Capacity Market Technical Design Stakeholder Update Session Straw Alberta Market (SAM 3.0)
Dec. 11, 2017 Public
Session outline
1
Time Agenda Item
1:30 – 1:35 p.m. Welcome and session overview: Matt Gray, AESO
1:35 – 1:40 p.m. Opening remarks: Miranda Keating Erickson, AESO
1:40 – 2:40 p.m.
Review of SAM 3.0 (Q&A to follow each presenter)
- Adequacy & Demand Curve Determination: Marcy Cochlan, TransAlta
- Eligibility: Janene Taylor, TransCanada
- Market Mechanics: Kris Aksomitis, Power Advisory, on behalf of Cogen Working Group
2:40 – 2:55 p.m. Break
2:55 – 3:45 p.m.
Review of SAM 3.0 (continued)
- Procurement and Hedging: Richard Penn, IPCAA
- Energy & Ancillary Services: Matt Davis, ATCO
3:45 – 4 p.m. Next steps for market design and engagement: Kevin Dawson, AESO
Public
Development of the comprehensive market design (CMD)
• SAM 3.0 working group (WG) recommendations will be considered in the development of the CMD by the AESO
2
SAM 2.0 SAM 3.0 AESO CMD
• A starting point on key design elements for collaborative discussions
• WG initial examination of design questions
• Industry feedback used as input into SAM 3.0
• SAM 3.0 contains WG provisional recommendations
May 2017
SAM 1.0
June – Aug. 2017 Sept. – Dec. 2017
• First draft of CMD to be shared with consolidated working groups
Jan 2018
Public
Development of provisional recommendations Exploration of a key design element (KDE)
3
Introduction of KDE
• KDE and related questions introduced for examination by WG members
• Poll of WG members conducted to establish directional alignment, initial WG member positions and interest
Examination of KDE
• Information and analysis about KDE presented to/by WG members
• Members review and discuss alternatives for designing KDE
• When majority of WG members believe sufficient examination has occurred, draft recommendation presented for review and voting by WG members
Recommendation for KDE
• Vote conducted and result documented
• Affirming and dissenting votes recorded, along with reasons for dissent
• Recommendations and context of WG discussions that produced them reported in SAM 3.0
Public
• SAM 3.0 WG provisional recommendations are understood as advice and will be considered by AESO in developing the draft comprehensive market design
Resource adequacy requirement How much capacity needs to be procured?
4 Public
SAM 3.0 provisional recommendations
• The capacity market will have an annual reliability requirement and delivery period instead of a seasonal requirement.
• A set of demand curve principles, which provide guidance on balancing resource adequacy, cost and volatility in the demand curve, were developed with the WG.
• A set of methodology and inputs for resource adequacy modelling have been reviewed and approach accepted by the workgroup; Continued transparency requested in the ongoing consultation process.
Working Group: Adequacy & Demand Curve Determination
SAM 3.0 discussion context
• Three candidate curves were produced for the working group. • General alignment on:
– Gross-CONE calculation approach. – Simple-cycle technology best fits the reference technology criteria. – EAS revenues for net-CONE calculation developed with a forecast approach.
Eligibility Who can provide capacity?
5
SAM 3.0 provisional recommendations
• Demand resource participation: demand response resources and price responsive load should be eligible to participate in the capacity market.
• Resources available over interties should be eligible to participate. • Storage resources should be eligible to participate.
Public
Working Group: Eligibility & Capacity Value Determination
SAM 3.0 discussion context
• Work group requires more information to determine how energy efficiency resources can participate.
Eligibility How much can they provide?
6
SAM 3.0 provisional recommendations
• Minimum resource size: Resources 1 MW and greater should be eligible to participate in the capacity market.
• Aggregation: Resources should be able to aggregate when participating in the capacity market.
• Unforced capacity (UCAP): UCAP should be used to represent capacity when determining capacity values.
Public
Working Group: Eligibility & Capacity Value Determination
SAM 3.0 discussion context
• AESO should be the UCAP calculating agent, but will require additional information to do so.
Performance assessments How do we know that capacity has been provided?
7 Public
SAM 3.0 provisional recommendations
• No recommendation.
