable; no TPS impact.
174
I:_ _" M T _" O t--4 RTR 174-01
O,¢4
tD
Ot.u05t
I---
In
lUI--<E
ZHI"-,<t.U-'r
INTERTANK ACREAGE
BODY POINT 110t
XT-112t.08 IN., THETA T-343.0 OEG.
i ! I ISYMBOL DESCRIPTION HEAT LOAD
BTU,_'I' 2
i RI
REMTECH
Agreement is acceptable; no TPS impact.
1'75 -
0
I1/UlI
/-.
I--m
mI.--.<rr
3,HF--
UlT
N
INTERTANK ACREAGE
BOOY POINT I107
XT-IIIi.85 IN.. THETA T-348.0 OEG.
SYMBOLfI I I I _DESCRIPTION HEAT LOAD
BTU/Fr 2
L ....... REMTECH
286.9
379.9
0 50 I00 150 200 250 300 350 400 450 500 550 600 650
TIHE (SEC)
ODifference in heating results in < 0.! inch of TPS.
Agreement is acceptable; no TPS impact.
176
F:_ =" r'v'l'T- =" C t---I RTR 174-01
O,i,,i
0iii(nI
L0
I--m
UJI-<1[E
ZHF--
W"I"
i
(_
0
j
ELLLL_0
INTERTAI'_< ACREAGE
I
//,1
i
II
J_LI. 1 lJl I ILl.
50 _00
I
L.
LLLLLU3L150 200 250
BODY POINT i108
XT-tI21.0B IN..
SYMBOL
THETA T--34B.O DEG.
I IDESCRIPTION HEAT LOAD
BTU/FT 2
I RI 369.1REMTECH 409.2
300 350
TIME (SEC}
Agreement is acceptable; no TPS impact.
177 ---_
F_ i==" M T i:,- O H RTR 174-01
5U'I
I
I--
D
j.-
m
ILl
I--
rr
Z
i..4
F-
<
tll
1"
: !
............. I
: //I
i //Iy I,
7//
I.I.I.UI.I_ U_tLU_I_
INTEATANK ACREAGE
1BOOY POINT 1746
XT-i02i.70 IN.. THETA T- i3.5 DEG.
I ISYMBOL DESCRIPTION HEAT LOAD
BTU/FT2
, 1
i, I%%- ..... ,,, _,,,1" Ip ...... ::1111Ill l}lllllt lil,,;;;; ;;;:;::II IIJ "'E=' ii ...... _.. ........
.... r-
IO0 150 200 250 300 350 400 450 500 550 SO0 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
178 --
INTERTANK ACREAGE
BODY POINT 1738
XT--I021.70 IN.. THETA T-- 2q.3 OEG.
LO
5w
Il--b,.
l-m
Wl..-
cr
r_ _7H
I"
o
SYMBOL
m, , •
DESCRIFFION HEAT LOAD
BTU/FT 2
RI 173.4
REMTECH 228.3
I I I
II/
0 50 I00 150 200 250 300 350 400 450 500 550 1500 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
179 -.
F=__" rv_'T _" C P-_ RTR 174-01
5wolI
I-
2m
t_I-
rr
ZH
l.-<W1"
0
II1
Od
0
INTERTANK ACREAGE
- j
-IF
O
LLLLLLLLL
5O
BOOY POINT 6286
XT--tttl.20 IN.. THETA T-- 23.5 DEG.
i
SYMBOL DESCRIPTION
3L3,133"/.S
I
500 550 600 650
Agreement is acceptable; no TPS impact.
180 --
F:_ _" r,,._ "r- =" C _--4 RTR 174-01
80OY POINT 6301
c)
rw,
INTERTRNK RCRERGE
c_
oL,J
t,_
k-,Oo
LJF--n-Oc
Z_:" ''
rr-b.J
"Fc_
a_
s
XT - 983.5 IN. THETR T - 23.5 OEG.
t 1FIKAT LOAD
BTU/_"r 2
RI 316.1
0.0 SO.O 100.0 ISO.O 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 SSO.O
TI_E ISEC_
Agreement is acceptable; no TPS impact.
181 - -
i=_E h,,,_-r_: C F-.-4 RTR 174-01
INTEBTANK ACREAGE
E(n L
I-
iI" -7--
||t||iH1
oo 50
BODY POINT 6331
XT-1026.00 IN.. THETA T-- t6.5 DES.
SYMBOL DESCR/PTION HEAT LOAD
BTU/FT 2
253.6
241A
t00 150 200 250 300 350 400 450 500 550 600 650
TIME ( SEC]
Agreement is acceptable; no TPS impact.
182 -- l " _
i=_ ram-M--'r E _ I--.!RTR 174-01
uI.iJ
It-
p.m
I11I.-.,<rr
Z_4
I--
I11I
o
TI_TERTANK ACI::_ AGE
BODY POINT 6367
XT-1006.65 IN,. THETA T-- 2q.O DEG.
SYMBOL DESCRII_ION
RI
REMTECH
II I I I
i
HEAT LOAD
BTU/FT 2
170.0
214.6
/
/J,H,H,,
o
.....
_k
50 100 150 200 250 300 350 ,400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
183
F::__" r,,,,,,1-r" _" C P--q RTR 174-01
INTERTANK ACREAGE
_r
BODY POINT 6368
XT--1006.65 IN,. THETA T- 15.0 DEG.
SYMBOL DESCRIPTION
RI
REMTECH
HEAT LOAD
BTU/FT 2
I_$.4
233.5
I5woII
I-
,,,p.<rr
H
<
t
[ IIIIII IIIIIIIIIioo 5o loo 15o 200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
184 --__
F:_ =- M-r- _" C P--I RTR 174-01
"7tuu_I
I-
t-m
IllI---<i1"
ZH
I-<m"r
INTERTANK ACREAGE
BODY POINT 636q
XT-iOOB.65 IN.. THETA T- lq.O DEG.
SYMBOL DESC_ION
RI
REMTECH
HEAT LOAD
BTU/Fr 2
193.0
237.4
// \1t
i/i/ t.-'!ij
7 7'0 [llllllll!lllllllllll Ill _ql'_;::;,:::::_P, ,,,,,,i,, lilting, ii ...... 1 i_111 "rT1"_p .... _
0 50 100 150 200 250 300 350 ,400 450 500 550 Boo 650
TIME ( SEC}
Agreement is acceptable; no TPS impact.
185 -
0wu_1
I--
"1I--m
ulI.---<ff
_ NzHI--
L
BODY POINT 6395
XT-IO7A.40 IN.. THETA T- 36.0 BEG.
--I--I--T---iSYMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
' RI / 248.7
REMTECH / 252.7
5O 100 i50 200 250 300 350 400 450 5o0 550 6o0 650
TIHE (SEC)
Agreement is acceptable; no TPS impact.
186 - "
!_ 15 M TI5 C I.--4 RTR 174-01
¢1
INTERTAhI< ACREAGE
BODY POINT 63q4
XT-- qOS.00 IN.. THETA T-- 31.5 DEG.
I
L0UJm
F"' EI-
rr
_ E
0
DESCRIPTION
LREMTECH
I
m|
HEAT LOAD
BTU/Fr 2
1193
1672
I
,i i Iilt.P... ......... ,,,,,,lql ttlltlll! lJJlllllJ imilikkt._tltC.;_;- li,t'rfYTt .****."_-..L._lltlil,i
t00 150 200 250 300 350 ,400 ,450 500 550 600 650
TIM_ (SEC)
Agreemen_ is acceptable; no TPS impact.
187
i=_ _-- M'T" _-" C P---I RTR 174-01
.,¢
5WU)I
I-
i.-.m
mi.-
rr
ZH
glI
0
I_rIEJ_T_aJ_K ACREAGE
BOOY POINT 6407
XT-t06q.40 IN.. THETA T- 2q.O DEG.
SYMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
R] 208.0
REMTECH 229.2
/
0
/\
50
_-PPP_-*-l._.. ,,,,,l,,, ,Li ...... i| ¸ .....'-"_... _-_'_llt,,,i
I00 150 200 250 300 350 400 ,450 500 550 600 650
TIME [ SEC)
Agreement is acceptable; no TPS impact.
188 -
I=_ _- P,,,A "r" _- C I--I RTR 174-01
u)I
l-
i-
¢r
H
p-
o
INTERTAt,,IK ACREAGE
IL
EPE
I/I
" /II -
J
lllllllllllllllll
0 50 iO0
IIIIII Illllllll
_50 200 250
BODY POINT 6408
XT--tO6q.AO IN..
I I
I
I
300 350
TIME [SEC)
THETA T- i5.0 DEG.
I J I I IDESCRIPTION
RI
RE,MFFECH
I III
I
i
400
HEAT LOAD
BTU/FT2
•?.5L0
ZS2.7
I
I
I!
450 500 550 800 BSO
Agreement is acceptable; no TPS impact.
189
F:_ _" rvl'r" =" C F--i RTR 174-01
INTERTANK ACREAGE
BODY POINT B40q
XT-tOBq.40 IN.. THETA T- tq.O DEB.
,q.
F-
DI- W/rn
/I-<(
i
iliiiilllo
0 50 t00
SYMBOL DESCRIPTION
PJ
REMTECH
H]EAT LOAD
BTU/FT 2
_SS
\
lili_llill
150 200 RSO 300 350 400 450 500
TIHE ( SEC}
550 600 650
Agreement is acceptable; no TPS impact.
190 -
I_ _:M T _ C I--! RTR 174-01
L
k
L
INTERTANK ACREASE
rI/)I
2 _
ulp-
¢r
(_.3 NZHt--
BOOY POINT 6At0
XT- BqO.O0 IN.. THETA T--t4t,3 OEG.
I I lSYMBOL DF._CRI_ON HEAT LOAD
5TU/FI'2
L 1%I 201.6RE,WI_ECH 204.6
II II I
fk
i.. t I
oo .'50
f
'lO0 :tSO 200 250 300 3,_i0 ,400 ,450 500 550 600 6"50
TIHE ( SEC]
Agreement is acceptable; no TPS impact.
191 - -.
F:_ _" r',_"T" _" C F--! RTR 174-01
ILl
I
m
ulp.
E
zHh.<
INTEJ::ITANK ACREAGE
FELL.
L-LL
E/:,/
_,,.H.
o0 50 100 i50 200
BOOY POINT 64i3
XT- qO0.O0 IN.. THETA T--i42.6 DEG.
IDESC_ON HEAT LOAD
BTU/FT 2
RI 175J.
REMTECH 1914
I
........ _ ,.,=.,.,, ,,°°°°..°I,,,,, .... _°,,_ ,,,, ....... °,,°,,
&"50 300 350 ,400 450 500 550 500 650
TIHE ( SEc}
Agreement is acceptable; no TPS impact.
192
I_ _=" M T" _ C i..-I
I NTEFITANK ACFEAGE
I
If. m
2mw
LUI-
ZHI--<
0
0 5O
BODY POINT B424
XT-I102,62 IN. , THETA T- 37.7 DEG.
--I-- i (
iO0 150 200 250 300 350 400 ,450 500 550 BOO 650
TIME (SEC)
RTR ]74-01
Agreement is acceptable; no TPS impact.
193
Lr'l
.q,
HLL.J
IF'-
2m
I-
rr
ZH
0
INTERTANK ACREAGE
P
1
I
BODY POINT 6427
XT-It02.B2 IN,, THETA T-- _x_.0 DEG,
I [ ISYMBOL
II i
DESCRIPTION HEATLOADBTU/FT2
RIRE,MTECH
1_7.7245,5
iJ 1
0 50
...k ...... ,,o.o,,
loo ¢50 200 a50 3o0 350 400 450 500 550 600 650TIME (SEC)
• Difference in heating results in---0.1 inch of TPS, i.e.,
within application tolerance.
Agreement is acceptable; no TPS impact.
194 -
I=_ _'- r,,_ "T" _" C P--i RTR 174-01
,q.
5lkl
II.-
2II1
UlF-<rr
Zi-4i-<
INTERTANK ACREAGE
i
i
....... l 1
i
i ' i
BODY POINT 642q
XT-I t02.62 IN.,
SYMBOL
THETA T- lq.O DEG.
i •
DESCRIPrlON
50 t00 150 200 250 300 350 400 450 BOO
TIHE (SEC)
m
HEAT LOAD
BTU/FT 2
321.7
322,3
........ ,,,,,i ,,,,,,,,
_5,_0 BOO B50
Agreement is acceptable; no TPS impact.
195 -..
INTERTANK ACREAGE
BODY POINT 7300
XT- 884.85 IN.. THETA T-- 0.0 DEG.
I I I, I!
I;Y'kl}OL I DI_SC'Itl]F_ON lt'_A.T LOAD
Iil ll'/J
........ _ 137.1
5W
II-
DI.--m
UlI--
rr
7"
I---<N"t- - /
°°,,,0,, ,°,,,,Ha llll|a|al0
0 50
ii1_11 ...! ............. ,, ,,Ill[Ill Illl,,,l| I,,,,HII .... qlll.;;_ll,_'_'T .... m -:1111111
100 150 200 250 300 350 '400 450 500 550 600 850
TIME (SEC)
Agreement is acceptable; no TPS impact.
196
F_ _- rvl-r" =" _ _-4 RTR 174-01
I_rTERTA_< ACREAGE
05O 100 150 200 250 "_00 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
197
F_ =- P,_'l- =" C P-_ RTR 174-01
INTERTANK ACREAGE
/
BODY POINT 7302
XT- BB4.B5 IN.. THETA T--3i5.0 DEe.
SYMBOL DESCRIPTION HEAT LOAD
BT U/_I" 2
RI 147.6
REMTECH 2.34.6
.I I
°E
r
t
ILl :--
, C
D
E<_
HI--<C
0 IIIII
o 5o
_: ..... li "* .... ill ,tttllH, t t t t..s.i_ t t r tTT'f'_,. ''l,Hllt,, ,| ,|_
iO0 ".=50 200 250 300 350 ,400 ,450 500 550 600 650
TZHE ( SEC}
• Difference in heating results in_O.l inch of TPS, i.e.,
within application tolerance.
Agreement is acceptable; no TPS impact.
198
F=:__" P,,,,'t"T" _" C J.-_ RTR 174-0I
INTERTAb_ ACREAGE
BOOY POINT 730.4
XT- 884.85 IN. , THETA T-2q2.5 OEG.
IF I,II
SYMBOL DESCRIPTION HEAT LOADBTU/FT 2
RI 142.9
RE,WrECH ?.50.2
' I I
L
_,)Il-
b. t..
(Iz
z
/
k L
o0 50 100 _.50 200 a.50 300 3.50 .400 4.50
TIHE ( SEC|
_n-1,,, .': .--,.... •.-T.,.'.,,,, ,,
500 '550 600 650
Agreement is acceptable; no TPS impact.
199 -.
!_ I=:- M T I=" C I.-- ! RTR 174-01
0
r"
Fp"L
r-i-
a) ,r-
INTERTANK ACREAGE
\
/f
800Y POINT 7305
XT- 884.85 IN.. THETA T-270.0 DEG.
SYMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
R[ 4_j
P_CH 467,7
II I
L
L
D L
W
" fZ LH L
j_ .
E/
I1|111 I|ll
00 50
_ILlll,l'lll I llllllll llllill I[ llllll(ll lllllil J' l[lil' .... lll_ ''l'_
100 1'_0 200 250 300 350 .400 .450 500 550 BOO BSO
TIME (SEC)
Agreement is acceptable; no TPS impact.
200
F:_ =" r,,,,d -'r" =" c l---_ RTR 174-01
LL
INTERTANK ACREAGE
BODY POINT 7306
XT- BB4. B6 IN.. THETA T--247.5 OEG.
I I
E
j-
al
hiP<{rr _.o N 1z
SYMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
RI 113.9
REMTECH 219.4
[] I
E \
oo 50
_, ..... _Ii iiiiiiiii ii ii iii11 iiiiiiiii IIIlllllt iI1--::_ i1(11 _ =
t00 150 200 250 300 350 400 .450 500 550 600 650
TIHE { SEC)
Agreement is acceptable; no TPS impact.
