Transcript
Page 1: Abdallah Waleed - CV

Abdullah Waleed I.Hasan

Mobile Phone: +971-551492094 Email Address: [email protected]

Address: Dubai – UAE

PPEERRSSOONNAALL IINNFFOORRMMAATTIIOONN

Date of Birth: September 3rd 1990 Place of Birth: Amman-Jordan

Gender: Male

Marital Status: Single Nationality: Egyptian

Driving license: Dubai-UAE

CCAARREEEERR OOBBJJEECCTTIIVVEE

I'm looking forward to be an effective Member and leave a good imprint in

the company. I already know that I don't own a Complete Knowledge, BUT I have the

Will to learn and I will save no energy to reach this target.

EEDDUUCCAATTIIOONN B.SC. IN CIVIL ENGINEERING FROM THE APPLIED SCIENCE UNIVERSITY (IN ENGLISH), AMMAN-JORDAN 2008-2013, WITH GPA (75%)(RATING: GOOD).

HIGH SCHOOL: (2008) SCIENTIFIC BRANCH/ AL-OUROBA SCHOOL, AMMAN-JORDAN

WITH AVERAGE (83.3 %)

WWOORRKK EEXXPPEERRIIEENNCCEE

Actco General Contracting Company, Dubai 8/1/2015- till now

Title: Site Engineer

Daraghmeh Engineering Consultants, Amman 6/5/2013 - 10/6/2014

Title: Site Engineer

Actco General Contracting Company, Dubai 6/8/2012 - 7/10/2012

Title: Trainer Engineer

Page 2: Abdallah Waleed - CV

PPRROOJJEECCTTSS

Design, Supply, Installation, Testing & Commissioning of 132 / 11 KV Mira Substation at REEM Development, Dubai

Title: Site Engineer

Main Contractor: DANWAY ELECTRICAL & MECHANICAL ENGINEERING

Consultant: POYRY SWITZERLAND Ltd.

Clint: EMAAR

End User: Dubai Electricity & Water Authority (DEWA)

Main Duties were, but not limited to, the following:

Insure that the work is done according to instructions, drawings and technical specifications as per contract documents & prepare shop drawings as per site requirement & Co-ordinate the work with the Main contracture& consultant.

Report immediately to the main contractor any changes required for equipments that not match with construction drawings and give them solutions with shop drawings as per site instillation.

Prepare the work plan for sub-contractors reach the given tasks and arrange the new jobs according the project schedule, give deadlines to the man power / Sub-contractors also performed purchasing responsibilities.

Organize and maintain a team of professionals who are responsible for different activities of construction.

Prepare and submit measurement sheets for the interim and final Payments of the work

Review the Design and Quantities Bill of Project Managing the important documentation related to the job site for the consultant &

client such as Monthly Reports, Daily Activity Reports, Surveying Logs etc. Prepare and submit measurement sheets for the interim and final Payments of the

work. Prepare weekly progress report and drawings when requested.

Page 3: Abdallah Waleed - CV

Design, Supply, Installation, Testing & Commissioning of 132 / 11 KV Marina Substation at Coast Line Island, Dubai

Title: Site Engineer

Main Contractor: EMIRATES ELECTRICAL & MECHANICAL ENGINEERING

Consultant: ENERGO PROJECT ENTEL CO.Ltd

Clint: MERAAS

End User: Dubai Electricity & Water Authority (DEWA)

Main Duties were, but not limited to, the following:

Prepare the work plan for sub-contractors reach the given tasks and arrange the new jobs according the project schedule, give deadlines to the man power / Sub-contractors also performed purchasing responsibilities.

Organize and maintain a team of professionals who are responsible for different activities of construction.

Managing to hire & arrange heavy equipments/machinery such as Excavators, Loaders, Dump trucks, Compactors etc according to the requirement of work.

Managing the important documentation related to the job site for the consultant & client such as Monthly Reports, Daily Activity Reports, Surveying Logs etc.

Prepare and submit measurement sheets for the interim and final Payments of the work.

Review the Design and Quantities Bill of Project. Prepare and submit measurement sheets for the interim and final Payments of the

work. Prepare weekly progress report and drawings when requested.

Reports immediately any problems/ constraints arising in the progress of work. Insure that the work is done according safety rules.

CCOOMMMMUUNNIICCAATTIIOONN && IINNTTEERRPPEERRSSOONNAALL SSKKIILLLLSS Extremely organized person.

Ability to establish and maintain good working relations with people of different national and cultural backgrounds.

Problem-solving attitude.

Rapid integration in different social groups and spaces, good human relation, public speaking and communication skills.

Enjoy team environment.

Page 4: Abdallah Waleed - CV

CCEERRTTIIFFIICCAATTEESS // TTRRAAIINNIINNGG CCOOUURRSSEESS

Primavera P6 (First Level)

- Consisting of 18 training hours.

- Location: The Engineers Training Center.

PROKON 2.5

- Consisting of 27 training hours.

- Location: The Engineers Training Center.

Prestressed Concrete

- Consisting of 15 training hours. - Location : Jordan Engineers Association.

Primavera III (First Level)

- Consisting of 18 training hours.

- Location: The Engineers Training Center.

Reading Engineering Plans

- Location: Jordan Engineers Association. geographic information systems (GIS) (Advanced Level)

- Consisting of 15 training hours.

- Location: Royal Jordanian Geographic Centre.

Advanced English Conversation

- Consisting of 20 training hours - Location : Jordan University

LLAANNGGUUAAGGEESS

Arabic (Native)

English (Fluent)


Top Related