Download - BP N4C14 Joint Inspection
Transcript
BUKIT PANJANG N4C14
REFER to the joint inspection on 27 July 2012, the following had been observed:
Shoddy Workmanship,Slack House-keeping,
Shoddy Workmanship
Shoddy Workmanship
Block Wall punctured with big hole
Shoddy Workmanship
Honey-comb not repaired, holes not filled
Block Wall punctured with big holes
Shoddy Workmanship
Reinforcement bars exposed in unit #09-554
Shoddy Workmanship
Incomplete work at staircase landings, re-bar exposed can be hazardous (All)
Reinforcement bars exposed in unit #09-546
Shoddy Workmanship
Block Wall punctured with big holes
Shoddy Workmanship
Shoddy Workmanship
Shoddy Workmanship
Slack House-keeping