Download - E book - How do you recovery costs from completed energy efficiency upgrades in NSW? Alan
þ Verify Upgrade þ Manage All Documentation & Prepare Claim þ Create ESCs þ Trade ESCs þ Pay You $
Haron Robson Energy is Accredited by the NSW Government to
create & trade Energy Savings Certificates
Copyright Haron Robson Energy Pty Ltd 2015. Haron Robson Energy is an Accredited Certificate Provider (ACP) of Energy Saving Certificates (ESCs)Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Energy Savings Certificates are traded and the money
($) is returned to You. You recover costs from
energy efficiency upgrade
*Each certificate represents the equivalent of 1 tonne of CO2-e resulting from energy savings activities.
Under The NSW Energy Saving Scheme future energy
savings from energy efficiency upgrades can be
converted to Energy Savings Certificates
An Energy Savings Certificate (ESC) is a tradable certificate created under Division 7 of Part 9 of the Electricity Supply Act 1995.
eBook How do you recovery costs from completed energy efficiency upgrades in NSW?
What does Haron Robson Energy do? We provide rapid pain relief from a highly regulated Government scheme
þ Verify Upgrade þ Manage All Documentation & Prepare Claim þ Create ESCs þ Trade ESCs þ Pay You $
Haron Robson Energy is Accredited by the NSW Government to
create & trade Energy Savings Certificates
Copyright Haron Robson Energy Pty Ltd 2015. Haron Robson Energy is an Accredited Certificate Provider (ACP) of Energy Saving Certificates (ESCs)Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Energy Savings Certificates are traded and the money
($) is returned to You. You recover costs from
energy efficiency upgrade
*Each certificate represents the equivalent of 1 tonne of CO2-e resulting from energy
savings activities.
Under The NSW Energy Saving Scheme future energy savings from upgrades can be
converted to Energy Savings Certificates
An Energy Savings Certificate (ESC) is a
tradable certificate created under Division 7 of Part 9 of the Electricity Supply Act 1995.
Energy Savings
Certificates
What are Energy Savings Certificates?
= $ Haron Robson Energy
takes on all risk of overpayment and non-compliance
Certificates are created from future
gas or electricity savings
What does Haron Robson Energy do? We provide rapid pain relief from a highly regulated Government scheme
Certificates are traded
You may be eligible to receive a forward
payment10 years upfront
Create &
Trade
þ Verify Upgrade þ Manage All Documentation & Prepare Claim þ Create ESCs þ Trade ESCs þ Pay You $
Haron Robson Energy is Accredited by the NSW Government to
create & trade Energy Savings Certificates
Copyright Haron Robson Energy Pty Ltd 2015. Haron Robson Energy is an Accredited Certificate Provider (ACP) of Energy Saving Certificates (ESCs)Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Energy Savings Certificates are traded and the money
($) is returned to You. You recover costs from
energy efficiency upgrade
*Each certificate represents the equivalent of 1 tonne of CO2-e resulting from energy
savings activities.
Under The NSW Energy Saving Scheme future energy savings from upgrades can be
converted to Energy Savings Certificates
An Energy Savings Certificate (ESC) is a
tradable certificate created under Division 7 of Part 9 of the Electricity Supply Act 1995.
Energy Savings
Certificates
What do you do withEnergy Savings Certificates?
= $ Haron Robson Energy
takes on all risk of overpayment and non-compliance
Certificates are created from future
gas or electricity savings
What does Haron Robson Energy do? We provide rapid pain relief from a highly regulated Government scheme
Certificates are traded
You may be eligible to receive a forward
payment10 years upfront
Create &
Trade
E.g. Install VSD to pumpsE.g. Gas efficiency upgrade to
stationary equipment ^ We can also apply Option No.2 to a lighting upgrade or a chiller
(replacement) upgrade
How does Haron Robson Energy create Energy Savings Certificates from energy efficiency upgrades?
