![Page 1: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/1.jpg)
Commissioning and prospects of the
ANAIS-112 experimentPatricia Villar onbehalf of the ANAIS team
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain
![Page 2: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/2.jpg)
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Outline
The ANAIS experiment Detectors performance Background evaluation ANAIS-112: Status & prospects Summary and conclusions
![Page 3: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/3.jpg)
Outline
The ANAIS experiment Detectors performance Background evaluation ANAIS-112: Status & prospects Summary and conclusions
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 4: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/4.jpg)
112.5 kg of ultrapureNaI(Tl) detectors in a
3 x 3 matrixconfiguration at LSC
ANAISAnnual modulation with NaI Scintillators
The ANAIS experiment
Confirming DAMA/LIBRA modulation signal: Experimental requirements:
- Energy threshold < 2 keVee- Background near the threshold at orbelow a few counts/(keV kg day)
Same target and technique Different experimental approach Different environmental conditions affecting systematics
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 5: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/5.jpg)
The ANAIS experiment
NaI-3210.7 kg BICRON
ANAIS-0
ANAIS-25
ANAIS-37
ANAIS-112
9.6 kg Saint-Gobain
2 x 12.5 kg Alpha Spectra Inc.
3 x 12.5 Alpha Spectra Inc.
9 x 12.5 Alpha Spectra Inc.
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 6: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/6.jpg)
ANAIS detectors
Manufacturer: Alpha Spectra Inc. CO (USA) from NaI selected powder
Characteristics:
4.75” φ x 11.75” length cylindrical shape
OFHC copper encapsulation+ Teflon diffusor
Mylar window for low energy calibration
Two optical windows for PMTs coupling
+ PMTs: Ham12669SEL2 with high quantum efficiency (>33%) and low dark current
NO LIGHT GUIDES Increase light collection
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 7: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/7.jpg)
ANAIS experimental features
Radon-free low energy calibration system
Electronics: Air conditioned roomto avoid temperature fluctuations
Muon-tagging system
Monitor environmental parameters:(External Rn air content, humidity, temperature (inside/outside/electronics), pressure, N2 flux, PMT HV, gain, trigger rate and level, coincidence window…
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Individual PMT signals digitized 2GS/s with high resolution (14 bits)
Robust algorithm for peak identification at low energy
![Page 8: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/8.jpg)
Outline
The ANAIS experiment Detectors performance Background evaluation ANAIS-112: Status & prospects Summary and conclusions
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 9: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/9.jpg)
Alpha Spectra Inc. detectors for ANAIS
D0 / D1 modules: First AS modules grown with purified NaI powder < 90ppb (Dec 2012)
D2 module: WIMPScint-II powderImproved protocols to reduce 210Pb (March 2015)
D3 module: WIMPScint-III powder Improved powder purification to reduce Potassium (March 2016)
D4 / D5 modules: WIMPScint-III powder Checking/confirming
radiopurity protocols @ AS(just arrived at LSC)
ANAIS-25 set-up
ANAIS-37 set-up (D0+D2+D1)
ANAIS-37 set-up (D0+D3+D2)
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 10: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/10.jpg)
Alpha Spectra Inc. detectors for ANAIS
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Excellent Duty Cycle at different ANAIS set-ups and runs Very important for annual modulation analysis
ANAIS-25-III
ANAIS-37-B
![Page 11: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/11.jpg)
Light collection
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Detector Set-up Light collected(phe/keV) at 22 keV
D0ANAIS25 ANAIS37 ANAIS37
15.6 ± 0.215.3 ± 0.1 15.1 ± 0.1
D1ANAIS25 (*)
ANAIS25 ANAIS37
12.6 ± 0.1 15.2 ± 0.1 14.4 ± 0.1
D2 ANAIS37 15.4 ± 0.1
D3 ANAIS37 15.2 ± 0.5
(*)PMT: Ham R11065
EXCELLENT LIGHT COLLECTION in Alpha Spectra Inc. detectorsin all set-ups
Good energy resolution and threshold
![Page 12: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/12.jpg)
Energy threshold
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Triggering below 1 keV with high efficiencyDetermined by coincidences between high energy gammas and low energy events in due to 22Na and 40K decays in the bulk of adjacent modules
Physical eventsBut difficult to disentangle from PMT-origin events
![Page 13: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/13.jpg)
Calibration
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Linear calibration down to 0.9 keV usingexternal sources at low energy (109Cd)
internal emissions (from 40K and 22Na in the bulk)
![Page 14: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/14.jpg)
Event selection
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
MULTIPARAMETRIC CUTS required for data selection down to 1 keVee:
-Number of peaks in the pulse (>2 per PMT) -Temporal parameters of the total light pulse -Asymmetry in the light sharing
- Coincidence with a signal in the muon veto - Time difference with previous event - Quality cut on baseline calculation
- Coincidence among modules Robust acceptance efficiency Estimate (during 109Cd/57Co calibrations)
Acceptance efficiency estimate
Live Time Estimate
![Page 15: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/15.jpg)
