![Page 1: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/1.jpg)
1
DER Growth: Load Forecast & Customer DataAppendix F1
![Page 2: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/2.jpg)
WILLOW PASS DEFERRAL OPPORTUNITYWillow Pass Bank 1 and Willow Pass Bank 3
![Page 3: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/3.jpg)
3
Technical and Operational Requirements
• A combined need of at least 0.3 MW across Willow Pass feeders 1101 and 1102 is required• A combined need of at least 5.1 MW across Willow Pass feeders 2107 and 2108 is required
Candidate Deferral
Expected Performance and Technical Requirements
GNA Facility Name
In-
Service
Date
Requirement
Real
Time
(RT) or
Day
Ahead
(DA)
Grid
Need
(MW)
MonthDelivery
DaysCalls/ Year Hours
Duration
(Hours)
Willow Pass Bank 1
WILLOW PASS BANK 1
• Willow Pass 1101
• Willow Pass 1102
6/1/2023 A DA 0.3 6-8 Sat - Sun 8 2PM-8PM 2
WILLOW PASS BANK 3
• Willow Pass 2107
• Willow Pass 2108
6/1/2023 B DA 5.1 6-9Mon –
Sun101 2PM-10PM 6
![Page 4: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/4.jpg)
4
Willow Pass Bank 1 and Feeders Location Overview
• Equipment: Willow Pass Bank 1 – Feeders 1101 and 1102
• Electrical Service:
• 3-phase, 3.5 MVA bank with two 12.47 kV feeders
Location
Willow Pass Substation Bank 1, Contra Costa County
All data depicted in thisapplication is for PG&Einternal use only.Dissemination to any entityoutside of PG&E requires theapproval of Corporate Security.
Willow Pass
Candidate Deferral GNA Facility NameIn-Service
Date
Grid Need
(MW)
Willow Pass Bank 1WILLOW PASS BANK 1 6/1/2023 0.3
WILLOW PASS BANK 3 6/1/2023 5.1
![Page 5: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/5.jpg)
5
DIDF Project Location:
Willow Pass Bank 1
Willow Pass Substation Bank 1 and Bank 3 Map
Willow Pass Bank 1
Willow Pass 1101
Willow Pass 1102
Willow Pass Bank 3
Willow Pass 2107
Willow Pass 2108
![Page 6: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/6.jpg)
6
DIDF Project Location:
Willow Pass Bank 1
Willow Pass Substation Bank 1 Map
![Page 7: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/7.jpg)
7
Willow Pass Bank 1
Technical and Operational Requirements
0
2
4
6
8
10
12
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
Willow Pass Bank 1 – Hourly Load Profile
June July August Facility Rating
0.3 MW
Candidate Deferral GNA Facility Name Requirement
Real
Time
(RT) or
Day
Ahead
(DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Willow Pass Bank 1WILLOW PASS BANK 1 A DA 0.3 6-8 Sat - Sun 8 2PM-8PM 2
WILLOW PASS BANK 3 B DA 5.1 6-9 Mon – Sun 101 2PM-10PM 6
![Page 8: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/8.jpg)
8
Customer Composition Served by Willow Pass Bank 1
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 1 0.00
Commercial/Industrial 183 1.64
Residential 2,674 7.23
Other 9 0.00
Total 2,867 8.87
1 183
2,674
9
Customer Count
Agricultural Commercial/Industrial Residential Other
0.0%
18.5%
81.5%
0.0%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
![Page 9: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/9.jpg)
9
Load by Customer Class – Willow Pass Bank 1
(Peak Load Day – August 15th, 2019)
0
1
2
3
4
5
6
7
8
9
10
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
Agricultural Commercial/Industrial Residential Other
![Page 10: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/10.jpg)
10
Willow Pass Bank 1 DER Overview
Historical 2019 Forecast
Observed Peak Load
(MW)
Installed DERsYear
(Need vs Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV (MW)
Storage (MW)
PV (MW)
ES (MW) EE (MW) DR (MW) EV (MW)
8.87 0.94 0.022020 10.11 0.26 0.004 0.07 0.00 0.00
2020 10.11 0.26 0.004 0.07 0.00 0.00
![Page 11: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/11.jpg)
11
Willow Pass Bank 3 and Feeders Location Overview
• Equipment: Willow Pass Bank 3 – Feeders 2107 and 2108
• Electrical Service:
• 3-phase, 30 MVA bank with two 21.6 kV feeders
Location
Willow Pass Substation Bank 3, Contra costa County
All data depicted in thisapplication is for PG&Einternal use only.Dissemination to any entityoutside of PG&E requires theapproval of Corporate Security.
