BIM Safety research project, Pilot 1 Kristiina Sulankivi & Markku KiviniemiKristiina Sulankivi & Markku Kiviniemi VTT Technical Research Centre of Finland
207/10/2011
Guardrail components for Pilot 1(modelling software: Tekla Structures)
3D presentation: Tekla custom components modelled corresponding to the real guardrail solution used at the site ”new model” 4D-planning: Assemblies in the components correspond to site installation and removing of the railings
Timber railings for the post
Guardrail post for surface installation(Vepe product, rented by Skanska Rakennuskone in Finland)(Vepe product, rented by Skanska Rakennuskone in Finland)
307/10/2011
BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)
Detailed BIM-based falling prevention planning based on p p gthe Tekla structural model of the building
Positions of the guardrail posts g pare planned to avoid need to move the posts during the construction work -> time savingsg-> risk of falling decreased
Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)
Structural engineering and modelling Magnus Malmberg consulting engineers
Falling prevention modelling VTT
407/10/2011
BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)
• Part of the timber railing mustbe removed before the casting mould can be installed
• The railing posts are at right distance from the column, to be able to install the mould--> no need to move the posts
Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)
Structural engineering and modelling Magnus Malmberg consulting engineers
Falling prevention modelling VTT
507/10/2011
BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)
Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)
Structural engineering and modelling Magnus Malmberg consulting engineers
F lli ti d lli VTTFalling prevention modelling VTT
607/10/2011
BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)
Railings are located far enough from the slab edge to leave room for installation of wall elements.
No need to remove the guardrail until the wall elements have been assembled -> risk of falling from heights is eliminated
707/10/2011
BIM-based falling prevention planning in Pilot 1,(underground floors: form work and related safety equipment)
Safety nets modelled as part of falling prevention solution planned to be used during form work g
Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)
Structural engineering and modelling Magnus Malmberg consulting engineers
Falling prevention modelling VTT
807/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
907/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1007/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1107/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1207/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1307/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1407/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1507/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1607/10/2011
BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)
1707/10/2011