3D MEP BIM SERVICESRevolutionizing The MEP Industry
ww
w.p
innacl
eca
d.c
om
3D BIM Model
Coordination and Clash Resolution
Shop Drawings, Sleeve/Penetration DrawingsBlock-out Drawings
Fabrication and Spool Drawings
Quantity Take-off
Value Engineering
Design Validation
Revolutionizing MEP
Benefits of MEP Modeling
Expertise and Specialization
HVAC
Electrical
Plumbing
QC Process
Work Process
3
3
4
6
8
10
11
12
Testimonials 13
Why Pinnacle?
Project Snap Shots 14
INDEX
COMMITMENT
We are committed to our core values and corporate mission:
Maximizing client value by adopting the latest technologies and innovations.
Improving project efficiency by streamlining workflow and providing high quality services.
Saving time by using a large global team to leverage time zone advantages.
Reducing client costs by up to 30% by harnessing a highly experienced global work force.
Revolutionizing MEP
Benefits of MEP Modeling
Our clients have reported cost savings up to 15% by successfully implementing BIM.
Proper planning and coordination are the keys to the successful execution of projects in the construction industry. Building Information Modeling (BIM) allows stakeholders to create and examine virtual representations of the Mechanical and Electrical (MEP) systems, and other utilities. The virtual construct can be used to generate accurate shop drawings and address design issues before construction begins.
Advancements in 3D technology and the advent of BIM have also revolutionized the Architectural, Engineering and Construction (AEC) industry.
Pinnacle Infotech has been acknowledged as the global leader in providing innovative BIM solutions. We have received several awards and recognition from both industry and government. Pinnacle received Deloitte Technology Fast 500 award in 2014 for 86% growth rate in Technology as per Asia Pacific Ranking and Deloitte Technology Fast 50 India award in 2015.
NASSCOM, the leading IT trade association, has named Pinnacle among the Top IT Innovators for 6 years between 2007-17. We are in the process to upgrade our existing ISO certification 9001:2008 to 9001:2015. Also, implementing Environment Management System (EMS) 14001:2015 which will be completed by 2017.
The successful completion of more than 4500 BIM projects in 34 countries has provided Pinnacle with a deep understanding of international building codes and procedures. Our global delivery system allows us to maintain constant contact with our clients making geographical separation meaningless.
We recognize the importance of effective work process management and regular communication when outsourcing services. We have developed an ideal mix of infrastructure, experience, global presence and commitment to excellence that has led to long-term relationships with more than 1000 clients worldwide.
COORDINATION: Streamline communication with 3D visualization among all stakeholders for quick decision making during design and pre-construction phase.
EFFICIENCY: Eliminate RFI’s, work stoppages and rework by checking the accuracy and completeness of drawings before starting construction on-site/off-site.
QUALITY: Improving Quality by producing accurate Shop Drawings directly from the 3D BIM model which could also be used for pre-fabrication.
SAVINGS: Pre-construction and Pre-fabrication reviews mean better use of manpower, better quality construction and reduced rework and wastage, all of which translate into lower costs.
03
BIM
| K
eep
s y
ou
ah
ead
PROJECT MANAGEMENT: Detailed Material BOQ and Shop Drawings with 3D visualization enable a better look at “The Big Picture” and aid in the review, scheduling and monitoring of each project.
HVAC
Pinnacle specializes in the virtual construction of 3D BIM models using a range of inputs including contract documents, specification sheets, design documents and equipment submittals. A model of the HVAC system, including Hangers, Trapeze and seismic restrainers, is created and augmented using information from architectural, structural and other trade and utility sources. The final model is generated after resolving any clash by re-routing ductwork, changing elevations and duct re-sizing. Value Engineering and Design Validations are also offered.
