-
APPENDIX D
Pipeline Facility Tables
Table D-1. Areas Where the Pipeline is Co-Located with Existing Rights-of-Way
and Corridors
Table D-2. Access Roads and Road Crossing Methods
Table D-3. Potential Hydrostatic Dewatering (Test Header) Locations within the
Construction Right-of-Way
Table D-4. Areas Where Topsoil Will Be Salvaged along the Proposed Route
Table D-5 Temporary Extra Work Areas Necessary for Construction of the
Pipeline
Table D-6. Uncleared Storage Areas Necessary for Construction of the Pipeline
Table D-7 Rock Source and Permanent Disposal Sites Identified for
Construction of the Pipeline
Table D-8 Landownership/Jurisdiction by Milepost
Table D-9 Contractor and Pipe Storage Yards that May Be Used during
Construction of the Pipeline
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-1
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1
A
reas
Whe
re th
e Pi
pelin
e is
Co-
Loca
ted
with
Exi
stin
g R
ight
s-of
-Way
and
Cor
ridor
s
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
Coo
s C
ount
y 1.
18
1.42
0.
24
Ser
vice
Roa
d P
rivat
e 0
Coi
ncid
es
6.63
R
7.45
R
0.90
b/
Logg
ing
Roa
d P
rivat
e 0-
175
Coi
ncid
es/A
djac
ent
8.45
R
9.15
R
0.7
Pow
erlin
e/Lo
ggin
g R
oad
BP
A T
rans
mis
sion
Li
ne/P
rivat
e 0-
80
Coi
ncid
es/A
djac
ent
9.29
R
9.51
R
0.22
Lo
ggin
g R
oad
Priv
ate
0 C
oinc
ides
9.
74R
10
.02R
0.
28
Logg
ing
Roa
d P
rivat
e 0-
35
Coi
ncid
es/A
djac
ent
10.5
4R
10.7
3R
0.19
Lo
ggin
g S
pur
Priv
ate
0-35
C
oinc
ides
12
.25B
R
12.2
9BR
0.
04
Unk
now
n R
d P
rivat
e 0
Coi
ncid
es/A
djac
ent
12.3
5BR
12
.46B
R
0.11
U
nkno
wn
Rd
Priv
ate
0-30
0 C
oinc
ides
/Adj
acen
t 12
.83
BR
13
.17B
R
0.34
25
S 1
2 W
33.
00
BLM
0-
80
Coi
ncid
es
13.1
7 B
R
13.6
8BR
0.
51
26 S
12
W 0
4.01
B
LM
0-10
0 C
oinc
ides
13
.68
BR
14
.46B
R
0.78
Li
lian
Crk
, 26
S 1
2 W
04.
04
BLM
0-
75
Coi
ncid
es/A
djac
ent
14.5
4 B
R
14.7
1BR
0.
17
Unk
now
n R
d P
rivat
e 0-
100
Coi
ncid
es/A
djac
ent
14.7
1 B
R
15.1
3BR
0.
42
Unk
now
n R
d P
rivat
e 0-
135
Coi
ncid
es/A
djac
ent
15.6
8BR
16
.73B
R
1.05
U
nkno
wn
Rd,
26
S 1
2 W
15.
02
Priv
ate
0-18
0 C
oinc
ides
/Adj
acen
t 16
.73B
R
16.9
9BR
0.
26
Unk
now
n R
d, 2
6 S
12
W 1
5.02
B
LM
0-80
C
oinc
ides
16
.99B
R
17.9
4BR
0.
95
Blu
e R
idge
Rd
BLM
0-
80
Coi
ncid
es/A
djac
ent
17.9
4BR
18
.48B
R
0.53
B
lue
Rid
ge R
d P
rivat
e 0-
200
Coi
ncid
es/A
djac
ent
18.4
8BR
18
.59B
R
0.12
B
lue
Rid
ge R
d B
LM
0-27
0 C
oinc
ides
/Adj
acen
t 18
.89B
R
19.6
7BR
0.
78
Blu
e R
idge
Rd
BLM
0-
210
Coi
ncid
es/A
djac
ent
19.8
8BR
20
.06B
R
0.18
U
nkno
wn
Rd
BLM
0-
70
Coi
ncid
es/A
djac
ent
20.3
0BR
20
.44B
R
0.14
U
nkno
wn
Rd
BLM
15
5-22
5 A
djac
ent
20.5
6BR
20
.74B
R
0.18
B
lue
Rid
ge T
rail
BLM
0-
40
Coi
ncid
es/A
djac
ent
21.0
5BR
22
.18B
R
1.13
B
lue
Rid
ge S
yste
m, B
lue
Rid
ge
Trai
ls, 2
6-12
-35.
1 B
LM
0-14
5 C
oinc
ides
/Adj
acen
t
22.1
8BR
22
.40B
R
0.22
26
-12-
35.1
, Unk
now
n R
d P
rivat
e 35
-200
A
djac
ent
23.0
8BR
23
.35B
R
0.27
U
nkno
wn
Rd
Priv
ate
0-18
5 C
oinc
ides
/Adj
acen
t 23
.35B
R
23.7
1BR
0.
36
Woo
dwar
d C
reek
Spu
r, U
nkno
wn
Rd
BLM
0-
40
Coi
ncid
es
23.9
9BR
24
.20B
R
0.21
W
oodw
ard
Cre
ek R
d P
rivat
e 0-
50
Coi
ncid
es
21.9
0 22
.15
0.25
P
ower
line
Acc
ess
Roa
d P
rivat
e 15
-75
Adj
acen
t
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-2
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
23.2
2 23
.66
0.44
U
nkno
wn
Rd
BLM
0-
85
Coi
ncid
es/A
djac
ent
23.6
6 24
.12
0.46
C
oos
Bay
Wag
on R
oad
Cou
nty
50-7
5 A
djac
ent
24.1
2 24
.31
0.19
P
ower
line/
Hud
son
Rid
ge T
ie -
BLM
27-
11-1
7.1
BLM
0-
150
Coi
ncid
es/A
djac
ent
24.5
5 25
.05
0.60
P
ower
line/
Logg
ing
Spu
r, B
LM 2
7-11
-30.
1, B
LM
BLM
0-
60
Coi
ncid
es/A
djac
ent
25.6
0 26
.75
1.15
P
ower
line/
Men
asha
Log
ging
Rd,
B
LM 2
7-11
-30.
1 P
rivat
e B
PA
Tr
ansm
issi
on L
ine
0-60
C
oinc
ides
/Adj
acen
t 20
feet
1
27.6
5 28
.13
0.48
Lo
ggin
g R
d P
rivat
e 0-
85
Coi
ncid
es
29.1
7 29
.26
0.09
Lo
ggin
g S
pur
Priv
ate
0-60
C
oinc
ides
30
.40
31.1
8 0.
78
Logg
ing
Spu
r P
rivat
e 0-
160
Coi
ncid
es/A
djac
ent
31.4
4 31
.69
0.25
Lo
ggin
g S
pur/D
ora
Spu
r Rd,
BLM
28
-11-
13.2
B, 1
3.2A
P
rivat
e 0-
80
Coi
ncid
es/A
djac
ent
31.6
9 31
.81
0.12
D
ora
Spu
r Rd,
BLM
28-
11-
13.2
B, B
ack
Dor
a, B
LM 2
8-11
-13
.6
BLM
0-
70
Coi
ncid
es/A
djac
ent
33.7
4 33
.81
0.07
E
lk M
ount
ain
Loop
, BLM
28-
11-
25.0
B
LM
0-65
C
oinc
ides
34.0
2 34
.31
0.27
b/
Gol
d B
rick
Rd
BLM
0-
140
Coi
ncid
es/A
djac
ent
34.6
8 35
.12
0.44
Lo
ggin
g R
d, L
oggi
ng S
pur
Priv
ate
0 C
oinc
ides
35
.33
35.8
0 0.
47
Elk
Cre
ek R
d, B
LM 2
8-11
- 29.
0 B
LM
0-65
C
oinc
ides
35
.83
36.1
8 0.
35
Elk
Cre
ek R
d, B
LM 2
8-11
- 29.