What is calculated? OLD lighting
equipment (Wattage) less NEW lighting
equipment (Wattage) = energy savings and convert to certificates
How? Measure energy savings from
upgrade & convert to certificates
When? We create ESCs and You receive
$ payment after post install measure period complete
How? Calculate energy
savings & convert to certificates
When? We create ESCs and you receive payment
immediately after installation of upgrade
lighting equipment
What is measured?* E.g. Motor / pump energy
consumption by sub-meter over a period pre & post upgrade install
Option No.2^Isolated Area or
Specific Plant Upgrade
Option No.1Lighting & Controls
Upgrade
E.g. Multiple energy efficiency upgrades (i.e. lighting + chiller replacement + VSD installed to motors / pumps + data analytics overlay to BMS or BMS upgrade
How? Measure energy savings from
upgrade & convert to certificates
When? We create ESCs and You
receive $ payment after post install measure period complete
What is measured?* E.g. Site energy consumption by utility (retail) meter over a period
pre & post install
Option No.3Whole of Site Upgrade
* If energy consumption is directly linked to production output the pre and post measurement period may only be one week or one month maximum
Gas or Electricity Energy Efficiency Upgrades
What is measured? Whole of site energy
consumption using utility (retail) meter data over a
12 month (seasonal) period pre and post
install
How? Measure energy savings & convert to certificates
When? We create ESCs and
You receive payment 12 months post install
measurement period.Annual creation ONLY
up to 5 years max.
Option No.4Chiller (Replacement)
Upgrade
10 year forward $ payment returned to you 5x annual $ payment
a. Confirm Nomination Form signed before Implementation Date.
b. Kick-off meeting and issue Project Brief
c. Monitor & assist d. Confirm the lighting
upgrade will comply with the Energy Saving Scheme Rule
e. Client option: request HRE to verify & document upgrade lighting complies with BCA and ASNZS 1680
What is the process?
a. Receive documentation (evidence) Review documentation and stakeholder sign-offs
b. Site visit to verify documentation aligns with site works
c. Calculate energy savings & ESCs
d. Confirm final ESC quantity to be registered
Step 2
Audit and Verify ESC Claim
a. Trade ESCs with a liable party
b. Confirm ESCs traded
Step 4
Trade ESCs
3 days 5 days
Step 1
Timeframe: X days
a. Register ESCs in the ESS Registry
b. Confirm ESCs registered and gain approval to trade ESCs
Step 3
Register ESCs
1 day
a. Transfer money from trade of ESCs less commission and fee into nominated bank account of the Client
Step 5
Pay Client
Nomination and Kick-Off Meeting
Client Yield1 – revenue returned to the client è $100,0001
You receive
No upfront payment of commission or fees
Star
t
Des
crip
tion
Fee
$
1. Client Yield calculated as per Table 1 Revenue Return To The Client, next page. This is an indicative value not the realised value. The realised value will be determined upon trade of ESCs
2. Commission as per Table 2, next page “The Breakdown” 3. Other Fees as Agreed as per Table 3, next page “The Breakdown”
Option No.1 - Lighting Energy Efficiency Upgrade
Ligh
ting
inst
alle
d an
d op
erat
ing
at s
ite
10 year forward payment
Commission2 & Other Fees As Agreed3 deducted from Net Revenue
What are the deliverables?
What is calculated? OLD lighting equipment
(Wattage) less NEW lighting equipment (Wattage) = energy
savings and convert to certificates
How?Calculate energy
savings and convert to certificates
using commercial lighting methodology
When? We create ESCs and you receive payment
immediately after installation and
operation of upgrade lighting equipment
Lighting Upgrade
Both packages
allow for 10 year
forward creation of
energy savings.
Energy savings are converted to Energy Savings
Certificates
Energy Savings
Certificatesare traded
for revenue ($)
Revenue ($)
is returned to You.
