The problem of reduction of expenses at water purification arises before each water
consumer which volume more than 1 m3/d in not dependence on forms of ownership
The problem arises because of imperfection of the applied systems of cleaning and their
moral and physical obsolescence
The problem is still not solved both in the central Russia and in regions
The water purification problem is very sharp in Latin America, Africa and Central Asia
2
The Goldman Sachs Group, Inc. in the report noted,
«The petroleum for the next century»
There is a need of water purification
with the minimum expenses and energy
consumption. It is also important to refuse use
of expensive accessories and and dangerous
reagents, such as chlorine.
-
The forecast of growth of the market of water treatment and sewage treatment in Russia
* - Frost & Sullivan, 2011 http://www.frost.com/
Gro
wth
rate
s o
f th
e m
ark
ets
, %
Market shares
3
Our potential consumers
4
Municipal and household consumers• Water purification for settlements and suburbs
• Additional water purification for apartment houses
• Water purification for townhouses
• Disinfecting of drains
Industrial consumers• Water purification for field camps of fuel and
energy and mining companies
• Purification of technological water for the industry
• Water purification for the food industry and a fast
food
• Cleaning of drains
Sport and rest•Water purification for hotels, campuses and
sanatoria
•Disinfecting of water in pools
•Preparation of water for ice resurfacing
Our technology
The AVR installations solve a water purification problem in a complex, and can beused for waters with various extent of pollution;
In the AVR installations reagents aren't used, therefore there are no expenses ontheir acquisition, delivery and storage. It significantly reduces costs of waterpurification;
The combination of electrolysis and jet aeration to shock dispergating in the AVRinstallations increases efficiency of processes of oxidation of the dissolved impurityand disinfecting of water
5
Disinfecting
– direct electrolysis
Deferrization and oxidation of impurity
– aeration with dispergating
6
Comparison of methods of aeration
Shortcomings Advantages
Ejector +
dispergator
(AQUIFER )
• manufacturing complexity
• Lack of the compressor
• Receiving fine air-and-water mix
• Small size of contact capacity
Pressure head
aeration
• Need of the compressor
• Expenses on the electric power
and spare part
• Big size of contact capacity
•Large volume of the blown air
• Possibility of application of the sprays
reducing the bubble size
Free-flow
aeration
• Small volume of the reacting air
• Complexity of receiving bubble
of the small size
• Big size of contact capacity
• Lack of electrocompressors
- the technology used in the AVR equipment
Comparison of methods of disinfectingShortcomings Advantages
Direct electrolysis
(AQUIFER)
•need of power supply
• rather difficult control system
•Increased requirements to electrodes
• effective disinfecting on all volume
• after-effect
• need of transportation and storage of
chlorine disappears
• simplicity of application
Ultra-violet
radiation
• high cost of the equipment
• lack of chemical activity
• low resource of a lamp and need of its
cleaning
• lack of the prolonged action
•lack of dangerous reagents
• simplicity of application
Ozonization
• ozone is poisonous even in low
concentration
• high energy consumption
• need of special preparation of air
• low chemical activity
• Ozone destroys all known microorganisms
• Ozone disinfects several times quicker, than any
other disinfectants
Chlorination•chlorine is toxic suffocating gas
• high cost of transportation and storage
• the difficult applied equipment
• effective disinfecting on all volume
• high chemical activity
• profitability
7- the technology used in the AVR equipment
Advantages of AVR equipment
8
When using the equipment of the AKQUIFER company you save on:
- costs of installation of equipment
- the personnel (installations work in the automatic mode);
- expendables (in the course of work of installation public sorption materials of the Russian
production are used, also in some cases when disinfecting food table salt is used)
The total cost of the equipment depends on productivity of installation, requirements
imposed by the customer to the cleared water and a chemical composition of initial water.
