Download - AVEVA Constructing the Digital Asset
-
8/9/2019 AVEVA Constructing the Digital Asset
1/37
-
8/9/2019 AVEVA Constructing the Digital Asset
2/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
This presentation may include predictions, estimates, intentions,
beliefs and other statements that are or may be construed as
being forward-looking. While these forward-looking statements
represent our current judgment on what the future holds, they are
subject to risks and uncertainties that could result in actual
outcomes differing materially from those projected in these
statements. No statement contained herein constitutes a
commitment by AVEVA to perform any particular action or to
deliver any particular product or product features. Readers are
cautioned not to place undue reliance on these forward-looking
statements, which reflect our opinions only as of the date of this
presentation. The Company shall not be obliged to disclose any
revision to these forward-looking statements to reflect events or
circumstances occurring after the date on which they are made or
to reflect the occurrence of future events.
-
8/9/2019 AVEVA Constructing the Digital Asset
3/37
Copyright 2014 AVEVA Solutions
Limited and its subsidiaries.
All rights reserved.
Constructing
the Digital
Asset
-
8/9/2019 AVEVA Constructing the Digital Asset
4/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
AVEVAs Solution
Project Planning at Highest Level
Construction Work Packages (CWP)
Work Scope and Budget
Material, Documents, Drawings, etc.
Schedule Responsible, Crew, Trade, Contractor, etc.
Workface Planning at Lower Level
Installation Work Packages (IWP)
IWP Report
Detailed and discrete work scope and budget Specific required material and related documents
Schedule and sequence
Responsible crew, etc.
Key Concept #1 Work Packaging
-
8/9/2019 AVEVA Constructing the Digital Asset
5/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
AVEVAs Solution
Integrating the schedulewith the 3D model
Simulate constructionsequence to verifycorrect planning
Visualize installationand completion statusby color-codingobjects in 3D model
Key Concept #2 4D Planning
-
8/9/2019 AVEVA Constructing the Digital Asset
6/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
AVEVAs Solution
Visualize materialand resourceavailability
Proactively
expedite materialor modify scheduleto accommodatematerial shortages
Key Concept #3 Integrated with Materials Management
-
8/9/2019 AVEVA Constructing the Digital Asset
7/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
AVEVAs Solution
Key Concept #4 Visualization
-
8/9/2019 AVEVA Constructing the Digital Asset
8/37
Copyright 2014 AVEVA Solutions
Limited and its subsidiaries.
All rights reserved.
Solution Review
and
Demonstration
-
8/9/2019 AVEVA Constructing the Digital Asset
9/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Construction Management
System Architecture
ERM
AVEVA-Construction Management
AVEVA-Digital Information Hub
DASHBOARD PLANNING CONSTRUCTION MATERIAL
Gateway GatewayGateway Gateway
-
8/9/2019 AVEVA Constructing the Digital Asset
10/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
High level flow example
ERM
DASHBOARD PLANNING CONSTRUCTION MATERIAL
E3D PrimaveraDocumentum SAP
3DModel
Level1-3
Documents Procurement
-
8/9/2019 AVEVA Constructing the Digital Asset
11/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
High level flow example
ERM
DASHBOARD PLANNING CONSTRUCTION MATERIAL
E3D PrimaveraDocumentum SAP
Construction
Work Package
-
8/9/2019 AVEVA Constructing the Digital Asset
12/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
High level flow example
ERM
DASHBOARD PLANNING CONSTRUCTION MATERIAL
E3D PrimaveraDocumentum SAP
Installation
Work Package
-
8/9/2019 AVEVA Constructing the Digital Asset
13/37
Copyright 2014 AVEVA Solutions
Limited and its subsidiaries.
All rights reserved.
Importing
3D-Models
and 3D-Items
-
8/9/2019 AVEVA Constructing the Digital Asset
14/37Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Initial Setup for pulling into Hub
Digital Asset Import Setup
Project Information Hub
-
8/9/2019 AVEVA Constructing the Digital Asset
15/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
3D Model Items Import
Import 3D Models brings inthe geometry of all the
models (no tag information isimported at this time)
Import 3D Models Items bringsin the tag information
-
8/9/2019 AVEVA Constructing the Digital Asset
16/37
Copyright 2014 AVEVA Solutions
Limited and its subsidiaries.
All rights reserved.
3D Material
Assignment
-
8/9/2019 AVEVA Constructing the Digital Asset
17/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
3D Material Assignment
Work PackageKitting allows theuser to use the
model to associate
material tohighlighted workpackage, andsubsequently
further breakdownwith construction
planning
-
8/9/2019 AVEVA Constructing the Digital Asset
18/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
3D Material Assignment
Green & Red Buttonscan be used to
promote or demote
the selection ofitems to and fromthe work packages
3D model
Within the jobkitting the
system identifiesall activityproperties
On the Left a Multilevel Bill of Materials
On the Right a flatBill of Materials
-
8/9/2019 AVEVA Constructing the Digital Asset
19/37
Copyright 2014 AVEVA Solutions
Limited and its subsidiaries.
All rights reserved.