Working Group: Eligibility & Capacity Value Determination
SAM 3.0 discussion context
• WG reached directional alignment that additional performance testing periods be considered to mitigate the concerns associated with performance measurement occurring only during EEA events.
• A majority of WG members agreed: – There is a need for a penalty framework. – Increasing the number of performance measurement events will recognize
the uniqueness of the Alberta market and make penalties more manageable. – Non-EEA event performance should be measured on resource availability
(where “availability” means that the resource is available for energy market dispatch).
Procurement timing and frequency How will the capacity market operate? When and how often will capacity be purchased?
8
SAM 3.0 provisional recommendations
• Auction type: The auction should be a single-round, sealed-bid auction. • Forward period: The auction should be held three years prior to the obligation
period. • Rebalancing auctions: There should be two rebalancing auctions.
Public
Working Group: Market Mechanics
Term How long will the capacity delivery period be?
9 Public
SAM 3.0 provisional recommendations
• The obligation period will be one year (non-seasonal).
Working Group: Market Mechanics
SAM 3.0 discussion context
• Obligation period: WG was largely split between a one-year term and a seven-year term for new resources.
• Asset substitution: WG agreed asset substitution is an important method for resources to manage risk; Supported a flexibility approach to ex ante asset substitution.
Term How should out-of-market power and out-of-market payments be managed?
10 Public
SAM 3.0 provisional recommendations
• No recommendation.
Working Group: Market Mechanics
SAM 3.0 discussion context
Market power • Mitigation should be enforced ex ante. • Resource suppliers that are not pivotal should not have any mitigation
applied to their capacity market offers. • Working group considered three approaches for pivotal supplier mitigation.
Out-of-market payments • Working group agreed offer mitigation for resources that receive out-of-
market payments should be applied on an ex ante basis; there was no agreement on definition of an out-of-market payment.
Obligation to procure Who will buy the capacity? Includes question of cogen treatment/self-supply
11 Public
SAM 3.0 provisional recommendations • AESO should hold the obligation to procure capacity on behalf of load. • AESO should operate an organized market, with a centralized auction
mechanism and standard product definition, where all capacity is exchanged through a centralized auction with a simple, transparent price.
Working Group: Procurement & Hedging
SAM 3.0 discussion context
• This aligns with Alberta Energy policy statement (September),
Obligation to procure Who will buy the capacity? Includes question of cogen treatment/self-supply
12 Public
SAM 3.0 provisional recommendations • Cost should be allocated to self-supply net load according to the cost allocation
method developed. • Self-suppliers will not be assessed a load obligation, provided the cost
allocation methodology addresses potential fairness issues that may result from self-suppliers failing to adequately self-supply during performance events.
Working Group: Procurement & Hedging
SAM 3.0 discussion context • A load obligation is a requirement placed on load to not consume beyond a
certain level, otherwise be subject to curtailment, penalties, or additional costs.
Obligation to procure Who will buy the capacity? Includes question of cogen treatment/self-supply
13 Public
SAM 3.0 provisional recommendations
• Physical bilateral procurement of capacity is not permitted. – However, a site may choose to self-supply capacity provided they meet the
following certain requirements.
Working Group: Procurement & Hedging
SAM 3.0 discussion context • ‘Physical bilateral procurement of capacity’ is not to be confused with a
‘contract-for-differences’ (CfD) for capacity, but rather a contractual arrangement between a load and a specific capacity resource, utilizing the transmission or distribution system for physical delivery of all or a portion of the load’s capacity needs.
• Majority of the WG felt the UCAP for self-supply sites should ideally be determined based on effective load carrying capability. – Concerns with the complexity and lack of transparency with the effective load
carrying capability approach. – Further exploration of this option is required and should investigate whether a
simpler process could proxy for full-blown effective load carrying capability modelling.
Capacity market settlement How will capacity providers be paid?
14 Public
SAM 3.0 provisional recommendations
• The capacity market should facilitate Capacity Market net settlement instructions (NSI) within design of the market.
Working Group: Procurement & Hedging
SAM 3.0 discussion context • Some items within the topic of settlement (e.g., settlement, billing, credit) were
not scheduled for the SAM 3.0 development cycle.