0,
BLM
28-
10-2
9.2
BLM
0-
65
Coi
ncid
es
36.6
3 37
.22
0.59
E
lk C
reek
Rd,
BLM
28-
10- 2
9.0,
B
LM L
oggi
ng S
pur
BLM
0-
30
Coi
ncid
es
38.3
6 38
.92
0.56
W
eave
r Sitk
um T
ie R
d, B
LM 2
8-10
-9.4
B
LM
0-90
C
oinc
ides
39.0
2 39
.06
0.04
C
o R
d 17
1, P
lum
Cre
ek L
oggi
ng
Spu
r B
LM
0 C
oinc
ides
39.2
0 39
.25
0.05
C
o R
d 17
1, P
lum
Cre
ek L
oggi
ng
Spu
r B
LM
0-65
C
oinc
ides
39.4
0 39
.56
0.16
W
eave
r Sitk
um T
ie R
d, B
LM 2
8-10
-9.4
B
LM
0-90
C
oinc
ides
39.7
2 39
.78
0.06
Tr
i-W G
roup
Acc
ess
Spu
r P
rivat
e 0-
30
Coi
ncid
es
39.7
8 39
.88
0.10
W
eave
r Sitk
um T
ie R
d, B
LM 2
8-10
-9.4
P
rivat
e 0
Coi
ncid
es
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-3
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
40.3
0 40
.43
0.13
W
eave
r Sitk
um T
ie R
d, B
LM 2
8-10
-9.4
P
rivat
e 0-
75
Coi
ncid
es
40.7
9 41
.48
0.69
W
eave
r Sitk
um T
ie R
d, B
LM 2
8-10
-9.4
P
rivat
e 0-
75
Coi
ncid
es/A
djac
ent
42.0
3 42
.48
0.45
W
eave
r Rd,
BLM
28-
8-18
.0
BLM
0-
120
Coi
ncid
es/A
djac
ent
42.7
3 42
.86
0.10
b/
Nor
th R
ock
Cre
ek, B
LM 3
0- 1
0-3
BLM
0-
65
Coi
ncid
es
42.9
3 43
.11
0.18
Lo
ggin
g S
pur,
BLM
30-
10-3
, N
orth
Roc
k C
reek
B
LM
0-15
0 C
oinc
ides
/Adj
acen
t
43.2
8 43
.46
0.18
B
LM 3
0-10
-3, N
orth
Roc
k C
reek
B
LM
0-65
C
oinc
ides
43
.61
43.9
1 0.
30
BLM
29-
9-8,
Co
Rd
177.
2R, L
one
Roc
k Lo
ggin
g S
pur
BLM
0-
135
Coi
ncid
es/A
djac
ent
44.5
3 45
.24
0.71
B
LM 2
9-9-
9.3,
Pvt
RW
A C
-344
G
.P.,
Upp
er s
igna
l Tre
e, B
LM 2
8-9-
35, L
oggi
ng S
pur,
BLM
29-
9-9.
2
BLM
0-
255
Coi
ncid
es/A
djac
ent
Dou
glas
Cou
nty
45.4
9 45
.71
0.22
U
nkno
wn
Logg
ing
Roa
d B
LM
0-50
C
oinc
ides
/Adj
acen
t 45
.85
46.5
8 0.
77 b
/ B
LM 2
8-9-
35, P
lum
Cre
ek
Logg
ing
Spu
r B
LM
0-12
5 C
oinc
ides
47.1
0 47
.79
0.69
B
ingh
am H
olm
es R
oad
- BLM
29-
9-23
, Hol
mes
Cre
ek S
pur,
Dee
p R
eed
Div
ide
Spu
r
BLM
/Priv
ate
0-16
0 C
oinc
ides
/Adj
acen
t
48.2
0 49
.15
1.10
b/
Dee
p C
reek
, BLM
29-
9- 1
2.1,
D
eep
Cre
ek S
pur,
BLM
29-
09-
13.0
, BLM
Log
ging
Roa
d
BLM
0-
135
Coi
ncid
es/A
djac
ent
51.9
9 52
.07
0.08
P
rivat
e D
irt R
oad
Priv
ate
0-12
5 C
oinc
ides
/Adj
acen
t 53
.22
53.7
4 0.
52
Shi
elds
Cre
ek S
pur,
BLM
29-
8-2.
2 B
LM
0-23
0 A
djac
ent
54.2
0 54
.34
0.14
Lo
ggin
g S
pur
BLM
0-
90
Adj
acen
t 54
.84
55.0
6 0.
22
Sen
eca
Logg
ing
Spu
r P
rivat
e 0-
30
Coi
ncid
es
55.5
3 55
.75
0.22
Lo
ggin
g R
d P
rivat
e 0-
30
Coi
ncid
es
56.8
0 56
.88
0.08
Ire
land
Rd
Pub
lic
50
Adj
acen
t 61
.89
62.5
1 0.
62
Nic
hols
Bro
s P
vt R
d, J
ohn
Cla
rke,
DG
-075
P
rivat
e 0-
115
Coi
ncid
es
62.5
2 63
.64
1.12
D
R J
ohns
on P
vt D
r (B
LM 2
9-7-
6.0)
P
rivat
e 0-
165
Coi
ncid
es
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-4
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
64.5
5 64
.61
0.06
P
rivat
e R
d, D
G-0
90.5
00, P
LMP
58
.3+4
.87
Priv
ate
0-65
C
oinc
ides
64.6
1 64
.73
0.12
P
rivat
e R
d, D
G-0
90.5
00, P
LMP
58
.3+4
.87
BLM
0-
75
Coi
ncid
es
64.9
0 65
.35
0.45
P
rivat
e R
d –
DG
-090
.500
P
rivat
e 0
Coi
ncid
es
66.2
0 66
.26
0.06
P
rivat
e R
d, D
G-0
98.0
00
Priv
ate
0-65
C
oinc
ides
66
.37
66.4
7 0.
10
Priv
ate
Rd,
DG
-099
.000
P
rivat
e 0-
65
Coi
ncid
es
67.1
9 67
.29
0.10
B
arto
n P
rivat
e R
d P
rivat
e 0-
95
Coi
ncid
es
67.7
1 68
.26
0.55
B
arto
n P
rivat
e R
d P
rivat
e 0-
80
Coi
ncid
es
68.6
0 68
.88
0.28
U
nkno
wn
Rd
Priv
ate
0-60
C
oinc
ides
69
.66
70.3
7 0.
71
Unk
now
n P
rivat
e D
irt R
d P
rivat
e 0
Coi
ncid
es
72.3
6 72
.65
0.29
P
rivat
e D
irt R
oad
Priv
ate
0-14
0 C
oinc
ides
/Adj
acen
t 75
.67
75.9
2 0.
18 b
/ B
ilger
Cre
ek R
d B
LM 2
9-5-
11,
B
ilger
Cre
ek S
pur,
BLM
29-
5-2.
2,
Priv
ate
Logg
ing
Spu
r
Priv
ate
0-65
C
oinc
ides
77.0
7 77
.13
0.06
U
nkno
wn
Rd
Priv
ate
0-11
5 C
oinc
ides
/Adj
acen
t 77
.83
78.0
0 0.
17
Littl
e Li
ck P
rivat
e R
d P
rivat
e 0-
120
Adj
acen
t 79
.89
80.4
2 0.
53
Sch
ool H
ollo
w S
pur,
BLM
29-
4-17
B
LM
0-25
0 A
djac
ent
80.6
1 81
.10
0.49
P
ower
line
corri
dor/
Priv
ate
Rd
Priv
ate
0-30
C
oinc
ides
82
.23
82.4
3 0.
20
Unk
now
n D
irt R
d P
rivat
e 0-
120
Coi
ncid
es/A
djac
ent
82.7
5 83
.75
1.00
W
ood
Cre
ek R
d, B
LM 2
9-4-
35
BLM
0-
165
Coi
ncid
es
83.7
9 83
.85
0.06
Lo
ggin
g S
pur
BLM
0
Coi
ncid
es
84.6
6 84
.81
0.15
Lo
ggin
g R
d P
rivat
e
85
.37
85.5
9 0.
22
Logg
ing
Spu
r. E
Fk
Woo
d C
rk
Sp,
BLM
29-
4-36
P
rivat
e 0
Coi
ncid
es
85.8
5 86
.04
0.19
Lo
ggin
g R
oad
Priv
ate
0-50
C
oinc
ides
/Adj
acen
t 86
.24
86.9
7 0.
