FINAL
DRAINAGEASSESSMENT
for
LAND TO THE WEST OFPUFFIN ROAD,
HERNE BAY
on behalf of
KITEWOOD ESTATESLTD
OH/JSM/D/TRN1027911 April 2011
Regent House, Hubert Road, Brentwood, Essex CM14 4JE
t 01277 238 100 f 01277 238 150 e [email protected]
Belfast - Brentwood - Bristol Cardiff - Dublin - Edinburgh - Glasgow - Leeds Manchester - Nottingham
Registered in England Number 4100666 Registered Office: Pickfords Wharf, Clink Street, London SE1 9DG
-
8/7/2019 Drainage Statement
2/26
-
8/7/2019 Drainage Statement
3/26
Page 3 of 15
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
Contents
Page
Executive Summary 41. Introduction 52. Scope of the Assessment 63. Existing Situation 74. Topographical Survey and Southern Water Records 95. Proposed Development 116. Surface Water Drainage 127. Foul Drainage 148. Conclusion 15
Appendices
A Location of Site Photographs Drawing TRN10279_design01
B Photographs
C Southern Water Records
D Southern Water Correspondence
E Outline Development Plan
F As Built Drainage Drawing for Puffin Road Drawing 57400-1683-2000
G Proposed Drainage Strategy Drawing TRN10279_design02
H Microdrainage Report
-
8/7/2019 Drainage Statement
4/26
Page 4 of 15
EXECUTIVE SUMMARY
Surface Water
There is no surplus capacity within the drains in Rosebery Avenue,
Rowland Crescent and Richmond Drive to the north
Puffin Road surface water discharges to the adjoining ditches which are
within the control of the applicant
Therefore, the use of the existing surface water drains in Puffin Road is
the preferred method of disposal subject to on site water attenuation
(approximately 250m3) under the 2 main car parks.
Foul Water
It is proposed to discharge to existing foul water drain in Puffin Road,
which are yet to be adopted, and which a right of connection has been
agreed.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
5/26
Page 5 of 15
1. INTRODUCTION
1.1 Waterman Boreham (WB) has been instructed by Kitewood Estates Ltd to carry out a surface and
foul drainage assessment for a proposed housing development of 40 dwellings at land to the
West of Puffin Road, Herne Bay, CT6 6RT.
1.2 The housing development is proposed to be built on an existing agricultural field, which is located
on the east of Herne Bay, immediately to the west of Puffin Road and to the south of Richmond
Drive.
1.3 The area of the site to be developed is approximately 1.091 hectare. Its boundaries are formed by
an existing housing development to the north and east; on the south, a natural boundary of
woodland and a ditch separate the site from an agricultural land.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
6/26
Page 6 of 15
2. SCOPE OF THE ASSESSMENT
2.1 The scope of the assessment is to carry out a Surface Water & Foul Drainage Assessment for the
proposed site and include the following:
Visit the site.
Liaison with Southern Water and obtain their up to date Surface and Foul
Water records for the area.
Obtain a topographical survey and check the levels of the site and
determine where the proposed development is likely to drain to.
Determine the impermeable area for the proposed development.
Calculation of the existing greenfield runoff rate (rate for undeveloped
land) which will determine the limited discharge rate of water to be
discharged to Southern Water sewers or local ditch.
Carry out some surface and foul drainage calculation based on
impermeable areas and number of dwellings.
Propose and discuss a mean of storage for surface water.
Propose and discussed discharge points for both foul and surface water.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
7/26
Page 7 of 15
3. EXISTING SITUATION
3.1 Waterman Boreham attended site on the 8th March 2011 and walked the entire perimeter of the
site with good views of the land. Below is a summary of the observations made:
3.2 It was noted that although there had not been major rain over the past week the ground condition
was generally saturated in water with two areas on the east side of the site being flooded.
3.3 Although weather was sunny and dry on the day of visit it was noticed a smell of stagnant water
on the approach of the site.
3.4 The entire area of the site was planted with the exception of the two eastern corners; crops were
approximately 10cm high.
3.5 The site can be physically accessed from three existing dead end roads: Rosebery Avenue,
Rowland Crescent and Richmond Drive. In the future, the site could also be accessed from Puffin
Road assuming that the natural hedge fence is cut down and metal mesh and posts removed.
3.6 There is however no vehicular access at present from any of these 3 dead end roads. The farmer
accesses the site through the fields on the southern side.
3.7 At the end of these roads, some utility chambers are present as well as foul and surface drainage
manholes. These manholes appear to be the top of runs for both foul and surface drainage.
3.8 From a general view, the site is falling slowly toward the south at a gradient of 1 in 135 and more
generally to the southeast. On the south east corner the ground tends to fall quickly over a
distance of approximately 15 meters at a gradient of 1 in 50 and this is where a considerable
volume of water is trapped (approximately 300mm deep). The same situation applies for the
northeast corner of the site but this is not as severe.
3.9 A wide hedge strip is located along the south part of the side.
3.10 Immediately on the south of the hedge, a shallow ditch runs toward the east where it discharges
into another ditch heading south.
