New Case ManagementSystem (CMS) Project
Initiation Document
January 27, 2011
-
8/7/2019 CMS Initiation Final
2/42
DOCUMENT HISTORY
Date Version Editor Changes
Jan. 6, 2011 1.0 D. Chase Initial draft Jan. 12, 2011 1.1 D. Chase Fixed various grammatical & text items
Updated Success Measures
Updated Project Scope
Updated Assumptions & Constraints
Updated Project Roles & Responsibilities
Appendix A - MOSTD Oversight Severity &Risk Analysis
Jan. 20, 2011 1.2 D. Chase Updated Schedule
Updated Work Products
Updated Resources Updated Success Measures
Appendix B Project Governance Jan. 27, 2011 1.3 D. Chase Found & replaced grammatical issues
Updated Resources
-
8/7/2019 CMS Initiation Final
3/42
New Case Management System ProjectInitiation Document
TABLE OF CONTENTS
1. Project Statement ..................................................................................................................................... 1
2. Business Case ........................................................................................................................................... 1
3. Objectives ................................................................................................................................................. 3
4. Scope ......................................................................................................................................................... 3
5. Assumptions ............................................................................................................................................. 4
6. Risk Factors .............................................................................................................................................. 5
7. Cost, Schedule, and Resources .............................................................................................................. 6
8. Work Products ......................................................................................................................................... 9
9. Project Organization ............................................................................................................................. 10
10. Success Measures ................................................................................................................................... 13
11. Agreement ............................................................................................................................................... 14
Appendix A. MOSTD Oversight Severity & Risk Analysis ...................................................................... 15
Appendix B. New UI CMS Governance ...................................................................................................... 18
-
8/7/2019 CMS Initiation Final
4/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 1
The purpose of this document is to provide an overview of the New Case Management SystemProject and describe the resources needed to complete the objectives outlined. This document willbe used to guide additional planning tasks and project activities.
1. PROJECT STATEMENT
The Office of Administrative Hearings (OAH) is an independent state agency that conducts morethan 70,000 impartial administrative hearings per year for state and local government agencies.Three separate case management systems are currently in place at OAH. Each system is completelyindependent, that is separate databases, separate reporting, and separate data entry.This project willfocus on the unemployment insurance cases but will be developed in a manner that is scalableenough to be used for the other caseloads as funds are secured.
The project will not only develop a new case management system (CMS) but will create newstandardized processes and procedures for the handling of cases at OAH. OAH will look to
streamline processes and procedures to maximize staff effectiveness and minimize costs such astime to process an appeal and the paper produced. Currently support staff spend a significantamount of time preparing and copying documents that go into an appeal file.
The goal is to create a system that provides flexibility to track appeals as they progress through thecase management lifecycle; be scalable to allow for modifications when necessary (i.e. new ESDprogram issue codes); and reflect efficient business processes. The new system will increaseeffectiveness in time and resources so OAH can be nimble and mobile in meeting UI caseloaddemands. The new CMS will be a system for the UI caseload that will become the model for allOAH case management systems. The new CMS will be a centralized system that provides safe,secure, and complete access to all necessary data wherever there is an Internet access in case ALJscannot access the office. Our future will be that we can literally do our jobs where ever we have
access to the system.
2. BUSINESS CASE
Currently, for the Unemployment Insurance (UI) caseload OAH relies on a system called ACTS Appeal Case Tracking System. ACTS was created about 15 years ago. At the time ACTS wasrecognized as a novel and cutting edge UI case tracking system. Recently OAH hired anindependent consulting firm to conduct an efficiency assessment. The result was that ACTS isbeyond its life expectancy and puts OAH at risk. Some of the risks identified are:
Ineffective business processes which result in poor use of staff resources and materials. Thecurrent system requires staff to complete several manual processes (e.g., assembly, sorting &
copying files) and uses WordPerfect macros to create the various case documents. Allprocesses are paper intensive and dependent on paper records. Consequently UI processesand practices vary between OAH offices and even within offices. There is no systemdocumentation and as a result much of the operational knowledge resides in the heads ofkey staff within an office on how to use ACTS.
-
8/7/2019 CMS Initiation Final
5/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 2
No data standards which results in poor and/or lost data. There are no data input standardswhich mean that incorrect data or that some critical data fields are empty. There are toomany data tables and the linkage between tables is confusing. Little or no databasedocumentation (data dictionary or data definitions, or data flow templates) exists. ACTS has
been repeatedly upgraded, modified, and changed over the years and no documentationexists.
Uses outdated software (Borland Paradox & WordPerfect) as core system componentswhich may result in lost data. Borland Paradox uses older database architecture which islimited in record and data processing (e.g., record locking, record indexing, sequencing, etc.).No technical support is available for Borland Paradox or WordPerfect.
ACTS is a document creation system not a case management or tracking system which mayresult in lost or misplaced records. There is no way to determine what step in the appealprocess a case is at within ACTS. Again, cases are tracked in the heads of key supportstaff through operational knowledge. No audit log exists on modifications or changes madeon data entered into the system.
ACTS is a distributed database which may result in lost or misplaced data and ineffective useof staff resources. Each OAH field office has its own database. Each day, field office dataare merged with a centralized agency core system. This takes 0.5 of an ITS4 FTE toaccomplish.
A new case management system will offer OAH an opportunity to change business processes andbecome more efficient in processing appeals. For example, all intake and scheduling can occur as acentralized system function, or have the ability to determine a case complexity based on the datainput which may reduce the time necessary for a hearing. Changing business processes requiresstrong management support as well as training and communications.
At the core of any case management system is a comprehensive document and informationmanagement system. Rather than trying to develop such a system from scratch, the new CMS willbe based on theMicrosoft SharePoint 2010 platform. This will enable the new CMS to use commonand Washington state government standard business tools such asMicrosoft Word,Microsoft Outlook,Microsoft SQL serverand other tools. The system will also make maximum use of establishedtechnologies at OAH such as Citrix.
At the completion of this project, we will have a system that:
Includes all necessary data relevant to the case;
Is stable and secure;
Includes a component for digital hearing record to be included in the case file;
Includes data validation and error checking; Uses standardized forms and documents;
Provides data that is necessary to create reports for reporting performance measures;
Does integrated scheduling usingMicrosoft Outlook.
-
8/7/2019 CMS Initiation Final
6/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 3
3. OBJECTIVES
Several project objectives have been identified with this project, these are:1. Development of a UI CMS that will have:
Standardized processes & procedures through standardized forms and documents, dataentry, and data templates; Production of electronic documents, electronic document transfer, and digital archiving; Integrated scheduling usingMS Outlook; Safe and secure data and files; and, Improved performance reporting.
2. Implementation of a UI CMS by March, 2012. Implementation will include the followingOAH staff training components: New CMS processes and procedures; UsingMS Outlook for scheduling; UsingMS Wordfor creating documents; and, UsingMS SharePoint for retrieving documents and reports.3. Acquisition, installation, and implementation of all necessary technology components (e.g.,
hardware & software) that is in accordance with DIS standards and procedures.4. Good coordination, cooperation and communication with OAH staff, vendors, and client
agencies through: Communications plan that identifies medium, methods, approval, audiences; Risk, issue, & event tracking and logging; Clearly defined roles & responsibilities; and, Periodic & routine meetings and sessions.