27
Eas
t For
k W
ood
Cre
ek R
d H
igh
Noo
n S
pur,
BLM
29-
3- 3
1.3,
BLM
29
-3-3
1.4
BLM
0-
65
Coi
ncid
es
86.9
7 87
.38
0.99
b/
Logg
ing
Spu
r Hig
h N
oon
Spu
r, B
LM 2
9-3-
31.
3, B
LM 2
9-3-
31.4
U
SA
(O&
C)
0 C
oinc
ides
88.1
5 88
.48
0.33
Fa
te C
reek
Rd,
BLM
30-
3-6
Priv
ate
0-20
0 A
djac
ent
89.1
1 89
.51
0.40
U
nkno
wn
Acc
ess
Rd
Sen
eca
Jone
s P
rivat
e R
d 7
& 8
P
rivat
e 0-
80
Coi
ncid
es
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-5
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
89.7
9 89
.88
0.12
b/
New
Log
ging
Spu
r P
rivat
e 0-
55
Coi
ncid
es/A
djac
ent
90.1
5 90
.36
0.21
B
land
Mtn
, BLM
30-
4-1
US
A (O
&C
) 0-
160
Adj
acen
t 90
.36
90.4
9 0.
13
Lava
dour
e C
reek
Spu
r, B
LM 3
0-3-
20.2
U
SA
(O&
C)
0-16
0 A
djac
ent
90.4
9 91
.26
0.77
B
LM 3
0-3-
20.2
, Unk
now
n S
pur,
John
Day
s S
pur,
BLM
30-
3-28
, W
ook
Rd
Priv
ate
0-13
0 C
oinc
ides
91.2
6 91
.76
0.50
Jo
hn D
ays
Spu
r BLM
30-
3-28
P
rivat
e 0-
175
Coi
ncid
es/A
djac
ent
91.9
6 92
.15
0.19
N
ew L
oggi
ng S
pur
Priv
ate
0-14
5 C
oinc
ides
93
.04
93.5
0 0.
46
Unk
now
n R
d B
LM
0-30
C
oinc
ides
/Adj
acen
t 93
.75
94.0
7 0.
32
Mai
ze T
s R
d, B
LM 3
0-3-
23.
5,
Unk
now
n R
d P
rivat
e U
SA
(O&
C)
0-65
C
oinc
ides
95.9
3 96
.22
0.29
U
nkno
wn
Rd
Priv
ate
0-50
C
oinc
ides
96
.28
96.3
8 0.
70 b
/ A
cade
my
Rd,
BLM
31-
3-3
Priv
ate
0-65
C
oinc
ides
96
.67
96.9
3 0.
26
Priv
ate
Rd
Priv
ate
0-10
0 C
oinc
ides
97
.07
97.6
7 0.
60
BLM
31-
3-3,
Aca
dem
y R
d,
Unk
now
n R
d B
LM
0-14
0 C
oinc
ides
98.2
9 98
.48
0.19
E
ast F
ork
Sto
uts
Cre
ek S
pur,
BLM
31-
3-1.
1 B
LM
0-90
C
oinc
ides
98.4
8 98
.60
0.12
E
ast F
ork
Sto
uts
Cre
ek S
pur,
BLM
31-
3-1.
1 P
rivat
e 0-
130
Adj
acen
t
98.7
0 98
.87
0.17
U
nkno
wn
Rd
Priv
ate
0 C
oinc
ides
98
.93
99.3
0 0.
37
Unk
now
n R
d B
LM 3
1-3-
12.A
N
on-In
v P
rivat
e 0-
100
Coi
ncid
es/A
djac
ent
100.
02
100.
38
0.36
FS
3220
705
BLM
0-
75
Coi
ncid
es
100.
38
100.
68
0.30
FS
3220
705
Um
pqua
Nat
iona
l For
est
0-75
C
oinc
ides
10
0.68
10
0.80
0.
12
BLM
31-
3-24
Non
-Inv.
P
rivat
e 0-
50
Coi
ncid
es
100.
86
101.
17
0.33
b/
Unk
now
n R
d P
rivat
e 0-
75
Coi
ncid
es
101.
75
101.
90
0.15
FS
322
0790
U
mpq
ua N
atio
nal F
ores
t 0-
50
Coi
ncid
es/A
djac
ent
102.
64
102.
86
0.22
S
wee
thea
rt T.
S.,
FS 3
2207
92
Um
pqua
Nat
iona
l For
est
0-10
0 C
oinc
ides
10
2.86
10
3.66
0.
80
C&
D L
umbe
r P
rivat
e 0-
120
Coi
ncid
es/A
djac
ent
104.
84
104.
88
0.04
G
rani
te T
.S.,
FS 3
2301
20
Um
pqua
Nat
iona
l For
est
0-65
C
oinc
ides
10
5.39
10
5.51
0.
12
Wild
cat R
idge
Rd,
FS
32
Um
pqua
Nat
iona
l For
est
0-14
0 C
oinc
ides
10
5.89
10
6.03
0.
34 b
/ N
eu T
hin
T.S
., FS
320
0255
U
mpq
ua N
atio
nal F
ores
t 0-
170
Coi
ncid
es/A
djac
ent
106.
13
106.
40
0.27
E
ast F
ork
T.S
., FS
320
0260
U
mpq
ua N
atio
nal F
ores
t 0-
70
Coi
ncid
es
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-6
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
106.
45
107.
12
0.68
b/
Wild
cat R
idge
Rd,
Cow
Cre
ek ,
FS 3
2003
01
Um
pqua
Nat
iona
l For
est
0-20
0 C
oinc
ides
/Adj
acen
t
107.
26
107.
63
0.37
W
ildca
t Rid
ge R
d, C
ow C
reek
, FS
320
0301
U
mpq
ua N
atio
nal F
ores
t 0-
75
Coi
ncid
es/A
djac
ent
108.
07
108.
41
0.34
W
ildca
t Rid
ge R
d, C
ow C
reek
, FS
32,
320
0330
U
mpq
ua N
atio
nal F
ores
t 0-
65
Coi
ncid
es/A
djac
ent
108.
41
108.
54
0.14
b/
FS 3
2003
59
Um
pqua
Nat
iona
l For
est
0-80
C
oinc
ides
/Adj
acen
t 10
8.90
10
8.97
0.
07
Cow
Cre
ek/W
ildca
t Rid
ge R
d (F
S
3200
000)
U
mpq
ua N
atio
nal F
ores
t 10
-150
A
djac
ent
109.
30
109.
37
0.07
FS
320
0500
U
mpq
ua N
atio
nal F
ores
t 0
Coi
ncid
es
109.
59
109.
68
0.09
FS
320
0500
U
mpq
ua N
atio
nal F
ores
t 0-
140
Coi
ncid
es/A
djac
ent
110.
42
110.
55
0.13
FS
323
2891
, Sou
th F
ork
Cow
C
reek
, US
FS 3
232
Um
pqua
Nat
iona
l For
est
0-75
C
oinc
ides
/Adj
acen
t
Jack
son
Cou
nty
111.
53
112.
07
0.54
W
ildca
t Rid
ge R
d, F
S 3
2, O
l B
lue,
FS
320
0750
U
mpq
ua N
atio
nal F
ores
t 0-
162
Adj
acen
t
112.
55
112.
63
0.08
W
ildca
t Rid
ge R
d, F
S 3
2 U
mpq
ua N
atio
nal F
ores
t 0-
65
Coi
ncid
es
113.
37
113.
65
0.28
U
nkno
wn
Rd
Priv
ate
0-15
0 C
oinc
ides
11
9.96
12
0.08
0.
12
Can
yon
Cre
ek R
idge
Rd
Priv
ate
0 C
oinc
ides
12
2.76
12
2.99
0.
23
Old
Fer
ry R
d P
rivat
e 0-
100
Coi
ncid
es/A
djac
ent
124.
97
125.
12
0.15
In
dian
Cre
ek F
irebr
eak,
BLM
34-
1-23
B
LM -
US
A (O
&C
) 0-
65
Adj
acen
t
125.
39
125.
66
0.27
In
dian
Cre
ek F
irebr
eak,
BLM
34-
1-23
B
LM
0-11
5 C
oinc
ides
126.