Willow Pass
Candidate Deferral GNA Facility NameOnline
Date
Grid Need
(MW)
Willow Pass Bank 1WILLOW PASS BANK 1 6/1/2023 0.3
WILLOW PASS BANK 3 6/1/2023 5.1
![Page 12: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/12.jpg)
12
DIDF Project Location:
Willow Pass Bank 3
Willow Pass Substation Bank 3 Map
![Page 13: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/13.jpg)
13
Willow Pass Bank 3
Technical and Operational Requirements
0
5
10
15
20
25
30
35
40
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
Willow Pass Bank 3 – Hourly Load Profile
June July August September Facility Rating
5.1 MW
Candidate Deferral GNA Facility Name Requirement
Real
Time
(RT) or
Day
Ahead
(DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Willow Pass Bank 1WILLOW PASS BANK 1 A DA 0.3 6-8 Sat - Sun 8 2PM-8PM 2
WILLOW PASS BANK 3 B DA 5.1 6-9 Mon – Sun 101 2PM-10PM 6
![Page 14: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/14.jpg)
14
Customer Composition Served by Willow Pass Bank 3
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 0 0
Commercial/Industrial 236 2.49
Residential 7,981 21.72
Other 10 0.00
Total 8,227 24.21
0.0%
10.3%
89.7%
0.0%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
0 236
7,981
10
Customer Count
Agricultural Commercial/Industrial Residential Other
![Page 15: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/15.jpg)
15
Load by Customer Class – Willow Pass Bank 3
(Peak Load Day – August 15th, 2019)
0
5
10
15
20
25
30
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
Commercial/Industrial Residential Other
![Page 16: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/16.jpg)
16
Willow Pass Bank 3 DER Overview
Historical 2019 Forecast
Observed Peak Load
(MW)
Installed DERsYear
(Need vs Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV
(MW)
Landfill Gas
(MW)
Storage (MW)
PV (MW)
ES (MW) EE (MW)DR
(MW)EV (MW)
24.21 4.88 4.75 0.162020 30.29 1.53 0.026 0.16 0 0.019
2023 34.74 1.71 0.03 0.0 0 0.024
![Page 17: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/17.jpg)
SAN MIGUEL DEFERRAL OPPORTUNITYSan Miguel Bank 1, San Miguel 1104, and Paso Robles 1107
![Page 18: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/18.jpg)
18
Technical and Operational Requirements
• A combined need of at least 3.5 MW across San Miguel feeders 1104, 1105, 1106 and 1107 is required• At least 1.0 MW of the 3.5 MW must be sourced at San Miguel feeder 1104• 0.6 MW must be sourced at Paso Robles 1107
Candidate Deferral
Expected Performance and Technical Requirements
GNA Facility Name
In-
Service
Date
Requirement
Real
Time
(RT) or
Day
Ahead
(DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
San Miguel Bank 2
SAN MIGUEL BANK 1• San Miguel 1104• San Miguel 1105• San Miguel 1106• San Miguel 1107
5/1/2023 A1 DA 1.3Jun-Sep
Mon -Sun
122 6AM-11PM 5
5/1/2023 A2 DA 2.2Jun-Sep
Mon -Sun
122 6AM-11PM 10
SAN MIGUEL 1104 5/1/2023 B DA 1.0Jun-Sep
Mon-Fri 66 5PM-10PM 4
PASO ROBLES 1107 5/1/2023 C DA 0.6Jul-Sep
Mon-Fri 21 3PM-9PM 4
![Page 19: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/19.jpg)
19
San Miguel Bank 1 and Feeders Location Overview
• Equipment: San Miguel Bank 1 – Feeders 1104, 1105, 1106, and 1107
• Electrical Service:
• 3-phase, 16 MVA bank with four 12.47 kV feeders
Location
San Miguel substation Bank 1, San Luis Obispo County
All data depicted in thisapplication is for PG&Einternal use only.Dissemination to any entityoutside of PG&E requires theapproval of Corporate Security.
