COMITÉ PANAMEÑO DE PRESAS
FORO: SEGURIDAD DE PRESAS
17 DE NOVIEMBRE DE 2012
Hans Schwarzweller
![Page 2: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/2.jpg)
Center Hill Dam Foundation Remediation BAUER Spezialtiefbau – Bauer Foundation Corp.
![Page 3: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/3.jpg)
3
Center Hill Dam Foundation Remediation Project Location
![Page 4: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/4.jpg)
4
Wolf Creek Dam Foundation Remediation Project Location
Wolf Creek Dam
Center Hill Dam
![Page 5: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/5.jpg)
5
Center Hill Dam Foundation Remediation Project Overview
- Concrete Dam approx. 420m long- Main Dam is 69m high above stream bed- Embankment Dam is approx. 300 m long- Diff. U/S to D/S Water Level approx. 50m
![Page 6: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/6.jpg)
6
Center Hill Dam Foundation Remediation The basic problem
![Page 7: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/7.jpg)
7
Center Hill Dam Foundation Remediation The basic problem
1959 2007
![Page 8: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/8.jpg)
8
Center Hill Dam Foundation Remediation The basic problem
![Page 9: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/9.jpg)
9
Center Hill Dam Foundation Remediation Sink holes
![Page 10: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/10.jpg)
10
Center Hill Dam Foundation Remediation Sink holes
![Page 11: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/11.jpg)
11
Center Hill Dam Foundation Remediation Sink holes
![Page 12: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/12.jpg)
12
Center Hill Dam Foundation Remediation Sink holes / Existing Condition
Sink hole
![Page 13: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/13.jpg)
13
Center Hill Dam Foundation Remediation Cut off trench works
![Page 14: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/14.jpg)
14
Center Hill Dam Foundation Remediation Solution
Barrier Wall
Encasement Wall
![Page 15: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/15.jpg)
15
Center Hill Dam Foundation Remediation Geology
1000Psi ~ 7Mpa
![Page 16: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/16.jpg)
USA - Center Hill Dam Foundation Remediation Geology
16
![Page 17: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/17.jpg)
USA - Center Hill Dam Foundation Remediation Geology
17
Formation Rock Type Approximate Thickness Character
Unconfined Compressive
Strength
Catheys Limestone 56 - 116 ftfinely crystalline shaley Limestone bands medium to thin bedded hard to moderately hard
108 MPa
Cannon Limestone 110 - 120 ftfinely crystalline shaley Limestone bands massive bedded hard to moderately hard
36 – 220 MPa
Hermitage 4 beds of Shale and Limestone 50 - 55 ft
dense to finely crystalline thin bedded soft to moderately hard
35 – 200 MPa
Upper Carters Limestone 25 - 27 ftdense to finely crystalline shale stringers/bands medium to thin bedded hard to very hard
55 – 195 MPa
T3 Bentonitesandy volcanic weak
shaleShale 1-1/4 to 2 ft
dense to fine grained sandy at top, shale at bottom thin bedded soft
Lower Carters Limestone 55 - 85 ftfine to medium crystalline shaley LS bands/stringers massive to thick bedded hard to very hard
120 – 180 MPa
![Page 18: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/18.jpg)
18
Center Hill Dam Foundation Remediation Geology
UCS 72 MPa
![Page 19: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/19.jpg)
100f
t ~ 3
0m
Center Hill Dam Foundation Remediation Encasement & Barrier wall layout
![Page 20: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/20.jpg)
20
Center Hill Dam Foundation Remediation Site Works Overview
E- & B- Wall
Extended Working Platform
Staging Area
Water Access
![Page 21: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/21.jpg)
21
Center Hill Dam Foundation Remediation Previous Works
![Page 22: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/22.jpg)
22
Center Hill Dam Foundation Remediation Todays Scope of Work
![Page 23: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/23.jpg)
23
Center Hill Dam Foundation Remediation Todays Scope of Work
![Page 24: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/24.jpg)
24
Center Hill Dam Foundation Remediation Todays Scope of Work
![Page 25: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/25.jpg)
25
Center Hill Dam Foundation Remediation Todays Scope of Work
![Page 26: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/26.jpg)
26
Center Hill Dam Foundation Remediation Todays Scope of Work
![Page 27: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/27.jpg)
27
Center Hill Dam Foundation Remediation Todays Scope of Work
![Page 28: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/28.jpg)
Center Hill Dam Foundation Remediation Todays Scope of Work
![Page 29: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/29.jpg)
Center Hill Dam Foundation Remediation Scheduled Small Drilling Equipment
Precision tool for Pilot Hole Drilling Verticality Control by Laser at a Coal Mine in Belgium Drilling depth: 626 ft – Laser beam confirms a total deviation of 1 inch = 0.01%
![Page 30: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/30.jpg)
Center Hill Dam Foundation Remediation Scheduled Large Drilling Equipment
