Page 1: Birthing the EDI Vision: Committee-Conceived Plan Transforms Virginia Beach into an Energy Leader

oda

soda

1,147 Places(including a number of pumping stations)

1,907 Metersfor electric, natural gas, water/sewer and propane

How EnergyCAP Helped

THE CITY OF

VIRGINIABEACH

Become An

for CVB’s approximately

3.3 MILLIONSQ FT

of building space

BY 2012,overall utility costs were over

$24 MILLIONANNUALLY

The team neededAN ENERGY ACCOUNTING

ANDMANAGEMENT SYSTEM

to track energy data

The team needed

As utility costs soared, the City formed

the Joint Energy Committeeto identify and fix energy issues

SUNBLOCK

PROCESSINGcredits correctly

SPLITTINGbills for internal

chargebacks

ATTRIBUTINGaccount chargesaccurately

ELIMINATING

PAPER

INVOICES

REDUCING BILL

PROCESSING

TIME

TERM

INATING INACTIVE

ACCOUNTS/MET

ERS

Catching keystroke errors

Validating bills before authorizing payments

Prioritizing retrofits through energy analysis

Automating invoice audits

©2013 EnergyCAP, Inc.

With

EnergyCAP,

the City of

Virginia Beac

h

now tracks:

Thanks to theJoint Energy Committeeand EnergyCAP,what was an entrenched, manual process in