San
Miguel
Candidate Deferral GNA Facility NameIn-Service
Date
Grid
Need
(MW)
San Miguel Bank 2
SAN MIGUEL BANK 1 5/1/2023 3.5
SAN MIGUEL 1104 5/1/2023 1.0
PASO ROBLES 1107 5/1/2023 0.6
![Page 20: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/20.jpg)
20
DIDF Project Location:
San Miguel Bank 1
San Miguel Bank 1 and Paso Robles 1107 Map
![Page 21: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/21.jpg)
21
DIDF Project Location:
San Miguel Bank 1
San Miguel Bank 1 Map
![Page 22: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/22.jpg)
22
San Miguel Bank 1 – Peak Day, Hourly Load ProfileFlat, baseload profile – Energy storage will not be able to charge from the constrained location to meet the grid
need (i.e., would need a separate energy source)
Technical and Operational Requirements
0
5
10
15
20
25
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
San Miguel Bank 1
June July August September Facility Rating
1.3 MW
Candidate Deferral GNA Facility Name
Distribution
Service
Required
Requirement
Real Time (RT)
or Day Ahead
(DA)
Grid Need
Grid
Need
Unit
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
San Miguel Bank 2
SAN MIGUEL BANK 1 Capacity A DA 3.5 MW 6-9 Mon – Sun 122 6AM-11PM 10
SAN MIGUEL 1104 Capacity B DA 1.0 MW 6-9 Mon - Fri 66 5PM-10PM 4
PASO ROBLES 1107 Capacity C DA 0.6 MW 7-9 Mon - Fri 21 3PM-9PM 4
2.2 MW
![Page 23: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/23.jpg)
23
San Miguel Bank 1 Options
• Option 1: Requirement A
– Requirement A: 3.5 MW, 10 hours
• Option 2: Requirements A1 and A2
– Requirement A1: 1.3 MW, 5 hours
– Requirement A2: 2.2 MW, 10 hours
– Both Requirement A1 and Requirement A2 must be met in order to meet the cumulative 3.5 MW grid need
![Page 24: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/24.jpg)
24
Customer Composition Served by San Miguel Bank 1
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 286 2.61
Commercial/Industrial 386 4.82
Residential 2,044 4.58
Other 12 1.14
Total 2,728 13.15
286
386
2,044
12
Customer Count
Agricultural Commercial/Industrial Residential Other
19.8%
36.7%
34.8%
8.7%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
![Page 25: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/25.jpg)
25
Load by Customer Class – San Miguel Bank 1
(Peak Load Day – September 4th, 2019)
0
2
4
6
8
10
12
14
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
AGR Commercial/Industrial Residential Other
![Page 26: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/26.jpg)
26
San Miguel Bank 1 DER Overview
Historical 2019 Forecast
Observed Peak Load
(MW)
Installed DERsYear
(Need vs Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV
(MW)
Wind (MW)
Storage (MW)
PV (MW)
ES (MW) EE (MW)DR
(MW)EV
(MW)
13.15 5.63 0.01 0.0052020 16.93 0.2 0.013 0.11 0.016 0.004
2028 19.32 0.2 0.018 0.00 0.00 0.013
![Page 27: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/27.jpg)
27
San Miguel 1104 – Peak Day, Hourly Load Profile
Technical and Operational Requirements
0
2
4
6
8
10
12
14
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
San Miguel 1104
June July August September Facility Rating
1 MW
Candidate Deferral GNA Facility Name
Distribution
Service
Required
Requirement
Real Time (RT)
or Day Ahead
(DA)
Grid Need
Grid
Need
Unit
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
San Miguel Bank 2
SAN MIGUEL BANK 1 Capacity A DA 3.5 MW 6-9 Mon – Sun 122 6AM-11PM 10
SAN MIGUEL 1104 Capacity B DA 1.0 MW 6-9 Mon - Fri 66 5PM-10PM 4
PASO ROBLES 1107 Capacity C DA 0.6 MW 7-9 Mon - Fri 21 3PM-9PM 4
![Page 28: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/28.jpg)
28
Customer Composition Served by San Miguel 1104
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 211 2.15
Commercial/Industrial 208 3.23
Residential 821 1.98
Other 1 0.00
Total 1,241 7.36
211
208
821
1
Customer Count
Agricultural Commercial/Industrial Residential Other
29.2%
43.9%
27.0%
0.0%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