$
*** The Client can request Haron Robson Energy to document and verify the upgrade lighting complies with the Building Code of Australia (BCA) and AS/NZS 1680. Alternatively, the Client can engage Haron Robson to prepare a lighting design to comply with the BCA and AS/NZS 1680
Deliverable By whom Deliverable By whom
Prepare existing and upgrade lighting plans; and take photos of existing luminaires in accordance with Schedule 1
Client
Complete lighting register, prepare existing and upgrade lighting plans; and take photos of existing luminaires in accordance with Schedule 1
HRE Fixed Fee
Prepare scope of works and contractor specifications Client
Prepare scope of works and contractor specifications
HRE Fixed Fee
Complete lighting design to comply with the Building Code of Australia and ASNZS 1680
Client Complete lighting design to comply with the Building Code of Australia and ASNZS 1680
HRE Fixed Fee
Project manage the supply, install and commissioning of upgrade lighting
Client Project manage the supply, install and commissioning of upgrade lighting
HRE Fixed Fee
Manage and coordinate all ESC documentation (evidence) requirements in accordance with IPART Evidence Pack & Schedule 1
Client
Manage and coordinate all ESC documentation (evidence) requirements in accordance with IPART Evidence Pack & Schedule 1
HRE Fixed Fee
Complete the IPART Evidence Pack and arrange for sign-offs
HRE - Included in HRE % Fee
Complete the IPART Evidence Pack including and arrange for sign-offs
HRE - Included in HRE % Fee
Verify and document upgrade lighting complies with the Building Code of Australia and ASNZS 1680***
Client
Not required if lighting design
completed
Verify and document upgrade lighting complies with the BCA and ASNZS 1680
HRE Fixed Fee
Submit IPART Evidence Pack and documentation in accordance with NSW Energy Saving Scheme Rule and methodology
HRE - Included in HRE % Fee
Submit IPART Evidence Pack and documentation in accordance with NSW Energy Saving Scheme Rule and methodology
HRE - Included in HRE % Fee
Create and trade ESCs HRE –
Included in HRE % Fee
Create and trade ESCs HRE –
Included in HRE % Fee
Client BYO Evidence Package
Client Select Flexible Package
Project Impact Assessment with
Measurement & Verification
Upg
rade
inst
alle
d an
d op
erat
ing
at
site
What is the process? St
eps
Ti
me
a. Develop Baseline Energy Model
b. Prepare M&V Plan, the “RESA Accreditation” in accordance with the NSW ESS Rule 2009
c. Obtain all stakeholder sign offs
Step 2
Plan & Submit Application
a. Register ESCS in the GGAS Registry
b. Confirm ESCs in GGAS registry with the Client
c. Trade ESCs with a liable party
d. Confirm trade with the Client
Step 4
Register & Trade ESCs
a. Define boundary motor/pump only. Measure baseline energy use
Note: Temporary or permanent sub-metering will be required enabling measurement of baseline energy use
Commission
Step 1
a. Measure operating energy use
b. Develop Operating Energy Model
c. Calculate lifetime energy savings for ESC creation
Note: Temporary or permanent sub-metering will be required enabling measurement of operating energy use
Step 3
Measure NEW Operating Energy
a. Transfer money from trade of ESCs less: IPART & brokerage fees and Haron Robson Energy commission
Note: PIAM&V allows forward ESC creation for the expected lifetime of upgrades & additional “Top-Up” ESC creation permitted annually up to 10 years
Step 5
Pay Client Measure Baseline Energy
Client Yield1 – Revenue returned to the Client from ESC creation & trade è $250,0001 10 year forward
payment
$
$
1. Client Yield calculated as per Table 1 Revenue Return To The Client. This is an indicative value not the realised value. The realised value will be determined upon trade of ESCs at a future date. A significant factor in the realised value is the ESC Spot Price at the time of trade.
Completed before
upgrade
Measurement period 1 week
only or 12 mths
Measurement period 1 week only
or 12 months
Pay client post measurement
period 5 day minimum
Progress Payment
Progress Payment
Progress Payment
Upg
rade
in
stal
led
and
oper
atin
g at
si
te
Option No.2 - Isolated Area or Specific Plant Energy Efficiency Upgrade
Step 1 - Measure Baseline Energy Who completes? Fee
Measure baseline energy use to complete item 2a. a. Client supply and install sub-metering, collection and sending of data to HRE OR b. HRE supply and install sub-metering and collection of data
Haron Robson Energy
Or Client
POA from
Haron Robson Energy
Step 2 - Plan and Submit Application Who completes? Fee
2a. HRE develop “Baseline Energy Model” using PIAM&V tool.
Haron Robson Energy
POA
2b. M&V Professional from Other to validate “Baseline Energy Model” as per “Method Guide PIAM&V” and Part B of Evidence Package.
Independent M&V Professional
2c. HRE prepare and submit application for RESA Accreditation.
