TRTL Design… and present open-ended issues to resolve
2016 INTEGRATED RESEARCH PROJECT ANNUAL MEETING
Wade Marcum
Oregon State UniversitySchool of Nuclear Science and Engineering
Pragmatic Accomplishments
• Acknowledgements• NEUP Fellow! (Emory Brown)• Assistant Professor Senior Research Hired (Dr. Dan LaBrier)
• Staff• Dr. LaBrier (0.8 FTE)• Dr. TBD (0.1 FTE)• Mr. Weiss (0.1 FTE)
• Students• Emory Brown• Yikuan Yan
• QAP umbrella increased to encompass all TRTL activities• QLD-2 (equivalent rigor) on INL QSL
Logistical Updates
• Fabrication• present
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
• Fabrication• present
• Elect. Installation• March, 2017
• Fabrication• present
• Elect. Installation• March, 2017
• TRTL Installation• March 2017
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
TRTL
• Fabrication• present
• Elect. Installation• March, 2017
• TRTL Installation• March 2017
• NRTL Installation• April, 2017
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
TRTL
NRTL
• Fabrication• present
• Elect. Installation• March, 2017
• TRTL Installation• March 2017
• NRTL Installation• April, 2017
• Control Room• April, 2017
Logistical Updates
Advanced Thermal Hydraulic Research
Laboratory(ATHRL)
Advanced Nuclear Systems Experimental
Laboratory(ANSEL)
Control RoomTool Room
NuScaleFacility
HMFTF HTTF
Tool
Rac
k
Transformer
TRTL
NRTL
Con
trol
Roo
m
RecallFrame Structure
Confinement around primary loop
Pump
Termination location for test section instruments
Accumulator tank
SCR
DAS Panel
Blow-down valveBlow-down tank
RecallFrame Structure
Confinement around primary loop
Pump
Termination location for test section instruments
Accumulator tank
SCR
DAS Panel
Blow-down valveBlow-down tank
DP TransmittersP Transmitters
RecallFrame Structure
Confinement around primary loop
Pump
Termination location for test section instruments
Accumulator tank
SCR
DAS Panel
Blow-down valveBlow-down tank
Placed on trunnions. Removed by lift
Recall
Suction sideFlexible high-pressure hose
Turbine flow meter
Band (pre-conditioning) heaters
Venturi flow meter
Inline heat exchanger
Instrument ‘neck’ & gas plenum
Heater and Instrument Pass-thru
Discharge sideParker Circulating
Pump
Test section
Recall
Recall
Known shakedown to include identification of appropriate spring-constant for check-valve
Recall A-A
A-A
P&ID
• Updates since last meeting• Thermal-Fluid on Secondary
Side• Have a dual cooling
plenum reservoir• Finalized on using SCR to
control power• Selected blow-down valve –
Swagelok SS-12UW-TW-8C
Heater Design
Heater Design
• Test heater-rod built and confirmed to meter out correctly.
• Cladding ID = 0.305 in• Cladding OD = 0.375 in
Shop Drawings
Shop Drawings
Questions for discussion
• TRTL bounds (known and present) pre-conceptual capabilities of TRTL.• What transients (RIAs) does the INL believe the TREAT can run• How do these tie into the experiment• What are the most impactful power ramp-rates for us to consider?• What are the most impactful fluid temperature conditions to consider?• What are the most impactful system pressure conditions to consider?
• Heater• What timelines are associated with AREVA’s ability to provide sleeves?• What are the limitations on dimensionality?
Thank You