~201
i=_ I=" M "1" I_E:_ i'-"1RTR 174-01
5LLI(,rlI
I-
i-ra
I11
<E
z
r
INTERTANK ACREAGE
BODY POINT 7307
XT _ 884.85 IN.. THETA T--225.0 DEG.
I ,ISYMBOL HEAT LOAD
BTU_I" 2
1,,I tDESCRIPTION
' RI
RE,_I'ECH 170.9
Iltlllllloo
I " '
_1,1 ''l''llll tllllllll Itttltttl Itllltlll |tlllltlq t .... _%t_ ffr_ll,, _Ju_-flrf_1-_llllll|
50 100 150 200 250 300 350 400 450 500 550 E_O0 650
TIME [ SEC)
Agreement is acceptable; no T95 impact.
202°
•_ E M"f- E O _.-..4
INTERTANK ACREAGE
0I,d
!I-
DI.-
Z
l.-
I
00 50
BODY POINT 730q
XT- BB4lB5 IN.. THETA T-IBO,O DEG.
RTR 174-01
100 150 200 250 300 350 400 ,450 500 550 600 650
TIME ( SEC}
Agreement is acceptable; no TPS impact.
203 _,
F:_ =-" P,,,,'l-r" _" c }.-._ RTR 174-01
INTERTAI_ ACREAGE
BODY POINT 73_0
XT- q2q.14 IN.. THETA T- 0.0 OEG.
O]I L
2m
UJ _-
11:
l-II--
/h
oo 50
SYMBOL DESCRIPTION
RI
REMTECH
I
HEAT LOAD
BTU/FF 2
131.1
16&3
• l"
.............. , I i [lllll II II II II [[ I I I I Illl I ..... Ii [_ lll(_ t,,_,--_'_.. !_I||[[l
I00 _1.50 200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
204 - -
F_ _-'- r',,,_ "-_- _" C P-.4 RTR 174-01
U'_I O
D
Wb-,
C_.9oZ
cr5_1-r
INTERTANK ACREAGE
BOOT POINT 7324
XT - 929.1 IN. THETA T - 292.5 DEG.
i I I i I II HEAT LOAD --
SI."M_OL DF_CRI]rI'ION I BTU/FI" l
RI
IILWTECll
_LO
_llLI
: \
ti
'l
i
i#' ;
1°
E -0.0 SO.O I00.0 ISO.O 200.0 250.0 300.0 350.0 400.0 450.0 500.0 SSO.O 600.13650.13
TIME [5EC]
• Difference in heating results in_--O.l inch of TPS, i.e.,
within application tolerance.
Agreement is acceptable; no TPS impact.
205
INTERTANK ACREAGE
BOOY POINT 7325
XT- q2q. lA IN.. THETA T--270.0 OEG.
O
L
O
m
SYMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
532.0
0 50 soo _so 20o 2so 3oo 3so 400 4so 50o 55o 600 6_TIHE ( SEC}
Agreement is acceptable; no TPS impact.
206
_ _" r,,_-r _" C _-_ RTR 174-01
LUUlI
I-
Dl-m
I-<rr
ZH
t-
INTERTANK ACREAGE
BODY POINT 732q
XT-- q2q. 14 IN..
.....1 I ISYMBOL DESCRIPTION
THETA T--t80.0 DEG.
RI
RE3_I'ECH
HEAT LOAD
BTU/F'I'2
124.4
156.7
ol
p-
r-
..... o,,,
0 50 iO0
i_i_-_, tllitli! !lllllllll ItllIlllt illlllll tlllllItI ,tl,_ |'' __"H" TI[III
150 200 250 300 350 400 450 500 550 600
TIME ( SEC}
II
650
Agreement is acceptable; no TPS impact.
207
F::__ r,,,_ "F" _" c_ J.-.i RTR 174-01
P_
c_
O,
Lr_I C)
L,_
CO
L,3h-
n-
£_9o
INTERTANK ACREAGE
BOOT POINT 7350
xT - 973.4 IN. THETA T - 0.0 OEG.
iSYMBOL DE3CRIFTION HEAT LOAD
. II
II£I
CD
O.O 50.0 IOO.O 150.0 2OO.O 250.0 3013.0 350.0 400.0 _50.0 500.0 550.0 SOO.O 650.0
TIME ISCCI
Agreement is acceptable; no TPS impact.
208
F=_ _-- r,,,A "T" _" C P--I RTR 174-01
CD
P4
C_
c_)f.,Ju'_
P-" o_L,-
p-,
w e'_
L,.Jp-,
cr-
C_
Z °_
f-,
L,_]
INTERTANK ACREAGE
BOOT POINT 7352
XT - 973.4 IN. THETA T - 315.0 OEG.
i I I I i ISYMBOL DESCRIPTION ! HEAT LOAD
_2
31&1
30/J
C:)
°,
at
t
/ ii
l# l
0.0 50,0 IO0.O ISO.O 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 6_.0 650.0
TIMF" [5EC1
• Difference in heating results in---O.l inch of TPS, i.e.,
within application tolerance.
Agreement is acceptable; no TPS impact.
209
I:::_ I=" M T" t::" C i,..,. ! RTR 174-01
¢D
¢_3L,.J
I.,_
(..-,rr't
u_L,J(..-,OC
Z °'
or"L,.J"r-
]NTERTANK BCREAGE
800T POINT 7354
XT - 973.4 IN. THETR T - 292.5 DES.
j t f I iHEAT LOAD
SYMBOL DF..3_]'ONBTUIFT 2
RI 3ZL?........ R.£MT£CH 386.4
II i
j,o /
o' 'J
_ .2--r
I
0.0 50.0 100.0 ISO.O 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 6130.0 550.0
TIME ISCC]
Agreement is acceptable; no TPS impact.
210
_ _rv1-r-_c P-4 RTR 174-01
25
2O
6wmI
k-" 15I.---fll
wF-
_10[9ZHI--<
INTERTANK ACREAGE
BOOY POINT 7355
XT- q6i.22 IN.. THETA T-270.0 DEG.
I I
, I[I_ IL -I_ II_[: IWI:
ii
!,,, ,,,
o_' l _,,c_-.,...i"
DESCRIFrION HEAT LOAD
BTU/FT 2
RI
REMTECH
809.91134.5
I
0 100 200 300 400 500 600
TIME (SEC)
• RI IVBC-3 low. Calculated without stringer factor.
• Potential TPS impact.
211 .-
RTR 174-01
UILlU'}I
I-'-
p-fn
I'-
rr
ZI-4
p-
WI
0
INTERTANK ACREAGE
BODY POZNT 7360
XT-i006.65 IN.. THETA T- 0.O DEG.
;-
SYMBOL DESCRIPTION HEAT LOAD
BTU/IrI" 2
I
RI 139.$
REMTECH 163.8
I
iiiiii lillllllll rllfltlll IiI1_ ...... 1 .... A ..... ' . IIIIIIIII Illllllll ll*lltl' I ...... I, _''*' _''''_illltll
50 t00 150 200 250 300 350 ,400 ,450 500 550 600 650
TIHE ( SEC}
Agreement is acceptable; no TPS impact.
213
v:_ _:: r,,,_ --r- ".:_ C I---! RTR 174-01
B00Y POINT 7364
C_
r_
C_
c_)LJo';
L.
-'I
rn
LJ
n-r_
___c_
(3=
L_
u-
c_
INTERTRNK RCRERGE XT - 1006.7 IN, THETR T - 292.5 OEG.
t I I 1 1 t
SYMBOL DESCRIPTION HEAT LOAD --BTUtF'r 2
------------ R.I 170_9
........ RE,M'TECH .._7.0
#
,tL
j4i
0.0 fiO.O lO0.O 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 500.0 650.0
TIME (SEC]
ODifference in heating results in_O.l inch of TPS, i.e.,
within application tolerance.
Agreement is acceptable; no TPS impact.
214
p:_ _" r',_'T" _" C P--i RTR 174-01
ffl
0CU
INTERTA_JK ACREAGE
1
I
_0
ZH
tlJttlttl III11 _tl Illllllll IIIllllll IIIIIKill IIILJIIII
00 50 CO0 150 200 250 300 350
TIME (SEC)
BOOY POINT 7365
XT- qq4.40 IN.. THETA T-270.0 DEG.
[ [ ,,I.I.....SYMBOL DESCRIPTION HEAT LOADBTU/FT 2
...... RF_MTECH $19.0
Illllllll Iltll,llllllll,ll,I II,_, Illllllll
400 450 500 550 600 650
Agreement is acceptable; no TPS impact.
215 .-
F:_ _" r',,_ T _" C l--_ RTR 174-01
0I,I
II-
ra
ult.-
E
zH
<ulT
_t
In
INTERTANK ACREAGE
,,,,,,,, ,,,,,t**,,,tMM,lill_V,_, ,,,,l,1,tlHIHtilJ
BODY POINT 73Bq
XT=I00B.B5 IN.. THETA T--I80.0 OEG.
SYMBOL DESCRIPTION HEAT LOAD
BTWFr 2
122.0
2.37.4
o0 50 100 150 200 250
ilUlllln Illllllll I|nlllllu ltlll..I.l,,I.,_ ,,LI_I_II_-I-_"_IIIill
300 350 400 450 500 550 BOO 650
TIME ( SEC]
Agreement is acceptable; no TPS impact.
216
I::_ _: M"F" E_-. 0 HRTR 174-01
Lrl
_f
UW
I1--
2m
UJ
,<
zH
I---
_ /,j
-I/
-It,l
0 _ :u.,u..l _u J_.
INTERTAhn< ACREAGE
. !
I
!
I'I
I
" p
%
%
. : : :.;.,U_Lt 'J '-2' Z"
0 50
BODY POINT 7380
XT-I038.03 IN., TI4ETA T-- 0.0 DEG.
I I I 1 1!
SYMBOL I DESCRIFFION HEAT LOAD
I B'I'U/FT2
.,.,,,,|.'_ ,_: .' t -" '- : -"
I00 150 200 250 300 350 ,400 450 500 550 BOO 850
TIME [ SEC)
Agreement is acceptable; no TPS impact.
217 .-
F:_ E r_,'1-T- E C I---I RTR 174-01
E
_J
I].-
m
wI-
rr
_ NZH
<IllT
0
INTERTA_< ACREAGE
BODY POINT 738i
XT-t038.03 IN.. THETA T--337.5 DEG.
SYMBOL DESCRIPTION
RI
REMTECH
HEAT LOAD
BTU/FT 2
175.2
222.1
/ l50
......... ,,l|,lq|l illll,i, illl ..... *, ..... _ _ .... ,'___llll II..... • , °,
100 :150 200 250 300 3=;0 ,400 ,450 500 5.50 B00 BSO
TIME (SEC)
Agreement is acceptable; no TPS impact.
218
INTERTANK ACREAGE
BODY POINT 7385
XT-IO3B.03 IN., THETA T--270.0 DEG.
5UJ(nI
p-
i-ra
I-
rr
ZH
WI
SYMBOL DF_CRIFrlON
Pd
RE_'_TECH
HEAT LOADBTU/'FT2
123.4197..9
-\t
00 50 100 '150 200 250 300 350 400 450 500 550 600 650
TIME ( SEC}
ODifference in heating results in < 0.i inch of TPS.
Agreement is acceptable; no TPS impact.
219
i=_ 1=="r,,,.,d"1- I=="C I---I RTR 174-01
uw
II-
"1t-.1
wt.-
rr
ZH
I,---
ulT
0
INTEATANK ACREAGE
BODY POINT 7386
XT-1025.80 IN,. THETA T-247.5 OE6.
,1 I ISYMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
RI
REMTECH
156.6
229.1
O
/\
/ \
[
i
50
-_, Illttll' tllllltt IIIllllll IIIIllll Illl[lllp' "'Ulll-- ;;.t,_:_;;;;;;; ;;allllll
lO0 150 200 250 300 350 400 450 500 550 800 650
TIME { SEC)
Agreement is acceptable; no TPS impact.
220
F_ =" P,.A"F =" C P--_ RTR 174-01
5Ill
It-
O
wk.
:r
ozI-I
mT
INTERTANK ACAEAGE
BODY POINT 7387
XT-i025.BO IN.. THETA T--225.0 DEG.
SYMBOL DESCRIPTION
RI
REMTECH
HEAT LOAD
BI"U/VI" 2
169.0
237.3
(11
/
0 Illllllll _'l Ilqllllll Illllll'l lllllllll IIIIIII11[111111111 .... U lll
0 50 t00 150 200 250 AO0 450300 350
TIME (SEC)
500 550 600 650
Agreement is acceptable; no TPS impact.
221
i::_ r,-,-,-,-,-,-,-,-,=-M T _., _ i---IRTR 174-01
I£l
C_II,-
F--Ill
llJI--
or
ZHF-
0
INTEFITANK ACI=IEAGE
'' I
i
I
/I
//// •
/!
_ I
- i
-p!
:// _t
llllJllllJlllllllll _Jllillllllllt
o 50
BOOY POZhrr 7400
XT-IO6q.40 IN.. THETA T-- 0.0 DE6.
1 I I I ISYMBOL DESCRLPTION
KIRE_'FECH
HEAT LOADBTU/]Zr2
-.,,,,.,.
I II
I|
I00 150 200 _50 300 350 400 450 500 550 GO0 650
TTt,_E (SEC)
Agreement is acceptable; no TPS impact.
222
I=_ =" M'T" EE C I'-I RTR 174-01
6wco!
I.-
2m
ILlt-
E
(.9ZH
Iii"r
113
N
oo
INTERTANK ACREAGE
J/ I
/ L50 _.00 150 200
BOOY POINT 7401
XT--to6q.40 IN. .
ITHETA T--337.5 DEG.
SYMBOL
I
DESCRI]FFION
RI
REMTECH
I 1HEAT LOAD
BTU/FT 2
1122.2 _Lu . ,..._,,-,,'_.: ,.,
250 300 350 400 450 500
TZH£ (SEEC)
560
_11111
600 650
Agreement is acceptable; no TPS impact.
223
;::_ ._" t',,_ '-r" _" C _-.-I RTR 174-01
INTERTANK ACF_EAGE
BOOY POINT 7404
XT-_O6q._o IN., THETA T--2q2.5 _G.
UJUlI
F-
F-
lUl-
n"
i
SYMBOL DESCRIFTION }[EAT LOAD
BTU/FT 2
R.I 147.8
REM'rECH 210.4
IIII I
ZH
I-<
i"
/ ''_i\" ..............................................,,-_.,.=o
o 51:1
_ztlltrlfJ
100 150 200 250 300 350 400 450 500 550 600 650
TIME ( SEC}
Agreement is acceptable; no TPS impact.
i=_ E _,_'-r- _'- C I---! RTR 174-01
INTERTANK ACREAGE
BODY POINT 7405
XT-lOBq.40 IN., THETA T-270.0 DEG.
RI
REMTECH
O50 iO0 150 200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
225
5"1
*¢
.I
II-
i-ra
tllF-
fr
ZHI--<tll"r
_ /\
0
0 50 100
INTERTANK ACREAGE
BODY POINT 7406
XT-IO6q.40 IN.. THETA T-247.5 DEG.
I ISYMBOL DESCRIPTION HEAT LOAD
BTU/FI' 2
RI 12&3
RE,%rI'ECH 188,/
............... ||.,. ,l.,,l,, ,,.l,ll,l IIIl'llll I.I.I.klIIIP'_'V'I'_'''_! [;:;;;;;; ;;1111111
150 200 250 300 350 400 450 500 550 600 650
TTHE (SEC)
Agreement is acceptable; no TPS impact.
226 - .
I=_ I=" M "-'i-- r_- C i,... I RTR 174-01
INTERTANK ACREAGE
BO[3Y POINT 740q
XT-tO6q.40 IN.. THETA T-180.0 DEG.