![Page 29: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/29.jpg)
29
Load by Customer Class – San Miguel 1104
(Peak Load Day – September 4th, 2019)
0
1
2
3
4
5
6
7
8
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
AGR Commercial/Industrial Residential Other
![Page 30: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/30.jpg)
30
San Miguel 1104 DER Overview
Historical 2019 Forecast
Observed Peak Load
(MW)
Installed DERsYear
(Need vs Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV
(MW)
Wind (MW)
PV (MW)
ES (MW)
EE (MW)
DR (MW)
EV (MW)
7.36 3.30 0.012022 12.34 0.15 0.01 0.06 0.00 0.01
2028 13.13 0.17 0.02 0.00 0.00 0.01
![Page 31: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/31.jpg)
31
Paso Robles Feeder 1107 Location Overview
• Equipment: Paso Robles Feeder 1107 (Bank 3)
• Electrical Service:
• 12.47 kV feeder
Location
Paso Robles substation Bank 3, San Luis Obispo County
All data depicted in thisapplication is for PG&Einternal use only.Dissemination to any entityoutside of PG&E requires theapproval of Corporate Security.
San
Miguel
Candidate Deferral GNA Facility NameIn-Service
Date
Grid
Need
(MW)
San Miguel Bank 2
SAN MIGUEL BANK 1 5/1/2023 3.5
SAN MIGUEL 1104 5/1/2023 1.0
PASO ROBLES 1107 5/1/2023 0.6
![Page 32: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/32.jpg)
32
DIDF Project Location:
Paso Robles Feeder 1107
Paso Robles 1107 Map
![Page 33: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/33.jpg)
33
Paso Robles – Peak Day Hourly Load Profile
Technical and Operational Requirements
0
2
4
6
8
10
12
14
16
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
Paso Robles 1107
July August September Facility Rating
0.6 MW
Candidate Deferral GNA Facility Name
Distribution
Service
Required
Requirement
Real Time (RT)
or Day Ahead
(DA)
Grid Need
Grid
Need
Unit
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
San Miguel Bank 2
SAN MIGUEL BANK 1 Capacity A DA 3.5 MW 6-9 Mon – Sun 122 6AM-11PM 10
SAN MIGUEL 1104 Capacity B DA 1.0 MW 6-9 Mon - Fri 66 5PM-10PM 4
PASO ROBLES 1107 Capacity C DA 0.6 MW 7-9 Mon - Fri 21 3PM-9PM 4
![Page 34: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/34.jpg)
34
Customer Composition Served by Paso Robles 1107
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 46 0.20
Commercial/Industrial 255 4.39
Residential 1,798 5.41
Other 9 0.11
Total 2,108 10.12
46255
1,798
9
Customer Count
Agricultural Commercial/Industrial Residential Other
2.0%
43.4%
53.5%
1.1%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
![Page 35: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/35.jpg)
35
Load by Customer Class – Paso Robles 1107
(Peak Load Day – August 15th, 2019)
0
2
4
6
8
10
12
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
AGR Commercial/Industrial Residential Other
![Page 36: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/36.jpg)
36
Paso Robles 1107 DER Overview
Historical 2019 Forecast
Observed Peak Load (MW)
Installed DERsYear
(Need vs
Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV
(MW)
Biogas (MW)
Wind (MW)
Storage (MW)
PV (MW)
ES (MW)
EE (MW)
DR (MW)
EV(MW)
10.12 3.36 0.36 0.008 0.0252021 13.67 0.32 0.002 0.09 0 0.04
2023 14.13 0.17 0.002 0.03 0 0.06
![Page 37: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/37.jpg)
CALISTOGA DEFERRAL OPPORTUNITYCalistoga Bank 1 and Calistoga 1102
![Page 38: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/38.jpg)
38
Technical and Operational Requirements
Candidate Deferral
Expected Performance and Technical Requirements
GNA Facility NameIn-Service
DateRequirement
Real
Time
(RT) or
Day
Ahead
(DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Calistoga Bank 1
CALISTOGA BANK 1
• Calistoga 1101
• Calistoga 1102
5/1/2023 A DA 1.3 6-9Mon –
Sun40 2PM-6PM 3
CALISTOGA 1102
5/1/2023 B1 DA 2.0 6-9Mon –
Sun122 12PM-9PM 5
5/1/2023 B2 DA 1.0 6-9Mon –
Sun122 12PM-9PM 8
