ECE355 Fall 2004 Software Reliability 1
Software Reliability
ECE-355 Tutorial
Jie Lian
![Page 2: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/2.jpg)
ECE355 Fall 2004 Software Reliability 2
Outline
• Part I: Software Reliability Model
– Musa’s Basic Model
– Musa/Okumoto Logarithmic Model
• Part II: Control Flow Graph
![Page 3: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/3.jpg)
ECE355 Fall 2004 Software Reliability 3
Definition of Software Reliability
• Reliability is usually defined in terms of a statistical measure for the operation of a software system without a failure occurring
• Software reliability is a measure for the probability
of a software failure occurring
• Two terms related to software reliability– Fault: a defect in the software, e.g. a bug in the code
which may cause a failure
– Failure: a derivation of the programs observed behavior
from the required behavior
![Page 4: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/4.jpg)
ECE355 Fall 2004 Software Reliability 4
Parameters of Software Reliability
• Average total number of failures (t)
Average refers to n independent instantiations of an identical software.
• Failure intensity (t)
Number of failures per time unit, derivative of (t).
• Mean Time To Failure (MTTF):
• t may denote elapsed execution calendar or machine clock time
)(
1
tMTTF
![Page 5: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/5.jpg)
ECE355 Fall 2004 Software Reliability 5
Importance of Software Reliability
• In safety-critical systems, certain failures are fatal. This requires pushing reliability to very high levels at very high costs (code redundancy, hardware redundancy, recovery blocks, n version programming…).
• In non-safety-critical systems a certain failure rate is usually tolerable.– This is a question of quality of service.
– Which failure rate is tolerable is mainly a question of customer acceptance. (customer lifts receiver and receives neither fast busy nor dial tone one every 10/10000 calls?)
• We will only talk about non-safety-critical systems
![Page 6: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/6.jpg)
ECE355 Fall 2004 Software Reliability 6
Software Reliability Growth Model (SRG)
• Purpose of SRG models
SRGs rely on observation of failure occurrence and try to predict future failure behavior
• Two different SRG models (appr 40 models totally):– Musa linear model
– Musa/Okomoto logarithmic model
![Page 7: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/7.jpg)
ECE355 Fall 2004 Software Reliability 7
Basic Assumptions of Musa’s Model
• Faults are independent and distributed with constant rate of encounter.
• Well mixed types of instructions, execution time between failures is large compared to instruction execution time.
• Test space covers use space. (Tests selected from a complete set of use input sets).
• Set of inputs for each run selected randomly.
• All failures are observed, implied by definition.
• Fault causing failure is corrected immediately, otherwise reoccurrence of that failure is not counted.
![Page 8: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/8.jpg)
ECE355 Fall 2004 Software Reliability 8
Musa’s Basic Model• Assumption: decrement in failure intensity function
is constant.• Consequence: failure intensity is function of average
number of failures experienced at any given point in time (= failure probability).
(): failure intensity. 0: initial failure intensity at start of execution. : average total number of failures at a given point in time.– v0: total number of failures over infinite time.
00 1)(
v
![Page 9: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/9.jpg)
ECE355 Fall 2004 Software Reliability 9
Example 1• Assume that we are at some point of time t time units in the
life cycle of a software system after it has been deployed.
• Assume the program will experience 100 failures over infinite
execution time. During the last t time unit interval 50 failures
have been observed (and counted). The initially failure
intensity was 10 failures per CPU hour.
• Compute the current (at t) failure intensity:
HourCPU
failures
v
5100
50110)50(
1)(0
0
![Page 10: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/10.jpg)
ECE355 Fall 2004 Software Reliability 10
Musa/Okumoto Logarithmic Model
• Decrement per encountered failure decreases:
: failure intensity decay parameter.
• Example 2 0 = 10 failures per CPU hour.
=0.02/failure.
– 50 failures have been experienced ( = 50).