Importing
DIH
Documents
-
8/9/2019 AVEVA Constructing the Digital Asset
20/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Import DIH Documents
A List of Pulled documents can beseen in s70010 Documents
Documents can be pulled in whenand as the user desires
Project Information Hub
-
8/9/2019 AVEVA Constructing the Digital Asset
21/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Documents
When you select an associateddocument, it can be opened in
your default browser andnavigate to that document.
Then display it using the builtin viewer
Lines of Data cancreated New,Delete
And Save
Documents can beassociated to work
packages & jobs theyare need for
-
8/9/2019 AVEVA Constructing the Digital Asset
22/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Lines of Data cancreated New,
DeleteAnd Save
Attachments
Save
Create Revisions
FilterEdit Open thedocument for
Editing
View Opensthedocument
Attachments aremeans of pulling indocuments from a
network and viewingamending them and
saving
-
8/9/2019 AVEVA Constructing the Digital Asset
23/37
Copyright 2014 AVEVA Solutions
Limited and its subsidiaries.
All rights reserved.
Construction
Managment
Material
Module
-
8/9/2019 AVEVA Constructing the Digital Asset
24/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Drawings
Lines of Data canbe created New,Delete
And Save
Drawings can beassociated to the jobs
they are need for
If those Drawings are used in Design Gant View, thenthe system will identify if the drawing is critical from theEnd of the Design Gant View finish date to the Planned
Usage date
-
8/9/2019 AVEVA Constructing the Digital Asset
25/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Material Procurement
Detailed informationon the material statusis available by using
the purchaseinformation button
-
8/9/2019 AVEVA Constructing the Digital Asset
26/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Material Stock Holding
Detailed information onthe material stock
holding is available byusing the stock button
-
8/9/2019 AVEVA Constructing the Digital Asset
27/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Material Critical
Within the GantChart there is aMaterial statuscolumn. This
identifies the overallMaterial Status. On
A Traffic light
Drill down to theindividual material is
possible, to get detailedinformation on why an
activity is material critical
Within the GantChart there is aMaterial statuscolumn. This
identifies the overallMaterial Status. On
A Traffic light
-
8/9/2019 AVEVA Constructing the Digital Asset
28/37
Copyright 2014 AVEVA Solutions
Limited and its subsidiaries.
All rights reserved.
Stages
Types of
Work
-
8/9/2019 AVEVA Constructing the Digital Asset
29/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Stages Types of Work
Stage 1
Assemble
Tubing
Stage 2
Machine
Flanges
Stage 3
Assemble
Spool
Stage 4
Install
Spool
Stage 4
Install
Spool
Stage 4
Install
Spool
Stage 5
Inspect
System
Stage 4
Install
Spool
Stages and Work
Types are means of
following the
material through its
life cycle within
planning
-
8/9/2019 AVEVA Constructing the Digital Asset
30/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Work Stages
Within Work Stages Types userscan define different types of work,that can be later associated with
material
Lines of Datacan be Cut
copied & PasteOr New, Delete
And Save
They can also attach a colourthat, so as to colourise the 3D
model to demonstrate the state ofthe model at that time
-
8/9/2019 AVEVA Constructing the Digital Asset
31/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Stages of Work
Within Stages of Work users can
setup generic routes
Once the userhas setup a Stageof Work, they can
then setup thegeneric route by
adding new a
Work Type
A sequence of Work Typescan then be defined
Each Work Type can then bedefined as a % of the overall
Product Code Norm value.So if the Product code is 170hours for Pipe spool then cutwill receive 5% of the Norm
= 8.5 hours
Note toPresenter this
screen willneed to be
updated withthe addition of
resources
-
8/9/2019 AVEVA Constructing the Digital Asset
32/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Stages of Work
Within Stages of Work, users
can define the Class Ids, thiswill have the function that all
the Class items within the3D Model and Items session,
will automatically get thatwork Stages
-
8/9/2019 AVEVA Constructing the Digital Asset
33/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
Timeline Simulation
Timeline Simulation allows the user to
simulate the construction of the 3Dmodel using the items attached to the
Project as the time rolls on itemsappear with a reference point on the
scheduleNote This Facility works within both
levels of the Plan
-
8/9/2019 AVEVA Constructing the Digital Asset
34/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
3D Timeline Simulation
Status Colours can be used todefine the Cad items in its
material cycle
With Auto zoom
User can setthe speed atwhich thetimeline
simulationruns
Select specific Time on
the Simulation relates tothe timeline of the
schedule
-
8/9/2019 AVEVA Constructing the Digital Asset
35/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
3D Model
3D Model allows the user tonavigate around the model
from within the plan. Makinggeneral enquires i.e. location,
size, etc.Note This Facility also works within
the detailed plan
-
8/9/2019 AVEVA Constructing the Digital Asset
36/37
Copyright 2014 AVEVA Solutions Limited and its subsidiaries. All rights reserved.
3D Model-Status
v
User can set the visibilitylevel of the surrounding
structure. This Introducesthe rest of the model
This Systemdisplay Status ofthe model colours
No stage toComplete
-
8/9/2019 AVEVA Constructing the Digital Asset
37/37
Thank you