COCHIN INTERNATIONAL AIRPORT LIMITED
1
![Page 2: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/2.jpg)
CIAL-A PATHBREAKER Cochin International airport, the country’s
first Greenfield airport built under public private partnership is a trendsetter in aviation infrastructure development.
The unique rehabilitation package, the astonishing public participation and a sustainable business model have made CIAL a path breaker
2
![Page 3: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/3.jpg)
UNIQUE ARCHITECTURE
The airport, featuring Kerala’s typical architecture is unique
3
![Page 4: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/4.jpg)
CREDENTIALS Over 5 million passengers a year47072 aircraft movements 54440 tons of cargo CIASL- Aviation Services LimitedCIAL Infrastructure limited18 hole golf courseAviation security training academy
4
![Page 5: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/5.jpg)
NEW INTERNATIONAL TERMINAL
CIAL is gearing up to take new challenges in passenger traffic growth as its dream project is about to set in. Chief minister Mr.Oommen Chandy laid the foundation stone of the new international passenger terminal on feb 1.
5
![Page 6: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/6.jpg)
AT THE CEREMONY
6
![Page 7: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/7.jpg)
HOW IT IS TO BE
7
![Page 8: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/8.jpg)
SALIENT FEATURES Two level terminal-Arrival in ground level Departure in first level
8
![Page 9: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/9.jpg)
SALIENT FEATURESFinger pier concept to handle 13-15 aircrafts
through aerobridges during peak operations
9
![Page 10: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/10.jpg)
SALIENT FEATURESElevated road approach to departure level
Parking area with a capacity of 3000 cars
10
![Page 11: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/11.jpg)
SALIENT FEATURES
Departure level 2Covered road/ Kerb area of 3 lakh sft- 3+3+2
lane traffic56 check in counters with provision for
additional 5648 immigration counters10000 sft duty free shop13 security gates
11
![Page 12: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/12.jpg)
SALIENT FEATURES
Departure level 3
2 food courts4 premium lounges
12
![Page 13: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/13.jpg)
SALIENT FEATURESArrival level-1Connectivity to departure for transit
passengers at arrival corridorConnectivity to remote arrival50 immigration countersAquarium, vertical garden, hanging
installations, murals
13
![Page 14: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/14.jpg)
SALIENT FEATURESArrival level-020000 sft duty free shop6 conveyor belts18000 sft passenger exit lounge with 2 main
exit pointsVisitors waiting area and related
concessionariesMeet and greet area
14
![Page 15: COCHIN INTERNATIONAL AIRPORT LIMITED](https://reader033.vdocuments.mx/reader033/viewer/2022061509/56815876550346895dc5d5f5/html5/thumbnails/15.jpg)
Cost of the project & period for completion
15
Us $ 150m( Rs. 8500 m)The terminal will have a built up area of 15
lakh sft. It will have a peak hour capacity of 4000 passengers.
The project is expected to be completed in 24 months.