27
126.
36
0.09
In
dian
Cre
ek F
irebr
eak,
BLM
34-
1-23
P
rivat
e 0-
100
Adj
acen
t
126.
36
126.
60
0.24
In
dian
Cre
ek F
irebr
eak,
BLM
34-
1-23
B
LM -
US
A (O
&C
) 0-
175
Adj
acen
t
127.
28
127.
38
0.10
In
dian
Cre
ek F
irebr
eak,
BLM
34-
1-23
P
rivat
e 0-
190
Adj
acen
t
128.
06
128.
18
0.12
B
LM 3
4-1W
-23.
5 B
LM
0-80
C
oinc
ides
/Adj
acen
t 13
3.97
13
4.15
0.
18
Unk
now
n R
d P
rivat
e 0-
100
Coi
ncid
es/A
djac
ent
139.
41
139.
48
0.07
U
nkno
wn
Rd
Priv
ate
0-10
0 C
oinc
ides
14
1.50
14
1.80
0.
30
BLM
Roa
d B
LM -
US
A
0-70
C
oinc
ides
14
2.02
14
2.14
0.
12
Sal
t Cre
ek A
cces
s R
d, B
LM 3
6-2E
-7
Priv
ate
115-
150
Coi
ncid
es/A
djac
ent
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-7
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
142.
78
142.
86
0.08
U
nkno
wn
Acc
ess
Rd
Priv
ate
0-95
C
oinc
ides
14
3.31
14
3.51
0.
20
Unk
now
n R
d P
rivat
e 0-
105
Coi
ncid
es/A
djac
ent
144.
69
144.
77
0.08
S
alt C
reek
Acc
ess
Rd,
BLM
36-
2E-1
9 P
rivat
e 0-
40
Coi
ncid
es
145.
50
145.
17
0.06
b/
Gar
dene
r Rd,
(Sal
t Cre
ek R
d)
Priv
ate
0-50
C
oinc
ides
15
0.42
15
0.65
0.
23
Hep
psie
Mtn
. D S
pur,
BLM
37-
2E-1
.1
BLM
0-
335
Coi
ncid
es/A
djac
ent
150.
95
151.
57
0.62
B
LM 3
7-3E
-6.1
0 B
LM
0-60
C
oinc
ides
/Adj
acen
t 15
1.77
15
2.13
0.
36
BLM
37-
3E-6
.10,
Unk
now
n R
d P
rivat
e 0-
90
Adj
acen
t 15
2.24
15
2.31
0.
07
Unk
now
n R
d B
LM
0-22
5 A
djac
ent
155.
31
155.
45
0.14
P
rivat
e R
d P
rivat
e 0-
65
Coi
ncid
es
155.
45
155.
50
0.05
FS
281
5-41
0 R
ogue
Riv
er-S
iski
you
Nat
iona
l For
est
0-95
A
djac
ent
155.
66
155.
98
0.32
FS
281
5-41
0 R
ogue
Riv
er-S
iski
you
Nat
iona
l For
est
0-10
0 C
oinc
ides
157.
44
157.
56
0.12
FS
281
5-30
0 R
ogue
Riv
er N
atio
nal
Fore
st
0-95
C
oinc
ides
158.
78
159.
44
0.66
FS
370
7500
R
ogue
Riv
er-S
iski
you
Nat
iona
l For
est
0-17
0 C
oinc
ides
/Adj
acen
t
159.
98
160.
91
0.93
S
outh
For
k Li
ttle
But
te C
reek
Rd,
FS
373
0, 3
7001
33, 3
7001
30
Rog
ue R
iver
-Sis
kiyo
u N
atio
nal F
ores
t 0-
95
Coi
ncid
es
162.
80
162.
93
0.13
FS
370
0113
R
ogue
Riv
er-S
iski
you
Nat
iona
l For
est
0-65
C
oinc
ides
163.
14
163.
22
0.08
FS
370
0115
R
ogue
Riv
er-S
iski
you
Nat
iona
l For
est
0-65
C
oinc
ides
163.
79
164.
04
0.35
b/
FS 3
7201
80
Rog
ue R
iver
-Sis
kiyo
u N
atio
nal F
ores
t 0
Coi
ncid
es
164.
21
165.
93
1.72
FS
372
0000
R
ogue
Riv
er-S
iski
you
Nat
iona
l For
est
0-80
A
djac
ent
Kla
mat
h C
ount
y 16
7.51
16
7.69
0.
18
Unk
now
n R
d R
ogue
Riv
er-S
iski
you
Nat
iona
l For
est
0 C
oinc
ides
168.
26
168.
68
0.42
W
est M
uddy
Spr
ings
, FS
37
0075
0 Fr
emon
t-Win
ema
Nat
iona
l For
est
0-95
A
djac
ent/C
oinc
ides
169.
52
184.
20
14.6
8 C
love
r Cre
ek R
d (C
o R
d 60
3)
Cou
nty
RO
W
50-3
50
Adj
acen
t
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-8
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
175.
38
176.
02
0.64
38
5201
5 P
rivat
e 0-
155
Coi
ncid
es/A
djac
ent
177.
89
178.
29
0.40
P
rivat
e R
d P
rivat
e 0
Coi
ncid
es
181.
29
181.
37
0.08
P
rivat
e R
d P
rivat
e 0
Coi
ncid
es
182.
97
183.
65
0.68
P
rivat
e R
d P
rivat
e 0-
70
Adj
acen
t 18
4.06
18
4.15
0.
09
Unk
now
n R
d P
rivat
e 0
Coi
ncid
es
184.
85
187.
28
2.43
C
love
r Cre
ek R
d (C
o R
d 60
3)
Cou
nty
RO
W
50-1
50
Adj
acen
t 18
7.76
18
8.83
1.
07
Pow
erlin
e/P
rivat
e R
oad
PP
&L/
Priv
ate
0-50
A
djac
ent
189.
32
189.
83
0.51
P
rivat
e R
oad
Priv
ate
0-50
C
oinc
ides
/Adj
acen
t 19
0.69
19
1.46
0.
77
Hom
este
ad L
n P
rivat
e 0-
100
Coi
ncid
es/A
djac
ent
192.
67
195.
45
2.78
W
eyer
haeu
ser T
imbe
r Com
pany
R
d, E
xist
ing
Pip
elin
e P
rivat
e 10
0 A
djac
ent
196.
58
197.
53
0.95
W
eyer
haeu
ser C
orp
Rd
Priv
ate
0 C
oinc
ides
19
7.62
19
9.18
1.
56
Wey
erha
euse
r Cor
p R
d P
rivat
e 0-
270
Adj
acen
t/ C
oinc
ides
19
9.96
20
0.22
0.
26
Pow
erlin
e P
P&
L/P
rivat
e 30
A
djac
ent
200.
65
202.
16
1.51
P
ower
line
PP
&L/
Priv
ate
30
Adj
acen
t 20
2.16
20
2.34
0.
18
Pow
erlin
e P
P&
L/P
rivat
e 0-
55
Coi
ncid
es/A
djac
ent
202.
34
203.
59
1.25
P
ower
line/
Priv
ate
Rd
PP
&L/
Priv
ate
55
Adj
acen
t 20
3.90
20
4.19
0.
29
Pow
erlin
e P
P&
L/P
rivat
e 45
-65
Coi
ncid
es/A
djac
ent
205.
17
205.
89
0.72
P
ower
line
PP
&L/
Priv
ate
0 A
djac
ent
206.
03
207.
50
1.47
P
ower
line
PP
&L/
Priv
ate
30
Adj
acen
t 20
9.38
21
0.08
0.
70
Sta
te H
wy
39 (K
lam
ath
Falls
- M
alin
Hig
hway
), R
ailro
ad
Sta
te
130-
200
Adj
acen
t
210.
57
211.
54
0.97
S
tate
Hw
y 39
(Kla
mat
h Fa
lls -
Mal
in H
ighw
ay),
Rai
lroad
S
tate
13
0-20
0 A
djac
ent
212.
70
213.
66
0.96
B
OR
No.
7 D
rain
B
OR
0
Adj
acen
t 21
1.54
21
1.87
0.