3.11 Although it cannot be confirmed, because of the amount of vegetation, it is possible that the
proposed site was originally linked to these ditches through the hedge. This blocked link would
explain why water is ponding in the southeast corner of the site.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
8/26
Page 8 of 15
3.12 A plan and photographs illustrating the above can be found in Appendix A and Appendix B.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
9/26
Page 9 of 15
4. TOPOGRAPHICAL SURVEY AND SOUTHERN WATER RECORDS
4.1 The levels of the existing site on the topographical survey confirm that the site falls toward the
south and more generally toward the southeast corner.
4.2 The OS map seems to indicate by the word DRAIN that an existing ditch is present along the
south boundary of the land.
4.3 The most obvious outfall for the proposed foul and surface drainage will be to connect to one or
all of the 3 existing roads around the proposed site (Rosebery Avenue, Rowland Crescent,
Richmond Drive and Puffin Road).
4.4 Some drainage manhole information is shown on the topographical survey for most of these
roads, unfortunately, they are very shallow manholes.
4.5 Southern Water records received in February 2011 (Appendix C) show the following information
for the 4 following roads:
Rosebery Avenue:
Surface water manhole 3950: Cover Level (CL): 35.772
Invert Level (IL): 35.002
Depth: 0.77m
Foul water manhole 3901: Cover Level (CL): 35.694
Invert Level (IL): 34.444
Depth: 1.25m
Rowland Crescent:
Surface water manhole 3953: Cover Level (CL): 35.361
Invert Level (IL): 34.641
Depth: 0.72m
Foul water manhole 3904: Cover Level (CL): 35.234
Invert Level (IL): 34.184
Depth: 1.05m
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
10/26
Page 10 of 15
Richmond Drive:
Surface water manhole 4950: Cover Level (CL): 34.691
Invert Level (IL): 33.521
Depth: 1.17
Foul water manhole 4901: Cover Level (CL): 34.841
Invert Level (IL): 33.671
Depth: 1.17
Puffin Road:
No information available. Southern Water Records indicate that sewers in this area are not
adopted.
4.6 As part of a previous planning application for this site, Southern Water advised in a letter dated
12/11/2003 (Appendix D) that there is not enough capacity within the adjacent sewerage system
to serve the proposed development as a single point flow. It is advised that the proposed foul flow
should be distributed, equally as far as possible, between manhole references 3901, 3904 and
4901.
4.7 With regards to the surface drainage, the same letter indicates that there is insufficient capacity
within the surface water sewers, downstream of the application site to accommodate the
proposed development.
4.8 Although this letter is dated 2003, it has been assumed that the situation remains unchanged.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
11/26
Page 11 of 15
5. PROPOSED DEVELOPMENT
5.1 The proposed development consists of approximately 40 dwellings and the main vehicular access
will be from Puffin Road.
5.2 A masterplan no. 02-263-102 for the proposed development can be found in Appendix E.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
12/26
Page 12 of 15
6. SURFACE WATER DRAINAGE
Impermeable areas
6.1 As stated previously, 40 dwellings are proposed to be constructed on a site of 1.091 hectare. This
is considered as a medium density development.
6.2 From the masterplan it has been determined that 5740m2
of the 1.091 hectare will be
impermeable.
6.3 This impermeable area of 5740m2
includes houses, driveways, carriageways and footways. The
rest is considered as permeable and will therefore drain naturally.
Greenfield runoff rate
6.4 In line with current drainage policies and legislation, the Environmental Agency (EA) will require
that the outflow from the proposed site does not exceed the outflow generated by the existing
agricultural/undeveloped site (greenfield runoff rate).
6.5 In order to achieve the above, surface water will have to be stored on site and discharged at a
limited rate to a local sewer or ditch. Some negotiation with the relevant Water Authority will have
to be undertaken to agree the discharge rate and location of discharge.
6.6 With the existing site being agricultural land and fully permeable, a greenfield runoff (IH124) has
been calculated using microdrainage software.
6.7 The Microdrainage result for a greenfield runoff for an area of 5740m2
is 2.4 litres per second (l/s).
6.8 However the code for sustainable homes, technical guidance Note 001 issued 16 December 2009
states that Where this calculation results in discharge flow rates of less than 5l/s this rate may be
increased up to a level of no more than 5l/s at the point of discharge from the site to reduce the
risk of blockage.
6.9 It is therefore assumed that the discharge for the proposed site is increased to 5l/s.
Storage Calculation
6.10 To achieve this limited discharge rate some sort of storage will have to be provided. The EA will
usually require that water is infiltrated into the ground if possible by the means of soakaways
(soakage test will have to be carried out) or stored on site by the means of balancing ponds or
underground tanks.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
13/26
Page 13 of 15
6.11 At this stage, the ground infiltration option has not been considered. Some soakage tests will
have to be undertaken to demonstrate that water can be infiltrated into the ground.
6.12 Utilising Microdrainage software, the amount of storage required for this site is calculated
between 274m3
and 376m3
, giving an average 325m3
. This volume of 325m3
will be used as aguide when a drainage strategy for the site is proposed.