SYMBOL DESCRIFTION
RIREMTECH
HEAT LOADBTU/Fr 2
124A
164.9
k
ttlllllll IIIIIIII lltllllll I_. m Itllltlll llttltlll llllllltl ttlllll[l lLllllltt till+ ,'*lll l__t '-PPf'I'T'P'_ 111111111
0 50 100 i50 200 250 300 350 400 450 500 550 600 650
TTME (SEC)
Agreement is acceptable; no TPS impact.
227
F:_ _=.-r,,,._ .n- _==-_ _...! RTR 174-01
5WO3I
I--
2El
mF-
rr
ZHF--<N"1-
INTERTANK ACREAGE
I
i-
- I/_ ,I
- II
_ -_-E--@-Z
'I_lllll| Illllll
00 5O
-7 !
I
....+ _ .--
BODY POINT 7420
XT-t102.62 IN..
I Ii i i I
SYMBOL
\
IIIIIII1 Illlllll .Ll,-IJ.l|l |_L _11|''' "':_; ....
THETA T- 0.0 DEG.
I
DESCRIlrFION I HEAT LOAD
I BTU/FT2
RI I 417.4REMTECH 337.4
_:]IITI,..,.,,,,,[
,00 150 200 250 300 350 400 450 500 550 600 650
TIME ( SEC}
Agreement is acceptable; no TPS impact.
228 .-
In
*¢
UJ
O')
I
I,-
k_
m
ul
p-
<
rr
3,
H
F-
o
INTERTANK ACREAGE
_-- i/i: // ,.
- '1 I
- JJ I \
_7-" I "
_J.llll.ll..U _LI.U lfll
0 50 100
.LI J_::PH.J I
t50 200 250
BODY PO1:NT 7421
XT-1102.B2 IN..
1 ITHETA T-337._ DEG.
I 1 I II
DESCRIPTION I HEATLOAD
I Ecru/IrT2
i
SYMBOL II:,. " RE,WrECH 288.1
I I
IIf
tII
I
II
..I ......... L,,,_LLjIj
300 350
TIHE (SEC),4OO ,450 5O0
i
I
i ..
I
550 600 650
Agreemen_ is acceptable; no T9$ impac%.
229
F:_ =" r'v'l'r" =" C ]--.-I RTR 174-01
,,qr
INTERTAI',_ ACREAGE
'" //
m
= / /p.<{
(.9 N ' •ZI.-4
_ !/ L,
o 50
BODY POINT 7422
XT-ttO2.B2 IN.. THETA T--3t5.0 DEG.
IISYMBOL DESCRIPTION HEAT LOADEI'U/F[" 2
i
L p.jREMTECH
231.8255.9
100 150 200 250 300 350 ,400 450 500 550 600 650
TTHE ( SEC}
Agreement is acceptable; no TPS impact.
230
!:_ i:-,, M T I:--" C i-,-IRTR 174-01
[NTERTANK ACREA6E
BOOY PO[NT 7424
XT-t102.62 IN.. THETA T-2q2.5 OEG.
I I P I ISYMBOL DESCRIPTION
RIREMTECH
I
HEAT LOAD
BT U/FT 2
209.1F-
uJ
II,,-
NI-
'1 (%1 ....
_ _ /
I/J/llll|| ii1|I|1|| IIIIIIIII
oo 50
L I...... 11 .*111.,11 ,till|ill itltlltt tllglllltm,ll_ .tal_ .,,. .... ,llllill I
_00 150 200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
231
I=_I_ M"I- E_ C l--IRTR 174-01
5uJ
Ip-
2en
WH-
Z
W"r
INTE_TAh_ ACREAGE
BOOY POINT 7425
XT-Ii02.62 ZN..
SYMBOL
THETA T-270.00EG.
,J I IDESCRIPTION HEAT LOAD
BTU/FT 2
L RIREMTECH
1/3.7
1863
\
/
z j/_\
o0 50 ioo 15o 200 250 300 350 ,400 ,450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
232
I=_ ==- r,,,_ T ,-:_-_ I--i RTR 174-01
Iiilrl
II-
2II1
t---,,¢rr
Z
}.-<
/\
f
INTEATANK ACAEAGE
BOOY POINT 7426
XT-ii02.62 IN.. THETA T-247,5 OEG.
E SYMBOL DESCRIPTION HEAT LOADBTU/FT 2
L RI 1293
RE.MTECH 187.0
0 50 iO0 150 200 250 300 350 400 450 500 550 600 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
233
I:_ I::" M T 1::" 0 i,_,,.!
BOOY POINT 7427
INTERTANK ACREAGE XT-i&02.62 IN,,
II
_r - _ SYMBOL
, C
DF-
= E
I
/
THETA T-225,0 0£G.
DESCRIPTION HEAT LOADBTU/PF 2
RI 162.7REMTECH
I
_ //I \I ....
fill|flit Ill|ll t|ll|||It_ .'LLItlIIII lllJllltl itlllill|!Slllltl[l llllt|t¢ llSJ_--t-al'
0
RTR 174-01
50 iO0 i50 200 250 300 350 400 ,450 500
TIHE (SEC)
-f,P'l'frr_rr '1'I I t I l u n l
550 600 650
Agreement is acceptable; no TPS impact.
234
_=_E rvl"l- E C P-_ RTR 174-01
W
[
m
I1]}-
E
zHF-<mT
INTERTAN}< ACREAGE
BOOY POINT 7A2q
XT-1102.62 IN..
I t
L, _...... REMTECH
IIII
THETA T-180.0 OEG.
I 1,DESCRWTION HEAT LOAD
BTU/F'r 2
129.9
166.6
,,,|l*,*l illlllll iilllllll
0 50 '100
I_'-I_,l I,*lllall lllllnlll Iluannll Itlllllll llll_tgll Itll||tu Ilo-I.-PcfJ4 t.tl_l"?lllllll
150 200 250 300 350 ,400 ,450 500 550 600 650
TIHE (SEC)
Agreement is acceptable; no TPS impact.
235
I=_ E P,,_ "r- _" C I---! RTR 174-01
5w
!r
H
<
, ,
=
: ./i
O _11111111!1111
0 50
It,,rI'ERTA_ ACFEAGE
BOOY POINT 7430
XT-t123.15 IN.. THETA T-- 0.0 DEG.
SYMBOL l ES ION
I RIREMTECH
I
!
HEAT LOAD
BTU/FT 2
!
I
.... i
I
I__. !
II
\'%.J
LIItl! tllllll_r_ I ill%l l_ ..... ,.tLLl,,,Ll
447.2
497.7
II
.... I--
II
I
: , D
t|, ...... ] ;: ::_.=_=:: _=__|111111i100 150 200 250 300 350 400 450 500 550 _o0 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
236
i=_ _:: I,,,_ -I- I=" C I-.-! RTR 174-01
w
Ii---
F-II)
ulI.-<¢r
ozHI-
ra"r
K1
INTEAT_ ACI=IEAGE
F
/
oo 50
//
0,,HIH* ,HHilll Illl||H* .....
too t5o 2O0 L:_
BODY POINT 7431
XT--i123.15 IN., THETA T--337.5 DEG.
Ill
SYMBOL DESCRIPTION
RI
REMTECH
HEAT LOAD
BTU/FT 2
260.1
314.0
....... l ' l ' l ' ' ll'llll' ll J ' l ' ' l' Jill ILU I ' L_" ' ' ' "I'_'_'___.: : : :T _ I I I I I I
3OO 350 400 450 50O 55O BOO BSO
TIME (SEC)
Agreement is acceptable; no TPS impact.
237
w
I
2m
m
rr
_ _ •ZH
I-
W1"
INTERT_d_B< ACREAGE
BOOY POINT 7434
XT-ii23. i5 IN.. THETA T-2q2.5 DEG.
SYMBOL DESCRIPTION F1EAT LOAD
BTU/FT 2
RI 1343
REMTECH 2072.
I
\
oO 50 iO0 150 200 250 300 350 400 450 500 550 SO0 650
TIME (SEC)
Agreement is acceptable; no TPS impact.
238 •
i=_ _" rvl"T" _" C t--_ RTR 174-01
T
rn
I-,<n"
ZH
I-<[
INTERTANK ACREAGE
/\
_'JA
0
BODY POINT 7435
XT-t123._5 IN., THETA T--270.0 DEG.
I DESCRIPTION I HEAT LOADBTU/FT 2
I• RI I 1M.I
REMTECH I 1_.6
l
!
IIiI
Agreement is acceptable; no TPS impact.
239
F:_ EE rvl-r- EE C I---! RTR 174-01
INTERT_ ACREAGE
BODY POINT 7436
XT-1123.15 IN.. THETA T-247.5 DEG.
_JulI
b-
I--m
tllI..-,<rr
ZH
SYMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
129.1
186.3
/\
oo 50
..... ii1,11 illlllll Illlttll IIiiIiIii iiiittJll ,tt_llll _tl,,--_::::_ ;;lllllll
100 150 200 250 300 350 400 ,450 500 550 600 650
TIME (BEC)
Agreement is acceptable; no TPS impact.
240
Uw
I
I-
IllF-,<rr
ZH
o
INTERTANK ACREAGE
800Y POINT 7437
XT-ii23.i5 IN,.
1 1THETA T-225.0 OEG.
1
DESCRIPTION [ HEAT LOAD
BTU/FF 2
RI l 156.9REMTECH 233.1
50 iO0 i50 200 250 300 350 400 450 500 550 SO0 650
TZHE (_C)
Agreement is acceptable; no TPS impact.
241 - :_
F=_ _ M"r-_ C b-_RTR 174-01
ow
IF-
ro
I11I-.-<rr
ZH
F-
roI
0
i IA
II°
° _ _
7/
L.,,! .........o
INTERTANK ACREAGE
BODY POIN_T 743q
XT-1123.15 IN.. THETA T-180.O OEG.
i SYMBOL i DESCRIPTION HEAT LOADBTU/FI' 2_ f
iIII I
i RI I 129.2REMTECH I 165.3
I _ l 11 _
!
j i
t%
I
L\iiiiii|i_i [_,-[._II._I.LI,llll,llllllllllllll lllllllll lllllllL[ llll;Itll llflltltl __
I
5O
I III
I
LJl
13AJ.tXU
10o t50 Eo0 _5o 300 350 ,400 450 500 550 6O0 S50
TIME ( SEC]
Agreement is acceptable; no TPS impact.
242 l-
I=_ l_'- M "1- EE C I,,._i RTR ]74-01
.,¢
UUlI
t--
Ixlt-<
ZHI-
[NTERTANK ACREAGE
BOQY POINT 56282
XT-_080.05 IN., THETA T- 32.5 DEG.
1
5O 100 t50 200 250 300 350 400 a50 500 550 600 650
TIHE (SEC}
Agreement is acceptable; no TPS impact.
243
!_ i=_- M-r I_ C I--IRTR 174-01
ASCENT DESIGN ENVIRONMENTS FOR THE ET LH2 TANK
ACREAGE BODY POINT LOCATIONS
244
i_ l_-" M T I=" C _-,.-IRTR 174-01
LH2 T£NK
BODY PDINT 1021
XT - 203].7 IN. THETA T - 289.S DES.
i
DESCRIPTION HEAT LOADBTU_T 2
Agreement is acceptable; no TPS impact.
245
r:_ _-- r,,A-T- _-" c _--4 RTR 174-01
C_
O
I O
C.Do
L.JZ
CD,
LH2 TANK
BOOT POINT 1023
XT - 2048.5 IN. THET£ T - 289.5 DEG.
iYMBOLi
D F._ C I_FXO N
t I
/q//
/' i.i
0 1 , nine ---
D.D SO.D I00.0 ISO.D 200.0 250.0 300.0 3S0.0 400.0 450.0 SO0.O SSD.O 600.0 650.,5
TIME ISCC)
Agreement is acceptable; no TPS impact.
246
F=__" r',,._ "-F"_" C i-.-_ RTR 174-01
C3,
BODY POINT 1025
L,J
G-
COCD
&J
n-rr"
r._9 c>
n-G.3n-
LH2 TRNK XT - 2052.7 IN. THETR T - 289.5 OCG.
Ia'YMBOL DESCRIPTION HEAT LOAD
BTU/FT 2
gl 1 416.7
........ iLEMTECIt i .%88.4
t 't
i!
1J
t'-'_ . I
O.O SO.O _O'O.O_SO.D200.0 2S'O.O3DO.O3SO.O_OO.O_S'D.OSDO._ 5SO.O_0'0.0 SS_.:,T I HE I SEO )
Agreement is acceptable; no TPS impact.
247
_=_ _ r',,_ -r-" "_- C 1..-4 RTR 174-01
BOOY POINT I032
LH2 TRNK XT - 2058.0 IN. THETR T - 283.9 OEG.
Agreemen_ is acceptable; no TPS impact.
248
i_ _ M "r" E_ _ i-.,..i
RTR 174-01
¢D
C>'
5.2U_
I ¢D
F'-,f_
LJ
fr"r_
E._c>Z j"
LJ-r--.a.=.
LH2 TANK
BODY POINT 1041
XT - 2040.8 IN. THETA T - 250.S DEG.
SYM30L DESCPGYI'ION HE.AT LOAD_I-U:FI-2
i 231..923"73
I I
I
,/ [ I'.. I 1
D.D SD.O lO0.O ISD.D 200.0 25D.O 3D'O.O 350.0 40'0.0 450.0 5Ot.).O SSO.O SD'C,.O 650.5
T IME I5EC )
Agreement is acceptable; no TPS impact.
249
j=_ _=--/x,,,,q"-i- ==" C _--.-_ RTR 174-01
LH2 TANK0
I'M.
I
p-,_.t,..
u;"
n-
BODY POINT 1043
XT - 2048.8 IN. THETR T - 250.5 DEg.
$_,¢BOL
_J'/l
I'L i
°
D ', t6 . _ I
'D.O 5O.O IDO.D lSO.D 2DD.O ;>50.0 34)0.0 350.0 400.0 450.0 50G.O 550.0 6OO.D 650._
TIME 15EC ]
Agreement is acceptable; no TPS impact.
250
C,
O
C__L_J
I C::>
C,_
LDc.,.Jt-'-,
C9c:,
p-,
ZC>
P_
BODY POINT 104B
LH2 TRNK XT - 2053.B IN. THETR T - 250.5 DEG.
C_
- i
SY_IBOL DF-.SCR/PTIO N HEAT LOAD
BTU_TT :
P.I 344.{)
I ........ RE._rrECH _l
II
I
fi ,
0.0 50.0 I00.0 ISO.O ZO0.O ZSO.O 300.0 3SO.O 400.0 450.0 500.0 550.0 SO0.O S5C.5
TIME [5ECI
Agreement is acceptable; no TPS impact.
251
F:_ _" r,,_ "-r" _" C F--_ RTR 174-01
C3
C)
c..)
I 0
F-,_.C,_
COc3,
r.II--.crCC
C_9_Z_"
bJ"l--
C:,
LH2 TRNK
BOOT POINT 1054
XT - 2058.0 IN. THETA T - 247.0 OEG.
i I i _ i T
SYMBOL DESCR/1_IONHEAT LOAD
B_ 2
I
_.0
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 S00.0 650.0
TIME [SEC]
Agreement is acceptable; no TPS impact.
252
I_ _MT I==" C HRTR 174-01
[_2 _
Lq_
L_
CD
L,J
_:Z_-
ED
i l
_i SYMBOL I DF_CRIPTION I I'IKAT LOAD
IrrUZFl'2
"i _ _ 371.1P..EM'T£CH _t.1
I I _
lr ' \
/
Agreement is acceptable; no TPS impact.
253
r:_ _ _,,A'r _ c l.--i RTR 174-01
C-)
Z
= ._ _ _ = Z_. .LH2 TRNK XT 1!39 IN. _Hz_R T 3,_ O D_3
Agreement is acceptable; no TPS impact:.
254
c_
LH2 TRNK
B0OT POINT 1115
XT - 1139.5 IN. THETR T - 12.0 DEG.