04
BIM
| C
lash
fre
e co
nst
ruct
ion
dra
win
gs
Design Support & Optimization
Our team of BIM professionals builds intelligent BIM model to design complex building systems with greater efficiency. This gives all stakeholders a clear idea of design intent enabling them to modify the design to achieve the outcomes they want, minimizing risk of costly changes later on. Different design options are simulated and analyzed to develop more efficient and cost-effective solutions. Some of these are listed below:
Revit based heat load calculation and generation of HVAC layouts
Sizing and calculation of HVAC ducts
Illumination calculation and generation of light and power layout
Calculation and creation of Fire fighting layout based on NFPA standards and hazard classifications
Creation of sanitary and water supply layouts based on fixture unit values and pipe sizing
Validation of equipment capacity for all services
Creation of Technical Schedules and Auto Updating the same based on design iterations
Pressure loss reports, Duct resizing
Other analysis reports as required.
Block-Out Drawings are required before a contractor can start pouring concrete on the site. Block-Out Drawings are created from the coordinated BIM model after alignment with the architectural grids. Our experienced team keeps the necessary clearances for the block-out as per the contract documents and construction codes.
Block-Out Drawing
05
BIM
| K
eep
s y
ou
ah
ead
Shop Drawings
Shop Drawings are created based on project standards and are useful to contractors, fabricators, suppliers and manufacturers during construction. BIM is highly useful for construction of any irregular or complex structures. We generate accurate sleeves, penetration and hanger locations from the BIM model before start of construction. These drawings are generated directly from coordinated BIM models and are detailed enough for workshop fabrication and/or on-site construction.
Quantity Take-Off
BIM model generates accurate quantity of all materials. These quantities are automatically updated with any changes in the BIM model. Quantity Take-Off (QTO) reports can be formatted in MS Excel and exported to a database for detailed analysis. Quantities can be generated for a specific time period or project area (4D/5D) to help manage material procurement and save inventory costs. It is an automated procedure on the HVAC model and is 100% accurate as per the design. Quantity Take-Off covers all ducts, duct-fittings, equipments, hangers, etc.
Equipment Pad Layout
Equipment Pad Layouts need to be accurately determined to ensure the proper installation of MEP equipment. BIM model provides accurate pad layout with reference to the architectural grids and structural drawings.
06
BIM
| B
ette
r co
ord
ina
tio
n a
t co
nst
ruct
ion
sit
e
Electrical
Input Legend & Lighting Plan
We create 3D BIM electrical model of all conduits, cable tray, lighting fixtures, fire alarms, and other electrical equipments. We are adept at using different types of inputs including sketches from our client to create 3D representations of individual systems and full buildings.
Equipment Modeling with COBie Data
Mechanical Room Modeling
We provide detailed mechanical piping models to show equipment locations and piping systems. From this model, we can generate exhaustive spool drawings for accurate manufacturing and procurement with Quantity Take-Off.
This will simplify work at site, usually mechanical plant rooms are more complicated, using Revit we shall generate the best model which can be utilized at real time installation.
Electrical Model
The electrical model is coordinated with architectural, structural, HVAC and plumbing models and an interference report is created. We re-design the route, fixture, tray layout, etc. based on the interference report. Final electrical model is created after resolving all constructability issues with other systems.
Compressor Tank Hot Water Pump Chiller Condenser Water Filter
Lighting PlanPower Plan
Construction Documents
Construction Documents are generated automatically from the coordinated BIM model. We provide fixture, conduit locations and tray layouts with reference to the architectural walls. This provides the electrical contractor with precise location for material and equipment installation.
07
BIM
| U
pto
40
% e
lim
ina
tio
n o
f u
nb
ud
get
ed c
ha
ng
e
Electrical Quantity Take-Off
The final output from the model is an accurate quantity take-off. We provide all the equipments, fixtures and material details with exact quantities. It helps the contractors to estimate the project cost and plan material procurement.
Equipment Modeling with COBie Data
Generator Inverter Transformer Alternator
Sleeve, Inserts and Hanger Drawings
Insert & Hanger DrawingSleeve Drawing
Plumbing
Model Coordination & Clash Resolution
The plumbing model is created from the contract/design drawings in strict compliance with contract specifications, technical submittals and the relevant codes (UA/EU or the country/state codes, UPC, NFPA and the local civil defense codes).