HRE POA
Step 3 - Measure NEW Operating Energy Who completes? Fee
3a. Measure operating energy use to complete item 3b. a. Client supply and install sub-metering, collection and sending of data to HRE OR b. HRE supply and install sub-metering and collection of data
Haron Robson Energy
Or Client
POA from
Haron Robson Energy
3b. HRE develop “Operating Energy Model” using PIAM&V tool.
Haron Robson Energy
POA
3c. M&V Professional from Other to validate “Operating Energy Model” as per "Method Guide PIAM&V" and Part B of the Evidence Package.
Independent M&V Professional
POA
3d. HRE verifies RESA, calculate energy savings and ESCs using PIAM&V tool, complete record keeping in accordance with PIAM&V requirements.
Haron Robson Energy
POA
Step 4 – Register and Trade ESCs
Who completes? Fee
4b. HRE Registration of ESCs in ESS Registry
Haron Robson Energy
Nil
4c. ESS ESC Registration Fee^^ • IPART ESC
Registration Fee $0.70 per ESC registered
Haron Robson Energy
$0.70 per
ESC
4d. ESS Independent Audit Fee • HRE / ESS
Independent Audit Fee
Haron Robson Energy
4e. Haron Robson Energy retains ownership of X% of all ESCs registered
Haron Robson Energy
What are the deliverables?
^^ Fee as per published IPART Schedule of Fees and subject to change
Option No.2 - Isolated Area or Specific Plant Energy Efficiency Upgrade
Copyright Haron Robson Energy Pty Ltd 2015 Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Project Impact Assessment with
Measurement & Verification
upg
rade
s in
stal
led
& o
pera
ting
at s
ite
What is the process? St
eps
Ti
me
a. Develop Baseline Energy Model
b. Prepare M&V Plan, the “RESA Accreditation” in accordance with the NSW ESS Rule 2009
c. Obtain all stakeholder sign offs
Step 2
Plan & Submit Application
a. Register ESCS in the GGAS Registry
b. Confirm ESCs in GGAS registry with the Client
c. Trade ESCs with a liable party
d. Confirm trade with the Client
Step 4
Register & Trade ESCs
a. Define boundary all of site. Measure baseline energy use
Commission
Step 1
a. Measure operating energy use
b. Develop Operating Energy Model
c. Calculate lifetime energy savings for ESC creation
Step 3
Measure NEW Operating Energy
a. Transfer money from trade of ESCs less: ESC registration & brokerage fees and Haron Robson commission
Note: PIAM&V allows forward ESC creation for the expected lifetime of upgrades & additional “Top-Up” ESC creation permitted annually up to 10 years.
Step 5
Pay Client Measure Baseline Energy
Client Yield1 – Revenue returned to the Client from ESC creation & trade è $550,0001 10 year forward
payment
$
$
1. Client Yield calculated as per Table 1 Revenue Return To The Client. This is an indicative value not the realised value. The realised value will be determined upon trade of ESCs at a future date. A significant factor in the realised value is the ESC Spot Price at the time of trade.
Completed before upgrade
Measurement period 1 week
only or 12 mths
Measurement period 1 week only
or 12 months
Pay client post measurement
period 5 day minimum
Progress Payment Fee
Progress Payment Fee
Progress Payment Fee
Upg
rade
in
stal
led
and
oper
atin
g at
si
te
Option No.3 - Whole of Site Energy Efficiency Upgrade
Step 1 - Measure Baseline Energy Who completes? Fee
1. Measure baseline energy use to complete item 2a. a. Client collection of NMI data from retail energy provider and send to HRE OR b. HRE arrange for collection of NMI data from retail energy provider
Haron Robson Energy
Or Client
POA from
Haron Robson Energy
Step 2 - Plan and Submit Application Who completes? Fee
2a. HRE develop “Baseline Energy Model” using PIAM&V tool.
Haron Robson Energy
POA
2b. M&V Professional from Other to validate “Baseline Energy Model” as per “Method Guide PIAM&V” and Part B of Evidence Package.
Independent M&V Professional
2c. HRE prepare and submit application for RESA Accreditation.