SYMBOL D [.SCIt.IIIT IONHEAT LOAD --
BTUtFT 2
........ I
RI 41&6
R£.',i"l'ECH 408.1
i-i
c;
CDLJU_I c>
L_.
l.,J _
n-
Z#
rr"
I
o
°Fc_
\0.0 50.0 IO0.O 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 500.0 550.0
TIME {5EC1
Agreement is acceptable; no TPS impact.
255
F=__" r,,,._ "r- _-" C l--I RTR 174-01
LH2 TRNK
B00Y POINT 1122
XT - 1139.5 IN. THETA T - 17.0 0ES.
I l t i I I
SYMBOL DESCRIPTION HEATBTu/FTLOAD2
II
........ i
RI [ 354.7
REMTECH ! .103.3
O
L,.JLf3
5-
1--,r_
r..,j u_'[.-..,cc
,lcr-L,J
3E
0.0 50.0 lol3.0 150.0 200.0 250.0 300.0 3so.o 400.0 450.0 500.0 sso.o soo.o 5so.oTIME 15EC]
Agreement is acceptable; no TPS impact.
256
t.--.t3Et, 1"r-
c_
LH2 TANK
- I
BOO'/ POINT 1205
XT - 2053.30 IN. THETA T -, 312.6 DEE.
m=,
i
SYMBOL t DESCRIFTION HEAT LOAD
I i _L',FT 2
RI q 4_.6I_MTECH I 3262.
I
I
c_
tD,-
h.3
b" od"h_
Db-..
hJ ag- "y
| ,
CIZ
j_. t fi I
V
/ ,D.O 5D.D IDO.D 150.0 2£10.D 2S0.0 300.0 350.0 400.D _SO.D 500.0 550.9 500.D 55'D.0
TIME [5E0)
Agreement is acceptable; no TPS impact.
257
I=_ t_-- r,,,_ "T" I=="C I-.-! RTR 174-01
B00Y POINT 1211
I'N
C_
15
L,J
I (3,
l..,-
:D
_D
I.-.rr"n,.'
(..9 c,
Z
rr"l.,J"r
LH2 TANK XT - 2058.0 IN. THETA T - 319.4 OEG.
I I i I I
SYMBOL' i
DF.$CII.IFTION tq
lu i_,_nEcH !
H_TLO_ --
BTU/FI "_
.w&o
32&6
I,
j,e',
L• \
,'..X.,..._. ,_ i | |hi ii
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 650.0
TIME (SEC]
Agreement is acceptable; no TPS impact.
258
r=:__" r,,._ "T" _ C _--4 RTR 174-01
tNl-
GJ
I c_,
r.
[-.,r_.-. C::)
r. 1E--.OEr_
,qp
BODY POINT 1300
n-5_]-c
LH2 TRNK XT - 1593.2 IN. THETR T - 30.9 OEG.
SYMBOL DF..,SCRIFFION KEAT LOAD
B"TU,TT 2
m
o /I'_ - .j
t J I
[ ,Y,cr = 2032.008 T= 355.0 ]--
N,
O.O 50.O lO'O.O 150.0 2..00.0 250.0 300.0 35'0.0 400.0 450.0 500.0 550.0 5OO.O 550.0
TIME {5ED)
Agreement is acceptable; no TPS impact.
259
F_ E _',.A "-r E C F-._ RTR 174-01
I'M,
LH2 TRNK
BOOT POINT 1303
XT - 1593.2 IN. THETR T - 30.9 OC8.
C_I
C_)r.lcr_I C_
r.
DF-.rrm
• i
CEOC
z_:
F-rr
SYMBOL DESCRLPTION HEAT LOAD
BTU,'FT 2
RI 438.6........ R£SfTECH 376.3
I _ I I I
! XT= 2053.50 8T = 355.0
O.O 50.D lO0.O I50.O 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 500.D 65'0.0
TIME lSCC}
Agreement is acceptable; no TPS impact.
260
I:_ =" M T I_-" C !--! RTR 174-01
c>
LH2 TANK
J
BODY POINT 1307
XT - 2058.0 IN. THETA T - 357.1 OCG.
J
i$Y_IBOL I DESCRIFTION HEAT LOAD
i' B'ru/FTl
RI
I RE,_f'rECH........ I
I II
J55_
i I
i!
I
r.
D
cT"
I
° i:7- ,
n-
"r-c>
c>,,_'
h
0.0 50.0 1013.0 150.0 _30.0 ;_::_3.0500.0 35_).0 400.0 450.0 500.0 $543.0 6430.0 $50.0
TIME {5EO_
Agreement is acceptable; no TPS impact.
261
i:_ rr_- M T 1=-'- C i_. I RTR 174.01
BODY POINT 1309
[.,...,C1:r,1-r-
CD
I"%1
LH2 TRNK XT - 2058.0 IN. THETA T - 358.8 DEG.
• . , ..
ISYMBOL DESCRIPTION
il
R/R.EMT]_CI'I 396.7
C:>
C.)LOU'>I C>
5-
[-.,
•--, C>
f'T-- .
I
o /!r_"
0.O 50.0 1O0.O 150.D P..D0.D 250.0 300.0 350.0 400.0 450.0 500.0 550.0 60O.O 650.0
TIME [SEC)
Agreement is acceptable; no TPS impact.
262
F:_ _" M"r- _" C t.-4 RTR 174-01
D
L_ _.
p-,
L-
L-_
C.9
ZCD
BDD_ PO'NT _81
LH2 TRNK XT - !B22._ IN. THETR T - 30g._ DEG.
jS_qe[aOL DESCP./FTION
214.9172.6
_,r_ ........................... '._ :'_ !':':_.g <5 :_ '3 5_G.C _=_ n
"RI IVBC-3 considered high from a consistency standpoint
with surrounding environments. Hi/Hu factors are high
compared with the IH-97 data base (T/C 5252).
Agreement is acceptable; no TP$ impact.
263
l=_'-_--r,_-i"',=" C I--I RTR 174-01
cz_
r_.
c_
c.JL,.J
I cD
5-
w C3
LJ
:Y
C9oZ_:"
co"LJ
LH2 TRNK
BOOT POINT i404
XT - 1BBB.S IN. THETR T - 309.4 BEG.
I I I II
HT_.ATLOAD --i DF...,qCKI_T1ONI BllfNT 2I
i 1_ I .._l&0
........ fl P.E._cx I =LS
ii
° / \./;;>-./ '.. \
0.0 so.o _00.0 _so.o 20'0.0 2so.o 300.0 ]s'o.o 400.0 450.0 soo.o sso.o soo.o sso.oTIME ISEC]
Agreement is acceptable; no TPS impact.
264
F_ _--- r,,,._ "F" _" C I---I RTR 174-01
o
LH2 TRNK
rrr_
O=LJ
-r" °
%%
B00¥ POINT 1406
XT - 1914.7 IN. THETR T - 304.0 OE_.
I
SYMBOL
i
! 0F.SCmFnON
I
i KII _,MTECII
I HEAT LOADBTIJ_'T_*
_3
I II
i ,
D.D .50.0 1OO.O 1SO.O 290.0 250.9 300.0 2;50.0 4DO.D 450.0 5DO.O 5.50.0 600.D 550.D
TIME (5EC_
Agreement is acceptable; no TPS impact.
265
RTR 174-01
D
LH2 TRNK
B00T POINT 1409
XT - 1914.7 IN. THETR T - 3t5.0 OEG.
i
iY_,f_OL DESC_J_wrIoN HEAT L O.._D
BTU,FT 2
I :63._[ 246.7i
r, 1
L,_
=Dt.--,rr',
u_' Irr-
z
- h11=
,4" ._ /
oI I
o.o so.o loo.o lso.o zoo.o 2SO,O_o.o sso.o _oo.o _so.o s6o.o sso.o s6o.o sso.oT[MC (5EC)
Agreement is acceptable; no TPS impact.
266
F_ _--_r',,,_ "F" _" C _..! RTR 174-01
oi
c_
c:),
r, 1U_I o
G_
D
lib•-. !:3,
r, 1b--,C_
c_
CEC.d-r-
c_
LH2 TANK
800Y POINT t4tq
XT - 1936.8 IN. THETR T - 330.2 OEg.
ISYMBOL DESCRIPTION
t'" R.I
RE._frECH
HEAT LOAD
f _r u4_'r'-
i
I _9.6.'862
|
• .--. ....
i i
O.O 50.0 IO0.O I_.O 200,0 250.0 300.0 350.0 400.0 450.0 500.0 SSO.O _O0.O BSO.O
TIME [5EC)
Agreement is acceptable; no TPS impact.
26T
F=__-- r,,._ -r- ,._.- c F.-t RTR 174-01
c)
LH2 TRNK XT = 1359.2 [_. THETR T - <0.C DES.
LDsa D.0") c_-
F-L
c3
r_r,
ZCD
L_
D
_D
!
8.9 50.9 :OC.O 158.?, 20r,.o 250.8 ?I2.C 350.C: _.OC,.3 450.8 5SD.C _53.0 5DS.LC 5,50.D
Agreement is acceptable; no TPS impact.
269
F::__" P,,.,,'t"T" _" C P--_ RTR 174-01
¢D
L,JU'_
I cII--'L,-
p-.CID
n-
n_
CDc_
Z
n-
LJ
LH2 TRNK
BOOT POINT 6582
XT - 1127.6 IN. THETR T - 23.5 OEG.
I I t l I
SY_IBOL DEscRrPTIONHEAT LOAD --
BTU,'I_" _"
376._
Z60.I
I ,
e o° _
° >--IO.D 50.0 I00.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 500.0 650.0
TIME ISEC]
• RI IVBC-3 environments considered high. B.P. 6582 is
located under the LO 2 feed line. Max rates at other
similar locations range from 1 to 3 BTU/FT 2 sec.
Agreement is acceptable; no TPS impact.
270
i:_ _ M T I=:" C H RTR 174-01
B_J _ _. £587
0
LJ_Cr3 _-
LJ
nr-_-rv
c_Dz
..,--.
i'_t-
LH2 TRNK XT = 1334.4 IN. THETR T = 23.5 OEG.
I
,-Dc-°NiTI--i p.j 149.4
RE_rEC_ 17_J.l
I
i '
il L
7
i
....... ,'u_., 25',;'.2 3D0._ 350.0 40.?,. 450 _'_500._ _5 r" _ .....
T[_ [SEn)
Agreement is acceptable; no TPS impact.
271
F:_ _'- r,,,A "q- _" <_ _--.i RTR 174-01
D
r i
K,
LH2 TANK XT 'i3SB.S ,fN. TH"r_L,nm = 235, . OEG.
l
i _ ! i !l !
i _ l [
SYMBOL DE.SC'Rn_r'ION HEAT LOAD
B'T%_'T 1
m
172.2
171.3
: ; : l i i I
i ; i[ i , i
[ i i : ! i!
l
i
i-- [
[ ! ;
: !
!
F
i
I ll
[
i
, 1
; T
: i
! --
l
•0 58.0 100.0 !52.2:200.0 250.0 300.2 350.2 4.00.0459.0 5CS.O 550.2 800.0 850.2
Agreement is acceptable; no TPS impact.
272
m:_ _=.. r,,_ -.r. u=- c i_.._ RTR 174-01
CD
803':._C ',T 6s89
XT = i356.4 IN. THETA T _ 23.5 OEG.
D
r_
, i
Z
u:'
g,-
O
i
{i
r
i Ii
t
!
!
, ir
I !
I
I
: r
; L
P
i i
i i :
F
t.t._., _.
---; ',.,./
i ' '
SYMBOl, DESCRJ]PTION HEAT LOAD
' BTUR-T 2
R/ 211..0
i RY.MTE(_! XIL._
! '
I
r
L _
i i
i i :
0.0 50.0 !'3C.3 !SJ,_ 200.0 25C.2 300._ 35r'.:]_JD.- _SO.O 5CS.C 55C.?, 5'J',_,.05.50.0
Agreement is acceptable; no TPS impact.
273
I:_ l_ M T E: C !.....I
RTR ].74-01
C_
,or'
O
L,J
rv
[_9Z
r','--
r
BO_Y _0 :,'_.N.55£0
LH2 TRNK XT = 1:372.C TN. THETR T = 23.5 OEG.
+_.__.__+
i r
[
'i ;
t i¸
i "i
i
i
J
i
SYMBOL DF..S_ON HF.ATLOAD
rru/l_
I ,,, I I
• " ' I" i'
: f
i I
i
• , , i
/
.0 52.0 100,3 _-r" ,"._._ 2DO,0 250.3 30P,,,3 350.P,} 40D.O 450.0 <0[
Ti_'_- _5EP_,}
i
•O 550.b 50O.O B5D.O
Agreement is acceptable; no TPS impact.
274
RTR 174-01
BODY POZNT BSB]
LH2 TRNK XT - 1375.3 IN. THETB T - 23.5 OEG.
i
T
i
•0 50.0 10'0.0 150.0 200.0 250.0 300.0 355,0 _OO.O _50,0 5OC.O 55C.0 50O.C 852.0
TT_r
Agreement is acceptable; no TP$ impact.
275
_=:__" rvl-'r- _" C P.-4 RTR 174-01
C3
F.J
U') O_
L_
LJ
Or"
C_
Z
{.-- ..:-C_L_
820_ _SiNT _5_
C_
.... p
" T
J i
i
I
I I
i
' i![' "_
i
i I
£
l
,l - i
i r
: i
! i
I
i---- SYMBOL DESCRIFI'ION HEAT LOADb! S'TU/Fr_
KI t 139.2........ _,_,fT£CH 119.9
n_. I I II
,,_-.,._._ ! i .... i..
r
. ,. . ; . .; i
I i :
' i i
! ;
; i !
I'
i'
' i
! _ , : ,
0.0 50.0 lO0.O ',50.0200.0 250.0 300.0 35D.0 400.0 450.0 500.J 550,0 50C.O 850.0
Tim-ESEC)
Agreement is acceptable; no TPS impact.
2T6
F:z_ M-r- _=-C F.._ RTR 174-01
CD
LH2 TRNK
BDSY _kT .....
XT = 1367.7 IN. THETR T = 23.5 DEG.
C)
C'Q
tm,_
L,_
c_
Z
L_2
p,;
i i' ii i
i ;I!
i 'Ii
i
i '
i ; !i :
i
/
i
E
i ri
I !
! '
I ,
! •
SYMBOL DESCI_'ION HEAT LOAD
BTU/y'r _-
! i i i _ ! i
i II r
I *
l
' !
PJ L_._
I_..M'T£CH ZL_._
I
; : i i
i I
' i
I
I L____
J I
J I
!
i
' I
i I
i l
I
9.8 50.0 ]9C.S :5O.C 200.0 250.0 39C.9 350.C 409.3 458.8 500.0 550.9 592.0 55C.0
.=,,. :5ES]
Agreement is acceptable; no TPS impact.
278
F:_ _" M "r _" C J--.I RTR 174-01
LH2 T_NK
_ o_'NT B597
CD
ED
H-,L-
E_
r_
(_9z
c2
C:D
! E
i i
i
i
J
tri
I
r
i
i
i!
l •
SYMBOL t
!--I
D£S_ONI HEAT LOADB'TUS"T 1
RI [ IIKJ_RE.MrTlrCH 119.6
kr
0.0 50.0 ]00.0 ;50.0 200.0 250.0 300.0 350.0 400.0 _50.0 500.D 550.0 500.0 550.0
i'M r {___]
Agreement is acceptable; no TPS impact.
279
i:_ _ M T I_" O I---I RTR 174-01
E._
r_
b.J
r i
909_ POINT 5503
LH2 TRNK XT = 1818.7 IN. THETR T _.- L_ 5 DEG.
/ii
, A G ...... I | ,,
SYM_0L DESCRi]_IO_ I HEAT LOADZr]-U/Fr 2
........ REMTECH 21£4
O.: m;,_ ,OO.O ;5O.O 2,;:,.O 252,.2 .3P_.0.P.350."._ 4r.,C..... "" 45S.D 5.3C.D 55C.3 50O.D .'3.5D.S
Agreement is acceptable; no TPS impact.