Inter-operability implications How will the capacity market impact the EAS markets?
• Overall deliverable is a roadmap for market rules, including timing for implementation of components.
• Adoption of phased approach to ensure proper alignment and functioning of CM and EAS markets:
Phase I • Identified changes to EAS with introduction of capacity market. • Assumed no change in supply mix and current system conditions.
Phase II
• Considered how market products, rules, etc. need to change due to expected impact of net demand variability (NDV).
• Considered if further market efficiencies should be introduced and when (e.g., SCUC, BDAM, EAS co-optimization, settlement interval changes).
SAM 3.0 summarizes:
• WG voting on all Phase I “conclusions” reached as part of SAM 2.0.
• WG voting of all KDE based on Phase II assumptions. 15 Public
Working Group: Energy & Ancillary Services
Inter-operability implications How will the capacity market impact the EAS markets?
16 Public
SAM 3.0 provisional recommendations based on Phase I assumptions
• Can continue unit self-commitment. • AESO will not approve outages; status quo for information will continue. • All committed supply capacity must offer physical availability, similar to rules today
on offering maximum capability (MC) subject to an acceptable operating reason (AOR); This includes loads that may be committed on the supply side of the capacity market; All non-committed supply capacity must ‘offer’ visibility of resources.
• No changes to AS products, markets, operations at this point.
Working Group: Energy & Ancillary Services
SAM 3.0 discussion context • All Phase I conclusions were accepted during voting, with exception of vote on
outage planning and distinction for ‘must offer’ for non-committed capacity resources.
• Outage vote was premised on assumption that approved outages was not an exemption for a performance period; Non-committed capacity resources must show visibility, but perhaps without a price.
Inter-operability implications How will the capacity market impact the EAS markets?
17 Public
SAM 3.0 provisional recommendations based on Phase II assumptions
Unit Commitment and Dispatch • Self-commitment can continue to work. • Status quo will continue for outage submissions and be used for information
only; AESO will not approve outages. • Intertie scheduling and dispatch options will be considered separately.
Working Group: Energy & Ancillary Services
SAM 3.0 discussion context
• Based on results of NDV study, there is likely increased supply surplus events and therefore possibly more unit cycling; However, at this time it was concluded that a self-commitment model could continue; Options related to SCUC may be considered as part of the roadmap.
• Intertie options required more detailed discussion, the vote was therefore deferred; WG members are to submit input to AESO.
Inter-operability implications How will the capacity market impact the EAS markets?
18 Public
SAM 3.0 provisional recommendations based on Phase II assumptions
Pricing • WG accepted an overall pricing package including the following elements (further
research on details will be completed for the consolidated proposal). • Ex ante hourly process will be used to evaluate market power. Pivotal
supplier/conduct and impact screens will be further evaluated. • Companies that fail ex ante mitigation screen on an hourly basis will have their
offers mitigated to a soft cap based on multiples of short-run marginal cost by fuel type, asset type or market cap.
Working Group: Energy & Ancillary Services
SAM 3.0 discussion context
• WG was able to advance conclusions on this KDE based on modelling conducted; However, more work is required to finalize detailed proposal.
• Further work is required to finalize level at which screens would be applied, whether some assets would fit the ‘no look’ category, whether an impact assessment was required, and level/form for the soft cap.
Inter-operability implications How will the capacity market impact the EAS markets?
19 Public
SAM 3.0 provisional recommendations based on Phase II scope
Pricing (continued) • Scarcity and shortage pricing mechanisms will be examined as part of bid
mitigation model; No change to price cap is proposed; Negative pricing requires further examination.
Working Group: Energy & Ancillary Services
SAM 3.0 discussion context
• WG agreed that scarcity, shortage pricing mechanisms and negative pricing require further exploration as part of price fidelity in a bid mitigation model (and are related to levels of mitigation); WG had differing views as to which design change best achieved goals related to price stability objectives (including tradeoffs between changing the price cap and introducing shortage pricing).
Inter-operability implications How will the capacity market impact the EAS markets?
