Airport Division
Airport Master Plan
Airport (Phased or Un-
Phased) Development
Definition
Scoping
Approach and Strategies
Technical and Commercial
Feasibility Study
Terminal Building
Planning and Capacity
Assessment
Airport Facilities Design
Airport Engineering
Design
Construction Supervision
Airfield Pavement
Maintenance and
Rehabilitation Services
Project/Construction
Management
Value Engineering and
Risks Management
*Cost in Malaysian Ringgit (Million)
Project Cost (mil) Client
Design for Runway 14L/32R, Parallel
Taxiways And Drainage Runway 14R/32L,
Parallel Taxiways And Drainage at Kuala
Lumpur International Airport, Sepang,
Selangor Darul Ehsan
410.0
Ministry of Transport
The Upgrading Works For The New Large
Aircraft (Nla) Ab-380 Operations at Kl
International Airport, Sepang (Up To Tender
Stage Only) - Design Consultancy (In
Conjunction With Design-And-Build
Contractor)
88.0
Trans Resources
Corporation Sdn.
Bhd.
Malaysia Airports
Sdn. Bhd.
DCA Project In Relation To LCAT at Kl
International Airport, Sepang Package B (In
Conjunction With Design-And-Build
Contractor
20.0
Ministry of Transport
Department of Civil
Aviation
Rehabilitation And Strengthening Of
Runway Pavement at Penang International
Airport - Design Consultancy (In
Conjunction With Design-And-Build
Contractor)
15.0
SM Pelangi Sdn.
Bhd. and Malaysia
Airports Sdn. Bhd.
Rehabilitation Of Airfield Pavement For
Parking Apron and Deepening Of The
Parking Apron Operations at Penang
International Airport
25.0 Malaysia Airports
Sdn. Bhd
Rehabilitation Of Taxiways At Penang
International Airport ( Design Consultancy) 12.0
Malaysia Airports
Sdn. Bhd
Terminal 3, Subang Airport (Design
Consultancy Including Pre-Planning Study) 150.0
Skypark Sdn Bhd
and Malaysia
Airports Sdn Bhd
Redevelopment of Penang International
Airport – User Requirement and Pre-
Planning Study Study
Malaysia Airports
Sdn. Bhd
Upgrading of Miri Airport 20.0 Binapuri Holdings
Berhad
Senai International Airport, Johor Bahru 100.0
Senai Airport
Terminal Services
Sdn. Bhd.
External Parking Apron for MAS Hangar at
KLIA 25.0
Malaysia Airlines
System
L i s t o f P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd.
52 | Jurutera Perunding Zaaba Sdn. Bhd.
Airport Division
Airport Master Plan
Airport (Phased or Un-
Phased) Development
Definition
Scoping
Approach and Strategies
Technical and Commercial
Feasibility Study
Terminal Building
Planning and Capacity
Assessment
Airport Facilities Design
Airport Engineering
Design
Construction Supervision
Airfield Pavement
Maintenance and
Rehabilitation Services
Project/Construction
Management
Value Engineering and
Risks Management
*Cost in Malaysian Ringgit (Million)
Project Cost (mil) Client
Upgrading of Kuala Terengganu Airport,
Terengganu: Runway Extension and
Associated Works
202.0
Trans Resources
Corporation
Sdn.Bhd.
Upgrading of Sultan Ismail Petra Airport,
Kota Bharu, Kelantan 50.0 Ministry of Transport
Privatisation Of The Proposed
Rehabilitation Expansion, Development,
Operation And Maintenance Of Prince
Mohammed Bin Abdulaziz International
Airport, Madinah Al-Munawarah, Kingdom
Of Saudi Arabia
Masterplan
and
Preliminary
Design
Al-Bakri and Sons
Holdings Co.
Malaysia Airports
Holdings Berhad
A Study On Proposed Expansion And
Upgrading Of Facilities To Accommodate
The Growth Of Cebu Pacific Air At Ninoy
Aquino International Airport In The
Philippines
Study Cebu Pacific
Senai Airport Aviation Park
Planning and Detail Design Of Aviation Park 36.0
Senai Airport
Terminal Services
Sdn.Bhd
Upgrading of Sandakan Airport, Sandakan,
Sabah 60.0 Ministry of Transport
Upgrading of The Existing Suai Aiport,
Timor-Leste 300.0
Ministry of
Petroleum and
Mineral Resources,
Republic Democratic
of Timor-Leste
Rehabilitation, Expansion, Development,
Operation And Maintenance Of Proposed
Upgrading and Extension Works,
Development, Operation And Maintenance
Of Iranian Imam Khomeini International
Airport , Islamic Republic Of Iran
– Airport Master Plan For China Railway,
Amona and Imam Khomeini International
Airport Consortium
Masterplan
Amona Holdings
Berhad
China Railway
Group Limited
Imam Khomeni
International Airport,
Iran.