280
F::__=="M ""r" E_: C }.-,-! RTR 174-01
C_
LH2 TRNK
800Y POINT _OOOO
XT - 1622.0 IN. THETA T - 23.5 DEG.
0
PJ
E_D
U';D
b
F_E_r_
b.2
C.9Z
CD
¢N
P:
i1I
d
SYM])OL D F_.,SC_I'_O N _T LOAD
_JE,W'_ C'_ 210.4
i
I
i i
F
I
t' i
I
: i
i
i I
i--
I
! it
! Ii
m
0.0 50.0 100.0 !50.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 556.0
Agreement is acceptable; no TPS impact.
281
;=_ _ r-,,,,n-r"E_:C F-.t RTR 174-01
BOOT POINT 6B]7
c)
6
F.JL,J(J"l! r'_
1-.cci
t.J1..-.,CIZ
CIC
C.O ,'_
I"--,
(3ZL.,.J-r"
LH2 TRNK
0
xT - IBBB.7 IN. THETA T - 23.5 DEG.
• ! i
i _ ''i"........ R._M'I'£CH !
I I
KK£T LOAD --
197.3
i
i ii
i
O.D SO.D ]DO.D )SO.O 200.0 25D.D 3OO.C) 3SO.D 4DO.D 4SD.O 56)0.0 SSO.D 5OO.O 6SO.D
TIME (SEC)
Agreement is accep_abie; no TPS impact.
282
]=:__-" r'v1"T" E C _-.4 RTR 174-01
¢>I
c>
=:-
U'_I ¢:>
c,..
[..-,
r,1p-.,QZC_
r.Do
i,..,-i
[-.-,CE[.d
LH2 TRNK
BOOT POINT 6632
XT - 1955.3 IN. THETR T - 23.5 DES.
I I i I I I$Y_iBOL DE$C.I_vI'ION HEAT LOAD
! BTUJFT 2
i' R3 { 2 I03
........ RJ_MTECH I 230.4
•- II II I
.... i
I
I
II / II_. - J. J
C_' I
d _
O.O 5O.O 1OO.O lSO.O 2_.80.0 ?._.O 300.0 350.0 400.0 ISO.D 500.0 550.0 500.0 650.0
TIMC [SCC}
Agreement is acceptable; no TPS impact.
283
c>
c3,c>
52U-)
G..
D
•--, c:>up
G.Jp.,OZ
E.Dc>z_:[-..,rF"
-1-
LH2 TRNK
BODY POINT 6633
XT - 1962.8 IN. THETR T - 23.5 DEG.
I I , I .....I
SYMBOL DE.SC_I_TION f HEAT LOADBTU/F'r2
I ....4
,, II I III I
i'.,
°_o
' 1I
I
I
I
O.O 50.D IDO.D 150.0 200.0 2SD.D 300.0 350.0 400.0 450.0 500.0 550.0 500.0 5S'O.D
TIME (SEC)
Agreement is acceptable; no TPS impact.
284
!::_ I=="1',,,,4"-I- _:: C I-..-i RTR 174-01
D
O
r_3hJU'_
I c=,
5_
F..,f13
5..]
n-r'r"
r...9 D
[--,
f.,J2Z
LH2 TANK XT - 1968.4 IN.
BODY POINT 6634
THETA T - 23.5 DEE.
DF..SCKIPTION _AT LOAD_i'U_r"
_.41.1I_._fTI_CH _3.1
I i
I
!
I
_D.D 5O.O IO0.O ISO.O 2_30.I) _l).O 300.0 3543.0 400.0 450.0 500.0 550.0 500.D 550.D
TIME [5EC_
Agreement is acceptable; no TPS impact.
285
F=__" r-,,,n "r" _- c _-.-! RTR 174-01
C3,
D
F._r,1U')
(-,_,G_
{.-,er_•.--, C:)
52{--,cI-
[--,co"G..]
¢:)
N
LH2 TANK
BOOT POINT B637
XT - 1971.7 IN. THCTA T - 23.5 DOG.
SYMBOL DESCRIPTION HEAT LOAD
i BTU,I;'T 2
L,gO.4
-'31.6
II
iiI
J
i
0
J
O.O 50.0 lO'O.O 1SO.O 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.O 8,50.0
TIME [5COJ
Agreement is acceptable; no TPS impact.
286
I_ =" M T =" O !.--I RTR 174-01
B007 P0]NT 6638
O
O
l..,JL,o
J O
L,.-
Z3t--
w Q
L,JI-,tl"t'r
¢_Oo0Z,,-
F-,rr"5.3"1"
LH2 TRNK XT - 1975.8 IN. THETR T - 23.5 0EG.O
- i ). f
II
DE.SCRIFTIONI HEAT LOAD
I BTU/FT !
L92.5137.5
II| II
.4
c_i
0.0 50.0 I00.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 5OO.0 550.0 500.0 550.0
TIME [5EC]
Agreement is acceptable; no TPS impact.
287
c)
L.JU_
e--. o_-r.
[.-,co
LJ
r_
r_9oZ
p-_r
I
LH2 TRNK
B00T POINT 6639
XT - tgB0.3 IN. THETR T 23.5 0EG.
I i HEAT LOAD
SY?,LBOL DESCR.I]_ION ! BTU/F'T _-
i RI
........ RE._CTECH 19"/.4 __
i
CD
o0.0 50.0 IO0.O 150.0 200.0 250.0 300.0 350.0 400.0 45'0.0 500.0 550.0 500.0 550.0
TIME ISEC]
Agreement is acceptable; no TPS impact.
288
B00Y P0[NT 6540
D
O
5LJLID
! o
I..,_
OO
t,Jt-.-,n-n.-
Z °_
rr"LJ"1"
,4 L
LH2 TRNK
q
XT - t9B4.l IN, THETR T - 23.5 0EG.
.! i i i ! i
SY_BOL DKSCR/I_IONL
pj i
........ RE._ECH I
III 1
193.4
i i
0.0 50.0 lOO.O 150.0 20'0.0 250.0 300.0 350.0 'lO0.0 450.0 500.0 550.0 600.O 650.0
TIME ISECI
Agreement is acceptable; no TPS impact.
289
m _ r,,A-r'_="c I..-4 RTR 174-01
,,,-,
BODY POINT 6647
D.3U')
5_
D
rm
u_-r..,j{-.,rror-
I---,n-C.J"r"
LH2 TANK XT - 2033.0 IN. THETR T - 23.5 OEG.
SY31BOL DKSCRIIrrlON
I
HEAT LOAD
. BTUfF'r2,
357..0, J27.9
I
c)
/: L'_.._---- _ _..
'D.D 5>0.0 ID0.D IS'O.O 200.0 250.0 300.0 350.0 4DO.D 45().0 500.0 550.0 BOO.{) BSO.D
TINE [5C0)
Agreement is acceptable; no TPS impact.
29O
i:_ l=='- M T I_" O HRTR 174-01
,v-'
O
r..2,
L_
L_
r,-"
Z
r:-
_4
BuJ,_; P3_NT. BBB_
LH2 TRNK XT 18i5.7 IN ~' _# = . .- . . IHE_,. T Ig 0 0ES
SYMBOL DF.,S_OM HF.AT LOADI%TU/1FI"!
........ P._ITI_ CIt 21Z3I
i
J
I !
I
/ , i i I
0.0 50.0 I00.0 I50.D 20C.S 250.0 3DO.C 35'0.0 400.0 _.50.0 500.0 550.0 500.0 550.0
Agreement is accepSable; no TPS ±mpact.
291
J=_ _" M"r- _" C P--.I RTR 174-01
¢3
c>c_,
r, 1Ub! c>
r,
t,.Jp-.QZ
C=9Z
t=.=(cr=L.J
LH2 TRNK
800T POINT B909
XT = 1999.5 IN. THETR T = 19.0 0C8.
) i i I$Y'H30L
I
D_.SCK_FION
i
HEAT LOADBTU;YT
189,4179.1
I
I j"
=, ,_ -_ " ._ ._.O.O SD.D IOO.O 150.0 200.0 250.0 300.0 350.0 400.0 ¢SO.O 5OO.O 550.O 5DD.D 85D.D
TIME [5CC1
Agreement is acceptable; no TPS impact.
292
I=__ r,,,,'l"T"_ C l---i RTR 174-01
LH2 TRNK
BODY POINT B929
XT - 2036.5 IN. THETA T - 1g.0 OE_.
SYMBOL DESCRIFTION HEAT LOAD_U/FT 3
l
I_TECH _4J
{:)
- 11C_U-)
f,
rr_C_ I
C_Oc_
F-,CI:(J
_1 "r % &
D.O 50.D 100.9 150.D 2J)O.D 250.0 300.0 350.0 4DO.D 450.0 500.0 550.0 BD'O.D B50.D
TIM[ {5E01
Agreement is acceptable; no TPS impact.
293
I:_ 1=" M T I_ O k.,. I RTR 174-01
C3
Lq2 TfiNK
800T POINT 7940
XT - 1!37.3 IN. THET£ T - 0.0 DEG.
_r
C.3
OO_1
L.2
c_oz
oz
CD
_ I i ;
I i _ I ii •t i - 1
i ILI
iI , t
i i :
: 'L I Li ¢ , _,
/
!
J
I
I
I '!
=' i
b !
i
i
HEAT LOAD
_-d/F'l" 2
SYMBOL DESC'RIF_ON
I RI 40_4
P.£.WTECH 47¢9
I
i i ' _ ! i! _' ! t
] ' L ] I
i , it _ i!
0.0 50.0 :OO.O ]50.0 200.0 250.0 300.0 350.0 400.0 450 - 500.3 550.0 500.C $53.0_M_ ._
Agreement is acceptable; no TPS impact.
294
I:_ [_-" M T I=- O I,-- ! RTR 174-01
C_
,_r',
p,a,
_RU") c>_
L
"_ o
L_
o
Z
L__
O
LH2 TRNK XT i_37.3 iN. THETR T - 337.5 D£G.
i
I '
i ;
0.0 50.0 100.0 150.0 200.0 250.0 300.,S 350.0 _100.O 458.0 500.8 550.C _00.0 650.0
TIME [5EC)
Agreement is acceptable; no TPS impact.
295
C_
LH2 TRNK
BODY PC!XT 7<<2
XT = 1177.3 IN. THEE8 T = 31S.O DEG.
D_RL'2. _
bJ
c_
CO
Z
F-
L3-r-
C
t i L I
!I
, i
q I
i i rL
i J
F•
! ,.i i
t
,Ji/"
i sr_mOL
! I
i '
I F
t t
F1
i i
---T !
DESCRIFTION HT_AT LOAD
BTU,qFT:
RI 176J
RE,_rTECH _5.6
i
I iI! i
i
,,. i
i I
F
Fi I
' i ! _ ' i !
I • i i
S.O 58.0 108.0 :5O.D 2SS.2 250.0 300.2 350.0 4DC.8 450.0 5DD.C 55D.0 600.0 650.2
TIME _SEC]
Agreement is acceptable; no TPS impact.
296
L=_.E_: r,,,._ "-F" _-" C F..-._ RTR 174-01
C3
LH2 TRNK
BODY PS:NT 74(_
XT = L:37.3 IN. THETR T - 292.5 DEG.
,q-.
D
I --
L
i i
('NI_
CD
rF
Z
(32
"T-
_#_T_ i_4_J_
i ii I
I i
S"_4BO L D F.,SCRIIvPION
E.E34..I_Cta 163,2,
iII
tJI
I
....... I..... [.'0.0 50.0 100.0 15'0.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 S0'0.0 650.0
TIME (fiEC_
Agreement is acceptable; no TPS impact.
297
F::__ r'v'l-r" I_ C I-.-i RTR 174-01
C3
,,¢,
C_
P,J
_R
L_
C_
LJp-- o
C._9Z
P" v,
O
B_J, PC;NT 7_5
LH2 TRNK XT = !137.3 IN. THETR T - 270.0 DEG.
I !
i I t--
JL I
i r
L
i
!
! ir
, , , ,,
I
J
"!i
!
-.i i
I
i m , • u :
SY'_4_O[, DF.SCIPJI_'_O N
I "- I J
L
i 'i •
, i iI + l
Li
] t
' II ! ,
' i i
P./KE.'Kr£cH
I II III I
! I
i
!I j
r
i
!
. i
[
k--
I i
.......... L - ;
•9 50.D !DD.O ]50.D 20D.O 25g.D 300.0 35D.0 4OD.D 45D.0 5DC.O 550.D 5,30.0 550.0
Agreement is acceptable; no TP$ impact.
298
l:::;__ h.,4"r-s_: C i--.4 RTR 174-01
C:;,
O
_J
C-.)
L..-
EDc_
C_
LJ
Z
BODY PO_,N_'_7_d6
LH2 TRNK XT _ !]37.3 iN. THETR T - 2_7.5 DEG.
SY'_QOL
i
i
I ; i !
I
DI_CI_ON I'IIEA, T I.,O&D
_rl.llFi'2
R.I [ 107.1P..F..MT_CI.I 149,8
8.0 5D.O 106.0 :50.C 208.0 250.0 3OO.O 35D.0 !9O.O 4.50.9 5OO.O 55D..D 5OO.O 550.9
Agreement is acceptable; no T?S impact.
299
I=_ _- p,,/l-r 1=" C !--! RTR 174-01
C)
D
i
r
C3
L_f6---c_
t'T- uJrr _
C_9
Z
,q+
czL_J
CD
C_
LH2 TBNK
_v _BO_+ Po NT 7_7
XT - !!37.3 IN. THETB T - 22S.0 DEG.
Agreement is acceptable; no TPS impact.
3OO
F:_ Er',,_-r E C _--! RTR 174-01
C)
O
L,_
L_
rF
Z
o
909T POTNT 7d50
LH2 TRNK XT - !i67.2 IN. THET£ T = 0.0 BEg.
] ir
i_
, i [
iI I
i
i/' %\
L
[r ii
I i
! I]
Ii
! ,m
SY'M_OL DF-_C]R[FTION IIF..AT LOAD
lffUffr 2
i
m RI 3139
&EMTECH _O&6
II II I
,, . : .... I
, ,_ ,
• ,: , . . -=_.
I
I
] I
[
]
i iT
[ i ; i ; '
|
0.0 50.0 ;00.0 150.0 200.,T, 250.0 300.0 35'0.0 400.0 4,50.0 500.0 550.0 50_.3 65C._
T .[r'1,E [SEC)
Agreement is acceptable; no TPS impact.
302
I=:__'r,,,,.,_'r- _-" c _ RTR 174-01
C)
E_
F_
L_J_U'3_
E--,L
E_
E_
Z
GZ
..:._
F_
900_ PS!NT 7451
' _ XT . - .uHd TaNK = 1157 2 IN. THETR T 337 S DEG.
F
i , I
J
, i
I
i I SYMBOL DEscRn_'ION HEATLOAD
i _rrr2
: P,.I_Wr£Cll 4_1_!
i "i
I iI I
r
i i
I i
F i
_ i i _ i ! I i : i, I _ i i t ! i i
[ i t i t :
I I' i i ! _
i i i : I i i
iI
' I
I
,'_q i i
; i :
I i ;
!
O.O 52.0 :OO.O !50.0 200.0 250.0 3DO.G 350.0 400.0 450.0 500.0 55C.0 500.0 550.0
TT_E rqr_
Agreement is acceptable; no TPS impact.
303
0
LH2 TRNK
BODY sS!NT 7_52
XT - !157.2 IN. THETR T 3i5.0 DEG.
¢:3
r...D"
b-
c::,
b__
,-r-_
r_9
ZEs
i.d
czs,
6
F ! b1 i
i I! i
ib i
L
i i
P i i
J
! i
i I
i '_ J
T ttL
SYMBOL DESCR/FrION 1-17.AT LOAD
_-,,jR',T 2
Rl 163.7
P_,fI_CB 2O2.$
ii J
, !