33
IOO
F C
emet
ery
Rd
Priv
ate
80-1
10
Adj
acen
t 21
5.34
21
7.00
1.
66
Pow
erlin
e P
rivat
e/P
P&
L/ B
LM
10
20 fe
et 1
21
7.49
21
7.54
0.
05
Unk
now
n R
d P
rivat
e 0-
125
Coi
ncid
es/A
djac
ent
217.
54
217.
84
0.30
D
odds
Hal
low
Rd
Cou
nty
0-10
0 A
djac
ent
217.
84
220.
07
2.25
b/
Pow
erlin
e P
P&
L/P
rivat
e 0-
100
Adj
acen
t 22
0.67
22
0.75
0.
08
Unk
now
n R
d P
rivat
e 0-
100
Adj
acen
t 22
2.74
22
2.79
0.
05
Pow
erlin
e/P
rivat
e R
ds
PP
&L
100
Adj
acen
t 22
3.10
22
3.25
0.
24 b
/ P
rivat
e R
d P
rivat
e 50
A
djac
ent
223.
70
223.
89
0.19
P
ower
line
PP
&L
75
Adj
acen
t
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
1-9
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TAB
LE D
-1 (c
ontin
ued)
Are
as W
here
the
Pipe
line
is C
o-Lo
cate
d w
ith E
xist
ing
Rig
hts-
of-W
ay a
nd C
orrid
ors
Beg
in M
ilepo
st
End
Mile
post
To
tal L
engt
h (m
iles)
R
ight
-of-W
ay/C
orrid
or T
ype
Ow
ners
hip
Pipe
line
Dis
tanc
e fr
om
Rig
ht-o
f-Way
(fe
et)
Off-
set
224.
86
225.
44
0.42
b/
Unk
now
n R
d P
rivat
e 0-
110
Coi
ncid
es/A
djac
ent
225.
63
226.
34
0.69
b/
Pow
erlin
e P
P&
L 75
A
djac
ent
226.
36
226.
71
0.35
U
nkno
wn
Rd
Priv
ate
40-9
0 A
djac
ent
226.
93
227.
15
0.12
b/
Unk
now
n R
d P
rivat
e 10
0 A
djac
ent
227.
59
227.
64
0.05
U
nkno
wn
Rd
Priv
ate
45
Adj
acen
t 22
8.37
22
8.62
0.
25
Unk
now
n R
d P
rivat
e 25
A
djac
ent
Tota
l 97
.74
a/
S
tand
ard
right
-of-w
ay o
verla
p.
b/
Den
otes
Co-
Loca
tion
that
incl
udes
a m
ilepo
st e
quat
ion.
Col
umn
repr
esen
ts a
ctua
l len
gth.
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
2-1
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TABL
E D
-2
Ac
cess
Roa
ds a
nd R
oad
Cro
ssin
g M
etho
ds
Mile
post
Na
me
Surf
ace
Ingr
ess/
Egre
ss e
/ C
ross
ing
Met
hod
Leng
th
Acre
s Im
prov
ed
Ave.
W
idth
0.
12
Priv
ate
Rd
Gra
vel
All
Not
Cro
ssed
0.
26
0 10
0.
12
Tran
s Pa
cific
Hw
y (C
nty
Rd
218)
Pa
ved
All-P
ublic
Bo
re
1.51
0
16
0.12
So
uthe
rn P
acifi
c Se
rvic
e R
d G
rave
l N
o In
gres
s / E
gres
s Bo
re
0.34
0
10
0.12
Jo
rdan
Cov
e R
d Pa
ved
All
Not
Cro
ssed
0.
91
0 0
0.12
U
nkno
wn
Rd
Pave
d Al
l N
ot C
ross
ed
0.06
0
0 0.
12
Unk
now
n R
d D
irt
All
Not
Cro
ssed
0.
47
0 0
0.12
U
nkno
wn
Rd
Pave
d Al
l N
ot C
ross
ed
0.33
0
0 0.
36
Sout
hern
Pac
ific
Rai
lroad
R
ails
R
R
Bore
2.
99
0 0
1.23
U
S H
wy
101
Pave
d Al
l-Pub
lic
Und
er B
ay B
ridge
3.
50
0 0
1.34
C
hape
lle P
kwy
Pave
d Al
l O
pen
Cut
0.
23
0 0
1.34
Fe
rry R
d Pa
ved
All
Not
Cro
ssed
0.
08
0 0
1.34
Pl
um L
oop
Pave
d Al
l N
ot C
ross
ed
0.36
0
0 3.
02
Kent
uck
Slou
gh R
d (K
entu
ck W
ay L
n)
Pave
d Al
l-Pub
lic
Bore
0.
73
0 10
3.
02
E Ba
y D
rive
(Cnt
y R
d 45
) Pa
ved
All
HD
D
0.21
0
0 6.
34R
C
ount
ry C
lub
Rd
Pave
d Li
ght
Not
Cro
ssed
0.
12
0 0
6.44
R
Cou
ntry
Clu
b R
d Pa
ved
All
Not
Cro
ssed
0.
54
0 12
6.
44R
C
ount
ry C
lub
Rd
Pave
d d/
Al
l N
ot C
ross
ed
0.14
0.
32
12
6.64
R -7
.34R
Lo
ggin
g Sp
ur
Gra
vel
All
In R
OW
0.
88
0 10
6.
68R
Lo
ggin
g Sp
ur
Gra
vel
All
In R
OW
0.
05
0 0
7.34
R
Logg
ing
Rd
Gra
vel
All
Not
Cro
ssed
1.
64
0 10
7.
34R
-7.4
4R
Car
lson
Hei
ghts
Rd
Pave
d/G
rave
l Li
ght
In R
OW
1.
24
0 10
7.
77R
Lo
ggin
g Sp
ur
Dirt
Al
l N
ot C
ross
ed
0.64
0
10
7.77
R
Logg
ing
Spur
D
irt
No
Ingr
ess
/ Egr
ess
Ope
n C
ut
0.64
0
10
7.88
R -8
.12R
Lo
ggin
g Sp
ur
Dirt
Al
l O
pen
Cut
0.
35
0 10
8.
17R
Lo
ggin
g Sp
ur
Dirt
Al
l O
pen
Cut
0.
18
0 10
8.
44R
W
illanc
h Sl
ough
Pa
ved
All-P
ublic
O
pen
Cut
0.
38
0 10
8.
91R
Lo
ggin
g Sp
ur
Dirt
Al
l O
pen
Cut
0.
26
0 10
8.
93R
Lo
ggin
g Sp
ur
Dirt
Al
l O
pen
Cut
0.
61
0 10
9.
11R
Lo
ggin
g Sp
ur
Dirt
Al
l In
RO
W
0.18
0
10
9.27
R -9
.51R
U
nkno
wn
Rd
Gra
vel/D
irt a
/,b/,c
/ Al
l In
RO
W
0.25
0
0 9.
40R
N
oah
Butte
Rd
Gra
vel
All
Not
Cro
ssed
0.
53
0 10
9.
40R
U
nkno
wn
Rd
Gra
vel
All
Not
Cro
ssed
1.
57
0 10
9.
51R
-9.8
2R
Unk
now
n R
d D
irt/G
rave
l a/,b
/,c/
All
Ope
n C
ut
0.35
0
0 9.
82R
-10.
02R
U
nkno
wn
Rd
Dirt
a/,b
/,c/
All
In R
OW
0.
21
0 0
10.2
0R
Unk
now
n R
d D
irt a
/,b/,c
/ Al
l O
pen
Cut
0.
68
0 0
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
2-2
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TABL
E D
-2 (c
ontin
ued)
Acce
ss R
oads
and
Roa
d C
ross
ing
Met
hods
Mile
post
Na
me
Surf
ace
Ingr
ess/
Egre
ss e
/ C
ross
ing
Met
hod
Leng
th
Acre
s Im
prov
ed
Ave.
W
idth
10
.54R
-10.
61R
U
nkno
wn
Rd
Gra
vel/D
irt a
/,b/,c
/ N
o In
gres
s / E
gres
s In
RO
W
0.09
0
0 10
.96R
Pr
ivat
e R
d G
rave
l Al
l N
ot C
ross
ed
0.13
0
0 11
.07R
St
ate
241
(Coo
s R
iver
Hw
y)
Pave
d Al
l-Pub
lic
HD
D
0.08
0
0 11
.18R
C
nty
Rd
6 (S
outh
Coo
s R
iver
Rd)
Pa
ved
All-P
ublic
H
DD
0.