• A combined need of at least 1.3 MW across Calistoga feeders 1101 and 1102 is required• 3.0 MW must be sourced at Calistoga feeder 1102
![Page 39: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/39.jpg)
39
Calistoga Bank 1 and Feeders Location Overview
• Equipment: Calistoga Bank 1 – Feeders 1101 and 1102
• Electrical Service:
• 3-phase, 7 MVA bank with two 12.47 kV feeders
Location
Calistoga substation Bank 1, Napa County
All data depicted in thisapplication is for PG&Einternal use only.Dissemination to any entityoutside of PG&E requires theapproval of Corporate Security.
Calistoga
Candidate Deferral GNA Facility NameIn-Service
Date
Grid
Need
(MW)
Calistoga Bank 1CALISTOGA BANK 1 5/1/2023 1.3
CALISTOGA 1102 5/1/2023 3.0
![Page 40: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/40.jpg)
40
DIDF Project Location:
Calistoga Bank 1
Calistoga Bank 1 and the associated feeders Map
![Page 41: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/41.jpg)
41
DIDF Project Location:
Calistoga Bank 1
Calistoga Bank 1 Map
![Page 42: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/42.jpg)
42
DIDF Project Location:
Calistoga Bank 1
Calistoga 1102 Map
![Page 43: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/43.jpg)
43
• Calistoga Bank 1 – Peak Day, Hourly Load Profile– Potential red flag – Interconnection in the area may be costly and challenging due to protection and operational issues. PG&E will continue to assess the
issue.
Technical and Operational Requirements
0
5
10
15
20
25
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
Calistoga Bank 1
June July August September Facility Rating
1.3 MW
Candidate Deferral GNA Facility Name Requirement
Real Time
(RT) or Day
Ahead (DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Calistoga Bank 1CALISTOGA BANK 1 A DA 1.3 6-9 Mon – Sun 40 2PM-6PM 3
CALISTOGA 1102 B DA 3.0 6-9 Mon – Sun 122 12PM-9PM 8
![Page 44: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/44.jpg)
• Calistoga 1102 – Peak Day, Hourly Load Profile
0
2
4
6
8
10
12
14
16
18
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
Calistoga 1102
June July August September Facility Rating
2 MW
Candidate Deferral GNA Facility Name Requirement
Real Time (RT) or Day
Ahead (DA)
Grid Need (MW)
MonthDelivery
DaysCalls/ Year
HoursDuration (Hours)
Calistoga Bank 1CALISTOGA BANK 1 A DA 1.3 6-9 Mon – Sun 40 2PM-6PM 3
CALISTOGA 1102 B DA 3.0 6-9 Mon – Sun 122 12PM-9PM 8
Technical and Operational Requirements
1 MW
![Page 45: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/45.jpg)
45
Calistoga 1102 Options
• Option 1: Requirement B
– Requirement B: 3 MW, 8 hours
• Option 2: Requirements B1 and B2
– Requirement B1: 2 MW, 5 hours
– Requirement B2: 1 MW, 8 hours
– Both Requirement B1 and Requirement B2 must be met in order to meet the cumulative 3.0 MW grid need
![Page 46: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/46.jpg)
46
Customer Composition Served by Calistoga Bank 1
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 157 0.51
Commercial/Industrial 658 6.95
Residential 2,824 7.35
Other 6 0.04
Total 3,645 14.85
157
658
2,824
6
Customer Count
Agricultural Commercial/Industrial Residential Other
3.4%
46.8%
49.5%
0.3%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
![Page 47: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/47.jpg)
47
Load by Customer Class – Calistoga Bank 1
(Peak Load Day – September 25th, 2019)
0
2
4
6
8
10
12
14
16
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
AGR Commercial/Industrial Residential Other
![Page 48: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/48.jpg)
48
Calistoga Bank 1 DER Overview
Historical 2019 Forecast
Observed Peak Load (MW)
Installed DERsYear
(Need vs
Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV
(MW)
Natural Gas
(MW)
Storage (MW)
PV (MW)
ES (MW)
EE (MW)
DR (MW)
EV (MW)
14.85 3.52 0.84 0.162021 20.9 0.23 0.01 0.11 0 0.06
2023 21.0 0.12 0.01 0.06 0 0.08
![Page 49: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/49.jpg)