5. Project completion by March, 2012 that is within the timelines and within budget.6. UI CMS will serve as a foundation for future case management systems within OAH.
4. SCOPE
All of OAH will be affected by this project.
Components within the scope of this project are:
How OAH processes UI appeals as well as how OAH receives and transfers data andinformation between ESD and OAH.
Defining CMS data elements & schema to be consistent with state enterprise dataframework standards.
Current system maintenance activities with current agency systems ACTS, HATSS, &
CATS. Improvements, upgrades, or major changes to these systems should be minimized.
Components not within the scope of this project are:
Automatic or integrated data transfer between ESD systems (Telecenters and/orCommissioners Review Office).
Billing or time accounting system to replace current OAH systems, e.g., TMS.
-
8/7/2019 CMS Initiation Final
7/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 4
5. ASSUMPTIONS &CONSTRAINTS
Project activities and deliverables are developed with the following assumptions in mind:
A test lab environment will be created and used to mimic the current OAH environment.The test lab will allow for evaluating technology and for providing a learning rip-and-tearenvironment. Further experimentation will be done in the test lab.
Technology will be implemented in phases (e.g., Test Lab, Pre-Production, andProduction).
Current existing infrastructure and technology equipment found in field offices (applicationservers, Ethernet switches, workstations, etc.) are satisfactory.
Whenever possible, commercially available solutions (hardware and software) will be used.
Security and access solutions will be compatible and within established DIS and ISB securitystandards.
Acquisition of services and equipment will be compatible and within established DIS &OFM purchasing guidelines.
CMS will be designed around usingMicrosoft SharePoint 2010 and the suite ofMicrosoft Office2010 products (e.g., Outlook, Word, Excel, InfoPath, etc.)
Project planning will be done usingMicrosoft Project.
Integration with current OAH systems will be done using existing OAH IT resources.
Necessary technology training, if needed, will be made available.
Staff involved will continue to fulfill their existing duties; however, required resources(whether existing team members or fill-ins) will be committed to this project as agreed uponto ensure successful implementation.
All work will be accomplished within budget allocation as identified in the Supplemental
Budget Request.
The following project activities and deliverables are developed with the following constraints inmind:
This project was identified by DIS MOSTD (Management Oversight & StrategicTechnology Direction) as Level 1 project (see appendix A). This required elimination ofautomatic & integrated data transfer processes between ESD & OAH.
Anticipated work load peaks will occur within the agency that will potentially compete forthis projects resources.
Operational constraints & agency issues, as well as workload peaks by staff need to beaccommodated (e.g., resource availability).
Scheduled leave or holidays may limit resource availability at times. Project Schedule will identify many tasks that have dependencies which if not met, will cause
a ripple effect downward of the project schedule.
No alternate resources have been approved should staff become unavailable to performtheir tasks.
-
8/7/2019 CMS Initiation Final
8/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 5
6. RISK FACTORS
It is critical to the success of this project that potential risks be identified and communicated, and arisk management strategy is in place for each phase of the project. The following table identifies
major risks and mitigation strategies. A separate, more detailed Risk Management Matrix will bedeveloped and incorporated into OAHs Risk Registry.
Elements forSuccess Risks Leading to Failure Mitigation Strategies
Staff Availability Key staff may not beavailable to effectivelydetermine requirements andperform development andtesting.
Communicate resources required and gainassurances that staff resources will be madeavailable in a timely manner.
ManageableScope
Requirements andrequested changes exceedto scope of the project.
Develop and follow an agreed upon changemanagement process.
The CMS Steering Committee will guide andkeep the project within scope and determinebusiness requirements.
Planning &coordination
Too aggressive timelines Poorly defined roles &
responsibilities
Poorly defined milestones
Use the CMS Steering Committee to guideproject timelines & milestones
Clearly defined roles & responsibilities Project manager monitors project progress and
coordinate resources Track & log issues and events
Knowledge,consulting &advice
Poor CMS design.
Poor technology (e.g.,
SharePoint) knowledge andunderstanding.
Poor implementationstrategies.
Develop a staff training plan.
Research and investigate agency case
management techniques and strategies. Coordinate and use existing SharePoint and
CMS knowledge developed in other stateagencies.
Develop and follow a good testing plan.
Establish good rapport with key business usersand agency experts
Use the CMS Steering Committee to guide theproject and determine business requirements.
Communication& coordination
Poor communication andcoordination with OAHemployees.
Poor communication and
coordination with vendor.
Develop and follow an agreed upon changemanagement process.
Develop and follow a communication plan. Document meeting minutes.
Training Inadequate technicaltraining
Inadequate staff training
Develop and follow a training plan Ensure training made available Use IT Liaisons
-
8/7/2019 CMS Initiation Final
9/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 6
7. COST,SCHEDULE, AND RESOURCES
CostThe total available federal funding awarded by the US DOL for this project is $489,742. The
following table shows a breakdown of the costs by major activity.
Category Cost % Confidence
Equipment (hardware & software) $34,400 90%
CMS Training $20,640 80%
External Consulting & Programming $403,022 80%
Quality Assurance $31,680 70%
TOTAL $489,742
ScheduleThe following table provides an overview of major activities and completion dates. A detailedproject schedule will be developed separately to provide additional detail regarding tasks, resourcesand dates.
Major Activities and Tasks Dates
UI CMS Project Initiation Identify and document project requirements
Identify project governance Review other agencies case management systems
Communication plan
October 2010 -January 2011
Determine Project Requirements Identify hardware & software requirements Identify business requirements through business workgroups Map & describe business work flows
Identify data elements Test consolidated business processes
October 2010 -February 2011
Vendor selection & initial development
Complete data dictionary & data structures Finalize consolidate business processes
Complete Software Requirements Specifications (SRS) document Complete vendor work order Interview & select vendor, contract with vendor
February 2011 -May 2011
Initial UI CMS review, testing & evaluation
Prototype & early version (alpha) UI CMS development Testing, evaluation, recommendations, modifications with selected users Project Team & UI CMS Steering Committee approval of version changes Coordinate changes with vendor and on-going development Create test UI CMS environment, ensure hardware & software are operational
Present pre-production (beta) version to stakeholders
June 2011 October 2011
-
8/7/2019 CMS Initiation Final
10/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 7
Major Activities and Tasks Dates
Final UI CMS testing & preparation for implementation Evaluate pre-production UI CMS (beta) and ensure data & functional accuracy
Testing, evaluation, modifications, with expanded group of selected users
Project Team & UI CMS Steering Committee approval of final UI CMS version Coordinate changes, modifications, and updates with vendor Present UI CMS to ADCs & Office Managers
Identify training materials and plans Create implementation plan
Create pre-production UI CMS (technical environment) for extensive testing &functionality
October 2011 December 2011
Quality Assurance
Hire private vendor to perform light quality assurance assessment of CMS Prepare for quality assurance - ensure all requirements documentation &
change orders are assembled Coordinate with vendor quality assurance
Review quality assurance report from vendor
December 2011 February 2012
UI CMS Implementation
Perform training at each field office
Coordinate with each field office for UI CMS installation Provide extra local IT & UI CMS support Lessons learned at each local office post-implementation
March 2012 April 2012
UI CMS Lessons Learned & Project wrap-up
Coordinate with vendor on final UI CMS issues
Meet with various UI CMS workgroups to do Lessons Learned Project Team & Steering Committee approval Identify with the vendor and Steering Committee what possible future
improvements can be made for future versions.