66
0 0
11.5
4BR
Pr
ivat
e R
d D
irt/G
rave
l a/,b
/,c/
All
Ope
n C
ut
0.37
0
0 11
.54B
R
Priv
ate
Rd
Dirt
/Gra
vel a
/,b/,c
/ Al
l O
pen
Cut
0.
48
0 0
12.4
1BR
Pr
ivat
e Lo
ggin
g/Fi
eld
Rd.
D
irt/G
rave
l a/,b
/,c/
All
Ope
n C
ut
0.45
0
0 13
.15B
R13
.66B
R
BLM
26-
12-4
.1
Aggr
egat
e Al
l In
RO
W
0.31
0
0 13
.15B
R-1
3.66
BR
BLM
26-
12-4
.1
Aggr
egat
e a/
,b/,c
/ Al
l O
pen
Cut
0.
66
0 0
13.6
6BR
-13.
83BR
Li
llian
Crk
(BLM
26-
12-4
.3)
Aggr
egat
e Al
l In
RO
W
0.18
0
0 13
.83B
R
Lillia
n C
rk (B
LM 2
6-12
-4.3
) Ag
greg
ate
a/,b
/,c/
No
Ingr
ess
/ Egr
ess
Not
Cro
ssed
0.
05
0 0
13.8
3BR
-14.
42BR
BL
M 2
6-12
-4.4
Ag
greg
ate
All
In R
OW
0.
50
0 0
13.8
3BR
-14.
42BR
BL
M 2
6-12
-4.4
Ag
greg
ate
All
IN R
OW
0.
13
0 0
15.0
6BR
Pr
ivat
e Fi
eld
Rd
Unk
now
n Al
l O
pen
Cut
0.
07
0 0
15.1
0BR
C
nty
Rd
54 (S
tock
Slo
ugh
Rd)
Bi
tum
inou
s Al
l-WTC
-Pub
lic
Ope
n C
ut
1.81
0
0 15
.10B
R
Stoc
k Sl
ough
(BLM
26-
12-4
.0)
Aggr
egat
e a/
,b/
All
Not
Cro
ssed
0.
04
0 0
15.6
8BR
U
nkno
wn
Priv
ate
Rd
Aggr
egat
e Al
l N
ot C
ross
ed
0.29
0
0 15
.68B
R
Unk
now
n Pr
ivat
e R
d G
rave
l/dirt
a/,b
/,c/
All
Ope
n C
ut
0.65
0
0 16
.09B
R16
.97B
R
BLM
26-
12-1
5.2
Aggr
egat
e a/
,b/,c
/ Al
l In
RO
W
1.32
0
0 16
.97B
R-1
8.14
BR
Blue
Rid
ge R
d (B
LM 2
6-12
-4.2
) Bi
tum
inou
s Al
l In
RO
W
3.16
0
0 18
.05B
R
Dan
iels
Tie
(BLM
26-
12-1
4.0)
Ag
greg
ate
All
Not
Cro
ssed
0.
95
0 0
18.0
5BR
D
anie
ls T
ie (B
LM 2
6-12
-14.
0)
Aggr
egat
e a/
,b/
All
Not
Cro
ssed
0.
23
0 0
18.3
9BR
BL
M 2
6-12
-22.
1 Ag
greg
ate
a/,b
/,c/
All
Ope
n C
ut
0.10
0
0 19
.20B
R-1
9.61
BR
Blue
Rid
ge R
d (B
LM 2
6-12
-4.2
) Bi
tum
inou
s Al
l In
RO
W
2.34
0
0 19
.88B
R-2
0.05
BR
BLM
Unk
now
n Lo
ggin
g Sp
ur
Aggr
egat
e a/
,b/
All
In R
OW
0.
16
0 0
20.0
5BR
Bl
ue R
idge
Rd
(BLM
26-
12-4
.2) (
Blue
R
idge
Com
m S
ite)
Gra
vel
All
Not
Cro
ssed
- C
omm
* 2.
45
0 16
20.0
5BR
Bl
ue R
idge
Sys
tem
Rd
(BLM
26-
12-3
5)
(Blu
e R
idge
Com
m S
ite)
Gra
vel
All
Not
Cro
ssed
- C
omm
* 0.
12
0 16
20.0
5BR
Bl
ue R
idge
Sys
tem
(BLM
26-
12-3
5.0)
Ag
greg
ate
a/,b
/ Al
l N
ot C
ross
ed
0.48
0
0 20
.42B
R
BLM
Log
ging
Spu
r Ag
greg
ate
a/,b
/ Al
l O
pen
Cut
0.
12
0 0
20.4
2BR
BL
M L
oggi
ng S
pur
Aggr
egat
e a/
,b/
All
Ope
n C
ut
0.02
0
0 20
.42B
R
BLM
Log
ging
Spu
r Ag
greg
ate
a/,b
/ Al
l O
pen
Cut
0.
04
0 0
20.6
4BR
T5
04 B
lue
Rid
ge T
rail
Aggr
egat
e a/
,b/
All
Ope
n C
ut
0.44
0
0 20
.95B
R
Blue
Rid
ge S
yste
m (B
LM 2
6-12
-35.
4)
Aggr
egat
e a/
,b/
All
Ope
n C
ut
0.41
0
0 21
.15B
R
Blue
Rid
ge S
yste
m R
d (B
LM 2
6-12
-35.
5)
(Blu
e R
idge
Com
m S
ite)
Gra
vel
All
Not
Cro
ssed
- C
omm
* 0.
21
0 16
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
2-3
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TABL
E D
-2 (c
ontin
ued)
Acce
ss R
oads
and
Roa
d C
ross
ing
Met
hods
Mile
post
Na
me
Surf
ace
Ingr
ess/
Egre
ss e
/ C
ross
ing
Met
hod
Leng
th
Acre
s Im
prov
ed
Ave.
W
idth
21
.50B
R-2
2.16
BR
Blue
Rid
ge S
yste
m (B
LM 2
6-12
-35.
1)
Aggr
egat
e Al
l In
RO
W
0.39
0
0 21
.50B
R-2
2.16
BR
Blue
Rid
ge S
yste
m (B
LM 2
6-12
-35.
1)
Aggr
egat
e Al
l In
RO
W
0.83
0
0 22
.12B
R
Unk
now
n R
d U
nkno
wn
No
Ingr
ess
/ Egr
ess
Ope
n C
ut
0.01
0
0 22
.19B
R
Pac.
Wes
t Log
ging
Spu
r D
irt/G
rave
l a/,b
/,c/
All
Ope
n C
ut
0.29
0
0 22
.46B
R
Unk
now
n R
d U
nkno
wn
No
Ingr
ess
/ Egr
ess
Ope
n C
ut
0.03
0
0 23
.29B
R-2
3.32
BR
Unk
now
n R
d U
nkno
wn
All
Ope
n C
ut
0.53
0
0 23
.32B
R
Stei
nnon
Crk
Rd
(BLM
27-
12-1
5.0)
Ag
greg
ate
All
Not
Cro
ssed
0.
40
0 0
23.4
2BR
-23.
53BR
W
oodw
ard
Crk
Spu
r (BL
M 2
7-12
-14.
2)
Aggr
egat
e a/
,b/
All
In R
OW
0.
63
0 0
24.0
0BR
-24.
14BR
W
oodw
ard
Crk
Rd
(BLM
27-
12-1
4.0)
Ag
greg
ate
All
In R
OW
0.
03
0 0
24.0
0BR
-24.
14BR
W
oodw
ard
Crk
Rd
(BLM
27-
12-1
4.0)
Ag
greg
ate
a/,b
/ Al
l In
RO
W
0.34
0
0 24
.00B
R-2
4.14
BR
Woo
dwar
d C
rk R
d (B
LM 2
7-12
-14.
0)
Aggr
egat
e N
o In
gres
s / E
gres
s In
RO
W
0.01
0
0 24
.37B
R
Cnt
y R
d 59
(Fai
rvie
w-S
umne
r Ln
/ Coo
s Ba
y W
agon
Rd)
Ag
greg
ate
All-W
TC-P
ublic
O
pen
Cut
0.