– Current failure intensity:
e0)(
68.31010)50( 1)5002.0( ee
![Page 11: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/11.jpg)
ECE355 Fall 2004 Software Reliability 11
Model Extension (1)
• Average total number of counted experienced failures () as a function of the elapsed execution time ().
• For basic model
• For logarithmic model
0
0
1)( 0vev
1ln1
)( 0
![Page 12: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/12.jpg)
ECE355 Fall 2004 Software Reliability 12
Example 3 (Basic Model)
0 = 10 [failures/CPU hour].
• v0 = 100 (number of failures over infinite execution time).
= 10 CPU hours:
= 100 CPU hours:
0
0
1)( 0vev
failuresee 6311001100)10( 110
100
10
failuresee 10011001100)100( 10100
100
10
![Page 13: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/13.jpg)
ECE355 Fall 2004 Software Reliability 13
Example 4 (Logarithmic Model)
0 = 10 [failures/CPU hour].
= 0.02 / failure.
= 10 CPU hours:
= 100 CPU hours:
5511002.010ln02.0
1)10(
1ln1
)( 0
152110002.010ln02.0
1)100(
(63 in basic model)
(100 in basic model)
![Page 14: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/14.jpg)
ECE355 Fall 2004 Software Reliability 14
Model Extension (2)
• Failure intensity as a function of execution time.• For basic model:
• For logarithmic Poisson model
0
0
0)( ve
1)(
0
0
![Page 15: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/15.jpg)
ECE355 Fall 2004 Software Reliability 15
Example 5 (Basic Model)
0 = 10 [failures/CPU hour].
• v0 = 100 (number of failures over infinite execution time).
= 10 CPU hours:
= 100 CPU hours:
hourCPU
failuresee 68.31010)10( 1
10100
10
0
0
0)( ve
hourCPU
failuresee 000454.01010)100( 10
100100
10
![Page 16: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/16.jpg)
ECE355 Fall 2004 Software Reliability 16
Example 6 (Logarithmic Model)
0 = 10 [failures/CPU hour]. = 0.02 / failure.
= 10 CPU hours:
= 100 CPU hours:
hourCPU
failures33.3
11002.010
10)10( (3.68 in basic model)
(0.000454 in basic model)
1)(
0
0
hourCPU
failures467.0
110002.010
10)100(
![Page 17: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/17.jpg)
ECE355 Fall 2004 Software Reliability 17
Model Discussion
• Comparison of basic and logarithmic model:
– Basic model assumes that there is a 0 failure intensity,
logarithmic model assumes convergence to 0 failure intensity.
– Basic model assumes a finite number of failures in the
system, logarithmic model assumes infinite number.
• Parameter estimation is major problem: 0, , and v0.
Usually obtained from:
– system test,
– observation of operational system,
– by comparison with values from similar projects.
![Page 18: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/18.jpg)
ECE355 Fall 2004 Software Reliability 18
Part II: Control Flow Graph (CFG)
• A graph representation of a set of statements is called
a flow graph or control flow graph.
• Nodes in the flow graph represent computations and
the edges represent the flow of control.
• A basic block is a sequence of consecutive three-
address statements in which flow of control enters at
the beginning and leaves at the end without halt or
possibility of branching except at the end.
• A CFG consists of a set of basic blocks.
![Page 19: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/19.jpg)
ECE355 Fall 2004 Software Reliability 19
Three-Address Statements• Assignment statements of the form x: = y op z or x: = op z, where op is a
binary or unary arithmetic or logical operation.
• Copy statements x: = y where the value of y is assigned to x.
• Unconditional jump goto L. Execution jumps to the statement labeled by
L.
• Conditional jump if x relop y goto L.
• Indexed assignments of the form x: = y[i] and x[i] := y.
• Address and pointer assignments of the form x := &y, x := *y, and *x := y.