We generate a coordinated BIM model after resolving the clashes among all the trades (Architecture, Structure, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.). Clashes are resolved through WebEx meetings / sharing 3D clash snapshot. Clashes are resolved by re-routing utilities, changing elevation and re-sizing. Value Engineering is also offered to improve system efficiency, reduce costs and easier construction and maintenance.
A critical component of plumbing project is proper sleeve location, inserts, and hanger positions. We can generate accurate sleeve, penetration, and hanger locations from the plumbing model prior to plumbing installation. These drawings can be directly downloaded on GPS instruments for fast and accurate layout on-site.
08
BIM
| B
ette
r sc
hed
uli
ng
& c
on
stru
ctio
n
Installation Drawings
We provide detailed Installation Drawings to help the contractors in planning and installing plumbing services efficiently.
Plumbing Fixture Models with COBie Data
Quantity Take-off
The significant benefit of 3D modeling is accurate quantity information. Quantity take-off can be detailed and tabulated as per the client requirement for procurement, fabrication and installation. It is software generated and automatically updates with the changes in the model.
09
BIM
| 3
D v
isu
ali
zati
on
of
all
co
nst
ruct
ion
ste
ps
Spool Drawings
Spool Drawings can be generated from the model for accurate pre-fabrication off-site/on-site. Segmented Spool Drawings are generated in accordance with the contractor’s pre-fabricating standards and preferences.
Spool detailing - isometric Spool installation
Double Carrier Valve Kitchenette Filtration System
10
BIM
| B
ette
r sc
hed
uli
ng
& c
on
stru
ctio
n
Quality Control Process
QC 2
Screen Check
Performed by QC Dept./Team
DELIVERY
TO
CLIENT
100% Quality
QC 1
Plot Check
Performed by Production Team
QC 3
Pre-Shipment Check
Performed by Project Manager
QC Check Phase I
The model is plotted on paper and a preliminary grid by grid check is done comparing it with the original contract documents. Member of the Project Management team assists in this process.
The project team leader sends status report to the QC Department to begin QC Phase II.
QC Check Phase III
The Project Manager conducts the pre-shipment check before sending them to the client.
QC Check Phase II
The QC Team performs a more detailed comparison of the Contract Documents against the 3D BIM model. Specific Checklist is prepared to review/check the deliverables. Their main objective is to review, identify and address the following:
The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical issues related to the project.
Missing data (if any)Mismatches with the contract documentsClashes (Old/New), Elevation, Routing, Fittings, etc.Construction point of view.Fly-Zones requirementsAttribute Checking (Pressure class, Pipe material, etc.)Location of Equipment such as VAV, Sleeves, Hangers, Valves.Equipment Connection details as per Schematic Drawings.Equipment Models as per Technical Submittals.Annotations & Dimensions, Aesthetic View.Miscellaneous issues
Our QC process is ISO 9001:2008 certified and managed by an independent QC team. We are in the process of implementing Environment Management System (EMS) ISO 14001: 2015, which will be completed by 2017.
The main objective of the quality control (QC) process is to detect errors and rectify it. Ensuring quality is a group effort and our dedicated QC team is led by a highly qualified and experienced Manager in M&E Coordination and Quality Control.