RIPON DEFERRAL OPPORTUNITYVierra 1707
![Page 50: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/50.jpg)
50
Technical and Operational Requirements
Candidate Deferral
Expected Performance and Technical Requirement
GNA Facility
Name
In-Service
DateRequirement
Real Time
(RT) or
Day
Ahead
(DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Ripon 1705 VIERRA 1707 4/30/2024 A DA 3.7 6-9Mon –
Sun102 3PM-10PM 5
• 3.7 MW must be sourced at Vierra feeder 1707
![Page 51: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/51.jpg)
51
Vierra 1707 Feeder Location Overview
• Equipment: Vierra Feeder 1707 (Bank 2)
• Electrical Service:
• 17 kV feeder
Location
Ripon Substation Bank 1, San Joaquin County
All data depicted in thisapplication is for PG&Einternal use only.Dissemination to any entityoutside of PG&E requires theapproval of Corporate Security.
Ripon`
Candidate Deferral GNA Facility NameIn-Service
Date
Grid
Need
(MW)
Ripon 1705 VIERRA 1707 4/30/2024 3.7
![Page 52: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/52.jpg)
52
DIDF Project Location:
Ripon 1705
Ripon Bank 1 and Vierra Bank 2 with associated feeders Map
Vierra Bank 2
Vierra 1706
Vierra 1707
Ripon Bank 1
Ripon 1701Ripon 1703
![Page 53: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/53.jpg)
53
DIDF Project Location:
Ripon 1705
Vierra Bank 2 Map
![Page 54: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/54.jpg)
54
0
5
10
15
20
25
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
Vierra 1707
June July August September Facility Rating
3.7 MW
• Vierra 1707 – Peak Day, Hourly Load Profile
Technical and Operational Requirements
Candidate Deferral GNA Facility Name Requirement
Real Time
(RT) or Day
Ahead (DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Ripon 1705 VIERRA 1707 A DA 3.7 6-9 Mon – Sun 102 3PM-10PM 5
![Page 55: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/55.jpg)
55
Customer Composition Served by Vierra 1707
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 54 0.12
Commercial/Industrial 200 1.96
Residential 4,171 12.70
Other 2 0.00
Total 4,427 14.79
54200
4,171
2
Customer Count
Agricultural Commercial/Industrial Residential Other
0.8%
13.3%
85.9%
0.0%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
![Page 56: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/56.jpg)
56
Load by Customer Class – Vierra 1707
(Peak Load Day – August 15th, 2019)
0
2
4
6
8
10
12
14
16
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
AGR Commercial/Industrial Residential Other
![Page 57: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/57.jpg)
57
Vierra 1707 DER Overview
Historical 2019 Forecast
Observed Peak Load (MW)
Installed DERsYear
(Need vs
Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV
(MW)
Storage (MW)
PV (MW)
ES (MW)
EE (MW)
DR (MW)
EV (MW)
14.79 8.22 0.132023 17.25 0.99 0.02 0.00 0 0.06
2029 20.73 0.72 0.03 0.07 0 0.07
![Page 58: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/58.jpg)
ZAMORA DEFERRAL OPPORTUNITYZamora Bank 1
![Page 59: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/59.jpg)
59
• A combined need of at least 1.1 MW across Zamora feeders 1105 and 1106 is required
Technical and Operational Requirements
Candidate Deferral
Expected Performance and Technical Requirement
GNA Facility NameIn-Service
DateRequirement
Real Time
(RT) or
Day
Ahead
(DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Zamora 1108
ZAMORA BANK 1
• Zamora 1105
• Zamora 1106
5/1/2023 A DA 1.1 6-7 Mon - Fri 45 6AM-10PM 14
![Page 60: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/60.jpg)
60
Zamora Bank 1 and Feeders Location Overview
• Equipment: Zamora Bank 1 – Feeders 1105 and 1106
• Electrical Service:
• 3-phase, 10.5 MVA bank with two 12.47 kV feeders
Location
Zamora Substation Bank 2, Yolo County
All data depicted in thisapplication is for PG&Einternal use only.Dissemination to any entityoutside of PG&E requires theapproval of Corporate Security.