CI2 NaOCl Ca(OCl )2 Aquifer MIOX ClO2 O3
1Relative capital
expenses100,0% 3,8% 3,8% 38,5% 32,3% 46,2% 115,4%
2Relative operating
expenses100,0% 122,2% 277,8% 55,6% 61,1% 277,8% 27,8%
3Relative expenses on
support100,00% 192,31% 176,92% 57,69% 50,00% 96,15% 61,54%
Installations of the AVR-E series of complex
water purification(Specification TU 4859-001-
18185997-2013)Productivity of installation is from 1 m3/hour to 8 m3/hour. It is
completed with various clearing modules according to
requirements of consumers to quality of the received water.
Installations of deferrization and deodorization of
water of the AVR-F series(Specification TU 4859-
002-18185997-2013)Basic installation is made with a nominal productivity up to 2
m3/hour. Purpose of the AVR-F installation is water purification
from iron and salts of metals and gases dissolved in water. The
main scope are objects of low building, dining rooms and child
care facilities. On the basis of the technology applied in the AVR-F
installations complexes with a productivity up to 200 m3/hour are
developed for application in water utility system.
Equipment of the company "AQUIFER» Ltd
10
10
Productivity – from 100 to 700 m3/days.
The treatment facilities offered by our company are developed on the basis of the
standard project of Gosgrazhdanstroy of the USSR No. TP 902.2.224 "Station of
biological sewage treatment with a productivity up to 200 m3/days" with application
of own technology of aeration tenk and disinfecting of the dumped cleared drains
by method of direct electrolysis.
Treatment facilities of AVR-K of
TU 4859-003-18185997-2013 can
be applied with success, both to
the cottage settlement, and to the
small settlement with the
population to 3500 people.
Overall dimensions of the
technological building (LхHхW) of
m 4,8 x 2,5 x 2,5
Cleaning of drains
11
Water treatment of water of swimming poolsOn the basis of the AVR technology, installations are developed for disinfecting and water
purification in reverse system of water supply of swimming pools of AVR-F-B.
СанПиН 2.1.2.1188-03The AVR-F-B installations are tested
and ready to use, the AVR-F-B
installation design completely
conforms to requirements
«Swimming pools. Hygienic
requirements to the device, operation
and quality of water. Quality control
The AVR-F-B installation works
without replaceable elements and
toxic waste, is mounted on a
uniform frame, works in the
automatic mode without the need
for continuous service. There
corresponds HARDWARE 010/2011
TR "About safety of cars and the
equipment" and has the Expert
opinion of TsGIE MO
12
Autonomous system in a module container
Installation clears water of
compounds of iron,
manganese, carbonic acid, the
dissolved gases, the weighed
particles and organic
compounds. In the course of
cleaning sorption materials of
the Russian production -
aluminosilicate of medical
clays, absorbent carbon of
BAU-A and/or AG-3 are
applied. Average service life of
the applied sorbents of 1,5-2
years..