33
0 0
24.3
7BR
C
nty
Rd
59 (F
airv
iew
-Sum
ner L
n / C
oos
Bay
Wag
on R
d)
Bitu
min
ous
All-W
TC-P
ublic
O
pen
Cut
4.
34
0 0
24.3
7BR
Pr
ivat
e Lo
ggin
g R
d G
rave
l a/,b
/ Al
l N
ot C
ross
ed
0.16
0
0 24
.50B
R
BLM
27-
12-1
4.1
Nat
ural
a/,b
/,c/
All
Ope
n C
ut
0.41
0
0 24
.72B
R
Priv
ate
Logg
ing
Spur
D
irt/G
rave
l a/,b
/,c/
All
Ope
n C
ut
0.12
0
0 24
.72B
R
Priv
ate
Logg
ing
Spur
U
nkno
wn
All
Ope
n C
ut
0.04
0
0 25
.12B
R
Pow
erlin
e Ac
cess
Rd
(BLM
27-
12-2
3.0)
G
rave
l b/
All
Not
Cro
ssed
0.
50
0 16
25
.12B
R
Pow
erlin
e Ac
cess
Rd
(BLM
27-
12-2
3)
Gra
vel b
/ Al
l O
pen
Cut
0.
60
0 16
14
.23
Coo
s C
ity -
Sum
ner R
d Pa
ved
All-W
TC-P
ublic
N
ot C
ross
ed
0.61
0
16
14.2
3 Pr
ivat
e R
d
All
Not
Cro
ssed
0.
50
0 10
20
Bl
ue R
idge
Sys
tem
Rd
(BLM
26-
12-3
5.1)
(B
lue
Rid
ge C
omm
Site
) G
rave
l Al
l N
ot C
ross
ed -
Com
m *
0.96
0
16
21.9
8 Po
wer
line
Acce
ss (B
LM 2
7-12
-14.
1)
Dirt
b/,c
/ Al
l O
pen
Cut
0.
33
0 14
21
.98
Pow
erlin
e Ac
cess
(BLM
27-
12-1
4.1)
N
atur
al a
/,b/,c
/ Al
l O
pen
Cut
0.
49
0 0
22.1
5 Po
wer
line
Acce
ss
Gra
vel/D
irt b
/,c/
All
Ope
n C
ut
1.13
0
16
22.1
5 Po
wer
line
Acce
ss
Gra
vel b
/,c/
All
Ope
n C
ut
0.14
0
16
22.3
9 Po
wer
line
Acce
ss R
d G
rave
l N
o In
gres
s / E
gres
s O
pen
Cut
0.
02
0 16
22
.57
Priv
ate
Rd
Gra
vel
No
Ingr
ess
/ Egr
ess
Ope
n C
ut
0.04
0
0 22
.58
Cnt
y R
d 9C
(Fai
rvie
w-L
aver
ne P
ark
Rd)
Pa
ved
All-W
TC-P
ublic
O
pen
Cut
0.
17
0 16
23
.09
Fish
er R
d (P
rivat
e) (B
LM 7
-12-
25.0
3)
Gra
vel b
/,c/
All
Not
Cro
ssed
0.
19
0 16
23
.09
Fish
er R
d (P
rivat
e) (I
nclu
des
BLM
7-1
2-25
) G
rave
l b/,c
/ Al
l O
pen
Cut
0.
16
0 16
23.2
2 U
nkno
wn
Rd
Dirt
N
o In
gres
s / E
gres
s O
pen
Cut
0.
02
0 16
23
.9
Unk
now
n R
d D
irt
No
Ingr
ess
/ Egr
ess
Ope
n C
ut
0.05
0
0
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
2-4
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TABL
E D
-2 (c
ontin
ued)
Acce
ss R
oads
and
Roa
d C
ross
ing
Met
hods
Mile
post
Na
me
Surf
ace
Ingr
ess/
Egre
ss e
/ C
ross
ing
Met
hod
Leng
th
Acre
s Im
prov
ed
Ave.
W
idth
23
.99
Pow
erlin
e Ac
cess
Rd
Gra
vel
No
Ingr
ess
/ Egr
ess
Ope
n C
ut
0.03
0
16
24.1
C
nty
Rd
60 (C
oos
Bay
Wag
on R
d)
Pave
d Al
l-WTC
-Pub
lic
Ope
n C
ut
1.06
0
16
24.1
C
nty
Rd
60 (C
oos
Bay
Wag
on R
d)
Bitu
min
ous
All-W
TC-P
ublic
N
ot C
ross
ed
0.53
0
0 24
.36
Hud
son
Rdg
Tie
(BLM
27-
11-1
7.1)
G
rave
l Al
l N
ot C
ross
ed
0.36
0
16
24.3
6 H
udso
n R
idge
Tie
(BLM
27-
11-1
7.1)
G
rave
l Al
l O
pen
Cut
0.
26
0 16
24
.55
Cnt
y R
d 63
(Coo
s Ba
y W
agon
Rd)
Pa
ved
All-P
ublic
O
pen
Cut
1.
12
0 16
24
.55
- 24.
81
Priv
ate
Logg
ing
Rd
(BLM
27-
11-3
0.1)
G
rave
l Al
l O
pen
Cut
0.
74
0 14
24
.99
- 25.
14
Logg
ing
Spur
(BLM
27-
11-3
0.03
) G
rave
l Al
l In
RO
W
0.35
0
16
25.1
5 Po
wer
line
Acce
ss R
ds (B
LM 2
7-11
-30.
3)
Dirt
Al
l N
ot C
ross
ed
0.52
0
10
25.2
9 Lo
ggin
g Sp
D
irt
Ligh
t H
DD
0.
04
0 0
25.3
1 Lo
ggin
g Sp
D
irt
Ligh
t H
DD
0.
08
0 0
25.6
0 - 2
6.07
Lo
ggin
g R
d M
enas
ha (B
LM 2
7-11
-30.
1)
Gra
vel a
/,b/,c
/ Al
l O
pen
Cut
1.
23
0 14
26
.08
- 26.
65
Men
asha
Priv
ate
Logg
ing
Spur
(BLM
N
onIn
v 27
-11-
32.A
) D
irt/G
rave
l Al
l In
RO
W
0.66
0
10
26.0
8 - 2
6.65
M
enas
ha P
rivat
e Lo
ggin
g Sp
ur (B
LM
Non
Inv
27-1
1-32
.C)
Dirt
/Gra
vel
No
Ingr
ess
/ Egr
ess
Ope
n C
ut
0.01
0
10
26.6
5 Po
wer
line
Acce
ss R
d (B
LM 2
8-11
-5.4
) D
irt b
/,c/
Ligh
t O
pen
Cut
0.
29
0 16
26
.65
Pow
erlin
e Ac
cess
Rd
(BLM
Non
Inv
27-1
1-
32.A
) D
irt b
/,c/
Ligh
t O
pen
Cut
0.
20
0 16
26.6
5 - 2
6.75
Lo
ggin
g Sp
ur
Dirt
N
o In
gres
s / E
gres
s In
RO
W
0.11
0
10
26.7
3 Lo
ggin
g Sp
ur
Dirt
N
o In
gres
s / E
gres
s O
pen
Cut
0.
03
0 10
26
.95
Cnt
y R
d 13
(Lee
McK
inle
y R
d) (M
iddl
e C
reek
Rd)
G
rave
l b/
All-P
ublic
O
pen
Cut
1.
94
0 16
26.9
5 - 2
6.99
BL
M 2
8-11
-5.2
Ag
greg
ate
No
Ingr
ess
/ Egr
ess
In R
OW
0.
07
0 0
27.0
7 BL
M 2
8-11
-4.1
Pa
stur
e/D
irt b
/,c/
All
Not
Cro
ssed
0.
32
0 10
27
.53
BLM
28-
11-4
.1
Dirt
a/,b
/,c/
All
Not
Cro
ssed
1.
02
0 16
27
.53
Logg
ing
Rd
(BLM
Non
Inv
28-1
1-4.