I
i
i i
i i i i _ i
I i iI I i i _ i
! 4
: i
i
i
O.O 50.0 lO0.O 150.0 200.0 250.9 3C0.3 358.3 489.3 <50.8 5C3.C 55.3.8 6DO.C r-SS.D
T!_-- _5C3]
Agreement is acceptable; no TPS impact.
304
RTR 174-01
C_
L.j _
90DY PO:NT 7455
L_
Z
LH2 TRNK XT = 1157.2 IN. THETR T ffi 270.0 DE_.
: i
! !
I
I, i
It
II
II
I
!
rm
' i I
i F
T i i |' I i
t i
i
I
!i
'[
i
I
DE$CRIlrrloN HEAT LOADBTU/Vr 2
REM'T_CH 137.5
II I
i
f ii
i
! i
! t
!
] 1
i [
!
i I
i
i I
2.3 52.0 iOO.C, :SC.C 220.0 250.0 320.0 350._ 4OG.O 452.2 530.0 250.2. 502.9 550.0
Agreemen_ is acceptable; no TPS impact.
305
I=_ _-" _,,,,,1-T" E¢: C !---I RTR 174-01
o
_qU') _z).
L_
CO
BS2Y _n_uiNT 7_$7
L_
n-u_.
Z
LJ
LH2 TRNK XT = IIS7.2 iN. TH£TR T = 225.0 BEG.
i I
_ D 50.0 lO0.O 15_,.0200.0 250.3 300.0 35D.0 _,O0.O=,S3.D50D,O 550.D 500.0 550.D
[ i ;,_. _ ,J L-._,_
Agreement is acceptable; no TPS impact.
3O6
I:_ _"r',,,,,1-r- _"C I---I RTR 174-01
t • c_
L
L_
n-_-
C9Z
CE_Ld
Be_ _8:N7 74E_
LH2 TaNK X7 = !]57.2 iN. T_ET? 7 - t89.0 8E$.
I
• I !
' i[I I
1I..1_
I /
i
J
i
:°.'x i t
• 0 50.0 :9g.9 !52,.0 20`3.0 250..0 300.9 358.3 480.8 45C.8 58.3,0 550.0 580,8
7i_'_£ i 3:72 ;
Agreement is acceptable; no TPS impact.
307
]=_ _" r',_ "r- _" C F---_ RTR 174-01
,,=.,
C_
E--,L_
BODY POINT 7470
z
C
LH2 TBNK XT _ 129] 5 IN THETR T - 0 9 _
i':,.
0.3 50.0 !DO.._ :50.0 220.O 25C,2. 300._ 350.0 40D.0 4.5_..0 502.0 550.2 5D0.9 650.0
T ': !SEC'
Agreement is acceptable; no TPS impact.
308
i=:__" M"r" '=="C I"--I RTR 174-01
C_
C_
CD
¢y
CD
Z
.L._-:v
C_
LH2 T6NK XT = i29!.5 !N. THEIR T - 270.0 DEG.
i ,I i
I
! i
i
i
[ ! :
r_,- , J
i
, I i
J
q
i
!
i :
]i !
i
iJ i
r
$'YM_OL DESCR.II_ION I'IKAT LOAD
rrl.I/fT 2
L
i i
I
I i
i
4
I
R.F-14TlgCH
' i[
L?.4.0
149._
f
[
L i
+--
I
i i i I i i
D.O 50.D IOD.D !50.D 200.D 25D,n 3DD.D 35D.0 _.g'S.D45C,D 5DD.O 55D.D 500.D _._D.O
Agreement is acceptable; no TPS impact.
309
F:__-" r,_-F _" C _--_ RTR 174-01
C9
_H2 iRNK
BODY _:N;°n',_ 7_S5
XT o :230.0 IN. THETR T - 260.9 DEG.
I:D
C'4-
C9
u_ 0.tJ], _.
&L._
ZD _,
t.d
[---, o
C9
ZCD
rr-
-r-
C:,
t'kl
_4
i
t
SYM_0L DESCPJ]PTION HF.,AT LOAD --
BTUtTT ]
R! 123.4
P.£.MTECH LtaJ
1
i : i i "I
! I
i
I ; I i
r t i
r I w
: i
: : L
i
! : i I '
i ' i
i
; r
I
[
i
: ' i
t
1.0 5D.0 _00.0 !50.D 2DO.D 25C.0 300.0 35_,.r_400.0 450.D SOD.: S50.D 6DD.S 653.9
Agreement is acceptable; no TPS impact.
313
i=;_ =" r',,_ "r" =" C P--f RTR 174-01
C_
,q-.
C_
r_
C3
U'_,oi --
L
r_
BODY POINT 7488
LH2 TBNK XT - 1230.0 IN. THETB T - 180.0 DEG.
o.o so.o !oo.o_so.o2oo.o2so.o3oo.o3so.o _so.o45o.osoc.o 5so.osoo.o 5sc.o
mT_r _SEC_
Agreement is acceptable; no TPS impact.
313
c)
c_
_RU3o
F-,L,_
p-,c_¢:=;O_
C_DZ
CIZ
0
BODY POINT 7520
rm
c_
LH2 TRNK XT - 1297.8 IN. THETR T - 0.0 DEG.
i .... 1
b' i $1qCBO/., D_ON I'ff_T LO.4J_ -
i . '" _l't_T 2
r /J J _ ?.0¢7
..... ' I I - ....... V,7,W'_C'rtLg"t3
!
I i '
I _ L ,! t I f
'.....I. I 'II i t _ I
_ I . I I i
, l _ t' I,,7., ' ,p , , r • i ....... i-
0.0 50.0 100.0 150.0 200.0 250.0 300.0 35'0.0 400.0 450.0 500.0 550.0 500.0 550.0
TIME [fiEC]
Agreement is acceptable; no TPS impact.
314
F_ _" r',,,,n"T- _" C m.--I RTR 174-01
CD
LH2 TRNK XT
BODY POINT 7525
i297.8 IN. THETR T = 270.0 DE G.
L_
r._
Z
LJ
I YMBOL I DESCRIPTION........I L_2
D.O 5D.O !no.D 'SZ.D 200.0 250.0 3OO.O 350.0 4OC.D a.5O.D 50D.D 550.D 5DC.D 55D.0
Agreement is acceptable; no TPS impact.
315
1_ I_" M T l=='. O I,.....IRTR 174-01
C_
C_
T'_
.._a
"--" COC3
L_
p-- (:3
toz
L_
LH2 T_NK XT - 12_7.8 IN. TH_T£ T - 180.0 DEG.
rw
.... i
i i
! I b
I ;' i
: L
i
! !\
i I:
I
iSYMBOL I DES_ION HF_T LOAD
BTU/F1" 2
I
i j
r
! i' "T I
/ fL
, !
i'
• |
i I
I
I
_JEMTIgCH
I I
I11.4
II
f
I
, ; . , _
i L 1
I
! ]
4 _
j [
I
0.0 _<D.D ]OC.D !5D.D 2O'O.D 25D.O 3DD.O 350.C 4_.o 45C.0 5DO.C 55D.D 5D_.__ ....==_O
TI _ {SEC'!H...
Agreement is acceptable; no TPS impact.
316
I::::__" r',,_ "T" _" C _-4 RTR 174-01
c_
E_2,
r..2 _
._..#
rm
FI,---
"..D
Z
.;--. ,...r-,--
r,_,]
LH2 TRNK XT
_;mY POINT 755_
_qC . .1_ 2 TN THET_ T = O.0 DE_.
IN
ED
c3
, - 4. -_Y ',X
D.D 50.0 i0'0.0ISC.O 2DO.D 250.2 3DO.O 350.0 4DO.g 450.2 5DO.C 550.0 BOO.D 5SD.g
Agreement is acceptable; no TPS impact.
317
F:_ _" r"A "r- _" C I-"! RTR 174-01
CD
_R
L
C_
c_
Zc3
LH2 ?_NK XT = !359.2 IN. TH_TR T = 337.5 DEg.
Agreement is acceptable; no TPS impact.
318
1=:_E_ r',,_ "T- E_ C I--I RTR 174-01
C_
end
CD
Z
B22_' _g:NT 7552
C3
r"2 _' - . THETR 31,,, :,NK XT 1359.2 IN ? - 5.0 DEg.
¢
II [o,=.,_,o,.,_.,_o,_
q= K£M'I"£CH I_S .7
-_ .... I-- I
! I
1 r, i1 t
2.D 5D.3 iDO.O :5C.D 208.2 250.C 3,OS.D350.0 40'0.0450.0 5'OO,O559.0 5DO.D _SO.D
Agreement is acceptable; no TPS impact.
319
I=_E_:M "1" _: C I-.--i RTR 174-0]
O
O
5.j °UD o.
_-_ o_"rr_
BODY POINT 7554
[--.o0::_.n..-
[_9Z
E--._(I:[.J
D
LH2 TRNK XT 1359.2 IN. THETR T - 292.5 DE_.
! I4
, .. , ..
i[ i
r,
_LEO I., DES_ON H]P_T LOAD
• rU/TT _
--,.,.,....--.--,-. pj 100.4_'_,t'T£CH LI&..]
I...... t
l ii ,
.,o
_ J
! , . ,.
t'0.0 S0.0 10'0.0 IS0.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 55'0.0 500.0 B50.0
TINE [5CC_
Agreement is accepsable; no TPS impact.
320
RTR 174-01
C_
0
LJ o
L--
BGOY POINT 7555
L_I
.rr- ,.5r-Y-
C.D
Z_cD
L,.-]
LH2 TRNK XT 13D_ 2 IN THETR T 270.0 DEG
_I_OL DE,SCII.I_rlON HX.AT LOAD
! m-_-r2
i
i
2 '" ' "-: _i¸ I
i I
I I
0.0 50.0 :O0.O :50.D 200.0 250.0 30C.O 350.0 400.0 450.D 500,D 55_.D 5DO.Q SSD.D
TZ_r _
Agreement is acceptable; no T?S :mpac%.
321
or"
D
CD
U'_m
r_
C_OZ
.K-
BODY pOTN_, : 7556
LH2 TRNK XT - !359.2 IN. THETR T 2_,7.5 DE3.
0
cM
c)
o
k ,i ,
II:; ,,_i _ DF_,S_ON I ItEAT LOADt rl'_/l_l" 2
I 111 _,I
i I I1| II
.¢._,
i ii
I i
' I I :' I
p
D.O 5D.O IOO.D i5B.2 200.D 25D.C 380.8 350.3 RDC.D 45D.D 5DO.O 55D._ 5S5.0 65D.D
T_N r" [ SF'31
Agreement is acceptable; no TPS impact.
322
F_ _- r',,.._ "c" _" C _-.i RTR 174-01
D
,,q.,,
O
/.-.j _
_R
-:"" :o
Ld
Z
E_
D
BOO_'_ ,_OINT 7557
.d
- . _HL,B T - 225 DEELH2 TBNK XT 13Sg.2 TN. _ -T .0 .
, ,, , , ,,
_OL DESL'R.n_rlO N 1"]l_._T LOAD
_/t'T 2
I RI _JR.F.MT£C_ 13L_ -t
/
II II
i
i iI
! i
F
iI .....
i .,. : _- .
1,0 50.0 100.0 150.0 200.0 250.0 3OO.O 350.: 400.0 450.0 500.g 550.0 SgC.O 550.2
TImE'S - _' '
Agreement is acceptable; no TPS impact.
323
F:_=" rv_'T" _-" C F--i RTR 174-01
,_r*.
CD
C,_ c_-
[._.
._-_.C_
Bn_¥ p_TNT 7S5_
(.J
Z
L_
r4
tm
LH2 TRNK XT "359.2 IN. IH_.R i _89.0 D£g.
I L
1
; i
I
-r
i
I
! I :
!
: I !: i
i
: E
r
T
] Bt
SYMBOL DESC"1_ ION HEAT LO/d)
_2
Im i R1
........ I REMTECH
I
I L r i
I ,
II I
i ;
i
f
+
I :
0.0 50.0 ;OO.O !50.0 200.0 250.0 300.0 350.0 4.00.0 _.50.0 500.0 550.0 600.0 650.0
Agreement is accepSable; no TPS impact.
324
F=:__" r',,,_ -r- _" C i---._ RTR 174-01
L.H2 TRNK
BODY PS:NT 7620
XT - 1486.5 IN. THETR T - 0.0 DEG.
i b° i
r
L i i
i i
i : i
: 1 I
4I
; i , L
i
CJ
L_Rt_ c_.
L
r,
°
rm
Ld
[-_
r_
C_9
Z
• mr
p iL
I i
: ii
IJ I
DE,._ZI_O N lt_AT LOAD
170,,_
I : i
l i '
, I
I ' I
'0.0 50.D !00.0 !50.0 200.9 25C.D 3D0.0 35D.0 4DO.O 450.0 500.0 550.0 688.0 850.0
TIME ^=_'
Agreement is acceptable; no TPS impact.
325
F::_ _"r,,_'T-_"C_ _ RTR 174-01
BOOT POINT 7625
LH2 TRNK XT = 1486.5 IN. THETR T - 270.0 DEG.
t
P..O SD.O I00.0 150.0 20D.O 250.0 300.0 350.0 400.0 45D.0 500.0 55g.D _CD.D _SD.D
T:NE [5Eg_
Agreement is acceptable; no TPS impact.
326
F:_ _" r,,_ -r- _" C P-_ RTR 174-01
O
LH2 TRNK
BODY POINT 7629
XT - 1486.5 IN. THETR T = tBO.O DEG.
I t
° I
r
I
i
I !
b I
, I
E i
i
4 i ./._ :.._ ,,,,',}
h_.l °5Qo,
rlb--, _
rr- u_.
CDZ
! I
j
$YM]O I. DESCRI]PTION BEAT LOAD
BTU/I_ 2
RI lI2J
R.F.,.MTECH t_'t..I
I
I
i
r
E J
k
! I
i I
' ii
, !
: i
t
I !i i
I
i
E i _ t ; i
, , i
lol0 50.0 iOOlO ltC.C 200.0 250.0 3CO'C ]toIO 4CO,O _5C,0 5DO,C 55C.0 600.D BSC.O
T;_ _ ,_)._IL _bLb
Agreement is acceptable; no TPS impact.
327
I=_ E r,,.,,1 -'V" E C I--_ RTR 174-01
O
o
G.j °
L
O3
L_
B--- o
o::: _-r_
Zo
n-
L_
Z
BODY PO]NT 7680
LH2 TRNK XT - ]6]5.7 IN. THETR T - 0.0 DEG.
o
_2
DESC_rI'ION
144.#
I II
r
S\ i [i
J]
p
p,,
O.O 5D.0 lOO.O !50.O 290.0 258.0 3DO.O 35D,8 400.0 _.5D.D5OO.O 550.0 6OO.O 650.0
T T_= ISECI
Agreement is acceptable; no TPS impact.
328
i=_ _: M"r" _: C I--I RTR 174-01
O
r_
c...9_R
I --
G3
[--., O
r'_
Z
LJ-7"
BODY POINT 769]
LH2 TRNK XT - 1615.7 ]N. THETR T - 337.5 DEG.
[
I , •
I
i
iI- I '_''' I/
I II Il
L -- '
I
' !1 '
!
1j,::-: i i
0.0 50.0 I00.0 15C.D 200.0 250.0 300.0 350.0 400.D 450.D 5DD.O 5SD.O BDO.D 550.0
TZME (SED)
Agreement is acceptable; no TPS impact.
329
I=:__:: I',,,_ "r" I_: C I-.---I RTR 174-01
o
D
b'_ o
L
r._
_d
Zo
BODY POINT 7B@2
D
0
LH2 TFINK XT 16t5.7 IN. THETR T 3tS.0 uE_.
I
II
DESCRIPTION
RI
REMTEC'H L_03
I
0.0 50.0 100.0 !50.0 200.0 250.0 300.0 350.0 400.0 450,0 500.0 550.0 600.0 550.0
TIME [5Eg_
Agreement is acceptable; no TPS impact.