May 2012
-
8/7/2019 CMS Initiation Final
11/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 8
Resources
The following table lists agency resources expected to participate in the project. The Est. ProjectInvolvement column identifies the estimated percent of time the resource is dedicated to theproject; since most staff will be participating in the project concurrently with their current job
responsibilities and duties. This percentage estimate is the average for the life-time (estimated 20months) of the project. Consequently, there may be times when the project resource mayperiodically be 100% involved with the project and other times involved very little or not at all.
Resource Project RoleEst. ProjectInvolvement
Lorraine Lee Project Sponsor, GMAP Project TeamLead, & CMS Steering Committee
30%
Don Chase Project Manager 50%Tarisse Injerd Project Coordinator 90%Bill Dodge Business Project Team Lead 90%Loree Hawkens Technical Team Lead 50%Stephanie Croom-Williams Stakeholder Team Lead & CMS Steering
Committee
20%
Virgil Sweeney Time-Keeping BMV Lead & CMSSteering Committee
20%
Patti Latsch Performance BMV Lead & CMS SteeringCommittee
20%
Justin Hansen SharePoint & Technical Team member 50%John Morgan Technical Team member 30%Frank Mighetto Technical Team member & multiple
workgroup member30%
IT Liaisons IT Liaisons 10%BMV Team Leads BMV Team Leads 15%BMV & Ad hoc Wrkgrp members BMV & Ad hoc Workgroup members 10%ADCs ADCs 5%
-
8/7/2019 CMS Initiation Final
12/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 9
8. WORK PRODUCTS
The following work products will be produced.
Major Activity Work ProductsCMS ProjectInitiation
Project initiation document Communications plan Project schedule
Risk management plan Project team roles and responsibilities document Project governance document
Determine ProjectRequirements
Business Activities Document
Business work flow drawing Data screens indicating elements as determined from business workgroups Agency glossary relating to terminology and measures
Vendor Selection &Initial Development
Data dictionary Software Requirements Specifications document
Vendor work request & work order Technical flow charts Sample or proposed screen views
Initial CMS Review,Testing &Evaluation
Prototype and Alpha CMS releases (for each)o Test plan (Implementation, audience, timeline & milestones)o Testing criteria
Summary of change orders
Issue & tracking log
Final CMS Testing& Preparation For
Implementation
Beta CMS releaseo Test plan (Implementation, audience, timeline & milestones)
o Testing criteria Summary of change orders, issue & tracking log CMS presentation for agency staff and stakeholders
o PowerPoint presentationo Demonstration of system
Agency CMS Training plan
Pre-Implementation plan
Quality Assurance Vendor work request & work order Vendor Quality Assurance report
CMSImplementation
CMS documentation instructions, guides, how-tos, FAQso Policy and procedures relating to use of CMS
Lessons learned per each local office Summary of issue & tracking log
CMS LessonsLearned & ProjectWrap-Up
Post Implementation Review document (Lessons Learned) Vendor summary report
Next version recommendations
-
8/7/2019 CMS Initiation Final
13/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 10
9. PROJECT ORGANIZATION
The project governance design can be found in Appendix B.
Not all project positions are defined below, only those that have significant roles and responsibilitiesin the project and directly influence the success of the project.
Project Sponsor Lorraine LeeThe Project Sponsor represents the business processes being addressed by the project and isultimately accountable for the projects success. The Project Sponsor must be committed to change,must have budget authority over the project, and must be willing to mandate business processalignment within the program and/or Agency where necessary.
Project Sponsor will:
Ensure commitment from the organization to participate in the project
Ensure that political and organizational obstacles to project success are addressed in a timelymanner
Ensure funding and other resources are available for the duration of the project
Resolve outstanding project personnel and resource issues
Supervise and direct the Project Manager, Project Coordinator, and Business Team Lead
Project Steering Committee Lorraine Lee, Patti Latsch, Stephanie Croom-Williams, VirgilSweeneyThe Project Steering Committee guides the project and ensures project and business objectives arebeing met. The Project Steering Committee must be committed to understanding projectrequirements and balance them with business requirements.
Project Steering Committee members will:
Ensure that political and organizational obstacles to project success are addressed in a timelymanner
Ensure resources are available for the duration of the project
Approve project plans
Approve major project changes (scope, schedule, etc.)
Approve final reports (deliverables) from all project phases
Resolve outstanding project operational and functional issues
Approve recommendations made by the Project Teams
-
8/7/2019 CMS Initiation Final
14/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 11
Project Manager Don ChaseThe Project Manager has the technical managerial oversight of the project and, along with theProject Sponsor, has overall responsibility for the project. The Project Manager has the basic task ofintegrating the efforts of both the user and technical teams in developing the CMS. The Project
Manager assigns the technical project deliverables to specific project personnel and tracks theirprogress in accordance with the project plan. The Project Manager is the prime planner, organizer,and team leader for the project. The Project Manager works very closely with the Project Sponsorin the development and management of the project from start to finish.
The Project Manager will: Plan & control the project Direct and coordinate project resources which may include assigning tasks and deliverables Approval of project documents, materials, presentations, and status reports Provide management oversight of system development tasks Be the primary agency contact with the vendor, developers, consultants
Prepare project work plans & work breakdown structures Approve technical system design and specifications, and technical deliverables such as
diagrams and specifications to be used by developers Produce project deliverables in accordance with the SDLC project management
methodology Verify that design and technical decisions are consistent with the OAH standards and
strategies and compatible with those of the state as a whole
Project Coordinator Tarisse InjerdThe Project Coordinator coordinates project meetings, workgroups, training and othercommunications are completed timely and within project specifications. The Project Coordinator isthe prime communicator, facilitator, and organizer for the project. The Project Coordinator works
very closely with the Project Manager in the development of the project.
The Project Coordinator will:
Assist in the creation and preparation of project documents and status reports.
Ensures that the project communications plan is being followed.
Work with the Project Manager that project milestones, tasks, and events are being mettimely and successfully.
Coordinates and ensures project resources are available for meetings, tasks, and other projectitems.