A)
Dirt
a/,b
/,c/
All
Ope
n C
ut
0.27
0
16
27.6
7 - 2
8.12
Lo
ggin
g R
d (B
LM N
onIn
v 28
-11-
4.A)
D
irt a
/,b/,c
/ Al
l In
RO
W
0.56
0
16
27.6
8 Lo
ggin
g R
d (B
LM N
onIn
v 28
-11-
4.B)
D
irt a
/,b/,c
/ Al
l O
pen
Cut
0.
03
0 16
27
.86
- 27.
94
Logg
ing
Rd
Dirt
Al
l In
RO
W
0.09
0
0 28
.06
Yank
ee R
un M
ainl
ine
(BLM
28-
11-2
0)
Aggr
egat
e Al
l N
ot C
ross
ed
0.53
0
20
28.0
6 BL
M 2
8-11
-9.6
Ag
greg
ate
All
Ope
n C
ut
0.15
0
0 28
.06
Yank
ee R
un M
ainl
ine
(BLM
28-
11-2
0)
Aggr
egat
e Al
l N
ot C
ross
ed
2.99
0
0 28
.35
Logg
ing
Spur
(BLM
Non
Inv
28-1
1-4.
C)
Aggr
egat
e Al
l O
pen
Cut
0.
15
0 16
28
.5
Dor
a R
idge
Rd
(BLM
28-
11.3
.1)
Gra
vel b
/,c/
All
Ope
n C
ut
1.66
0
20
28.5
D
ora
Rid
ge R
d (B
LM 2
8-11
.3.1
) G
rave
l b/,c
/ Al
l N
ot C
ross
ed
0.03
0
20
29.0
2 BL
M 2
8-11
-9.5
G
rave
l b/,c
/ Al
l O
pen
Cut
0.
29
0 16
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
2-5
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TABL
E D
-2 (c
ontin
ued)
Acce
ss R
oads
and
Roa
d C
ross
ing
Met
hods
Mile
post
Na
me
Surf
ace
Ingr
ess/
Egre
ss e
/ C
ross
ing
Met
hod
Leng
th
Acre
s Im
prov
ed
Ave.
W
idth
29
.02
BLM
28-
11-9
G
rave
l b/,c
/ Al
l N
ot C
ross
ed
0.41
0
16
29.2
5 Lo
ne R
ock
Logg
ing
Rd
Gra
vel b
/,c/
All
Not
Cro
ssed
0.
15
0 16
29
.25
Lone
Roc
k Lo
ggin
g R
d D
irt
All
Ope
n C
ut
0.27
0
0 29
.32
Logg
ing
Sp
Dirt
Al
l O
pen
Cut
0.
42
0 0
29.5
9 C
nty
Rd
1C (M
yrtle
Poi
nt -
Sitk
um R
d)
Pave
d Al
l-WTC
-Pub
lic
Ope
n C
ut
0.38
0
16
29.5
9 La
ird -
Priv
ate
Rd
Gra
vel
All
Not
Cro
ssed
0.
21
0 10
30
.38
- 31.
19
Logg
ing
Spur
(BLM
Non
Inv
28-1
1-14
.C)
Gra
vel/D
irt a
/,b/,c
/ Al
l In
RO
W
0.96
0
16
31.3
Lo
ggin
g Sp
ur (B
LM N
onIn
v 28
-11-
14.B
) G
rave
l/Dirt
a/,b
/,c/
All
Not
Cro
ssed
0.
14
0 16
31
.30
- 31.
46
Logg
ing
Spur
(BLM
Non
Inv
28-1
1-14
.A)
Gra
vel
All
Ope
n C
ut
0.26
0
10
31.5
1 D
ora
Spur
Rd
(BLM
28-
11-1
3.2)
G
rave
l/Dirt
a/,b
/,c/
All
Not
Cro
ssed
0.
97
0 14
31
.69
- 31.
81
Back
Dor
a (B
LM 2
8-11
-13.
6)
Gra
vel
All
In R
OW
0.
16
0 12
32
.1
Dor
a Th
inni
ng R
d (B
LM 2
8-11
-13)
G
rave
l Al
l N
ot C
ross
ed
1.49
0
14
32.1
G
oldB
Ric
k R
d G
rave
l/Dirt
b/,c
/ Al
l N
ot C
ross
ed
0.33
0
16
32.3
5 Lo
ggin
g Sp
ur (B
LM N
onIn
v 28
-11-
24.A
) G
rave
l a/,b
/,c/
All
Ope
n C
ut
0.10
0
16
32.5
G
oldB
Ric
k R
d (B
LM N
onIn
v 28
-11-
24.B
) G
rave
l/Dirt
a/,b
/,c/
All
Not
Cro
ssed
0.
06
0 10
32
.54
Logg
ing
Rd
(BLM
Non
Inv
28-1
1-24
.B)
Gra
vel/D
irt a
/,b/,c
/ Al
l O
pen
Cut
0.
24
0 10
32
.55
Gol
dBR
ick
Rd
Dirt
/Gra
vel b
/,c/
All
Not
Cro
ssed
0.
27
0 16
32
.86
Logg
ing
Spur
D
irt
All
Ope
n C
ut
0.12
0
0 32
.94
Logg
ing
Rd
(BLM
Non
Inv
28-1
1-24
.B)
Gra
vel/D
irt a
/,b/,c
/ Al
l O
pen
Cut
0.
33
0 10
33
.25
Unk
now
n R
d (B
LM N
onIn
v 28
-11-
24.B
) D
irt
All
Ope
n C
ut
0.43
0
10
33.3
7 Lo
ggin
g Sp
ur (B
LM N
onIn
v 28
-11-
24.C
) D
irt
All
Ope
n C
ut
0.31
0
10
33.7
4 - 3
3.80
El
k M
ount
ain
Loop
(BLM
28-
11-2
5)
Pave
d Al
l-WTC
In
RO
W
0.51
0
20
34.0
2 El
k C
reek
Rd
(BLM
28-
11-2
9)
Pave
d Al
l-WTC
O
pen
Cut
7.
35
0 20
34
.31
Gol
dBric
k R
d G
rave
l/Dirt
a/,b
/,c/
All
Ope
n C
ut
0.37
0
16
34.3
7 Lo
ggin
g Sp
ur (B
LM N
onIn
v 28
-10-
19.A
) G
rave
l a/,b
/,c/
All
Ope
n C
ut
0.10
0
10
34.4
2 Lo
ggin
g R
d (B
LM N
onIn
v 28
-10-
19.B
) D
irt b
/,c/
All
Not
Cro
ssed
0.
27
0 16
34
.42
Logg
ing
Rd
(BLM
Non
Inv
28-1
0-19
.B)
Dirt
b/,c
/ Al
l O
pen
Cut
0.
06
0 16
34
.44
- 34.
52
Logg
ing
Spur
(BLM
Non
Inv
28-1
0-19
.B)
Dirt
N
o In
gres
s / E
gres
s O
pen
Cut
0.
09
0 16
34
.69
Logg
ing
Rd
Gra
vel b
/,d/
All
Ope
n C
ut
1.49
0.
11
16
34.7
1 - 3
5.04
Lo
ggin
g Sp
ur (B
LM N
onIn
v 28
-10-
30.A
) G
rave
l Al
l In
RO
W
0.43
0
10
35.3
3 - 3
5.80
El
k C
reek
Rd
(BLM
28-
11-2
9)
Pave
d Al
l-WTC
In
RO
W
2.83
0
20
35.3
4 - 3
5.80
C
nty
Rd
84 (B
ig C
reek
Rd)
(BLM
28-
11-
29.0
) Pa
ved
All-W
TC-P
ublic
N
ot C
ross
ed
3.16
0
16
35.3
4 - 3
5.80
Bi
g C
reek
Rd
(BLM
29-
11-2
8)
Pave
d Al
l-WTC
N
ot C
ross
ed
1.52
0
16
35.8
El
k C
reek
Ext
. (BL
M 2
8-10
-31)
Pa
ved
All-W
TC
Not
Cro
ssed
3.
23
0 14
35
.83
- 36.
11
Elk
Cre
ek R
d (B
LM 2
8-11
-29)
Pa
ved
All-W
TC
In R
OW
0.
39
0 20
-
Jord
an C
ove
Ener
gy P
roje
ct
Dra
ft EI
S
D
2-6
Appe
ndix
D –
Pip
elin
e Fa
cilit
y Ta
bles
TABL
E