Суммарная мощность электрооборудования, кВт 5
Мощность источника питания электролизёра, кВт 3,5
Минимальное сопротивление изоляции, мОм 20
Средний уровень звука на расстоянии 1 м., не более, дБа 80
Масса установки (без воды и загрузок фильтров), кг 50
Габаритные размеры, мм:
* - - the table is made on the basis of laboratory researches ФБУЗ «ЦГиЭ в Московской области»
13
Water
indicators
after cleaning
Sm
ell
Colo
r
Tu
rbid
ity
Pe
rma
ngan
at
Oxid
ab
ility
Dry
res
idu
e
Fe
Nitro
ge
n o
f
am
mo
nia
an
d ion
of
am
mo
niu
m
Nit
rate
s(N
O3)
Bio
logic
al
co
nsu
mption
of
oxyge
n(5
da
y)
Zn
Cu
Pb
2 25 4,64 4,89 315,6 21,24 0,31 3,7 1,6 0,24 0,029 0,01
0 5 0,58 0,5 62,4 0,12 0,05 0,2 0,66 0,01 0,004 0,004
100,00 80,00 87,50 89,78 80,23 99,44 83,87 94,59 58,75 95,83 86,21 60,00
Water
indicators
before
cleaning
Efficiency of
cleaning in %
Efficiency of cleaning on the main indicators of pollution
Экономическая эффективность использования установок АВР
14
Сто
имос
ть 1
м3
вод
ы в
мно
гокв
арти
рном
дом
е
Бут
илир
ован
ная
вод
а
При
возн
ая в
ода
Очи
щен
ная
фил
ьтра
ми
«Кув
шин
»
АВР-Ф
Об
оруд
ован
ие
конк
урен
тов
1 Обезжелезивание + + + + + +
2 Удаление запаха + + + + + +
3 Умягчение + + + + + +
4 Обеззараживание + + + - + +
5Автоматический режим
работы- - - - + +
6Стоимость оборудования
с монтажом, тыс.руб.- - - 0,6 650* 770
7Стоимость расходных
материалов тыс.руб./год- - - 3 18 100
8З/П оператора,
тыс.руб./год- - - - - 42
9 Объем воды м3/год - - - 1,2 16560 14400
10Производительность,
м3/сут (номинальная)- - - 0,004 46 40
11Стоимость 1 м3 воды,
тыс.руб.0,2 10 0,25 3 0,0058 0,0191
* - стоимость установки АВР-Ф-УС /полная комплектация/
Установка серии АВР-Ф
с производительностью от 0,5
до 2 м3/час, предназначена для очистки
воды от соединений железа,
марганца, растворенных газов и
взвешенных частиц
On technology of water
purification our company took
out the patent.
The patent is supported
Intellectual property
Competitive advantages of the AVR technology
Proceeding from the analysis of initial water without change of dimensional
characteristics of the ARV installations the technicians of the AKVIFER company combine the
most effective methods for achievement of the maximum ratio on the demanded quality of
water and energy efficiency of installation
Also It should be noted that the AVR installations don't use revers osmosy
membranes. The block of bulk filters works at a basis of public not catalytic loadings of the
Russian production.
Application of bezkompresorny aeration with shock dispergating of air-and-water
mix, allows to receive a big interface of the phases "water-air" that on the gained effect is
comparable with application BIRM technology of deferrization.
16
Water purification, is the complex process which is divided into three main stages -
deferrization, disinfecting, softening. Each of these stages shares on some substages:
deferrization disinfecting softening
17
FromMini - the AVR-F Installation * with a productivity from 23 m3/days for water purification from iron, manganese, chromaticity, a turbidity, hydrogen sulfide
and carbonic acid.. - $4000 (EXW)To Max - the AVR-E Installation with a productivity from 132 m3/days for complex water purification, including industrial drains – $30 000 (EXW).
* - - if necessary installation is completed with blocks of softening, disinfecting and ultrafiltration
Equipment cost
Similar decisionsIn Russia there are no direct competitors of our technology. Various Russian companies
use the technologies applied in the equipment of AVR separately or in connection with othertechnologies to water purification, but not one of the Russian companies doesn't use theeffects gained at application of this or that technology for addition of other technology.The combination of two processes allows our equipment to differ qualitatively from theequipment of competitors on energy efficiency and cumulative cost of possession.Direct competitors of the AKVIFER company are presented in the foreign market, but the
equipment offered by these companies is significantly more expensive than the AVR installationsand don't maintain the competition in connection with an exchange rate difference.