Drainage strategy
6.13 As stated previously, Southern Water indicates in their letter that they have no capacity in their
sewers on Rosebery Avenue, Rowland Crescent and Richmond Drive. Moreover, with the depth
of their manholes being very shallow and the proposed site falling toward the south east, it would
be almost impossible to connect to their manholes without major earthworks taking place and
levels of the site being raised locally.
6.14 It will possible to attenuate the surface water from the proposed development to 5l/s and
discharge into Puffin Roads sewers which currently discharge water into the drainage ditches
adjoining the site. It is understood that the connection and discharge rate to Puffin Road surface
water sewer have been agreed by the developer for the scheme. An as built drainage drawing is
attached to the report, refer to Appendix F.
6.15 As surface water from Puffin Road discharges into the adjoining drain, the simplest option is to
connect the drainage network for the proposed development to surface water manhole SWMH1 tothe far east of Puffin Road refer to drawing TRN10279_design02 in Appendix G.
6.16 It is therefore proposed to store the surface water under the 2 main car parks of the proposed
development using 2 cellular storage systems, cellular storage 01 and 02. These 2 storage
systems will be linked to a pipe network located under the main road down to Puffin Road. To limit
the outflow to Puffin Road surface water sewer to 5l/s, a hydrobrake will be installed in manhole
MH7. A proposed drainage layout, (drawing TRN10279_design02), is shown in Appendix G.
6.17 A microdrainage model has been undertaken and simulated for a 100 year storm return period
and 30% increase for climate change.
6.18 The sizes for cellular storage 01 and cellular storage 02 have been calculated at respectively
250m2
and 260m2
in area with a depth of 500mm giving a volume of storage of approximately
120m3 and 124m3. Levels and location for these storage systems are shown on drawing
TRN10279_design02 (Appendix G).
6.19 A microdrainage report for the drainage model can be found in Appendix H.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
14/26
Page 14 of 15
7. FOUL DRAINAGE
7.1 With regards to foul drainage, Sewer for Adoption 6th
Edition, 2006 states that the design flows for
gravity sewers for residential developments should be 4000 litres / unit dwelling / per 24 hours.
7.2 In line with the above, the foul flow generated from the proposed housing development will be:
40 dwellings x 4000 l / day = 160,000 l / day
= 1.86 l/s
7.3 Similarly, to the surface drainage, an application will have to be made to the Local Water Authority
Southern Water in order to connect and discharge into their sewers.
7.4 To equally drain the foul water to Rosebery Avenue, Rowland Crescent and Richmond Drive,
level difference will be an issue and foul water will have to be pumped. This represents additional
costs and ongoing maintenance liability.
7.5 It might be possible to discharge into Puffin Road foul sewer under gravity. Indeed Southern
Water records do not show any information for this area as the sewers in this area have not
been adopted pending the completion of a deed of consent for Discharge to the adjoining
drainage ditches which is within the control of the applicant.
7.6 In view of the total flows to the foul water treatment works at Sweetbridge Road, the additional
flows from 40 dwelling will be negligible.
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
-
8/7/2019 Drainage Statement
15/26
Page 15 of 15
Final - Drainage Assessment Waterman Boreham LtdLand at the West of Puffin Road, Herne BayD/TRN1027911 April 2011
8. CONCLUSION
8.1 A drainage assessment for the proposed development has been carried out in order to determine
the volume of storage required for the surface water, the foul flow generated by the development
as well as the location of discharge for both foul and surface water drainage.
8.2 With regards to surface water, the preferred option is to store approximately 300m3
of water on
site. To achieve this, cellular storage systems have been proposed under the 2 main car parks. A
pipe network will drain the water toward the east of Puffin Road. At this location, a hydrobrake
manhole will limit the flow from the proposed site at 5 l/s.
8.3 As far the foul drainage is concerned, the preferred option is to drain the proposed site by gravity
and discharge into the existing foul sewer at Puffin Road. This option is believed to be the
cheapest and easiest and a right of connection has been agreed by the developer.
-
8/7/2019 Drainage Statement
16/26
APPENDICES
-
8/7/2019 Drainage Statement
17/26
APPENDIX A
Location of SitePhotographs Drawing
TRN10279_design01
-
8/7/2019 Drainage Statement
18/26
-
8/7/2019 Drainage Statement
19/26
APPENDIX B
Photographs
-
8/7/2019 Drainage Statement
20/26
Photograph 01:
Photograph 02:
-
8/7/2019 Drainage Statement
21/26
Photograph 03:
Photograph 04:
-
8/7/2019 Drainage Statement
22/26
Photograph 05:
Photograph 06:
-
8/7/2019 Drainage Statement
23/26
Photograph 07:
Photograph 08:
-
8/7/2019 Drainage Statement
24/26
Photograph 09:
Photograph 10:
-
8/7/2019 Drainage Statement
25/26
Photograph 11:
Photograph 12:
-
8/7/2019 Drainage Statement
26/26