Haron Robson Energy
POA
Step 3 - Measure NEW Operating Energy Who completes? Fee
3. Measure operating energy use to complete item 3b. a. Client collection of NMI data from retail energy provider and send to HRE OR b. HRE arrange for collection of NMI data from retail energy provider
Haron Robson Energy
Or Client
POA from
Haron Robson Energy
3b. HRE develop “Operating Energy Model” using PIAM&V tool.
Haron Robson Energy
POA
3c. M&V Professional from Other to validate “Operating Energy Model” as per "Method Guide PIAM&V" and Part B of the Evidence Package.
Independent M&V Professional
POA
3d. HRE verifies RESA, calculate energy savings and ESCs using PIAM&V tool, complete record keeping in accordance with PIAM&V requirements.
Haron Robson Energy
POA
Step 4 – Register & Trade ESCs
Who completes? Fee
4b. HRE Registration of ESCs in ESS Registry
Haron Robson Energy
Nil
4c. ESS ESC Registration Fee^^ • IPART ESC
Registration Fee $0.70 per ESC registered
Haron Robson Energy
$0.70 per
ESC
4d. ESS Independent Audit Fee • HRE / ESS
Independent Audit Fee
Haron Robson Energy
4e. Haron Robson Energy retains ownership of X% of all ESCs registered
Haron Robson Energy
POA
What are the deliverables?
^^ Fee as per published IPART Schedule of Fees and subject to change
Copyright Haron Robson Energy Pty Ltd 2015 Haron Robson Energy Pty Ltd, ABN 68 151 296 347, of Level 5, 37 Pitt St Sydney NSW 2000 T: (02) 7903 4567
Option No.3 - Whole of Site Energy Efficiency Upgrade
Metered Baseline Methodology
What is the process? St
art
a. HRE - Collect and assemble all documentation HRE - Verify documents
b. HRE - Prepare claim in accordance with the NSW ESS Rule
c. HRE - Verify upgrade works in accordance with the NSW ESS Rule
d. HRE - Calculate ESCs
Step 2
Prepare ESC Claim
a. HRE - Sell ESCs to the highest bidder (liable party)
b. HRE - Confirm sale of ESCs with the Client
Step 4
Trade ESCs
a. Haron Robson Energy Pty Ltd (HRE) - Arrange for sign-offs on Nomination Form before the Implementation Date
No up-front fees or progress payments required
Step 1
a. HRE - Register ESCs in ESS Registry
b. HRE - Confirm ESCs registered with the Client
Step 3
Register ESCs
a. HRE - Transfer money from sale of ESCs less commission and fees into the nominated bank account
Step 5
Pay Client Nomination and Kick-Off Meeting
Client Revenue1 – money returned to the client from ESC creation & trade è $110K1 / over 5x yrs
Commission2 & Fees3 deducted from Gross Revenue
1. Client Revenue calculated as per Table 1 Slide: Breakdown. This is an indicative value not the realised value. The realised value will be determined upon sale of ESCs at a future date.
2. Commission as per Table 2 Slide: Breakdown 3. Fees as per Table 3 Slide: Breakdown Note: Metered Baseline Methodology for chiller upgrades allows ESCs to be created annually for a maximum period of 5 years only.
Verify energy savings for a minimum of 12 months
Chiller upgrade completed
Create and trade ESCs 12 months post chiller CX
Pay client 12 months post chiller upgrade & annually 5x
Net Amount
Del
iver
able
s - D
escr
iptio
n
Fee
Tim
e
$
E.g. Client Year 1 - $22K1
E.g. Client Year 2 - $22K1
E.g. Client Year 3 - $22K1
E.g. Client Year 4 - $22K1
E.g. Client Year 5 - $22K1
Option No.4 - chiller (replacement) upgrade
Upg
rade
inst
alle
d an
d op
erat
ing
at s
ite
Who else does Haron Robson create Energy Savings Certificates for? NSW Health, Commonwealth Superannuation Fund, Rooty Hill RSL Club, Colliers, Knight Frank, Eureka Funds Management and Lend Lease
Who do I contact at Haron Robson for more information or confirm an opportunity? Alan Richardson Sustainability & Compliance Manager Email: [email protected] Phone: 7903 4567 or 0417 238 448
Thank you
Before any upgrade works commence on site simply confirm by telephone or email You want to create certificates. Sign our Nomination Form before the implementation date.
What is your next step?