CHEROKEEPIPELINEENGINEERING,DESIGNANDCONSTRUCTION

PROJECTDESCRIPTIONProjectscopeincluded:ENGlobal furnishedallengineering,designandconstructionas-builtservicesforanew34mile,24-inchnaturalgaspipelinefromFt.Lupton,ColoradototheCherokeePowerPlantinCommerceCity,Colorado.Thisnewpipelinewillprovidenaturalgastothenew569MWgasturbine(2015startup)beinginstalledatthepowerplant.

PROJECTACCOMPLISHMENTS•Underbudget•Onschedule•SuccessfulexecutionofseveralHDDcrossings

Office:[email protected]

SCOPEOFWORKWorkexecutedincluded:• Designbasis• Routeinvestigationandselections• Construction,materialsand

equipmentspecifications• Populationclassandhigh

consequenceareaimpactdetermination

• Trafficcontrolplans• Constructionscopeofwork• Equipmentdatasheetsandbillof

materials• ProcessflowandP&IDs• Alignmentsheetsandtemporaryuse

areas• Crossingandboredesigns• Mechanicalandelectrical

engineeringanddesigns• Tie-in,cleaning,dryingandpurging

procedures• As-builtdatacollectionand

processing• As-builtsurvey