330
I:_ l==" rvl-r" E_: C I--I RTR 174-01
C_
'_P" F
0
C_,I.
5_1 C_
p-,r,
"mo
rm
p,.,-
C.9Z
or"
"t-
o
C_
CI
,4
BODY POINT 76_4
LH2 TaNK XT - t615.7 IN. THETR T - 292.5 BEg.
ii%
DICSC_B_TION _..XT LOA9IITTj/_ 2
Jr/J."0¢6
--" ILl
........ _C,4"rlgc_
I I_
tt.O 50.0 I00,0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 55'0.0 500.0 650.0
TIME (5EC)
Agreement is acceptable; no TPS impact.
33!
0
.¢.
C)
["%1
LJ o
[--.L
r_
r,1[--, c_
rY
C9Z
_4r]
BODY PCiNT 7695
0
CD
rm
LH2 TRNK XT - IB]5.7 IN. THETR T - 270.0 DEG.
, i
Ii
i
il
i
IL
." i_ i',
LV/j
14L@
ii - - |
O.D 50.0 I00.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 650.0
TIME [SCC)
Agreement is acceptable; no TPS impact.
332
C_
w-'
0
_R
L,J
C_
Z0
CD
0
BODY POINT 7888
LH2 TRNK XT _ 1825.7 IN. THETR T - 2_7.S DEG.
i
0.0 50.0 !O0.D I
Agreement is acceptable; no TPS impact.
333
C3
0
CDL_ _b'30
E-_L,-
BOOY PO t T,N. 7B37
53o
rr"
EDZ
,_r.¸CEL]..l-
f
I
LH2 TRNK XT - t615.7 IN. THETR T - 225.0 DEG.
-.; i
, i, ,.-,
SYMBOL DII_S_ON H_.AT LOADIlTUR'T 2
IU
R£.WW..CH 12,¢Z
BII
I+' J i 1q , + i
, !
i t I JI t I
_ ! ! I ,I1 I ' L ij Ii , 1
! + I '
' l b _ + t t II , l I
0.0 50.0 IO0.D 150.0 200.0 25'0.0300.0 350.0 400.0 450.0 500,0 550.0 500.0 550.0
TI_E (5E3_
Agreement is acceptable; no TPS impact.
334
LH2 TRNK
BOgY POINT 76_9
XT - 1B15.7 IN. THETA T - tSO.O DEG.
0.0 50.0 i00.0 !
i 1 i ! !
O.O 200.0 250.0 300.0 350.3 400.0 4.50.0 500.0 550.0 500.0 653.0
TIME [ St..,.,l
Agreement is acceptable; no TPS impact.
335
•_ EM T_'C i---!RTR 174.01
o
o
C.3r.._ oCr_ ,-,
1
_D
O3
800Y POINT 7760
n- Zn_
C_9Z
rr-
OJ
LH2 TRNK
o
XT 1743.0 IN. THETR T - 0.0 OEG.
i ._Pt'_4_OL D_C]PJ]F11ON H]ULT LOAD
I
0.0 50.0 lO0.O 150.0 200.0 250.0 300.0 35'0.0400.0 _50.0 500.0 550.0 60`0.0650.0
T[MC (SEC_
Agreement is acceptable; no TPS impact.
336
C_
L_ _
L
m
Qnny POINT 77s,
LJ
_GrY
C_9z
{---.,,_.
L_]
LH2 TRNK XT - 17_3.0 IN. THEIR T - 337.5 DEG.
CD
t
! F I I
I I
r . I
]
; : i i
;
i: !
' Ii
i, --. I
SYMBOL DESC_FT_ON i{_T LOAD_2
I pJ 10&6q
R,£,_/'ECH I_,4
I .F
tI
r
ir
I E
I
'! i
, , I r
, i i i 1 r! I i I , Ir !' I i 1
t _ 1 , i
I
0.0 50.0 _90.0 150.8 200.3 2SD.O 300.0 350.0 400.0 450.9 500.D 550.9 53S.3 558.0
TTNE _qr_,
Agreement is acceptable; no TPS impact.
33T
I=:__" r',_ "T" ==" C I---I RTR 174-01
c_
,¢,
o
L,J o
r,
"-_o
E--, c_
C.9Z
c3,
:1-
o
c_
BODY POINT 7752
LH2 TRNK XT - t7_3.0 IN. THET£ T - 3tS.O DEG.
SYMBOL DES_AFrlON
11@,3
144,.7
•0 50.0 I00.0 15'0.0 200.0 250.0 300.0 350.0 40'0.0 450.0 500.0 550.0 50'0.0 650.0
TIME [SECI
Agreement is acceptable; no TPS impact.
338
i:_ _-- M-I- _-- C HRTR 174-01
O
CDL.] °
B83 v P_,NT 778_
L_
r_
Z
b.J-r-
LH2 TRNK XT - 17_3.0 IN. THETR T - 292.5 DE9.
i/Fa, ! ' , _
,, .. ,.
0.0 50.0 IOC.0 150.0 200.0 25C.3 300.0 350.0 400.0 450.0 500.D 550.3 600.D B50.O
TI,_E [ SF_C]
Agreement is acceptable; no TPS impacz.
339
F::_ _=="M-T" _ <_ I---I RTR 174-01
o
F_J
r,1 o
b
r_
E.J
r_.9Z
Z
D
c)
30D_' POINT 7726
LH2 TRNK XT = !7_3.0 IN. THETR T - 247.5 DEG.
i
r
L
I r
r Ii
i
i I :
i ; i. p ,
_e.AT LOAD
i
SYMBOL
Ii _ ! IIr I , iI i I ' i ,
, i I I i I' i
i t i Ii
l !
tI i
ri
i
I
Il
; i
: !
h
, i
I
O.O 50.0 100.0 150.0 200.0 250.0 300.0 350 ""_.L;2.O450.0 500.3 55C.0 8OO.C 650.0
iF" [....
Agreement is acceptable; no TPS impact.
340
o
c)
CDrJ _
[--,
O:3
L_
r_
C_9Z
E---,_
LJ"T-
c_
800Y PD!NT 7757
LH2 TRNK XT - 17_3.0 IN. THETR T - 225.0 BEG.
' tL I
r
! i
I
J
,
.0 50.0 lO'O.O!50.0 200.0 25D.D 300.0 350.0 400.0 _50.0 500.0 550.D 600.0 650.0
TT_,.b,_ (5ECl
Agreement is acceptable; no TPS impact.
341
F:_ _" M"_ _" C I---I RTR 174-01
C)
C)
L,_J o
r_
ZD
.L-..r.,n-r.',
BOD_ POINT 77S9
0
LH2 TRNK XT - 17_3.0 IN. THETR T - tSO.O DEG.
J
i
I
SYMBOL I DESC_IFrlON HEAT LOAD_'IJ/FT2
Ii1
F _
1
' !I
!' i
d
0.0 50.0 100.0 150.C 200.3 250.0 300.0 350.0 400.0 450.0 500.0 550.0 60'0.0 550.0
T[ME [SEt]
Agreement is acceptable; no TPS impact.
342
F:_ _'- r',,,,'l'r" _" <_ t..-_ RTR 174-01
D
E3,
C_)
U_I C)
5_
D
•-, O
I,Dr,1
n-
F-.n-
LH2 TANK
BODY POINT 7830
XT - ]872.2 IN. THETR T - 0.0 OEG.
II
SY_|BOL DESCRIPTION HEAT LOAD_l.Ufl_r 2
R.I l 214_RE,MTECH .?._I
/,,
[_) it _
O.O 50.D lO0.O 151).0 200.D 250.0 31)0.0 350.0 4DO.D 450.0 500.0 550.0 500.0 550.D
TIME [ 5EC
Agreement is acceptable; no TPS impact•
343
F:_ _" r',,,,'l'n- E_: C n---I RTR 174-01
C_
c_
U
L,-
L.I
n'-n.-
C.9o
Zv:'
!--,n-5..I"I"
LH2 TRNK
B00Y POINT 783l
XT - 1872.2 IN. THETA T - 337.5 OEG.
| I 1 L fSYMBOL DESCIUPTTON
I i
HEAT LOAD
BTU/FT 2
IlmmmmmmmmmmrI L
0.O 50.0 100.O 150.0 200.0 2SO.O 3OO.0 350.0 t00.0 45'0.0 500.0 550.0 600.0 650.0
TlrI£ [5E01
Agreement is acceptable; no TPS impact.
344
J=_ _" P,_'T" _" C F--! RTR 174-01
c:)
c3
C3
c.)
U')I CD
P,=;r,
I--,_3w
LDL,Jf--,n-
COO
Z_:'
I-',cr-5.1
LH2 TRNK
800Y POINT 7832
XT - 1872.2 IN. THETR T - 315.0 OEG.
SYMBOL DF..SCI_PT]ON
gl
REMTECH
I tI.I[F_ T LOAD
_'U/VI""
201.2
"-_.0
i|o
cDi
eI
t:D. "-.-2.a. ,.
0.O 50.0 lO0.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 500.0 650.0
TIME (5EC]
Agreement is acceptable; no TPS impact.
345
i_ i_-' M '1-1=-.. C i... ! RTR 174-01
BO0¥ POINT 7835
C_
C_)_JU_! C}
f-._LG_
O3
L_JF-,
n-"OC
¢._9C_Z
n-GJ
-r"
LH2 TRNK xT - ]872.2 IN. THETR T - 270.0 DEG.
I I I, I I Im
1 H£AT LOADSYTd_OL DESCRIPTIONI
I
R.I 217.6
........ g.KM'I_CH
I II
o L0.0 50.0 100.0 iSO.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 500.O 550.0
TI_E (5CCJ
Agreement is acceptable; no TPS impact.
347
F_ _" r,,_ -r- _" c p-..i RTR 174-01
BOOY POINT 7836
c_
,4.
0
p.._.L,-
03
n"t',,,"
C.9oZ_
[.....,n'-
"r"
,.4-
LH2 TRNK XT - 1872.2 IN. THETR T - 247.5 OEG.
I iS_OL
........ i
,1 1 f 1HEAT LOAD
DEscRn_rioN _TU/FT 2
RI I$OJ
ggMTECR 202J
. I I II
_'j ,,
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 550.0
TIME [ 5EC ]
Agreement is acceptable; no TPS impact,
348
C)
¢.DLJU'_
! 0
5-
p-.nn
L,Jt---,n-n_
G::L,J"1-
LH2 TRNK
BODY POINT 7837
XT - 1872.2 IN. THETR T - 225.0 OEG.
I I I IDF__ON I I-r£ATBTu/_..rLOAD2 --
i
SYMBOL
t
........ P.,F_'_IECli
L0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 5OO.O 550.0
TI_E [5EC1
Agreement is acceptable; no TPS impact.
349
I=:__" M"I- :" C _--i RTR 174-01
D
P4.
LH2 TANK
B00T P0]NT 7839
XT - ]872.2 IN. THETR T - ]80.0 0E8.
c_
c;
L,JL/3
! c_ m
5-
-nf-,nn
I.D5.1[--,or"CIC
C9_
GEI.,J
"t- c}
,4
I I !L
D_C_ION I HEATBTI.I_TLOAD2]
RI L_.4
R£,M-FECH 175JI
C:)
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 500.0 550.0
TI_E [5ECI
Agreement is acceptable; no TPS impact.
350
c>
....,
c)cD.
F.D5,_1U'>I c>
r,
•.-, c>
tJp-,O=
F.Dc,Z.:-
i--,
5.]"1-
LH2 TQNK
BODY POINT 7850
XT - ]898.0 IN, THETR T - O.O DEG.
i
II
SY3,LBOL DESCRIPTION HEAT LOADBTU_Fr2
I RI :3_`3RE._frECH 244,3|
o,/
O.O 50.0 IOO.O I50.D 200.0 250.0 300.0 350.0 4DO.O 450.13 500.0 550.0 600.0 S50.D
TIME {5EC)
Agreement is acceptable; no TPS impact.
351
I::_E r,,_l'r" E C _-'I RTR 174-01
c_
D
r_..)_.J
,.-, c)
b..J
n..-
LH2 TRNK
800¥ POINT 7852
XT - 1898.0 IN. THETR T - 315.0 OEg.
SYMBOL DESCI_ION HEAT LOADErTUffI"I
I| I
RI I :14..3REM'rECH ZI_3
II I
I
, • , F • -,
0.1) 50.0 lO0.O lSO.D 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.1) 550.13
T IME [ 5EO }
Agreement is acceptable; no TPS impact.
352
!=_ ==- r,_ "1- I_ C I---I RTR 174-01
c>
LH2 T_NK
BODY POINT 7855
XT - 1898.0 IN. THETR T - 270.0 DEG.
D.D 50.D 100,0 15D.D 21)0.0 2SO.D 300.0 350.0 4DO.D _50.O 5430.0 5SO.O 500.0 5SO.D
TIME 15C0)
Agreement is acceptable; no TPS impact.
353
I:::_ =" M T =:" C I--,,I RTR 174-01
F_.
C)
G-]U'_
5-
[--,
0I.D"
5-1[--,cr-
F_._O
G.]'1-
LH2 TANK
BODY POINT 7859
XT - 1898.0 IN. THETA T - 180.0 OEG.
S'IC_BOL DESCRIPTION
I ,,1
H£AT LO.&D
RI L_$3R.EMTECH 17L7
,-A
O.O SO.O IO0.O ISO.O 2DO.D _O.O 300.0 350.0 400.0 450.0 5430.0 SSO.O 6OO.O 650.0
TIME [SEO;
Agreement is acceptable; no TPS impact.
354
i:_ _ M T I=" C I.,,,4 RTR 174-01
BOOT POINT 7920
LH2 TANK XT - 2036.5 IN. THETR T - 0.0 OCG.
II
I
Agreement is acceptable; no TPS impact.
355
F=__" M"T" _" C I---! RTR 174-01
c>
c,
F_.)L,.JU'_
G..
G.J[....,o-
r.__Oz_[.--.(IZG.J
LH2 T_NK
BOOY POINT 7921
XT - 2038.S IN. THET£ T - 337.S DEG.
SY_V_OL i D£SC_,"PT_O N
r
........ ! R£MT[CH :¢3J
r
....
o /I,
O.O 50.0 lO0.O 150.0 200.0 250.0 50'0.0 :350.0 4DO.D 450.0 500.0 550.0 600.0 B50.O
TIME [SEO)
Agreement is acceptable; no TPS impact.
356
F::__:: M'T" _:: C P-4 RTR 174-01
c)
I'M.
c:>D
C..)r,'l
I c_,
5_
D
n'_
r,'tb.-,rr"r,F
C._o:_,. _.I-,,-,,,I
[.-,n-.5_1-1-
BODY POINT 7922
LH2 TANK XT - 2036.5 IN. THETA T - 315.0 O[8.
[ I I Ii -SY'3iBOL DESCRIPTION HEAT LOAD! _TL_'T"r_-
J
,iREMTECH f _.39.1
I I
• i
t
Z -_ _._.I
D.D SO.D I00.0 ISO.D 2130.0 L>50.D 3130.0 350,0 41)0.0 450.0 5130.0 550.0 BO0.O 650.0
TIMC ISCD_
Agreement is acceptable; no TPS impact.
357
C,
E>
C3,.
h.JU'_I ¢>
5-
i--,
,.-.. C3,i
I.OhJp-,ri-Ce:
n-UJ
LH2 TANK
BODY POINT 7925
XT - 2036.5 IN. THETR T - 270.0 DEG.
SY_IBOL DE3CRIFTION HEAT LOAD
I RI .127.1RL%trEC_I 280.9
........ t
I
o ,'7
O.O 50.0 IO0.O 15'0.0 2..00.0 250.0 300.0 350.0 400.0 450,0 500.0 SSO.O 600.0 650.D
TIME [5E0)
Agreement is acceptable; no TPS impact.
358
F:__" P,,._ "T"_" C _---I RTR 174-01
Di
N-
C:,
C.)f.J
I t_
5_
[--,Ct_,.-, tD
I.DLJp.,n-o':
p.-,
L,J"r"
C)
LH2 TRNK
BODY POINT 7929
XT - 2036.5 IN. THETR T - t80.O OEg.