Facilitate and lead various meetings (e.g., Steering Committee, training, Lessons Learned,
testing) and workgroup sessions Assist in the development of user testing criteria and user testing
Coordinate, facilitate, and/or lead user testing
Coordinate, facilitate, and/or lead user training
Coordinate and facilitate CMS implementation
Assist and help create technical deliverables such as diagrams and specifications to be usedby developers
Manage & publish content for the SharePoint CMS sites and Inside OAH
-
8/7/2019 CMS Initiation Final
15/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 12
Business Team Lead Bill DodgeThe Business Team Lead coordinates BMV workgroups, and ad-hoc workgroups for the project andis the lead ensuring that business elements are included in the CMS. The Business Team Lead works
very closely with the Project Manager and Project Coordinator in the development of the project.
The Business Team Lead will:
Assist in the creation and preparation of project documents and status reports.
Ensure that the communications plan is being followed.
Coordinate and ensure project resources are available for meetings, tasks, and other projectitems.
Assist in facilitation & organization of BMV Workgroup & Ad hoc workgroups, user testingand user training meetings
Assist in the development of user testing criteria and user testing
Assist in user testing
Assist in user training
Assist in CMS implementation
Assist and help create technical deliverables such as diagrams and specifications to be usedby developers
Assist in managing & publishing content for the SharePoint CMS sites Steering Committee& Workgroups.
Verify that CMS design and deliverables are consistent with the OAH legal standards andstrategies and compatible with those of the state as a whole
Technical Lead Loree HawkensThe Technical Lead provides the linkage between the technical needs of the project and businessrequirements. The Technical Lead is the technical subject matter expert who understands thedetailed business aspects of the project and will provide a clear understanding as to whatfunctionality the system must provide to the potential system users. The Technical Lead is expectedto work very closely with the Project Manager and Project Sponsor, and interfaces continually withothers working on the project.
Technical Network Lead will: Provide technical oversight on the CMS technical system
Define the basic concepts of the system to meet needed functionality
Determine information and system requirements
Perform and assign technical tasks, as needed
Prepare test plans and test data, and coordinate and conduct system testing
Define and document operational procedures
-
8/7/2019 CMS Initiation Final
16/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 13
10. SUCCESS MEASURES
The following factors will be used to guide and measure the success of this project.
Project concludes with all identified work plan components (tasks and milestones)successfully completed within the scheduled time and budget.
All project purchases (hardware, software, consulting, development, and training) arecompleted by 09/30/12.
Good system performance;o Measures:
No. of help desk calls; Server & database system uptime of greater than 99.9%; and, No record of complaints or issues.
Good coordination between OAH and DIS.o Measures:
Written evaluation written by DIS MOSTD; Periodic meetings with meeting minutes; and, No record of complaints or issues.
Good coordination between OAH and ESD.o Measures:
Written evaluation written by ESD and ESD Commissioners Review Office; Periodic meetings with meeting minutes; and, No record of complaints or issues.
Good coordination between OAH and vendors;o Measures:
Closing vendor evaluation; Periodic meetings with meeting minutes; and, No record of complaints or issues.
Good coordination between CMS Project Team and OAH employees/customers;o Measures:
Closing survey & evaluation with a cumulative score above 3.3 (1 poor 5excellent) in the following categories:
Testing; Training; Communication methods; and, Implementation.
Periodic meetings with meeting minutes; and, No record of complaints or issues.
The CMS system receives a cumulative approval rating by OAH staff equal to or greaterthan 3.3 (1 poor 5 excellent) in the following areas:
o Functionality; and,o Design, layout & appearance.
CMS project plan milestones met within 90% of the time as set forth in the project plan.
-
8/7/2019 CMS Initiation Final
17/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 14
11. AGREEMENT
The following signatures by the Project Sponsor and Project Manager indicate acceptance andapproval of the Project Initiation document as written.
Lorraine Lee, Chief Administrative LawJudge
Don Chase, CIO & Project Manager
-
8/7/2019 CMS Initiation Final
18/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 15
Appendix A. MOSTD Oversight Severity & Risk Analysis
Severity Level CriteriaThe severity matrix assesses the proposed projects impact on citizens and state operations, its visibility
to stakeholders, and the consequences of project failure.
Categories
Levels
Impact onClients
Visibility Impact on StateOperations
Failure or NilConsequences
High Direct contactwith citizens,politicalsubdivisions, andservice providers
including
benefitspayments andtransactions.
Highly visible topublic, tradingpartners, politicalsubdivisions andLegislature.
Likely subject to
hearings.System
processessensitive /confidential data(e.g. medical,SSN, credit card#s).
Statewide ormultiple agencyinvolvement /impact.
Initial mainframeacquisitions or
networkacquisitions.
Inability to meetlegislative mandateor agency mission.
Loss of significantfederal funding.
Medium Indirect impacts
on citizensthroughmanagementsystems that
supportdecisions thatare viewed asimportant by thepublic.
Access bycitizens forinformation &researchpurposes.
Some visibility tothe Legislature,trading partners,or public thesystem / program
supports. May be subject to
legislative hearing.
Multipledivisions orprogramswithin agency.
Potential failure ofaging systems.
Low Agency
operations only. Internal agency
only. Single division. Improve or
expand existing
networks ormainframes withsimilartechnology.
Loss of opportunityfor improvedservice delivery or
efficiency. Failure to resolve
customer servicecomplaints orrequests.
-
8/7/2019 CMS Initiation Final
19/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 16
Risk Level CriteriaThe risk matrix measures the impact of the project on the organization, the effort needed to complete theproject, the stability of the proposed technology, and agency preparedness.
Categories
Levels
Functional Impacton BusinessProcesses or
Rules
Development Effort& Resources
Technology Capability &Management
High Significant change
to business rules. Replacement of a
mission criticalsystem.
Multipleorganizationsinvolved.
Requires extensive
and substantial jobtraining for workgroups.
Over $5 million. Development and
implementationexceeds 24 months.*
Requires a seconddecision package.
* Clock starts after
feasibility study orproject approval andrelease of funding.
Emerging. Unproven. Two or more of the following
are new for agency technologystaff or integrator, or are new tothe agency architecture:programming language;operating systems; databaseproducts; development tools;
data communicationstechnology.
Requires PKI certificate. Complex architecture greater
than 2 tier.
Minimal executivesponsorship.
Agency uses ad-hocprocesses.
Agency and/or vendortrack record suggestsinability to mitigaterisk on projectrequiring a given level
of development effort.
Medium Moderate change to
business rules. Major enhancement
or moderate changeof mission criticalsystem.
Medium complexitybusinessprocess(es).
Requires moderatejob training.
Under $5 millionbut over agencydelegatedauthority.
12 to 24 months fordevelopment andimplementation. *
* Clock starts after
feasibility study orproject approval andrelease of funding.
New in agency with 3rd partyexpertise and knowledgetransfer.
One of the technologies listedabove is new for agencydevelopment staff.
Executive sponsorknowledgeable butnot actively engaged.
System integratorunder contract withagency technicalparticipation.
Agency and/or vendorrecord indicates good
level of success butwithout the structurefor repeatability.
Low Insignificant or no
change tobusiness rules.
Low complexitybusinessprocess(es).
Some job trainingcould be required.
Within agencydelegated authority.
Under 12 monthsfor developmentandimplementation.*
* Clock starts afterfeasibility study orproject approval and
release of funding.