The entire QC process is handled in three phases:
Work Process Flow Chart
11
BIM
| 3
D v
isu
ali
zati
on
of
all
co
nst
ruct
ion
ste
ps
�
PINNACLE MARKETING
TEAM
ESTIMATES
`
CLIENT Architects / Engineers / General Contractors / MEP Contractors
RF
I /
Cla
rific
atio
ns
BIM PINNACLE
PROJECTMANAGER
De
live
rab
les
ARCHITECTURAL & STRUCTURAL TEAM
3D Model from Client
(If client does not provide 3D Models, then Pinnacle will prepare the models for basic MEP Coordination)
MECHANICALTEAM
RFI’s Generation 3D Model CreationConstructability ReviewValue EngineeringQuality Control
ELECTRICALTEAM
RFI’s Generation 3D Model CreationConstructability ReviewValue EngineeringQuality Control
PLUMBINGTEAM
RFI’s Generation 3D Model CreationConstructability ReviewValue EngineeringQuality Control
FIRE PROTECTIONTEAM
RFI’s Generation 3D Model CreationConstructability ReviewValue EngineeringQuality Control
BIM COORDINATION
Combining of all the Models of various Trades/Discipline
Performing Clash Detection
Coordination Meetings to discuss unresolved Clashes
Updating the Model to resolve Clashes
MECHANICAL TEAM4D PhasingQuantity Take-OffShop DrawingsHangers & InsertsSpool & Fabrication DrawingsWall Penetration/Sleeve/Block-Out DrawingsEquipment Pad LayoutCoordination Drawings
ELECTRICAL TEAM4D PhasingQuantity Take-OffShop DrawingsCoordination Drawings
PLUMBING & FIRE PROTECTION TEAM 4D PhasingQuantity Take-OffShop DrawingsHangers & InsertsSpool & Fabrication DrawingsWall Penetration/Sleeve DrawingsEquipment Pad LayoutCoordination Drawings
DELIVERABLES
QUALITY CHECK (QC)
BIM
| B
ette
r sc
hed
uli
ng
an
d c
on
stru
ctio
n
12
Why Pinnacle?
Pinnacle is a global leader in providing innovative BIM services. Our in-house team of more than 1100 experienced Architects, Engineers and BIM professionals helps us provide end-to-end solutions to discerning clients around the world.
Our 3,28,364 sq ft, world-class production facility is equipped with high-end workstations, advanced servers with real time backup and a high speed data and voice network. There is a 24 x 7 uninterrupted power supply security system by CISCO.
Fast Turnaround
Our skilled team of professionals can provide quick turnarounds on complex projects. Pinnacle has successfully completed several large-scale projects across multiple verticals.
Global Presence
Experience in BIM Domain
We have a global experience of 17 years and have successfully collaborated with several leading contractors on BIM projects for specialty hospitals, stadiums, universities, dams, apartment complexes, hotels, casinos, large retail center, high school, airport, commercial buildings, convention center, high rise towers, and industrial projects.
Communication
Pinnacle's Project Management team is available to clients through a number of communication channels including:
1. Global telephone networks for instant communication2. FTP (Exavault) over a secured network for file transfers3. Email (on Google server) for reports and interactions
Technical Strengths
4. Video and teleconferencing for presentations and conversations5. WebEx conferences with UK & US based phone systems6. Newforma project information management system
Our professionals use the latest BIM software: Autodesk Suite (Revit, Revit MEP, Revit Architecture and Revit Structure), Microstation, NavisWorks, Inventor, AutoCAD Civil 3D, Plant Design Suite, Pro/Engineer, Sysque, Allplan, Adobe Photoshop, Adobe Illustrator, Adobe Aftereffects, 3DS Max, Tekla Structure, SolidWorks, Autodesk Fabrication Suite, Quickpen, Cadpipe, SketchUp, Bluebeam, Pipenet, Elite, ETAP, DIALux and other software.
Pinnacle has offices around the world (USA, UK, UAE, ITALY, INDIA - Durgapur, Kolkata & Jaipur) enabling us to serve our clients around the clock.
As we have a deep understanding of global and regional codes and standards, we have ensured that our Quality Management System is as per ISO 9001:2008.
