DIRT PARK
over view
FÖRSLAG TILL EN
UNGDOMS ATTRAKTION
I ÄLMHULT
Bakgrund
Målsättning
Förslag
Kostnadskalkyl
Tid för frågor
Core STRUCTURE
Size diagram
BACK
WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH.
A 20-30 cm THICK LAYER OF SAND/DIRT.CONCRETE
CORE SO THAT THE JUMP/BUMP KEEPS IT’S SHAPE.
BACKWOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY.
BACK
TOTAL VOLUME = 0.2m³
TOTAL GROUND AREA COVERED = 1.04m²
THESE ARROWS SHOW IN WHAT WAY/ORDER YOU ARE TO MAKE YOUR WAY AROUND THE TRACK. YOU ARE HOWEVER NOT MEANT TO RIDE TO PARTS THAT ARE ABOVE YOUR OWN PERSONAL LEVEL OF RIDING.
BACK
Size diagram BACK
WHIP BOARD ADD TO TECHNICAL COURSE
TECHNICAL MAIN TRACK
BACK
Size diagram
Core STRUCTURE
BACK
BACK
A 10-20 cm THICK LAYER OF SAND/DIRT.
CONCRETE CORE SO THAT THE JUMP/BUMP KEEPS IT’S SHAPE.
WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH.
WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY.
Sizes
BACK
S
M L
BACK
160 cm 164,3 cm
530,1 cm
62 cm
201,5 cm
TOTAL VOLUME = 3.63m³
TOTAL GROUND AREA COVERED = 8.49m²
BACK
185,6 cm
272 cm
350 cm
160 cm
TOTAL VOLUME = 13.86m³
TOTAL GROUND AREA COVERED = 14.3m²
BACK
160 cm
550 cm
110 cm
165 cm
TOTAL VOLUME = 6.78m³
TOTAL GROUND AREA COVERED = 8.8m²
BACK
BACK
35 m
6 m
HIGHT ABOVE GROUND = 155 cm
TOTAL GROUND AREA COVERED = 70 m²
BACK
450
cm
375 cm
836.25 cm
45°
BACK
350 cm45
0 cm
450 cm
350 cm
300 cm
1100 cm
BACK
1100 cm
450
cm
BACK
Platform frontal
3D view
PLATFORM IN PROFILE
BACK
BACK
A 10-20 cm THICK LAYER OF SAND/DIRT.
CONCRETE CORE SO THAT THE PLATFORM KEEPS IT’S SHAPE.
WEATHER RESISTANT CARPET (SUCH AS THE ONES USED IN SAND BOXES TO KEEP THE SAND IN THE BOX), PREVENTS SAND FROM SLIDING OF AND STOPPS IT FROM ENTERING SOROUNDING EARTH.
WOODEN INNERFRAME REDUCES THE COSTS, BUT NOT THE STABILITY AND DURABILITY.
Start Platform
Core structure
SizeBACK
Mark 1400m2 SKÄNKES AV KOMMUNEN
Eventuellt markarbete 15,000 SEK
Trävirke (formar) 10,000 SEK
Cement 42m³ 40,000 SEK
Sand 32m3 8,500 SEK
Specielkapade träd för teknisk del 15,000 SEK (eventuell sponsring)
Byggnadstid, snickeri & gjutning 25,000 SEK
100 timmar
TOTAL KOSTNAD 85.125 SEK (73,875) exklusive moms
Kostnadskalkyl
http://www.beijerbygg.se/default.aspx?id=11080 http://www.starka.se/aterforsaljarstod.asp
http://www.jehander.se/WebSites/Jehander/Start/Stockholm
http://www.imba.org.uk/index.php?page=AboutUs_Contactshttp://www.freeridehub.se/43.html
LENGHT = MAX 70m W
IDT
H =
MA
X 25m
start
Större hopp
Större hopp
Större hopp
Fart hinder
Teknisk del
kurvan
L L L
M M M
S S S
Presentation för Älmhults kommun 25 April 2007
• Bakgrund
• Målsättning
• Förslag
• Kostnadskalkyl
• Tid för frågor