20 Public
SAM 3.0 provisional recommendations based on Phase II scope Ancillary services • Based on the expected impacts due to increased variable generation and fleet
changes, rule changes and price signals for flexibility can address the issue; AESO will provide details on these choices as part of consolidated proposal.
• WG was split on need and timing for a ramp product as part of these market changes, and concluded that further analysis was required.
• A must-offer for ancillary services is not required consistent with the conclusion that the current AS market (sequential model) will continue.
Working Group: Energy & Ancillary Services
SAM 3.0 discussion context • WG wanted to review the proposed rule/price signal package and test whether they
were sufficient to ensure price signals for flexibility; Some thought it was of value to develop a ramp product even if it is implemented later.
• Should the co-optimized EAS model be part of the roadmap, a must-offer (an alternative bid structure) would be required.
• All of this will be evaluated as part of roadmap discussions.
Inter-operability implications How will the capacity market impact the EAS markets?
21 Public
SAM 3.0 provisional recommendations based on Phase II scope Efficiency • A 15-minute settlement interval will be explored (aligned with current dispatch
based on hourly offers) to provide incentives for flexible resources. • Given results of other efficiency provisional recommendations and need to
provide further details prior to a vote on financial binding day-ahead market (BDAM), WG agreed to defer vote of the BDAM for discussions as part of roadmap.
Working Group: Energy & Ancillary Services
SAM 3.0 discussion context
• The settlement proposal on the table at present is a 15-minute settlement model within an hourly dispatch market.
• A financial day-ahead market will be considered in context of the other recommendations once completed and considered as part of roadmap.
Illustrative EAS market roadmap
• The draft roadmap will be part of the consolidated design
22
Design Element
Phase I Provisional Recommendations
Phase II Provisional
Recommendations
EAS Roadmap
(2021) (Date) (Trigger) (Off the Table)
• The draft roadmap will consider how changes required will be implemented, and when, based on the following (preliminary) categories:
1. For implementation with the 2021 capacity market delivery.
2. Required but delayed to a date-specific implementation.
3. To be evaluated as part of an identified trigger need.
4. Not required based on current information available. To be removed from project scope.
Public
SAM 3.0 and comprehensive market design scope
23
SAM 3.0
Credit
Reporting
Offer format
TX constraints
Buyer side market power
Detailed UCAP calculations
Rebalancing auction mechanism
New resource qualification milestones
Settlement and billing
Further implementation detail on areas covered in SAM 3.0
+ = Comprehensive Market Design
CMD working groups – session outline
General session (all members of consolidated WG)
• CMD Review – General overview
– Concentrate on areas impacting total revenue, operability or risk between markets
• E.g., market mitigation, performance penalties
• Confirm focus areas for Design, EAS and Technical working groups
• Q&A
24 Public
CMD working groups – session outline
Capacity market design • CMD review
– Entire document
– Penalty mechanism
– Mitigation
– Term
– Auction timelines and delivery cycle
– Auction mechanics
– Qualification requirements
25 Public
CMD working groups – session outline
Energy and ancillary services • EAS modelling
– Pricing • Mitigation proposal comparison • Shortage pricing – impact of different price levels given fixed number of
shortage hours
– AS: Evaluation of co-optimization – Unit Commitment: Impact of different fleets (testing robustness of
conclusion with high coal to gas portfolio)
• CMD review – Entire document – EAS: Intertie offer and dispatch offers; Ramp product – Must offer visibility
• Roadmap: Four categories
26 Public
CMD working groups – session outline
Technical • Resource adequacy modelling
– Review feedback on load forecast – Modeling inputs (outage information, intertie) – Modeling output
• UCAP – Principle to calculation – Data needs/issues/process – Draft calculation methodology for conventional thermal resources,
intertie
• Net-CONE – Review scope of work: gross-CONE and net-CONE – Seek feedback on financing assumptions, EAS methodology
27 Public
Timeline
28 Public
Session wrap-up and key near-term dates
29
Dec. 15 Stakeholder feedback on SAM 3.0 due
Dec. 20 AESO posts feedback ‘as received’ on aeso.ca
Jan. 12 AESO response to feedback posted
Jan. 26 Draft comprehensive design published on aeso.ca
Feb. 12–16 Working group review sessions
Public
Thank you
Public