ESTIMATE OF POTENTIAL COST FOR STREET CONSTRUCTION WORKS
Estimated costs per metre frontage - based on 3.5m width property owner cost
Complete
Construction
Drainage, Seal,
Kerb & Channel
Existing street
drainage has
suitable capacity
Road Seal
ONLY
Infill existing
road
ONLY
$1,100 - $1,200 $800 - $950 $550 - $750 $500 - $650
Site Establishment � � � �
Traffic Management � � � �
Survey setout � � � �
Survey and Design � � � �
Scheme Administration � � � �
Excavation � � � �
Supply and place crushed rock
pavement
� � � �
Supply and place asphalt
wearing course
� � � �
Reinstate naturestrips � � �
Sub Surface Soil Drainage � �
Prepare and Construct Kerb and
Channel
� �
Install side entry drainage pits � �
Connect drainage pits to
existing pipes
� �
Supply and lay street drainage –
varying pipe sizes
�
Whilst all due care has been undertaken in devising these April 2012 estimates, no warranty is
expressed or implied by the City of Greater Geelong that these estimates are valid at the time of a
Special Charge Scheme being implemented.
Construction costs are a reflection of market rates and are competitively tendered at the time of
construction, hence the City does not have influence over the expenditure required to complete
construction. A formal estimate is provided for each property at the time of a scheme being
declared and actual costs incurred charged to each property.
Works listed above are not exhaustive of that required for each construction and should not be used