BIM the UK Way
Presented by Linda Newton, PhD, FCSCE, PMP Technical Specialist, Real Property
Ottawa, ON, 20 November 2014
![Page 2: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/2.jpg)
“Government will require fully collaborative BIM level 2 (with all project, and asset information, documentation and data being electronic) as a minimum by 2016”
- UK Government Construction Strategy May 2011
![Page 3: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/3.jpg)
Overview
• The UK Construction Strategy and BIM • Response to the Strategy • Progress and challenges • UK BIM Framework • Potential for Canada
![Page 4: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/4.jpg)
The UK Construction Strategy
• Construction Strategy - 14 months to write • New model for public sector procurement • Chief Construction Advisor role created
reporting directly to Cabinet Office
![Page 5: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/5.jpg)
Response to Strategy
• BIM Task Group created – Participants from: industry, government, public sector,
institutes, academia
• Construction Industry Research and Information Association (CIRIA) Workshops
• Defining BIM
![Page 6: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/6.jpg)
What is BIM?
• 3-D computer-aided design (CAD) • Tool for clash & interference detection • GIS for buildings • Collaborative process used throughout the
life-cycle of a building or infrastructure asset • Structured collation and utilization of
building data
![Page 7: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/7.jpg)
What is Level 2 BIM?
![Page 8: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/8.jpg)
Response - The BIM Toolbox
• Government Soft Landing (GSL) program • BIM Protocol • PAS 1192-2:2013 • PAS 1192-3:2014 • BS 1192-4:2014 • Digital Plan of Works (DPoW) • Standard classification system
![Page 9: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/9.jpg)
Progress
• Importance of BIM champion AND senior management support
• BIM push, forcing supply chain to respond
![Page 10: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/10.jpg)
Challenges
• Focus was on ‘how’ before the ‘what’ • Understanding what to do with information/
data – What information do I need & what detail? – How do I move it along?
![Page 11: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/11.jpg)
The Data Plug
![Page 12: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/12.jpg)
Successes/Applications
• Ministry of Justice (MoJ) early adopter – Liverpool Prison kitchen refurbishment – Cookham Wood
• Gatwick Airport – BIM viewers in firefighting vehicles
![Page 13: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/13.jpg)
The Outcome - UK BIM Framework
SUPPORTING POLICY, STANDARDS & TOOLSGSL PolicyBIM ProtocolPAS 1192-‐2:2013PAS 1192-‐3:2014BS 1192-‐4:2014Digital Plan of WorksClassification SystemDEPARTMENTAL STRATEGY
DEPARTMENTAL PROCESSES
BIMASSET Management
CONTRACT Management
(Figure 3)
FACILITY Management
PROJECT Management
DESIGN Management
GOVERNMENT STRATEGY
![Page 14: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/14.jpg)
UK Contractual Precedences
![Page 15: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/15.jpg)
Potential and Challenges for Canada
• UK framework is a good model • Greatest challenge – senior involvement and
commitment • BIM will not be driven by industry
![Page 16: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/16.jpg)
Roadmap to Success
• Identify champion(s) • Select pilot project • Assemble project team • Develop BIM process • Develop BIM documents • Implement project • Evaluate and report
![Page 17: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/17.jpg)
Contact Coordinates
Defence Construction Canada | Construction de Défense Canada 180 Kent St, 14th Floor | 180 rue Kent 14e étage Ottawa, ON K1P 0B6 | Ottawa, ON K1P 0B6 Land line | ligne terrestre: 1-613-949-7932 [email protected]
![Page 18: BIM the UK Way - RPIC-IBIC · BIM level 2 (with all project, and asset information, documentation and data being ... • Select pilot project • Assemble project team • Develop](https://reader034.vdocuments.mx/reader034/viewer/2022050404/5f81d5b4094b921d1c0cc9db/html5/thumbnails/18.jpg)
Thank you!
http://www.bimtaskgroup.org/