- About the Amsterdam Bridge
- Recommendations for Maintenance Work
- Improvements to stairs
- Improvements for slipperiness
-Implications
Table of Contents
![Page 3: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/3.jpg)
About the Amsterdam Bridge:- Opened in 1978
- Named after Toronto's twin city.
- Steel Cable Footbridge
- In low traffic Toronto Harbour area, below is a docking facility for boats
![Page 4: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/4.jpg)
- Only light damage according to OSIM guidelines.
- Design for Aesthetics
![Page 5: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/5.jpg)
Recommendations for Maintenance Work
- Repaint rusted areas (Rusting classified as light by OSIM guidelines)
- Wood, Concrete and Steel all in good condition apart from minor rusting.
![Page 6: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/6.jpg)
-Replace rusty nails and wires
Recommendations for Maintenance Work
![Page 7: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/7.jpg)
Improvements on the stairsADA Accessibility Guidelines from
Buildings and Facilities 4.9.2• "Open risers are not permitted"
![Page 8: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/8.jpg)
Improvements on the stairsC.T.A.D.G 1.1.10"Tread nosings should be clearly marked with a brightly painted non-slip finish"
![Page 9: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/9.jpg)
Improvements for Slipperiness:Apply anti-slip treads horizontally across
the bridgeC.T.A.D.G 1.1.10 • "Steps must be of firm non slip material".
![Page 10: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/10.jpg)
ImplicationsAnti-Slip Improvement:• Bridge will be more convenient to
use, especially in the winter. • Better for people with mobility
issues because of anti-slip treads• Improved safety: Fewer people
would slip on the bridge due to wet surfaces or ice.
![Page 11: Bridge Improvement Presentation: Amsterdam Bridge](https://reader035.vdocuments.mx/reader035/viewer/2022062218/56816661550346895dd9ed75/html5/thumbnails/11.jpg)
Implications
Improvements to stairs:
• Better visibility especially at night.