Transcript
Page 1: AMEER TAIMOOR KHAN cv 2016

ELECTRONICS ENGINEER RESUME

________________________________________________________________________________

| | | | | | |

AMEER TAIMOOR KHAN

TEL. +966598845755

Email. [email protected]

Address. MADINAH MUNAWARAH,KSA.

Nationality. Pakistani

Languages. English , Urdu , Pashto and Arabic

ABSTRACT

I have done Bachelors in Electronics Engineering from IQRA University Peshawar,

Pakistan and I am working in Saudi Arabia since November 2012 and so far I have 29

months of experience in construction field as an Electrical Site Engineer , QC Engineer

and ULV Systems Site Engineer.

Education

2011 | Bachelors in Electronics Engineering IQRA UNIVERSITY PESHAWAR , Pakistan.

Majors in Low voltage and Telecommunications

GPA 2.71/4

Page 2: AMEER TAIMOOR KHAN cv 2016

________________________________________________________________________________

| | | | | | |

Experience

1. WAQF PROJECT MADINAH MUNAWARAH.

QC / SITE ENGINEER

DEC 2012 | SEP 2013

ABWA CONTRACTING COMPANY|Riyadh KSA

+966 11 4645338

www.abwacontracting.com

RESPONSIBILITIES :

1. Preparing quantities of material used and making invoice for payment.

2. Preparing Variation between Mockup , Shop , Issued For Construction and Contract drawings.

3. Following up Variation 4. Supervising and monitor Installation of electrical equipment , devices and grounding

system.

5. Handling Inspection requests from Sub contractor.

6. Prepare Documentation and record for turn over package.

7. Inspecting of material ,equipment and devices installed with Sub contractor and main contractor.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. PRINCE MUHAMMAD BIN ABDUL AZIZ INTERNATIONAL

AIRPORT,MADINAH

ELECTRICAL SITE ENGINEER

NOV 2013 | JAN 2015

|

BNJV | Istanbul ,Turkey.

+90 (216) 373 69 80 | +90 (216) 466 38 00

www.berksan.com | www.novatekltd.com.tr

RESPONSIBILITIES :

1. Monitoring installation of fire alarm devices ,Public Announce , Access control and Master Clock devices such

as control module , monitor module , flashers , various types of smoke detectors ,speakers , card readers ,

Page 3: AMEER TAIMOOR KHAN cv 2016

________________________________________________________________________________

| | | | | | |

emergency exit buttons ,break glass pull station, Fire alarm panels , public address panels door control

units ,clocks and duct detectors .

2. Running various tests before and after installation of cables and devices

3. Trouble shooting loops and panels which were having any ground fault or device fault .

4. Preparing documentation for works progress and material used on daily bases.

5. Checking termination of cables in panels and to devices.

6. Preparing inspection of completed works.

7. Making sure that cable used for each system is according to project specifications and standards.

8. Following rules for installation of fire alarm and access control devices.

9. Participating in Testing and Commissioning of various systems.

10. Installing cable trays for ULV systems .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. PROPHET MUHAMMAD S.A.W MOSQUE EXTENSION PROJECT,MADINAH

ELECTRICAL SITE ENGINEER

AUG 2015 | SEP 2015

STARMASS | Riyadh ,Ksa.

+966112487442

www.starmass.ca

RESPONSIBILITIES :

1. Inspecting of various stain sensors, corrosion sensor ,pressure sensors and raft sensors before

installation.

2. Providing data taken from pre installation of sensors to consultant and main contractor.

3. Inspection of devices installed on site.

4. Routing cables from source to destination .

5. Testing for continuity for various sensors in a loop through RST VW2106 tester .

6. Installation of raft ribbon anode , reference anode and pile anode .

7. Inspection of hole drilled for pile anode.

8. Splicing and termination of cables.

9. Installation of pile stain sensors to frame of pile .

10. Installation of pressure sensors after pile was completed.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4. MAIN CHILLER PLANT TAYBAH UNIVERSITY,MADINAH

Page 4: AMEER TAIMOOR KHAN cv 2016

________________________________________________________________________________

| | | | | | |

ELECTRICAL SITE ENGINEER

SEP 2015 | TILL DATE

SONMEZ | Istanbul ,Turkey.

+902164990100

www.sonmezmetal.com

RESPONSIBILITIES :

1. Designing shop drawings for various low voltage systems .

2. Inspection of various completed works on site.

3. Making material list of items needed for various system .

4. Contacting different suppliers for FIRE ALARM , ACCESS CONTROL , CCTV , UPS , and other

systems and getting offers form them .

5. Providing suppliers list of materials and specification which they needed for preparing submittal .

6. Preparing documents required for acquiring approval from consultant .

7. Making comparison list of offers received from various suppliers and forwarding to procurement

department .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _


Top Related