5YT,tSOL
• I
174d
itt
'O.O 50.0 IO'O.D 1S'O.O 200.0 250.0 51%1.0 550.0 4180.0 450.0 500.0 550.0 500.0 550.0
TIMC [SOD)
Agreement is acceptable; no TPS impact.
359
F::__" r',_ "-I- _" C i--i RTR 174-01
C:>
O
C:>-
r_.)G.J
IcD
C_•.--, C>
t,1
cr-C_
p-..i
G_]
CD
LH2 TRNK
BODY POINT 7930
XT - 2058.0 IN. THETA T - 0.0 DEE.
;Y_OL
1 I
I DESCRJ]_TION I-[EAT LOAD1 BTUA_'T 2
t IU ".JO.O; _..W1"£CI{ 309..I
II
/ -%%
t, ,E:,
f-_ • i
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 41)0.0450.0 500.0 550.0 r>O0.OS5'O.O
TIME [5ED]
Agreement is acceptable; no TPS impact.
360
F=;__" r'vl"T" _" C l--i RTR 174-01
C::,
LH2 TRNK
BOOT POINT 7931
XT - 2058.0 IN. THSTR T - 337.5 DEG.
ISY_,tBO I- DF..SCR.[FTION HEAT LOAD
B'TU,'PI" 2
KI _.0"/,.$
REMTECH $0"/._1
C:>
r._)L,J
i c>
c,_
['t"3 s,,J
p.-,n-
c..9o
#
o
_" ,,'j_t # /
A
iL
11iI %
If
%
%,I
,%|
\ ,O.O 5O.O IOO.O lSO.O ?.DO.O 250.0 :300.0 350.0 4DO.D 450.0 5DO.O SSO.O &OO.O 550.0
TIME (5CC:)
• RI IVBC-3 environment considered low. Body point 7931 is
located in front of the LH_ feed line; consequently, the
separation would drive the aero convection up over the clean
skin acerage level. Comparison of the IVBC-3 interference
factors with the IH-97 data base (T/C 5052) show that the
cold wall heating rates in the environment are low.
• Possible TPS impact.
36!
RTR 174-01
BODY POINT 7935
('%1,
C)
C.)C,2U'_
F--a6l,-
I.--.
I---,crCIC
p.-,rr-L_"I-
LH2 TRNK XT - 2058.0 IN. THETR T - 270.0 OEG.
I I I .. I I I
$'¢_,1110L
I
ltF_.ATLOADDE3CIU]PTION lrTIL1ArT_
iU %.wr/_P.,JE,WT£CI'! .13L0
II II
t
Jttlf iit
I i
, t
|
' j
/.j.j
D.O 50.0 I00.0 |50.0 200.0 250.0 300.0 350.0 100.0 150.0 500.0 5.50.0 500.0 550.0
TIME 15EC]
• RI IVBC-3 environment considered low. Comparison of IVBC-3
interference factors with the IH-97 data base (T/C 5051)
show that the cold wall heating rates are low in the
M _ = 3 range.
• Possible TPS impact.
363
i:_ _ M T'I_ O I,---!RTR 174-01
BOOT POINT 7937
L_L_U_
L_
QD
t_F-n-
p-
D:
L_
LH2 TANK xT - 2058.0 IN. THETA T - 225.0 DEG.
I 1 I 1 ISYMBOL DLSC1RIFrlON
• II [
0.0 SO.O IO0.O 150.0 200.0 250.0 300.0 :350.0 400.0 450.0 500.0 5,50.0 SO0.O 650.0
TIME (SEC]
Agreement is acceptable; no TPS impact.
363
RTR 174-01
O
CO,
C:),
(__u.Ju")
I C)
p.,_.I.,..
(.-,s3
L,.JI'-,Q_r_
COoz,,:p-,n-U.l"l-
eD
P4
LH2 TRNK
800T POINT 7939
XT - 2058.0 IN. THETR T - 180.0 0EG.
m
SYMBOL D£SCRZ]PTION
--- I........ ]_£MT£CH
II. II I
i iR EX'I" LOAD
lrl-_-r 2
LS2..O
I_.0
O.O 50.0 IDO.O 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 650.0
Title {5£C1
Agreement is acceptable; no TPS impact.
364
RTR 174-01
LH2 TRNK0
0
_4
uj _.trio
L
rr_
GJ(_,. r-,,
rr"
r.DZ
(I:::
BOOY POINT 50108
XT - IISI.8 IN. THETR T - 30.9 OEG.
II
j ,
I
I
I
i
II
IiI
I
SYM]IOL DESC3,/I_ ION
El
........ ]_._rl"ECH
[ I
,, J
I
2I£_
II
IIt I
:f I I'O,O 5(].0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 600.0 650.0
T[I'IE (5CC_
Agreement: is accepCable; no TPS impact.
365
F:_ _" rvl"r" _- C _-..i RTR 174-01
{:D
C}
B;
_RU3_
p-5-
5-1
{2:/
C.9Z
{--- ,¢.K-L3T-
C_
n v ,* T9u9_ PC.N, 50109
LH2 TRNK XT - 1151.8 IN. THETR T - 30.g Dfio_.
r
r
, ! / : ,\
SYMBOL DESCRIPTION I.I_T LOAD
_I'U/y'T 2
El ]Z13
........ PJE,'_3E:Cl1 :¢/J
tI
k
O.O 50.0 I00.0 150,0 200.0 250.0 30D.O 350.0 400.0 450.0 5DO.D 550.0 50'0.0550.0
TIME {fiEC_
Agreement is acceptable; no TPS impact.
366
F=__" P,,,,1"-r- _- C _-_ RTR 174-01
C_
D
F_
r,
CD
Z
o
C)
BDDT PGiNT SOi!l
CD
0
LH2 TRNK XT _51B IN THETfl T 30.g D_.
i iJ
! I
i il
i
i , r
i i
t
' !
i
; ii
I
! ,i
I
"Ir
! I
D_CRIFrlON HEAT LOAD
BTU/_r 2
i
i i
1
i i
iI
i
m
._ 50.D !00.0 ',50.D200.0 250.0 300.D 350.0 400,O 450.0 500.D 550.0 60b.D 550.D
TiME {SEE)
Agreement is acceptable; no TPS impact.
367
i_' =" M T =" 0 I--! RTR 174-01
BODY PCINT 50308
LH2 TRNK XT * 1270.2 IN. THET£ T = 30.g DEG.
Agreement is acceptable; no TPS impact.
368
F::__" M "-'r-_" C H RTR 174-01
BODY Pg!NT 50309
LH2 ?RNK XT = 1270.2 IN. THETR T = 30.9 DEG.
\ i
• i
' L-:o o sO.o _oo.o:so.o 2oo.o2so._ _oo.o 3so._ ,_oo.o4so.o soo.o sso.o 6oo.o 6so.o
Agreement is acceptable; no TPS impact.
369
F:__" r,,_ -r" _" C _--_ RTR 174-01
0
0
BOOY POINT 50311
r, 1
[--_ c3,
n-_.7,..-
coz,---, 0
crr.l7-
0
LH2 TRNK XT = 1270.2 IN. THETR T - 30.g DEG.
ILl _rT.4
_r.,_"I_C_ 291.4
0.0 50.0 tO0.O lS'O.O 20'0.0 25'0.0 :300.0 _50.0 400.0 450.0 500.0 550.0 50'0.0 650.0
TIME [SEC_
Agreement is acceptable; no TPS impact.
370
F::z_" r,,_ -r- _" c I---g RTR 174-01
E_
LH2 TRNK
BOOT PGINT 50508
XT = 1399.4 IN. THETB T - 3a.e DE9.
_t"M]lOI.
I
! !i
!I
IiI
i
I D_ON HEAT LOAD_TutTr 2
I
I
0.0 50.0 lOO.O 150.0 200.0 250.0 300.0 35D.0 400.0 450.0 500.0 550.0 500.0 650.D
T_NF_ [5EC_
Agreement is acceptable; no TPS impact.
371
i=_ i_-,- M -r i==,,,C I,,,_iRTR 174-01
C3
0
BOOY POINT 50509
LH2 T£NK XT - 139g.4 IN. THET£ T - 30.g DEG.
I
Agreement is acceptable; no TPS impact.
37'2
I=_'r,,,_-r"_'-c f.--I RTR 174-01
D
C_
r
[--. ¢;-C_
L,_}
_-u_C_
CDZ
CtZ
C)
C_
O
BOOY POINT 50SII
LH2 TBNK XT - 1399._ IN. THETR T - 3O.g DEG.
i,if,
0L DF-_CR/I_T]ON J_T I_D
pJ 211.7
&E.'_TIBCII /._ --
L
LJ i
Ii
I I
i
]
I
[I
, I
i
iI
i 1
E I
I .
o.o so.o _oo.oIso.o2oo.o2So.o soo.o3so.o:oo.o 4so.osoo.o ss,_q soo.o sso.o
_T_r [5EC)
Agreement is acceptable; no TPS impact.
3"/3
I_ I_" M T 1_..,. O I._. IRTR 174-01
C3
C_
C.3_o.(.,Q _,.
r,
F--, _.
cz:: _-r'r"
[..9Z
LJ-'r--
BOOY PO'NT 50808
0
0
LH2 TRNK XT - t593.2 iN. THETR T - 30.£ DEG.
0
r
f
, i1 ,' L
!
iI
ql I
j
: !
,
t
÷
i
, !
i
I ' i i
, ,, i
i.. SYMBOL DF.,SC_I_PTZON
I/
RJ_I"I£Cll
! I
I iI
i
I?U
18LI
I
i
L
0.0 50.0 I00.0 :50.0 200.0 250.0 300.0 350.0 4,00.0 450.0 500.0 55'0.0 600.0 _50.0
TI_E ',5£C ;
Agreement is acceptable; no TPS impact.
374
F:_ _-" r,,,,4 -r- _" C I--_ RTR 174-01
BODY POINT 50809
[._)L.] o
S_
w
rr"
r_9Z
Ld
LH2 TRNK XT _ ]593.2 IN. THETR T - 30.g DEG.O
- i i° i
I ! 'i i r
! : iP
i io I !
_- ! ,'i i i
II
w
0.0 50.0 ]O0.O !5D.O 200.0 25D.0 300.0 350.0 400.0 _.50.0 500.0 SSO.O 500.0 550.0
TIME {5EC_
Agreement is acceptable; no TPS impact.
375
RTR 174-01
O
C_
_.,_o
_o
[.,.Jb-,o
C_
Z
800Y POINT 50811
LH2 TqNK XT - 1593.2 IN. THETR T - 30.g DEG.
CM
6
tii ,
i i_ _ iI _ ! ! I!
i
i
i
i sY_mol.
I ...
! ,
7
D ES C]/,.II_'1ON HEAT L,OA._
rl-t_-l- 2
105.11
: I I ' i
"- i !
i ! I ' !
,- I i
I
'i
I I
L
i--
0.0 50.0 !gO.g '.5C.] 200.0 250.D 30'0.0 35D.0 40O.D 450.0 500.0 550.0 SOC.O 550.0
T!NE [SECJ
Agreement is acceptable; no TPS impact.
3T6
F:__" M"T" _" C }--4 RTR 174-01
i
N.
¢=,
r._
I ¢:>
F-, =;.5_
F--,
•.-, ¢:>
I.D_Jp-n-
[..-,I"I-L,.J"r"
LH2 TANK
BOO¥ POINT 5130B
XT - 1918.0 IN. THETA T - 30.9 DES.
IS'Y_OL
I DESCRII_'ION HEAT LOAD
_j "..30,9
RJ_fTECH -"'/3.3
* ,p,t _
eIjl" o, /
_ ° ,
0.0 51).0 I_.0 150.0 200.0 ZSO.D 300.13 350.0 4130.0 450.0 50'0.0 550.0 r_O0.O 550.0
TIM[ [5[0_
Agreement is acceptable; no TPS impact.
377
_=__" r',_"_- _" c H RTR 174-01
e
¢:>,
L_JU_I ¢>
_=_'5..
DF.-,n_
g.__oZ
n-
-r=
LH2 TRNK
BOOY PO I/',IT 5 ] 309
XT = 1916.0 IN. THFTR T = 30.9 DEE.
I ! ISY?,[BOL DESCI_ION FI]gATLOAD
BTt'Jlrl-2
:3SJ
q
C> )
O.O 50.0 1DO.D 150.O 200.0 2SO.D 500.0 3.50.0 4DO.O 450.0 54)0.0 550.0 54:)0.0 5.50.0
TIMC [SCD)
Agreement is acceptable; no TPS impact.
378
1=_ ==="r""_ "-i- _:: C I'-'i RTR 174-01
o
c>
LH2 TRNK
BOOT POINT 51311
XT - Igi6.O IN. THCTA T - 30.g OEG.
[_)
J
D
03
r.l
rr-
Zq:-
- F"n-5_i
_u
i RE._tTECH :36_I
o
¢J
O.O 543.0 IDO.D 150.D 2.JXI.D 250.D 300.0 350.0 4130.0 450.D 500.0 550.0 5130.0 550.0
TIM£ [5[0]
Agreement is acceptable; no TPS impact.
3T9
c)
LH2 TANK
800Y POINT 51608
XT - 2028.0 IN. THETR T,- 30.9 DES.
I I ISY_IBOL I DESC_.PTION
I6.
C._
r.
D
CD
- jF-- •
= !C_
CDc_Z
- hCE
!
O.D 50.0 100.0 150.0 2:00.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 8430.0 650.0
TIME 15EO)
Agreement is acceptable; no TPS impact.
380
I=_ _" r",._ "i- "=="_ _'-"l RTR 174-01
o
F_)G.JU%
5_
D
G.JE-,
5_)
r_
Q
LH2 TRNK
800Y POINT 5]609
XT - 202B.0 IN. THETR T - 30.9 DEE.
SYMBOL ' DESCR/FrlON HEAT LOAD
t BTU,_r z
i RI
........ RESITECH
391.6
445.7
• (
/ l
I
i
%
O.O 50.0 lO0.O 150.O 290.0 250.0 300.0 350.0 4D0.D 450.0 500.0 550.0 600.0 650.0
TIME (5EO_
Agreement is acceptable; no TPS impact.
381
F:_ _" r'v'! "T" _" C P---q RTR 174-01
o0
¢>
C.>
U'_I ¢>
[-,5_
[...,
._., ¢=,)
rT=
Z
n'=
LH2 T_NK
BODY POINT 51811
XT = 2028.0 IN. THET_ T = 30.9 0E8.
., t I I II DESCRIPTION ltEAT LOADB'TU_F'T2
I_E.'_TECH 34¢6
C:>
"I
D.D 5D.D IDO.D ISD.D 200.D 2SD.D 3DD.O 35D.0 4DO.D 4SD.D SDO.O SSD.O 500.0 BSD.D
TIME ISgg)
Agreement is acceptable; no TPS impact.
382
1:_ E M TE C I--.! RTR 174-01
BOOT P0]NT 56283
LH2 TSNK XT - ill. 24.5 IN. THETA T - 32.5 0ES.O
. | i
SYMBOL D_ON I I_AT LOADlrrT._ z
£ ' I i '' ' '
i ' ' X£._'T.C14 273.0 '(-J , -"U'_ ] _ I II '
I O
I I 1! . [
::3 , .,I ! '1 ' J
I I i
.... I , • , I
[-- ' i I_" ! i t - , . !
i iCOo - i• ! • • _; ..z.- i ' I ' '
P-' ! " ' Irr- ; ' .' _A ., _
,' ;/ _\ i! i! ..
3:: O ] ,, .. I I
_- J' i _ : ' 'I ' "tl ! I
--'7 i• _ l, !' I , ,, , ,
O I " J I - ! J _ - -
0.0 50,0 lO0.O 15O.O 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0 6013.0 550.0
TIME 15EC]
Agreement is acceptable; no TPS impact.