Standard, proven agencytechnology.
Strong executivesponsorship.
Agency and vendorhave strong ability tomitigate risk on adevelopment project.
Project staff usesdocumented andrepeatable processesfor tracking status,problems, and
change. Agency or vendor is
CMM Level 3equivalent or above.
-
8/7/2019 CMS Initiation Final
20/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 17
Project Approval and Oversight MatrixThe level of approval and oversight required on a given project is determined through an assessment ofproject risk and severity:
High SeverityLevel
2Level
2Level
3
Medium SeverityLevel
1Level
2Level
2
Low SeverityLevel
1Level
1Level
1
Low Risk Medium Risk High Risk
-
8/7/2019 CMS Initiation Final
21/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 18
-
8/7/2019 CMS Initiation Final
22/42
New Case ManagementSystem (CMS) Project
Initiation Document
January 27, 2011
-
8/7/2019 CMS Initiation Final
23/42
DOCUMENT HISTORY
Date Version Editor Changes
Jan. 6, 2011 1.0 D. Chase Initial draft Jan. 12, 2011 1.1 D. Chase Fixed various grammatical & text items
Updated Success Measures
Updated Project Scope
Updated Assumptions & Constraints
Updated Project Roles & Responsibilities
Appendix A - MOSTD Oversight Severity &Risk Analysis
Jan. 20, 2011 1.2 D. Chase Updated Schedule
Updated Work Products
Updated Resources Updated Success Measures
Appendix B Project Governance Jan. 27, 2011 1.3 D. Chase Found & replaced grammatical issues
Updated Resources
-
8/7/2019 CMS Initiation Final
24/42
New Case Management System ProjectInitiation Document
TABLE OF CONTENTS
1. Project Statement ..................................................................................................................................... 1
2. Business Case ........................................................................................................................................... 1
3. Objectives ................................................................................................................................................. 3
4. Scope ......................................................................................................................................................... 3
5. Assumptions ............................................................................................................................................. 4
6. Risk Factors .............................................................................................................................................. 5
7. Cost, Schedule, and Resources .............................................................................................................. 6
8. Work Products ......................................................................................................................................... 9
9. Project Organization ............................................................................................................................. 10
10. Success Measures ................................................................................................................................... 13
11. Agreement ............................................................................................................................................... 14
Appendix A. MOSTD Oversight Severity & Risk Analysis ...................................................................... 15
Appendix B. New UI CMS Governance ...................................................................................................... 18
-
8/7/2019 CMS Initiation Final
25/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 1
The purpose of this document is to provide an overview of the New Case Management SystemProject and describe the resources needed to complete the objectives outlined. This document willbe used to guide additional planning tasks and project activities.
1. PROJECT STATEMENT
The Office of Administrative Hearings (OAH) is an independent state agency that conducts morethan 70,000 impartial administrative hearings per year for state and local government agencies.Three separate case management systems are currently in place at OAH. Each system is completelyindependent, that is separate databases, separate reporting, and separate data entry.This project willfocus on the unemployment insurance cases but will be developed in a manner that is scalableenough to be used for the other caseloads as funds are secured.
The project will not only develop a new case management system (CMS) but will create newstandardized processes and procedures for the handling of cases at OAH. OAH will look to
streamline processes and procedures to maximize staff effectiveness and minimize costs such astime to process an appeal and the paper produced. Currently support staff spend a significantamount of time preparing and copying documents that go into an appeal file.
The goal is to create a system that provides flexibility to track appeals as they progress through thecase management lifecycle; be scalable to allow for modifications when necessary (i.e. new ESDprogram issue codes); and reflect efficient business processes. The new system will increaseeffectiveness in time and resources so OAH can be nimble and mobile in meeting UI caseloaddemands. The new CMS will be a system for the UI caseload that will become the model for allOAH case management systems. The new CMS will be a centralized system that provides safe,secure, and complete access to all necessary data wherever there is an Internet access in case ALJscannot access the office. Our future will be that we can literally do our jobs where ever we have
access to the system.
2. BUSINESS CASE
Currently, for the Unemployment Insurance (UI) caseload OAH relies on a system called ACTS Appeal Case Tracking System. ACTS was created about 15 years ago. At the time ACTS wasrecognized as a novel and cutting edge UI case tracking system. Recently OAH hired anindependent consulting firm to conduct an efficiency assessment. The result was that ACTS isbeyond its life expectancy and puts OAH at risk. Some of the risks identified are:
Ineffective business processes which result in poor use of staff resources and materials. Thecurrent system requires staff to complete several manual processes (e.g., assembly, sorting &
copying files) and uses WordPerfect macros to create the various case documents. Allprocesses are paper intensive and dependent on paper records. Consequently UI processesand practices vary between OAH offices and even within offices. There is no systemdocumentation and as a result much of the operational knowledge resides in the heads ofkey staff within an office on how to use ACTS.
-
8/7/2019 CMS Initiation Final
26/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 2
No data standards which results in poor and/or lost data. There are no data input standardswhich mean that incorrect data or that some critical data fields are empty. There are toomany data tables and the linkage between tables is confusing. Little or no databasedocumentation (data dictionary or data definitions, or data flow templates) exists. ACTS has
been repeatedly upgraded, modified, and changed over the years and no documentationexists.
Uses outdated software (Borland Paradox & WordPerfect) as core system componentswhich may result in lost data. Borland Paradox uses older database architecture which islimited in record and data processing (e.g., record locking, record indexing, sequencing, etc.).No technical support is available for Borland Paradox or WordPerfect.
ACTS is a document creation system not a case management or tracking system which mayresult in lost or misplaced records. There is no way to determine what step in the appealprocess a case is at within ACTS. Again, cases are tracked in the heads of key supportstaff through operational knowledge. No audit log exists on modifications or changes madeon data entered into the system.
ACTS is a distributed database which may result in lost or misplaced data and ineffective useof staff resources. Each OAH field office has its own database. Each day, field office dataare merged with a centralized agency core system. This takes 0.5 of an ITS4 FTE toaccomplish.
A new case management system will offer OAH an opportunity to change business processes andbecome more efficient in processing appeals. For example, all intake and scheduling can occur as acentralized system function, or have the ability to determine a case complexity based on the datainput which may reduce the time necessary for a hearing. Changing business processes requiresstrong management support as well as training and communications.
At the core of any case management system is a comprehensive document and informationmanagement system. Rather than trying to develop such a system from scratch, the new CMS willbe based on theMicrosoft SharePoint 2010 platform. This will enable the new CMS to use commonand Washington state government standard business tools such asMicrosoft Word,Microsoft Outlook,Microsoft SQL serverand other tools. The system will also make maximum use of establishedtechnologies at OAH such as Citrix.
At the completion of this project, we will have a system that:
Includes all necessary data relevant to the case;
Is stable and secure;
Includes a component for digital hearing record to be included in the case file;
Includes data validation and error checking; Uses standardized forms and documents;
Provides data that is necessary to create reports for reporting performance measures;
Does integrated scheduling usingMicrosoft Outlook.