![Page 31: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/31.jpg)
Center Hill Dam Foundation Remediation Scheduled Large Drilling Equipment
![Page 32: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/32.jpg)
Center Hill Dam Foundation Remediation Scheduled Large Drilling Equipment
![Page 33: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/33.jpg)
33
Center Hill Dam Foundation Remediation Scheduled Cutter Equipment
320to
![Page 34: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/34.jpg)
34
Center Hill Dam Foundation Remediation Scheduled Cutter Equipment
2,25m
3,2 m
70to
![Page 35: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/35.jpg)
35
Center Hill Dam Foundation Remediation Scheduled Slurry Equipment
![Page 36: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/36.jpg)
36
Center Hill Dam Foundation Remediation Scheduled Submittals & Reporting
![Page 37: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/37.jpg)
37
Center Hill Dam Foundation Remediation Scheduled Survey & Monitoring
![Page 38: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/38.jpg)
38
Center Hill Dam Foundation Remediation Scheduled Survey & Monitoring
![Page 39: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/39.jpg)
39
Center Hill Dam Foundation Remediation Scheduled Survey & Monitoring by CIS
![Page 40: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/40.jpg)
40
Center Hill Dam Foundation Remediation Scheduled Survey & Monitoring by CIS
![Page 41: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/41.jpg)
WallTrackerDokumentation und Visualisierung von Projektdaten
41
![Page 42: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/42.jpg)
WallTrackerDokumentation und Visualisierung von Projektdaten
Zweck und Ziele
1. Zeitnahe Qualitätskontrolle / -überwachung (z.B. erreichte Tiefen,
Überschnitte, Testergebnisse, …)
2. Zeitnahe Datenanalyse (Tiefe-Soll-Ist, Überschnitt-soll-Ist, …)
3. Zeitnahes Produktions-Controlling (Massen, Soll-Ist-Vergleiche)
4. Visualisierung der erbrachten Leistung
5. Übersichtliche Dokumentation von geographisch zugeordneten Daten
(geocoded data)
42
![Page 43: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/43.jpg)
WallTrackerVisualisierung und Dokumentation von Projektdaten
Software-Hintergrund1.Visualisierung von verschiedenen Daten aus verschiedenen Datenbanken über die ArcGIS-Software von Esri (ArcGIS: GeoInformationssystem)
2.ArcGIS-Reader ist kostenlos und wird bei Bedarf von IT installiert
Info aus Wikipedia:GeoinformationssystemGeoinformationssysteme (GIS), Geographische Informationssysteme oder Räumliche Informationssysteme (RIS) sind Informationssysteme zur Erfassung, Bearbeitung, Organisation, Analyse und Präsentation geografischer Daten. Geoinformationssysteme umfassen die dazu benötigte Hardware, Software, Daten und Anwendungen.
43
ArcGis Explorer Online
![Page 44: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/44.jpg)
WallTrackerDokumentation und Visualisierung von Projektdaten
44
![Page 45: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/45.jpg)
WallTrackerDokumentation und Visualisierung von Projektdaten
45
![Page 46: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/46.jpg)
WallTrackerVisualisierung und Dokumentation von Projektdaten
46
![Page 47: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/47.jpg)
WallTrackerVisualisierung und Dokumentation von Projektdaten
47
![Page 48: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/48.jpg)
WallTrackerVisualisierung und Dokumentation von Projektdaten
WallTracker ©
for
Center Hill Dam Seepage Rehabilitation
48
![Page 49: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/49.jpg)
CHD – Data Flow: Principles and Concepts
Single comprehensive data structure– Described in Data Management Plan to be submitted to Government– Master database serves as single authoritative repository of all project data– Relational database structure
Balance between automation and QC– Data flow is automated to eliminate transcription, but transparent to allow
QC at all steps
![Page 50: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/50.jpg)
CHD – Data Flow: Principles and Concepts
Data integrity built into each stage of process:– Raw data uploaded to Government FTP site immediately on generation– All data are verified on appending to database:
• Checks for completeness• Checks for compliance with valid values
– Normalization within database allows for efficient management:• All locations related by coordinates and stations• Consistent unit nomenclature across entire database
Government and QCS can remotely view operator screens and access all data with WallTracker
![Page 51: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/51.jpg)
CHD – Data Flow: Instrumentation and Survey
Inputs
Argus ADAS
Government’s or QCS’s Tablet PC:• Mirror of Argus data view• WallTracker view
Argus data view
Master Site Database
WallTracker
FTP(raw data;
submittals)
![Page 52: COMITÉ PANAMEÑO DE PRESAS](https://reader030.vdocuments.mx/reader030/viewer/2022021500/586677921a28abe33f8b4764/html5/thumbnails/52.jpg)
CHD – Data Flow: Wall Installation
Bauer equipment with B-Tronics
Operator’s Control Screen
Wireless router
B-Tronics.dat file
Master Site Database
FTP(raw data;
submittals)
WallTrackerGovernment’s or QCS’s Tablet PC:• Mirror of Operator’s Control
Screen (within 1,000m)