Outline
The ANAIS experiment Detectors performance Background evaluation ANAIS-112: Status & prospects Summary and conclusions
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 16: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/16.jpg)
Internal contaminations
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
• Very good levels of 238U & 232Th
• Acceptable levels of 40K (improved in last module to the DAMA upper limit)
• 210Pb out-of-equilibrium contamination, improved in D2, but increased again in D3
![Page 17: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/17.jpg)
Internal contaminations
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
• Very good levels of 238U & 232Th
• Acceptable levels of 40K (improved in last module to the DAMA upper limit)
• 210Pb out-of-equilibrium contamination, improved in D2, but increased again in D3
![Page 18: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/18.jpg)
The 210Pb problem
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
210Pb contamination is a problem at low energy Origin of the 210Pb contamination is understudy in collaboration with Alpha Spectra→ 1 kg crystals tests at LSC
Two of the samples measured by now are below 0.7 mBq/kg (D2 level)
![Page 19: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/19.jpg)
Background in the RoI
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Background at low energy is dominated by 210Pb (continuum) and 40K (peak) contaminations in the crystal
Cosmogenics still decaying in D3
Working to improve filtering protocols below 2 keV
![Page 20: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/20.jpg)
Background in the RoI
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
D0 Detector D2 Detector D3 Detector
D0 & D2: Continuum excess at low energy can be explained by including 3H and 210Pb at a surface depth from 10 -100 𝝁𝝁m
![Page 21: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/21.jpg)
Background in the RoI
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
D0 Detector D2 Detector D3 Detector
D0 & D2: Continuum excess at low energy can be explained by including 3H and 210Pb at a surface depth from 10 -100 𝝁𝝁m
D3: Under constructionD0 & D2 model preliminarily extended to D3
![Page 22: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/22.jpg)
Background in the RoI
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
D0 Detector D2 Detector D3 Detector
Eur. Phys. J. C (2016) 76:429
D0 & D2: Continuum excess at low energy can be explained by including 3H and 210Pb at a surface depth from 10 -100 𝝁𝝁m
![Page 23: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/23.jpg)
Outline
The ANAIS experiment Detectors performance Background evaluation ANAIS-112: Status & prospects Summary and conclusions
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 24: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/24.jpg)
ANAIS-112 status
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
D4 & D5 arrived at LSC ! • D4 same ingot as D3 • D5 same ingot as AS2K2/3 SCHEDULE:
Nov 14th : Start data-taking for background assesment
![Page 25: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/25.jpg)
ANAIS-112 sensitivity
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
• 1-6 keVee region
• D2 background level
• 5 years data taking
• Detection limit at 90% C.L. for a critical limit at 90% C.L.
According to S. Cebrián et al., Astroparticle Physics 14, 2001, 339
![Page 26: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/26.jpg)
+ Liquid Scintillator Veto simulation
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
A Liquid Scintillator Veto (LSV) could be incorporated to ANAIS-112 in a second phase of the experiment
LSVc 3.8 t LAB scintillator
LSVb1.7 t LAB scintillator(fits in presentexperimental setup)
3x3 modules 69.0 62.4 62.3 83.7
3x3 modules + LSVb(500 keV threshold) 20.5 11.0 31.1 61.3
3x3 modules + LSVb 14.5 3.7 7.3 56.6
3x3 modules + LSVc(500 keV threshold) 15.5 5.7 29.3 59.1
3x3 modules + LSVc 11.9 1.2 7.3 55.6
R.F. (%) 40K from crystals
R.F. (%) 22Na from crystals
R.F. (%) PMTs R.F. (%) All
![Page 27: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/27.jpg)
Outline
The ANAIS experiment Detectors performance Background evaluation ANAIS-112: Status & prospects Summary and conclusions
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
![Page 28: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/28.jpg)
Summary and conclusions
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
ANAIS experimental proposal:
• 112.5 kg (3x3 crystals matrix) of NaI(Tl) at LSC: - 6 modules available at LSC (75 kg) /waiting for 3 more with improved radiopurity- Blind Analysis Strategy
• Good quality NaI(Tl) detectors from Alpha Spectra: - Outstanding light collection- Triggering at 1 keVee- Potassium content at 20ppb level- 210Pb required level to be confirmed with D5
• Shielding, DAQ system and software ready at LSC – Hall B • Expected to start data-taking by the beginning of March 2017 • Neutron calibrations and REF measurements pending
Good sensitivity prospects forexploring the DAMA/LIBRAsignal in a model independentway:
DISCOVERY POTENTIAL
![Page 29: Commissioning and prospects of the ANAIS-112 experiment · Commissioning and prospects of the ANAIS-112 experiment. Patricia Villar. on behalf of the ANAIS team. RENATA meeting -](https://reader030.vdocuments.mx/reader030/viewer/2022040901/5e725be468004d479e6bd32e/html5/thumbnails/29.jpg)
Summary and conclusions
RENATA meeting - VIII CPAN days, 28 – 30 November 2016, Zaragoza, Spain P. Villar
Thank you