ECE445: The Design ReviewRaj VinjamuriFebruary 3, 2014
![Page 2: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/2.jpg)
Pro Tip: Be Organized!
Always look ahead in the calendar Organize a central repository for your
team (Box/OneDrive/DropBox/Drive/Blue Waters/etc.)
Version control documents and code Hope for the best, plan for the worst– Price, lead time, design margins, etc.
Document your progress throughout– Video and pictures are great for a
portfolio!
![Page 3: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/3.jpg)
What the Design Review is
Structured discussion of your entire project
Defense of the complete electrical design
Design Review should be a stand alone document
‘Requirements and Verification’ section is thought through and thorough
![Page 4: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/4.jpg)
What the Design Review is NOT
Do not prepare a PowerPoint Do not dress up Do not bring in or demonstrate any
hardware Do not bring datasheets for all the
parts you use
![Page 5: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/5.jpg)
Administrative
Mock DR 2/18 - 2/19 (sign-ups open 2/11)
DR week of 2/23 (sign-ups open 2/16)– Don’t forget to sign up to peer-review
another project Grading rubric on the website Description on the website Look at design reviews from past
award-winning projects
![Page 6: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/6.jpg)
Structure/Sections of the Document Modular Block Diagrams Written descriptions of each block
– Similar to proposal, but now includes the detailed design
– Circuit diagrams, design calculations, circuit simulations
– Flow charts for software and algorithms Requirements and Verifications Tolerance Analysis Cost analysis (parts and labor) Schedule Ethics and Safety Citations and References
![Page 7: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/7.jpg)
Block Diagrams
High level overview of components Break into sub-blocks if necessary Clarity is important Not a flowchart
![Page 8: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/8.jpg)
Block DiagramsExamples and Considerations
Growing Degree Day Monitor, Spring 2014
![Page 9: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/9.jpg)
Block DiagramsExamples and Considerations cont.
Ski Computer, Spring 2014
![Page 10: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/10.jpg)
Block Descriptions
Similar to proposal, but includes detailed design
Justify your design Reference your schematics (see
schematics lecture) Flowcharts for software and control Calculations and simulations– Equations and their application– Design feasibility
![Page 11: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/11.jpg)
FlowchartsGoo
dBad
Clearly labeled All decision paths
shown No unnecessary
information
![Page 12: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/12.jpg)
Calculations and Simulations
Power budget Link budget Calculations for component values Simulations of circuit designs
![Page 13: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/13.jpg)
Calculations and Simulations cont.
![Page 14: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/14.jpg)
Requirements and Verification
Requirements– Quantitative operational requirements– Break down into sub-requirements if
necessary
![Page 15: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/15.jpg)
Requirements and Verification cont. Verification–Method to confirm each requirement– Checklist of acceptable results,
quantitative– Debugging plan– “Make sure it works” is not a verification
![Page 16: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/16.jpg)
Requirements and Verification cont. Assign 100 points across all
requirements. – This will be used as a rubric for your
team. Break down functionality into
requirements and what is needed to fulfill the separate requirements
![Page 17: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/17.jpg)
Tolerance Analysis
A part of the design process, not just a test procedure
R/V Table is a guide to goals of tolerance analysis
Actual test procedure in a separate section outside the R&V table
![Page 18: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/18.jpg)
Cost Analysis
Bill of Materials (BOM)– Specific part numbers & component
values–Module that uses it– Price and quantity
Labor costs
![Page 19: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/19.jpg)
Schedule
Week-by-Week Break down tasks Assign responsibility Stick to it
![Page 20: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/20.jpg)
Ethics
IEEE code of ethics– Do not just copy/paste this into your paper– Know and understand it– http://
www.ieee.org/about/corporate/governance/p7-8.html
Discuss ethical concerns as they apply to your project
If no ethical concerns, justify yourself
![Page 21: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/21.jpg)
Safety
Discuss safety concerns– Electrical safety–Mechanical safety– Lab safety– Consider safety of both yourselves and
end users–Make a safety plan if necessary– If few safety concerns, justify yourself
If you have hazardous, or volatile elements of your project, you must create a “Lab Safety Manual”
![Page 22: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/22.jpg)
Citations and References
List of references formatted using the IEEE standard– http://
www.ieee.org/documents/ieeecitationref.pdf
Should include things like…– Textbooks or datasheets where you got
design equations– Informative articles or tutorials used– IEEE code of ethics
![Page 23: ECE445: The Design Review Raj Vinjamuri February 3, 2014](https://reader036.vdocuments.mx/reader036/viewer/2022062719/56649ece5503460f94bda9f4/html5/thumbnails/23.jpg)
Questions?
Mock DR 2/18 - 2/19 (sign-ups open 2/11)
DR week of 2/23 (sign-ups open 2/16)– Don’t forget to sign up to peer-review
another project Grading rubric on the website Description on the website Look at design reviews from past
projects