Coal-Fired Power Plants in the Philippines
CalacaLocation: Batangas
Operator: SEM-Calaca Power CorpConfiguration: 2 X 300 MW
Operation: 1984-1995Fuel: bituminous and subbituminous coal
Boiler supplier: FW, MHIT/G supplier: Toshiba, GEC-Alstom
EPC: Commonwealth Engineers, MHIQuick facts: Unit-1 was the first 300-MW class coal-fired plant in the country. In July 2009, the plant was
sold to DMCI Holdings for $361.71mn.
Photograph by Avilash Rould
Re-posted 21 Aug 2010
MasinlocLocation: Zambales
Operator: Masinloc Power Partners Co LtdConfiguration: 2 X 330 MW
Operation: 1998-1999Fuel: coal
Boiler supplier: MHIT/G supplier: MHI, Melco
EPC: Stone & Webster, Commonwealth Engineers,MHI
Quick facts: After an international auction process,PSALM awarded the Masinloc plant to a consortium
of YNN Holdings Corp and Great Pacific FinancialGroup for $561.7mn in Dec 2004. This was the
largest Philippine power plant divesture to that dateand the price was both double the next highest bid
and substantially above the expected bid. In theevent, the consortium could not consummate the
sale and the plant was rebid in Jul 2007 andeventually sold to a consortium led by AES Corp.
Financing closed in mid-April 2008, with theparticipation of the ADB, IFC and a syndicate of
commercial banks. AES has made extensiveinvestments to recover lost capacity and improve
plant efficiency and environmental operations.Masinloc was named a Power magazine Top Plantin 2011. Two more 300-MW units are in planning.
Photograph courtesy of Power
Re-posted 16 Oct 2011
MindanaoLocation: Misamis Oriental
Operator: STEAG State Power IncConfiguration: 2 X 116 MW
Operation: 2006Fuel: bituminous coal
Boiler supplier: KawasakiT/G supplier: Toshiba
EPC: Kawasaki, Commonwealth Engineers CoQuick Facts: This plant at the Phivdec Industrial
Estate near Cagayan de Oro City was approved byNPC and PSALM in Sep 2003. The lead financingwas by Taiwan’s State Investment Trust which hasan 11% stake in the project with STEAG taking an89% stake. The project dates to 1996 when a 25yrPPA was signed. This was formalized in Oct 2001and in Apr 2002, Kawasaki was awarded the EPCcontract for the plant, which burns Indonesian coal.Construction started in Jan 2004 and the plant cost
$305mn. Financial close was in Dec 2003 with agroup of lenders including JBIC, Nippon Export and
Insurance Corp,and Germanys KfW, BayerischeHypo-und Vereinsbank, and Dresdner Bank.
Photograph courtesy of STEAG
Posted 13 Jan 2007
Naga City-2Location: Cebu
Operator: Kepco Phillipines CorpConfiguration: 2 X 103 MW
Operation: 2010-2011Fuel: coal
Boiler supplier: DoosanT/G supplier: Doosan
EPC: Doosan
PagbilaoLocation: Quezon
Operator: TeaM Energy CorpConfiguration: 2 X 367 MW
Operation: 1996Fuel: coal
Boiler supplier: MHIT/G supplier: MHI, Melco
EPC: B&V, Slipform
QuezonLocation: Quezon
Operator: Quezon Power LtdConfiguration: 1 X 490 MW
Operation: 1999Fuel: coal
Boiler supplier: FWT/G supplier: GE
EPC: BechtelQuick facts: This IPP on a 100ha site in Maubanhas electrostatic precipitators, low-NOX burners,
8/14/12 st-coal-philippines
2/2www.industcards.com/st-coal-ph.htm
Quick facts: In Jun 2004, a 200-MW coal-fired IPPextension to the 100-MW coal-fired plant at NagaCity, in Cebu was officially launched as a result ofbilateral agreements signed by the Philippine and
Korean governments. Development was by a 60:40joint venture of Kepco and Salcon Power Corp from
Singapore. The Philippine Board of Investmentsapproved incentives for the project, which has twoCFB boilers and burns local coal from Semirara
Mining Corp. The project cost an estimated$278mn.
Photograph by edgar j ediza (fl ickr)
Posted 30 May 2012
Quick facts: This site is only 15km from Manila onthe southwestern tip of Pagbilao Grande island, but
the location is isolated from heavy transportationlinks and the construction logistics were daunting.While about $45mn over the initial budget, and not
inexpensive at $1,300/kW, Pagbilao was a model forfast-track IPP deployment in developing countries.
In Jun 2007, Mirant sold the Pagbilao and Sual coal-fired plant and a 20% stake in the Ilijan combined-
cycle plant to TeaM Energy Corp for $3.424bn.TeaM is a joint venture of Tepco Intl and Marubeni
Corp.
Photograph courtesy of Power
Posted 8 Sep 2004
and an FGD scrubber. Union Bank of Switzerlandagreed to underwrite up to $600mn of bank financingfor the $860mn project, which also includes a 31kmtransmission line. The project has a 25yr PPA withMeralco. In late 1997, lead developer InterGen sold
a 26% stake in Mauban to Global PowerInvestments LP, formed in 1994 by GE Capital,
Soros Fund Management, and International FinanceCorp. InterGen retains a 46% stake, with Covanta
having a 26% share and PMR holding 2%. The planthas a long-term coal supply contract with
Indonesia’s PT Adaro and Kaltim Prima and burnsabout 1.65mn tons per year. Dedicated port and
coal handling facilities were built.
Photograph courtesy of Covanta
Posted 28 Sep 2005
SualLocation: Pangasinan
Operator: TeaM Energy CorpConfiguration: 2 X 647 MW
Operation: 1999Fuel: bituminous coalBoiler supplier: Stein
T/G supplier: GEC-AlstomEPC: GEC-Alstom, Arup, Slipform
Quick facts: This is the largest coal-fired powerstation in the Philippines. Development started whenConsolidated Electric Power Asia Ltd (a subsidiaryof Hopewell Holdings) bid and won a $900mn BOOTtender for a 1,000-MW power station at Sual. Site
prep started in 1995 and construction started in Feb1996. Uni-1 went commercial in Oct 1999. The
142ha site is on Bangayao Point on Lingayen Gulf.The plant has wet limestone FGD scrubbers fromAlstom: these were the first FGD systems in the
country. The stack is 226m tall.
Photograph courtesy of tinypic
Re-posted 22 Aug 2010
Toledo NewLocation: Cebu
Operator: Kepco Phillipines CorpConfiguration: 3 X 82 MW
Operation: 2011Fuel: coal
Boiler supplier: Formosa Heavy IndustriesT/G supplier: Kawasaki, Toshiba Mitsubishi-Electric
Industrial SystemsEPC: Formosa Heavy Industries
Quick facts:In Sep 2004, Mirant announced that itwould build a 100-MW CFB at its Sangi plant inToledo City, Cebu, for $100mn. The project wastaken forward by Global Business Power Corp,
which completed a trio of 82-MW, CFB coal-firedunits at the site in 2011.
Photograph by mmcg968 (fl ickr)
Posted 30 May 2012