Privatisation Of The New Al-Maty
International Airport, Kazakhstan
- Technical Feasibility Study And Airport
Master Plan
- Detail Engneering Design
Masterplan
The Government of
Kazakhstan
Airport Limo(M)
Sdn.Bhd
Malaysia Airports
Holdings Berhad
L i s t o f P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd.
Jurutera Perunding Zaaba Sdn. Bhd. | 53
Airport Division
Airport Master Plan
Airport (Phased or Un-
Phased) Development
Definition
Scoping
Approach and Strategies
Technical and Commercial
Feasibility Study
Terminal Building
Planning and Capacity
Assessment
Airport Facilities Design
Airport Engineering
Design
Construction Supervision
Airfield Pavement
Maintenance and
Rehabilitation Services
Project/Construction
Management
Value Engineering and
Risks Management
*Cost in Malaysian Ringgit (Million)
Project Cost (mil) Client
Redevelopment Of Penang International
Airport For Unrestricted Boeing 747-400
And Airbus 380 Operations
Study Global Upline
Sdn.Bhd.
Upgrading of Sultan Azlan Shah Airport,
Ipoh ,Perak 37.8
Ministry of
Transport
Upgrading Of Kuala Terengganu Airport,
Terengganu: Package IV(a) Runway
Extension and Associated Works.
Risk
Management
Jabatan Kerja Raya
KLIA2 – Detail Design and Construction
Supervision for Package AF01 – Runway 3,
Taxiway and Drainage
336.0
Malaysia Airports
Holdings Berhad
Kuala Lumpur International Aiport, Sepang,
Selangor. (Project Management) 9,000.0
Ministry of
Transport
New Bintulu Aiport (User Requirements and
Pre-Planning Study and Project
Management)
390.0 Ministry of
Transport
Upgrading Of Miri Airport (User
Requirements and Pre-Planning Study And
Project Management)
200.0 Ministry of
Transport
Redevelopment Of Alor Setar Airport (User
Requirements and Pre-Planning Study And
Project Management Including Pre-Planning
Study)
88.0 Ministry of
Transport
Upgrading of Sibu Airport (Project
Management Including Pre-Planning Study) 65.0
Ministry of
Transport
Redevelopment of Kuching Airport (User
Requirement and Pre-Planning Study and
Project Management)
620.0 Ministry of
Transport
Redevelopment Kota Kinabalu Airport (User
Requirement and Pre-Planning Study) 900.0
Ministry of
Transport
Development Plan for Batu Berendam
Airport (Land Development and Pre-
Planning Study)
165.0 Ministry of
Transport
Redang Airstrip 20.0 Bank
Pembangunan
L i s t o f P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd.
54 | Jurutera Perunding Zaaba Sdn. Bhd.
Airport Division
KLIA2 – Runway 3, Taxiways, Drainage and Associated Works
L i s t o f P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd.
Upgrading Of Kuala Terengganu Airport, Terengganu -
Runway Extension On Reclaimed Area and Associated
Works.
Senai Airport - VVIP Hangar and Associated Services
KLIA2 - Official Opening of Runway 3 - Trial Landing.
Jurutera Perunding Zaaba Sdn. Bhd. | 55
Airport Division
Sandakan Airport Passenger - Terminal Building Upgrading
L i s t o f P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd.
Penang International Airport – Pavement Rehabilitation
Upgrading of Sultan Azlan Shah Airport, Ipoh ,Perak – Landside and Airside
56 | Jurutera Perunding Zaaba Sdn. Bhd.
Airport Division
L i s t o f P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd.
Suai Airport, Timor-Leste - Under Construction
Suai Airport, Timor-Leste – Overall Upgrading Scope
Jurutera Perunding Zaaba Sdn. Bhd. | 57
Airport Division
Kota Bharu runway reposition and helipad
Senai Hangar, view from outside and inside of hangar.
L i s t o f P r o j e c t s Jurutera Perunding Zaaba Sdn. Bhd.
Privatisation Project for The Expansion, Upgrading Operation And Maintenance Of Iranian Imam Khomeini International
Airport , Islamic Republic Of Iran – Airport Master Plan For China Railway, Amona and Imam Khomeini International
Airport Consortium
Privatisation Project For Prince Mohammed Bin Abdulaziz International Airport - Madinah Al-Munawarah, Kingdom Of Saudi Arabia - Airport Masterplan For Al-Bakry and Malaysia Consortium
58 | Jurutera Perunding Zaaba Sdn. Bhd.