-
8/7/2019 CMS Initiation Final
27/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 3
3. OBJECTIVES
Several project objectives have been identified with this project, these are:1. Development of a UI CMS that will have:
Standardized processes & procedures through standardized forms and documents, dataentry, and data templates; Production of electronic documents, electronic document transfer, and digital archiving; Integrated scheduling usingMS Outlook; Safe and secure data and files; and, Improved performance reporting.
2. Implementation of a UI CMS by March, 2012. Implementation will include the followingOAH staff training components: New CMS processes and procedures; UsingMS Outlook for scheduling; UsingMS Wordfor creating documents; and, UsingMS SharePoint for retrieving documents and reports.3. Acquisition, installation, and implementation of all necessary technology components (e.g.,
hardware & software) that is in accordance with DIS standards and procedures.4. Good coordination, cooperation and communication with OAH staff, vendors, and client
agencies through: Communications plan that identifies medium, methods, approval, audiences; Risk, issue, & event tracking and logging; Clearly defined roles & responsibilities; and, Periodic & routine meetings and sessions.
5. Project completion by March, 2012 that is within the timelines and within budget.6. UI CMS will serve as a foundation for future case management systems within OAH.
4. SCOPE
All of OAH will be affected by this project.
Components within the scope of this project are:
How OAH processes UI appeals as well as how OAH receives and transfers data andinformation between ESD and OAH.
Defining CMS data elements & schema to be consistent with state enterprise dataframework standards.
Current system maintenance activities with current agency systems ACTS, HATSS, &
CATS. Improvements, upgrades, or major changes to these systems should be minimized.
Components not within the scope of this project are:
Automatic or integrated data transfer between ESD systems (Telecenters and/orCommissioners Review Office).
Billing or time accounting system to replace current OAH systems, e.g., TMS.
-
8/7/2019 CMS Initiation Final
28/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 4
5. ASSUMPTIONS &CONSTRAINTS
Project activities and deliverables are developed with the following assumptions in mind:
A test lab environment will be created and used to mimic the current OAH environment.The test lab will allow for evaluating technology and for providing a learning rip-and-tearenvironment. Further experimentation will be done in the test lab.
Technology will be implemented in phases (e.g., Test Lab, Pre-Production, andProduction).
Current existing infrastructure and technology equipment found in field offices (applicationservers, Ethernet switches, workstations, etc.) are satisfactory.
Whenever possible, commercially available solutions (hardware and software) will be used.
Security and access solutions will be compatible and within established DIS and ISB securitystandards.
Acquisition of services and equipment will be compatible and within established DIS &OFM purchasing guidelines.
CMS will be designed around usingMicrosoft SharePoint 2010 and the suite ofMicrosoft Office2010 products (e.g., Outlook, Word, Excel, InfoPath, etc.)
Project planning will be done usingMicrosoft Project.
Integration with current OAH systems will be done using existing OAH IT resources.
Necessary technology training, if needed, will be made available.
Staff involved will continue to fulfill their existing duties; however, required resources(whether existing team members or fill-ins) will be committed to this project as agreed uponto ensure successful implementation.
All work will be accomplished within budget allocation as identified in the Supplemental
Budget Request.
The following project activities and deliverables are developed with the following constraints inmind:
This project was identified by DIS MOSTD (Management Oversight & StrategicTechnology Direction) as Level 1 project (see appendix A). This required elimination ofautomatic & integrated data transfer processes between ESD & OAH.
Anticipated work load peaks will occur within the agency that will potentially compete forthis projects resources.
Operational constraints & agency issues, as well as workload peaks by staff need to beaccommodated (e.g., resource availability).
Scheduled leave or holidays may limit resource availability at times. Project Schedule will identify many tasks that have dependencies which if not met, will cause
a ripple effect downward of the project schedule.
No alternate resources have been approved should staff become unavailable to performtheir tasks.
-
8/7/2019 CMS Initiation Final
29/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 5
6. RISK FACTORS
It is critical to the success of this project that potential risks be identified and communicated, and arisk management strategy is in place for each phase of the project. The following table identifies
major risks and mitigation strategies. A separate, more detailed Risk Management Matrix will bedeveloped and incorporated into OAHs Risk Registry.
Elements forSuccess Risks Leading to Failure Mitigation Strategies
Staff Availability Key staff may not beavailable to effectivelydetermine requirements andperform development andtesting.
Communicate resources required and gainassurances that staff resources will be madeavailable in a timely manner.
ManageableScope
Requirements andrequested changes exceedto scope of the project.
Develop and follow an agreed upon changemanagement process.
The CMS Steering Committee will guide andkeep the project within scope and determinebusiness requirements.
Planning &coordination
Too aggressive timelines Poorly defined roles &
responsibilities
Poorly defined milestones
Use the CMS Steering Committee to guideproject timelines & milestones
Clearly defined roles & responsibilities Project manager monitors project progress and
coordinate resources Track & log issues and events
Knowledge,consulting &advice
Poor CMS design.
Poor technology (e.g.,
SharePoint) knowledge andunderstanding.
Poor implementationstrategies.
Develop a staff training plan.
Research and investigate agency case
management techniques and strategies. Coordinate and use existing SharePoint and
CMS knowledge developed in other stateagencies.
Develop and follow a good testing plan.
Establish good rapport with key business usersand agency experts
Use the CMS Steering Committee to guide theproject and determine business requirements.
Communication& coordination
Poor communication andcoordination with OAHemployees.
Poor communication and
coordination with vendor.
Develop and follow an agreed upon changemanagement process.
Develop and follow a communication plan. Document meeting minutes.
Training Inadequate technicaltraining
Inadequate staff training
Develop and follow a training plan Ensure training made available Use IT Liaisons
-
8/7/2019 CMS Initiation Final
30/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 6
7. COST,SCHEDULE, AND RESOURCES
CostThe total available federal funding awarded by the US DOL for this project is $489,742. The
following table shows a breakdown of the costs by major activity.
Category Cost % Confidence
Equipment (hardware & software) $34,400 90%
CMS Training $20,640 80%
External Consulting & Programming $403,022 80%
Quality Assurance $31,680 70%
TOTAL $489,742
ScheduleThe following table provides an overview of major activities and completion dates. A detailedproject schedule will be developed separately to provide additional detail regarding tasks, resourcesand dates.