• Param x and call p, n, and return y, where
return value of y is optional. For a procedure
call p(x1, x2, … , xn), the transformed
three-address statements are:
param x1
param x2
…
param xn,
call p, n
![Page 20: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/20.jpg)
ECE355 Fall 2004 Software Reliability 20
Partition into Basic Blocks
• Input: A sequence of three-address statements.
• Output: A list of basic blocks with each three-address
statements in exactly one block.
• Method
1. Determining leaders (the first statement of basic blocks) by three rules:
i. The first statement is a leader.
ii. Any statement that is the target of a conditional or unconditional goto is a
leader.
iii. Any statement that immediately follows a goto or conditional goto
statement is a leader.
2. For each leader, its basic block consists of the leader and all
statements up to but not including the next leader or the end of the
program.
![Page 21: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/21.jpg)
ECE355 Fall 2004 Software Reliability 21
Example
I = 1;
TI = TV = 0;
sum = 0;
DO WHILE (v[I] <> –999 and TI < 1) {
TI++;
IF (v[I] >= min and v[I] <= max) {
TV++; sum = sum + v[I];
}
I++;
}
IF TV >0 )
av = sum/TV;
ELSE
av = –999 ;
…
1 I = 1;
TI = TV = 0;
sum = 0;
2 IF (v[I] == –999) GOTO 10
3 IF (TI >= 1) GOTO 10
4 TI++;
5 IF (v[I] < min) GOTO 8
6 IF (v[I] > max) GOTO 8
7 TV++;
sum = sum + v[I];
8 I++;
9 GOTO 2
10 IF (TV <= 0) GOTO 12
11 av = sum/TV;
goto 13
12 av = –999;
13 …
While loop
IF ELSE
Basic Block
We do not strictly follow the transformationfrom source code to three-address statements.Note that each statement with a label is a leader.
![Page 22: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/22.jpg)
ECE355 Fall 2004 Software Reliability 22
Transformation from Basic Blocks to CFG1
2
3
4
5
6
8 7
9
10
12 11
13
R4
R1
R3
R5
R2
R6
Outer region
predicate node
…
1 I = 1;
TI = TV = 0;
sum = 0;
2 IF (v[I] == –999) GOTO 10
3 IF (TI >= 1) GOTO 10
4 TI++;
5 IF (v[I] < min) GOTO 8
6 IF (v[I] > max) GOTO 8
7 TV++;
sum = sum + v[I];
8 I++;
9 GOTO 2
10 IF (TV <= 0) GOTO 12
11 av = sum/TV;
goto 13
12 av = –999;
13 …
![Page 23: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/23.jpg)
ECE355 Fall 2004 Software Reliability 23
Cyclomatic Complexity
• McCabe’s cyclomatic complexity
– V(G) = E – N + 2, E: number of edges, N: number of nodes.
– V(G) = p + 1, p is a number of predicate (decision) nodes.
– V(G) = number of regions (area surrounded by nodes/edges).
• V(G): upper bound on the number of independent paths
– Independent path: A path with at least one new node/edge.
• Example (pp. 22) :
– V(G) = E – N + 2 = 17 – 13 + 2 = 6
– V(G) = p + 1 = 5 + 1 = 6
– V(G) = 6
• Advantage: # of test cases is proportional to the program size.
![Page 24: ECE355 Fall 2004Software Reliability1 ECE-355 Tutorial Jie Lian](https://reader035.vdocuments.mx/reader035/viewer/2022062516/56649de55503460f94add6d8/html5/thumbnails/24.jpg)
ECE355 Fall 2004 Software Reliability 24
References
[1] Musa, JD, Iannino, A. and Okumoto, K., “Software Reliability:
Measurement, Prediction, Application”, McGraw-Hill Book
Company, NY, 1987.
[2] A. V. Aho, R. Sethi, and J. Ullman, "Compilers: Principles,
Techniques, and Tools", Addison-Wesley, Reading, MA, 1986.