Canada
CA
Aruba
Brazil
FinlandSwedenNorway
Ireland
France
Turkey
SAUDI ARABIA
Delhi
Hyderabad
Sanghai
Japan
Singapore
WA
Production Centres
AZ
Puerto Rico
Australia
Columbia
Iraq
Kazakhstan
LibyaMexico
Rwanda
Sri Lanka
OR
NV
MT
TX
PA
NYMI
MA
NJRI
CO
MN
OK
OHIN VANC
ALGASC
FL
MDDCIL
West Indies
LA
TNKY
Lebanon
USA
INDIAOman
Kuwait
UAE
BahrainJordan
Israel
QatarRiyadh
SWITZERLAND
Denmark EUROPE
BelgiumNetherlands
Malayasia
China
UK
DURGAPUR
KOLKATA
JAIPURDUBAI
Abu Dhabi
ITALY
LONDON
HOUSTON
Germany
Testimonials
13
BIM
| 3
D v
isu
ali
zati
on
of
all
co
nst
ruct
ion
ste
ps
“Communication between different time zones has its challenges. One must be completely clear about what they want and offer. Considering the 11:30 hr difference I am very pleased with the results. The correspondence I received was cordial and concise. The product I received was prompt and well developed.”
Patrick Madrid | U.S. Engineering Company
“Team has done an amazing job so far on this project. The projects deadlines are constantly changing and this team has been able to keep up and meet all deadlines. They have been outstanding to work with and I hope to continue to work with them on other projects in the near future.”
Leonard Musselle | Comprehensive Energy Services, Inc
“Pinnacle provided the exact service we needed which was to aid in reducing our CAD departments load on one of our projects. Thanks to their services we are now weeks ahead of schedule. Looking forward to using your services again.”
Raffy Amaro | Tropic Mechanical
“The drawings were what we had discussed and they were done on time. Communication on missing items and issues was very good by Pinnacle. Pinnacle follows up to make sure they have the answers needed and are very professional.”
Michael A Rivera | Heating & Plumbing Engineers INC
“Knight and Wilson has been working with Pinnacle for years. We are very satisfied with the quality of their work and the competent staff.“
Darrick Russell | Knight & Wilson
“The experience has been good working with Pinnacle. The Pinnacle team pushes to get all the correct info before starting a project and return a quality finished project in a timely fashion.”
Anthony Warren | Minton & Robertson
“This was a difficult project because we changed CAD platforms half way through. Thank you for working with us on all the changes and revisions to complete the job.”
Jason Pecha | Iron Mechanical
“Pinnacle completed the work in a timely fashion with in the needed time restraints. Work was done according to what was requested with minimal supervision.”
Chris Duhan | John W. Danforth Company
“I've been satisfied with the Pinnacle team on this job, just like the others we've worked on together. Great job from everyone, keep up the good work!!”
Robert Pickett | Mechanical Construction Company, L.L.C.
“Pinnacle's team has done a wonderful job for us on the Roosevelt Hospital. The team was very professional and responsive to our needs. Any changes that needed to be implemented were completed and turned around to us in a very rapid manner. Your services will allow us to build a culture of prefabrication going forward and we anticipate doing more business with Pinnacle in the future.”
Mickey W. Cantrell, II | Keith Lawson Mechanical
As with all of the previous projects that we have worked with Pinnacle on, this project came together seamlessly and without any problems. The Pinnacle team is very detailed in their approach, always meets our demanding schedules, and always with excellent quality in the finished product. There are not many companies that work for/with us that can keep up with our pace, but Pinnacle can every single time. I would personally recommend them to anyone in need of BIM, CAD, and drawing coordination services.
Jeriot Burr | Rivers Plumbing and Electric
BIM
| C
ost
est
ima
tio
n a
ccu
racy
wit
hin
3%
Project Snap Shots
14
LOCATIONBIM ENDDATE
PROJECT AREAAVG. TEAM SIZE
PROJECT NAMECLIENTROLE
SECTOR
14
SCOPE OF WORK
Jeddah,Saudi Arabia
568,199 sq mMEPContractor
Kingdom Tower (Worlds Tallest Tower - 1100 Metre)
The scope includes 3D Modeling, Coordination, Developing Design Drawings to Shop Drawings which meets engineers satisfaction and up gradation of typical details to reflect the approved materials & equipment supplier. The scope also include to Coordinate the openings/Sleeves finalized in accordance with Issued For Construction (IFC) drawings. After preparation of Individual Service Drawings (ISD), Pinnacle is also preparing a Combined Service Drawings (CSD) from the BIM Model.