Zamora
Candidate Deferral GNA Facility NameIn-Service
Date
Grid
Need
(MW)
Zamora 1108 ZAMORA BANK 1 5/1/2023 1.1
![Page 61: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/61.jpg)
61
DIDF Project Location:
Zamora 1108
Zamora 1108 Map
![Page 62: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/62.jpg)
62
DIDF Project Location:
Zamora 1108
Zamora Bank 1 and Bank 2 Map
Zamora Bank 1
Zamora Bank 2
![Page 63: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/63.jpg)
63
Technical and Operational Requirements
• Zamora Bank 1 – Peak Day, Hourly Load Profile– Flat, baseload profile – Energy storage will not be able to charge from the constrained location to meet the grid need
(i.e., would need a separate energy source)
0
2
4
6
8
10
12
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Load
(M
W)
Hour
Hourly Load Forecast - Peak Year (2020)
May June July August Facility Rating
1 MW
Candidate Deferral GNA Facility NameIn-Service
Date
Real Time
(RT) or Day
Ahead (DA)
Grid
Need
(MW)
MonthDelivery
Days
Calls/
YearHours
Duration
(Hours)
Zamora 1108 ZAMORA BANK 1 5/1/2023 DA 1.1 6-7 Mon - Fri 45 6AM-10PM 14
![Page 64: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/64.jpg)
64
Customer Composition Served by Zamora Bank 1
Customer Class Total Customer Count Peak Day Load (MW)
Agricultural 194 6.60
Commercial/Industrial 87 1.14
Residential 230 0.24
Other 2 0.00
Total 513 7.99
194
87
230
2
Customer Count
Agricultural Commercial/Industrial Residential Other
82.6%
14.3%
3.0%
Peak Day Load by Customer Class (%)
Agricultural Commercial/Industrial Residential Other
![Page 65: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/65.jpg)
65
Load by Customer Class – Zamora Bank 1
(Peak Load Day – June 29th, 2019)
0
1
2
3
4
5
6
7
8
9
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
MW
Hour
Peak Day Hourly Load Profile by Customer Type
AGR Commercial/Industrial Residential
![Page 66: DER Growth: Load Forecast & Customer Data Appendix F1...Customer Class Total Customer Count Peak Day Load (MW) Agricultural 286 2.61 Commercial/Industrial 386 4.82 Residential 2,044](https://reader036.vdocuments.mx/reader036/viewer/2022071406/60fc1d46787ed07e8743a6d8/html5/thumbnails/66.jpg)
66
Zamora Bank 1 DER Overview
Historical 2019 Forecast
Observed Peak Load
(MW)
Installed DERsYear
(Need vs Peak)
Peak Load
(1 in 10 Year) (MW)
Incremental DER Growth
Solar PV (MW)
Wind (MW)
Storage (MW)
PV (MW)
ES (MW) EE (MW) DR (MW)EV (MW)
7.99 1.10 0.002 0.0052020 10.35 0.12 0.01 0.03 0 0
2020 10.35 0.12 0.01 0.03 0 0