Major Activities and Tasks Dates
UI CMS Project Initiation Identify and document project requirements
Identify project governance Review other agencies case management systems
Communication plan
October 2010 -January 2011
Determine Project Requirements Identify hardware & software requirements Identify business requirements through business workgroups Map & describe business work flows
Identify data elements Test consolidated business processes
October 2010 -February 2011
Vendor selection & initial development
Complete data dictionary & data structures Finalize consolidate business processes
Complete Software Requirements Specifications (SRS) document Complete vendor work order Interview & select vendor, contract with vendor
February 2011 -May 2011
Initial UI CMS review, testing & evaluation
Prototype & early version (alpha) UI CMS development Testing, evaluation, recommendations, modifications with selected users Project Team & UI CMS Steering Committee approval of version changes Coordinate changes with vendor and on-going development Create test UI CMS environment, ensure hardware & software are operational
Present pre-production (beta) version to stakeholders
June 2011 October 2011
-
8/7/2019 CMS Initiation Final
31/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 7
Major Activities and Tasks Dates
Final UI CMS testing & preparation for implementation Evaluate pre-production UI CMS (beta) and ensure data & functional accuracy
Testing, evaluation, modifications, with expanded group of selected users
Project Team & UI CMS Steering Committee approval of final UI CMS version Coordinate changes, modifications, and updates with vendor Present UI CMS to ADCs & Office Managers
Identify training materials and plans Create implementation plan
Create pre-production UI CMS (technical environment) for extensive testing &functionality
October 2011 December 2011
Quality Assurance
Hire private vendor to perform light quality assurance assessment of CMS Prepare for quality assurance - ensure all requirements documentation &
change orders are assembled Coordinate with vendor quality assurance
Review quality assurance report from vendor
December 2011 February 2012
UI CMS Implementation
Perform training at each field office
Coordinate with each field office for UI CMS installation Provide extra local IT & UI CMS support Lessons learned at each local office post-implementation
March 2012 April 2012
UI CMS Lessons Learned & Project wrap-up
Coordinate with vendor on final UI CMS issues
Meet with various UI CMS workgroups to do Lessons Learned Project Team & Steering Committee approval Identify with the vendor and Steering Committee what possible future
improvements can be made for future versions.
May 2012
-
8/7/2019 CMS Initiation Final
32/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 8
Resources
The following table lists agency resources expected to participate in the project. The Est. ProjectInvolvement column identifies the estimated percent of time the resource is dedicated to theproject; since most staff will be participating in the project concurrently with their current job
responsibilities and duties. This percentage estimate is the average for the life-time (estimated 20months) of the project. Consequently, there may be times when the project resource mayperiodically be 100% involved with the project and other times involved very little or not at all.
Resource Project RoleEst. ProjectInvolvement
Lorraine Lee Project Sponsor, GMAP Project TeamLead, & CMS Steering Committee
30%
Don Chase Project Manager 50%Tarisse Injerd Project Coordinator 90%Bill Dodge Business Project Team Lead 90%Loree Hawkens Technical Team Lead 50%Stephanie Croom-Williams Stakeholder Team Lead & CMS Steering
Committee
20%
Virgil Sweeney Time-Keeping BMV Lead & CMSSteering Committee
20%
Patti Latsch Performance BMV Lead & CMS SteeringCommittee
20%
Justin Hansen SharePoint & Technical Team member 50%John Morgan Technical Team member 30%Frank Mighetto Technical Team member & multiple
workgroup member30%
IT Liaisons IT Liaisons 10%BMV Team Leads BMV Team Leads 15%BMV & Ad hoc Wrkgrp members BMV & Ad hoc Workgroup members 10%ADCs ADCs 5%
-
8/7/2019 CMS Initiation Final
33/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 9
8. WORK PRODUCTS
The following work products will be produced.
Major Activity Work ProductsCMS ProjectInitiation
Project initiation document Communications plan Project schedule
Risk management plan Project team roles and responsibilities document Project governance document
Determine ProjectRequirements
Business Activities Document
Business work flow drawing Data screens indicating elements as determined from business workgroups Agency glossary relating to terminology and measures
Vendor Selection &Initial Development
Data dictionary Software Requirements Specifications document
Vendor work request & work order Technical flow charts Sample or proposed screen views
Initial CMS Review,Testing &Evaluation
Prototype and Alpha CMS releases (for each)o Test plan (Implementation, audience, timeline & milestones)o Testing criteria
Summary of change orders
Issue & tracking log
Final CMS Testing& Preparation For
Implementation
Beta CMS releaseo Test plan (Implementation, audience, timeline & milestones)
o Testing criteria Summary of change orders, issue & tracking log CMS presentation for agency staff and stakeholders
o PowerPoint presentationo Demonstration of system
Agency CMS Training plan
Pre-Implementation plan
Quality Assurance Vendor work request & work order Vendor Quality Assurance report
CMSImplementation
CMS documentation instructions, guides, how-tos, FAQso Policy and procedures relating to use of CMS
Lessons learned per each local office Summary of issue & tracking log
CMS LessonsLearned & ProjectWrap-Up
Post Implementation Review document (Lessons Learned) Vendor summary report
Next version recommendations
-
8/7/2019 CMS Initiation Final
34/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 10
9. PROJECT ORGANIZATION
The project governance design can be found in Appendix B.
Not all project positions are defined below, only those that have significant roles and responsibilitiesin the project and directly influence the success of the project.
Project Sponsor Lorraine LeeThe Project Sponsor represents the business processes being addressed by the project and isultimately accountable for the projects success. The Project Sponsor must be committed to change,must have budget authority over the project, and must be willing to mandate business processalignment within the program and/or Agency where necessary.
Project Sponsor will:
Ensure commitment from the organization to participate in the project
Ensure that political and organizational obstacles to project success are addressed in a timelymanner
Ensure funding and other resources are available for the duration of the project
Resolve outstanding project personnel and resource issues
Supervise and direct the Project Manager, Project Coordinator, and Business Team Lead
Project Steering Committee Lorraine Lee, Patti Latsch, Stephanie Croom-Williams, VirgilSweeneyThe Project Steering Committee guides the project and ensures project and business objectives arebeing met. The Project Steering Committee must be committed to understanding projectrequirements and balance them with business requirements.
Project Steering Committee members will:
Ensure that political and organizational obstacles to project success are addressed in a timelymanner
Ensure resources are available for the duration of the project
Approve project plans
Approve major project changes (scope, schedule, etc.)
Approve final reports (deliverables) from all project phases
Resolve outstanding project operational and functional issues
Approve recommendations made by the Project Teams
-
8/7/2019 CMS Initiation Final
35/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 11
Project Manager Don ChaseThe Project Manager has the technical managerial oversight of the project and, along with theProject Sponsor, has overall responsibility for the project. The Project Manager has the basic task ofintegrating the efforts of both the user and technical teams in developing the CMS. The Project
Manager assigns the technical project deliverables to specific project personnel and tracks theirprogress in accordance with the project plan. The Project Manager is the prime planner, organizer,and team leader for the project. The Project Manager works very closely with the Project Sponsorin the development and management of the project from start to finish.
The Project Manager will: Plan & control the project Direct and coordinate project resources which may include assigning tasks and deliverables Approval of project documents, materials, presentations, and status reports Provide management oversight of system development tasks Be the primary agency contact with the vendor, developers, consultants
Prepare project work plans & work breakdown structures Approve technical system design and specifications, and technical deliverables such as
diagrams and specifications to be used by developers Produce project deliverables in accordance with the SDLC project management
methodology Verify that design and technical decisions are consistent with the OAH standards and
strategies and compatible with those of the state as a whole
Project Coordinator Tarisse InjerdThe Project Coordinator coordinates project meetings, workgroups, training and othercommunications are completed timely and within project specifications. The Project Coordinator isthe prime communicator, facilitator, and organizer for the project. The Project Coordinator works
very closely with the Project Manager in the development of the project.