Anolytech AB, Sweden
Envirolyte Industries International Ltd, Estonia
Electrolytic Technologies Corporation , USA
WaterDiam, Switzerland
Miox, USA
Danish Clean Water), Denmark
WAPOTEC GmbH, Austria
Аkvachlor, .Russia
18
Promotion• Открытые инновации 2013, г.Москва - 31.10-01.11.13;
• Ресурсосбережение и экология, г.Тула - 28.11.13
• Безопасность и охрана труда 2013, г.Москва –
10.12-13-12.13
• Здравоохранение 2013, г.Москва - 09.12.-13.12.13
• Коллегия Министерства ЖКХ Калужской области г.Калуга - 10.02.14
• Открытые инновации 2014, г.Москва - 14.10-16.10.14
• Конференция «Снижение затрат на оплату энергоресурсов при эксплуатации и
строительстве объектов жилищно-коммунального хозяйства», 29 октября 2014 г.,
г. Новомосковск Тульской области,
Видео - http://www.youtube.com/watch?v=v8Hevktw5sw
http://www.slideshare.net/modelan/1001-1
http://www.youtube.com/watch?v=w909DhrWBqU&feature=youtu.be• Полуфиналист конкурса CleanTech Open 2014
• Финалист конкурса ВЭБ конкурса на лучший инновационный проект среди молодых
предпринимателей - 2014)
Публикации;«Строительная орбита» - 02.2014Публикация: http://rusbase.vc/news/rsr-aquifer/
20
Выполненные проекты и работыНазвание Регион Продукция Год Примечание
1 Компания РДН Московская область АВР-К 2013 Проект, КП
2 ЗАО «КПС»Ханты-Мансийский
Автономный ОкругЭКБ-Э 2013
Выполнен
ремонт
3 Бассейн «Металлург» Московская область АВР-Ф-Б 2014 Проект, КП
4 ИП ГалабайчукРеспублика Саха-
ЯкутияАВР-Ф 2014 Поставка
5 НПО Неорганика Московская область АВР-Ф 2014 Поставка
6 Поселок Яблоневый ГайСаратовская
областьАВР-Ф 2014 Проект
7 Балашовское ЛПУ МГСаратовская
областьЭКБ-3м 2014 Ремонт.
8 Мокроусское ЛПУ МГ Саратовская
областьЭКБ-3м 2014
Модернизация,
ввод в
эксплуатацию
21
В период 2000-2004 поставлено 80 установок предыдущего поколения
ЭКБ
Shopping center in Yakutia
22
The AVR-F installation *
with a productivity from 23
m3/days for water
purification from iron,
manganese, chromaticity,
a turbidity, hydrogen
sulfide and carbonic acid is
used for pouring of
drinking water
Preparation of technological water (Electrostal)
23
Установка АВР-Ф
*производительностью от 23 м3/
сутки для очистки воды от
железа, марганца, мутности,
сероводорода .используется для
очистки технологической воды
для промывки продукции
После установки у заказчика
исчезла проблема регулярной
очистки дистилятров
Purification of drinking water for employees of LPU (Balashov))
24
№ п/п Name of works
1 Replacement of sorption materials
2 Replacement block of electrolyzers
3 Replacement block of bulk filters
4 Replacement of the block of ultrafiltration
5 Installation of the block of a reverse of current
6 Partial replacement of pipes and NPVH fittings
Purification of drinking water for employees of LPU (Mokrous)
25
№
п/пНаименование работ
1 Replacement of sorption materials
2 Replacement block of bulk filters
3 Installation of the block of a reverse of current
4Partial replacement of pipes and NPVH fittings
Water purification from an autonomous well
(Surgut)
26
№ п/п Наименование работ
1 Partial replacement of pipes and NPVH fittings
2 Ремонт блока питания
3 Replacement of the block of ultrafiltration
4 Replacement block of bulk filters
5 Replacement of the block of ultrafiltration
6 Installation of the block of a reverse of current
7 Partial replacement of pipes and NPVH fittings
Адрес: 144000, Sportivnaya str. 24 , Electostal , Moscow
Region.
Director– Kobzev Andrey;
Technical director– Jukov Igor;
Phone +7 (917) 500-33-53,
E-mail – [email protected]
Сайт – www.aquifer.ru, www.аквифер.рф
27