MEASUREMENT QUANTITIES FOR PILING WORKS
PREPARED BY :ROHAIDAH BINTI MD NOR013-3648820
![Page 2: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/2.jpg)
PILING
Building structure that receive load and spread the load to the soil underground
Most important element in building structureCan be obtainable in various form and size.
Type of piling depends on Soils conditions Design loads Site requirements
![Page 3: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/3.jpg)
COMES IN VARIOUS SIZE3M, 6M, 9M AND 12MRC NORMALLY RETANGULAR SHAPETIMBER IN CIRCULAR SHAPE
SOURCE OF SUPPLYCAN BE OBTAIN DIRECT FROM MANUFACTURER CAST ON SITE
FORMOne pile pont in pile cap-singularMore than 1 –cluster
![Page 4: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/4.jpg)
CLASSIFICATION OF PILES
CLASSIFICATION OF PILE ACCORDING TO TYPE OF MATERIALS USED :
TIMBERSTEELCONCRETECOMPOSITE PILES
![Page 5: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/5.jpg)
SEQUENCES OF PILING WORK
![Page 6: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/6.jpg)
![Page 7: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/7.jpg)
![Page 8: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/8.jpg)
![Page 9: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/9.jpg)
![Page 10: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/10.jpg)
![Page 11: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/11.jpg)
![Page 12: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/12.jpg)
![Page 13: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/13.jpg)
![Page 14: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/14.jpg)
![Page 15: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/15.jpg)
![Page 16: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/16.jpg)
![Page 17: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/17.jpg)
![Page 18: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/18.jpg)
![Page 19: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/19.jpg)
![Page 20: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/20.jpg)
![Page 21: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/21.jpg)
![Page 22: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/22.jpg)
![Page 23: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/23.jpg)
LOAD TEST BEING CARRIED OUT
![Page 24: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/24.jpg)
![Page 25: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/25.jpg)
SENARAI PENGUKURAN KUANTITI (TAKING OFF LIST)
Definition - List of items that needs to be measured complete with its units
Why prepared?
1)To make sure no missing items2)To cross out the items that already measured so as to avoid doubled measurement
![Page 26: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/26.jpg)
Examples of Taking Of List (TOL)
Items Units
Bringing in and removing plant Item
Maintaining plant on site Item
Supply of initial piles No
Supply of extension piles <3.00m long M
Supply of extension piles > 3.00m long M
Driven depth M
Pile extension No
Cut Off piles No
Prepare piles head No
Load test Item
![Page 27: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/27.jpg)
SENARAI PERTANYAAN (QUERRY LIST)
1)Table of query that needs clarification from architect, engineers regarding inaccurate information, discrepancies in drawing and specification, missing items etc2)The architect/engineers needs to verify the queries and answers
![Page 28: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/28.jpg)
EXAMPLES OF QUERY LISTS
ITEM QUERRIES ASSUMPTIONS
REMARKS
1 Size of ceiling joint 100mm x 50mm
2 Type of timber for roof members
Pressure Treated Grade B timber
3 Height of walls tiles at kitchen not given
To ceiling height(3600mm high)
![Page 29: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/29.jpg)
SCHEDULE OF PILES CAP
LOCATION TYPES OF PILES CAP
P1 P2 P3
A/1-4 2
B/1-4 2 1
C/1-4 2 1 1
D/1-4 4
TOTAL 10 2 1
![Page 30: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/30.jpg)
Item Bringing plant to and removing from site all plant required for this section of work
Item Maintaining on site all plant required for this section of work
2/3/4/
1021
Supply 200mm x 200mm Precast concrete piles “UCP” 6.00m long complete with 200mm x 200mm x 1.25 mils steel head and 200mm x 200mm x 10kg m.s. shoe obtainable from UCP Manufacturing Sdn. Bhd.(P1(P2(P3
![Page 31: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/31.jpg)
2/103/24/1
14.0014.0014.00
Driven, 200mm x 200mm precast concrete piles
(P1(P2(P3
2/103/24/1
222
Precast concrete piles extension
(P1(P2(P3
![Page 32: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/32.jpg)
2/103/24/1
3.003.003.00
Supply 200mm x200mm Precast concrete extension piles”UCP” not exceeding 3.00m depth
(P1(P2(P3
2/103/24/1
6.006.006.00
Ditto, exceeding 3.00m long
(P1(P2(P3
![Page 33: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/33.jpg)
2/3/4/
1021
Cut off top of piles to required levels
(P1(P2(P3
2/3/4/
1021
Prepare concrete pile heads and reinforcement for capping
(P1(P2(P3
![Page 34: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/34.jpg)
Item
Item
Item
Allow for 1 No testing on a group of 4 Nos 200mm x 200mm piles by kentledge s to a total load of 360 tonnes (twice their combined working loads)
&
Ditto, 1 No testing on a group of 3 Nos 200mm x 200mm piles by kentledge s to a total load of 270 tonnes , ditto
&
Ditto, 1 No testing on a group of 2 Nos 200mm x 200mm piles by kentledge s to a total load of 180 tonnes , ditto
![Page 35: Boq piling works](https://reader034.vdocuments.mx/reader034/viewer/2022050620/5561632cd8b42a5f4b8b4e1c/html5/thumbnails/35.jpg)