Construction Progress

It is a fundamental value of Spence Brothers that safety

always be a primary consideration. It is a top priority to

do all in our power to provide a safe work place for all

workers and to mandate the use of good safety

practices.

Interlochen Public Library

February 2018

Project Safety

3/6/2018

CONSTRUCTION MANAGER’S REPORT

February 2018 Page 2

Week of February 4, 2018

• Snow removal

• Continue with framing walls in Building Area B

i

Building Area B

3/6/2018

CONSTRUCTION MANAGER’S REPORT

February 2018 Page 3

Week of February 11, 2018

• Framing for the front door area and the Children’s Area

Front Door Area

Children’s Area

3/6/2018

CONSTRUCTION MANAGER’S REPORT

February 2018 Page 4

Week of February 18, 2018

• Continue with wall framing

Con

Building Area B

3/6/2018

CONSTRUCTION MANAGER’S REPORT

February 2018 Page 5

Week of February 25, 2018

• Set steel columns and high wall framing in Study Area

Study Area

3/6/2018

CONSTRUCTION MANAGER’S REPORT

February 2018 Page 6

Upcoming Construction Tasks• Start setting trusses beginning at the Community Room moving west

on the project site

• Start framing interior walls

• Plumbing and electrical rough-in