The Project Coordinator will:
Assist in the creation and preparation of project documents and status reports.
Ensures that the project communications plan is being followed.
Work with the Project Manager that project milestones, tasks, and events are being mettimely and successfully.
Coordinates and ensures project resources are available for meetings, tasks, and other projectitems.
Facilitate and lead various meetings (e.g., Steering Committee, training, Lessons Learned,
testing) and workgroup sessions Assist in the development of user testing criteria and user testing
Coordinate, facilitate, and/or lead user testing
Coordinate, facilitate, and/or lead user training
Coordinate and facilitate CMS implementation
Assist and help create technical deliverables such as diagrams and specifications to be usedby developers
Manage & publish content for the SharePoint CMS sites and Inside OAH
-
8/7/2019 CMS Initiation Final
36/42
-
8/7/2019 CMS Initiation Final
37/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 13
10. SUCCESS MEASURES
The following factors will be used to guide and measure the success of this project.
Project concludes with all identified work plan components (tasks and milestones)successfully completed within the scheduled time and budget.
All project purchases (hardware, software, consulting, development, and training) arecompleted by 09/30/12.
Good system performance;o Measures:
No. of help desk calls; Server & database system uptime of greater than 99.9%; and, No record of complaints or issues.
Good coordination between OAH and DIS.o Measures:
Written evaluation written by DIS MOSTD; Periodic meetings with meeting minutes; and, No record of complaints or issues.
Good coordination between OAH and ESD.o Measures:
Written evaluation written by ESD and ESD Commissioners Review Office; Periodic meetings with meeting minutes; and, No record of complaints or issues.
Good coordination between OAH and vendors;o Measures:
Closing vendor evaluation; Periodic meetings with meeting minutes; and, No record of complaints or issues.
Good coordination between CMS Project Team and OAH employees/customers;o Measures:
Closing survey & evaluation with a cumulative score above 3.3 (1 poor 5excellent) in the following categories:
Testing; Training; Communication methods; and, Implementation.
Periodic meetings with meeting minutes; and, No record of complaints or issues.
The CMS system receives a cumulative approval rating by OAH staff equal to or greaterthan 3.3 (1 poor 5 excellent) in the following areas:
o Functionality; and,o Design, layout & appearance.
CMS project plan milestones met within 90% of the time as set forth in the project plan.
-
8/7/2019 CMS Initiation Final
38/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 14
11. AGREEMENT
The following signatures by the Project Sponsor and Project Manager indicate acceptance andapproval of the Project Initiation document as written.
Lorraine Lee, Chief Administrative LawJudge
Don Chase, CIO & Project Manager
-
8/7/2019 CMS Initiation Final
39/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 15
Appendix A. MOSTD Oversight Severity & Risk Analysis
Severity Level CriteriaThe severity matrix assesses the proposed projects impact on citizens and state operations, its visibility
to stakeholders, and the consequences of project failure.
Categories
Levels
Impact onClients
Visibility Impact on StateOperations
Failure or NilConsequences
High Direct contactwith citizens,politicalsubdivisions, andservice providers
including
benefitspayments andtransactions.
Highly visible topublic, tradingpartners, politicalsubdivisions andLegislature.
Likely subject to
hearings.System
processessensitive /confidential data(e.g. medical,SSN, credit card#s).
Statewide ormultiple agencyinvolvement /impact.
Initial mainframeacquisitions or
networkacquisitions.
Inability to meetlegislative mandateor agency mission.
Loss of significantfederal funding.
Medium Indirect impacts
on citizensthroughmanagementsystems that
supportdecisions thatare viewed asimportant by thepublic.
Access bycitizens forinformation &researchpurposes.
Some visibility tothe Legislature,trading partners,or public thesystem / program
supports. May be subject to
legislative hearing.
Multipledivisions orprogramswithin agency.
Potential failure ofaging systems.
Low Agency
operations only. Internal agency
only. Single division. Improve or
expand existing
networks ormainframes withsimilartechnology.
Loss of opportunityfor improvedservice delivery or
efficiency. Failure to resolve
customer servicecomplaints orrequests.
-
8/7/2019 CMS Initiation Final
40/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 16
Risk Level CriteriaThe risk matrix measures the impact of the project on the organization, the effort needed to complete theproject, the stability of the proposed technology, and agency preparedness.
Categories
Levels
Functional Impacton BusinessProcesses or
Rules
Development Effort& Resources
Technology Capability &Management
High Significant change
to business rules. Replacement of a
mission criticalsystem.
Multipleorganizationsinvolved.
Requires extensive
and substantial jobtraining for workgroups.
Over $5 million. Development and
implementationexceeds 24 months.*
Requires a seconddecision package.
* Clock starts after
feasibility study orproject approval andrelease of funding.
Emerging. Unproven. Two or more of the following
are new for agency technologystaff or integrator, or are new tothe agency architecture:programming language;operating systems; databaseproducts; development tools;
data communicationstechnology.
Requires PKI certificate. Complex architecture greater
than 2 tier.
Minimal executivesponsorship.
Agency uses ad-hocprocesses.
Agency and/or vendortrack record suggestsinability to mitigaterisk on projectrequiring a given level
of development effort.
Medium Moderate change to
business rules. Major enhancement
or moderate changeof mission criticalsystem.
Medium complexitybusinessprocess(es).
Requires moderatejob training.
Under $5 millionbut over agencydelegatedauthority.
12 to 24 months fordevelopment andimplementation. *
* Clock starts after
feasibility study orproject approval andrelease of funding.
New in agency with 3rd partyexpertise and knowledgetransfer.
One of the technologies listedabove is new for agencydevelopment staff.
Executive sponsorknowledgeable butnot actively engaged.
System integratorunder contract withagency technicalparticipation.
Agency and/or vendorrecord indicates good
level of success butwithout the structurefor repeatability.
Low Insignificant or no
change tobusiness rules.
Low complexitybusinessprocess(es).
Some job trainingcould be required.
Within agencydelegated authority.
Under 12 monthsfor developmentandimplementation.*
* Clock starts afterfeasibility study orproject approval and
release of funding.
Standard, proven agencytechnology.
Strong executivesponsorship.
Agency and vendorhave strong ability tomitigate risk on adevelopment project.
Project staff usesdocumented andrepeatable processesfor tracking status,problems, and
change. Agency or vendor is
CMM Level 3equivalent or above.
-
8/7/2019 CMS Initiation Final
41/42
New Case Management System ProjectInitiation Document
January 27, 2011 Version 1.2 Page 17
Project Approval and Oversight MatrixThe level of approval and oversight required on a given project is determined through an assessment ofproject risk and severity:
High SeverityLevel
2Level
2Level
3
Medium SeverityLevel
1Level
2Level
2
Low SeverityLevel
1Level
1Level
1
Low Risk Medium Risk High Risk
-
8/7/2019 CMS Initiation Final
42/42