Design of a Wastewater Collection Network for
the New Nablus Area (B)
By
Hatem Abu Asbeh
Mohammad Qamhiya
Sayel At-Torman
Supervisor
Dr. Mohammad N. Almasri
December 2012
![Page 2: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/2.jpg)
2
OUTLINEINTRODUCTION
OBJECTIVES
STUDY AREA
METHODOLOGY
RESULTS
COST
CONCLUSIONS
![Page 3: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/3.jpg)
3
INTRODUCTION
![Page 4: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/4.jpg)
4
OBJECTIVES
ESTIMATE THE
OVERALL COST USING ARCGIS
DESIGN THE SEWER NETWORK
USING SEWERCA
D
ESTIMATE THE
WASTEWATER
GENERATION (LOAD)
![Page 5: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/5.jpg)
5
BACKGROUND
Effective WASTEWATER COLLECTION NETWORK
EFFICIENT SOFTWARE
ENGINEERING CONCEPTS
GOOD DESIGN
![Page 6: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/6.jpg)
6
STUDY AREA
• LOCATION
• LAND USE
• TOPOGRAPHY
![Page 7: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/7.jpg)
7
LOCATION
camp
![Page 8: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/8.jpg)
8
LAND USEIt luxurious . residential buildings
![Page 9: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/9.jpg)
9
TOPOGRAPHY
![Page 10: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/10.jpg)
10
METHODOLOGY
Data collection Network delineation
Quantification ofwastewaterper manhole
Determination ofdesign constraints
Cost estimatesusing GIS
Selection of the study area
Design of thenetwork using
SewerCAD
Conclusionsand
Recommendations
![Page 11: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/11.jpg)
11
SELECTION OF STUDY AREAWe selected an area
◦Not served◦Located in Nablus◦Priority for Nablus Municipality◦Availability of data
Facts about our study area1- one-third of the area is sparsely built2- The area is hilly with high range slopes
![Page 12: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/12.jpg)
12
DATA COLLECTION
Information from Nablus Municipality about the study area
Street plan Contour map Parcels and buildings distribution
planItems cost
Site investigation
![Page 13: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/13.jpg)
13
WASTEWATER GENERATION
WASTEWATER GENERATION
FAMILY PER BUILDING
2
FAMILY SIZE
6
DAILY WATER
CONSUMPTION
100 L/c/d
(WW/W) FACTOR
0.8
HOURLY PEAK
FACTOR
4
INFILTRATION
10%
![Page 14: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/14.jpg)
14
MANHOLE No.
7
•
PARCELS SERVED
2
• Each Parcel Contains One Building
BUILDINGS
2 • Two Families per Building
FAMILIES
4 • Each Family of 6 Personnel
PERSONNEL NUMBER
24
•Water Consumption 100 L/c/d
![Page 15: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/15.jpg)
15
TOTAL WATER
CONSUMPTION
2400
• WasteWater Factor is 0.8AVE. WW
GENERATION
1920
• Peak Factor is 4
MAX. WW GENERATION
7680
• Infiltration 10 %
INFILTRATION
192DESIGN WW
VOLUME
8448
DESIGN WASTEWATER
VOLUME7872 L/d
![Page 16: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/16.jpg)
16
Design and analysis using SewerCAD
Designing a Sewer system by using SewerCAD is
More efficient .
Provides the output in a short duration .
![Page 17: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/17.jpg)
17
DATA COLLECTED
A) Maps: (all in AutoCAD format) 1- Contour map for the area 2- Road network 3- ParcelsB) Wastewater related dataC) Design constraints
![Page 18: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/18.jpg)
18
Development of the network
Drawing the network using AutoCAD
![Page 19: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/19.jpg)
19
PLAN
![Page 20: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/20.jpg)
20
Assign manholes loads and extract elevations
Define design constraints
Initial run
Solving warning messages
Final design
PROCEDURES
![Page 21: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/21.jpg)
21
Warning messages
![Page 22: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/22.jpg)
22
RESULTSDiametersVelocityCover
![Page 23: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/23.jpg)
8 inch
DIAMETERS
![Page 24: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/24.jpg)
24
VELOCITY
0 20 40 60 80 100 120 1400
0.5
1
1.5
2
2.5
3Velocity (Average) (m/s)
Conduit
Ve
loc
ity
(m
/s)
![Page 25: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/25.jpg)
25
COVER
0 20 40 60 80 100 120 140 1600
1
2
3
4
5
6 cover
Manhole
Co
ve
r (m
)
![Page 26: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/26.jpg)
26
PROFILES
![Page 27: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/27.jpg)
27
PROFILES
![Page 28: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/28.jpg)
28
COSTQuantity identification using
ArcGIS
Cost calculation
![Page 29: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/29.jpg)
29
Quantity identification using ArcGIS
![Page 30: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/30.jpg)
30
Cost calculation
Cost ($) Unit Cost Quantity Item
37872 7.9 ($/m3) 4800 (m3) Excavation
95535 29 ($/m) 3300 (m) Sewer line
45724 329 ($/manhole) 140 Manhole (No.)
24874 179 ($/cover) 140Manhole cover
(No.)
27786 21 ($/m3) 1320 (m3) Backfill
69465 21 ($/m) 3300 (m) Asphalt
301256 Total
Cost per kilometer is~ $ 90,000
![Page 31: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/31.jpg)
31
ConclusionsOnly 8-inch diameter sewer lines
were used SewerCAD and ArcGIS are
important and efficient to use. Teamwork is critical .
![Page 32: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/32.jpg)
32
RecommendationsWWTP ENTIRE AREA SITE INVESTIGATIONS
![Page 33: Design of a Wastewater Collection Network for the New Nablus Area (B)](https://reader035.vdocuments.mx/reader035/viewer/2022062810/56815a43550346895dc77abb/html5/thumbnails/33.jpg)
33
Thank you