May2018
110 Engineers
High RiseBuilding
Tampa,Florida,USA
721,348 Sq ftMEPContractor
The Channel Club
Our scope of work for the project included creation of Plumbing BIM Model and Online Clash Coordination. Basic coordination was done by us and other trade coordination should be done as per the clash report provided by the client.
December 2017
5 Engineers
Residential
Houston,Texas,USA
303,500 Sq ftMEPContractor
Star of Hope Family Shelter & Development Center
Our scope of work for the project was to prepare 3D model of plumbing pipe & associate plumbing fitting with equipment. We were also responsible for validating the base design model provided by the client and updating the same with Revit Model to prepare construction document set.
June 2017
5 Engineers
Family Shelter & Development Center
Nashville,Tennessee,USA
460,000 Sq ftMEPContractor
JW Marriot Hotel
Our scope of work for the project included creation of 3D Models of Sheet Metal, Mechanical Piping and Plumbing (accessory, equipment and fittings) of all buildings, Basic & Other trade coordination as well as preparation of Shop Drawing/2D Drawings for HVAC, MP and PL trades. We provided As-Built Updates as per mark-up drawings and facility management as per available information.
June2017
6 Engineers
Hotel
Pensacola,Florida,USA
1,752,223 Sq ftMEPContractor
Navy Federal Credit Union Office Building (Phase 2)
Our scope of work was to provide coordinated 3D models for all the levels with complete construction information as well as shop and sleeve drawings. Moreover, we were responsible for providing hanger placement for HVAC & Mechanical Piping and penetration information for deck.
April2017
3 Engineers
Office & Amenity Building
Hampton,Virginia,USA
270,000 Sq ftMEPContractor
Riverside Regional Medical Center
Our scope of work for the project included sheet metal model creation, 3D model creation for plumbing and piping, coordination as well as preparation of shop drawing/2D Drawings.
April2017
6 Engineers
Medical Center
Las Vegas,Nevada,USA
256,874 Sq ftMEPContractor
Southside High School
Our scope of work for the project included sheet metal model creation of all buildings (HVAC Equipment Modeling per approved submittals, HVAC Detailed connection to Equipment). Basic coordination was done by us and other trade coordination was done as per the clash report provided by the client. We were also responsible for providing Shop Drawings/2D Drawings for Sheet Metal (Drawing Creation for Slab Penetration), As-Built Update as per mark-up drawings, Facility Management as per available information and Quantity Take-off.
March2017
8 Engineers
School
Greenacres City,Florida,USA
537,750 Sq ftMEPContractor
UTC Center for Intelligence Office Building
Our scope of work included creation of 3D Models, Clash Coordination and preparation of Shop Drawing, Embeded Drawing, Spool and Sleeve Drawings.
March2017
6 Engineers
Office Building
Miami,Florida,USA
507,000 Sq ftMEPContractor
P620 Studio
Our scope of work for the Project included 3D Model creation with different types of Hangers as well as Coordination and preparation of Shop Drawing, Sleeve Drawing, Spool Drawing, Equipment Pad Layout, As-Built Drawing and BOQ or Quantity Take-Off. Full coordination was done by us and other trade coordination was done as per the clash report provided by the client.
January2017
3 Engineers
Studio
BIM
| S
up
po
rt g
reen
bu
ild
ing
in
itia
tiv
e
Project Snap Shots
Tampa,Florida,USA
462,000 Sq ftMEPContractor
The Manor at Harbour Island
Our scope of work for the project included:Mechanical & Plumbing underground modeling, Coordination & Shop drawing creation - Modeling comprised of transition floor, apartment unit, HVAC ductwork, Shop Drawings included Shaft & Stair Case, Sleeve drawings, Roof equipment pad layout
December 2016
5 Engineers
High-Rise Residential
OrlandoFloridaUSA
473,260 Sq ftMEPContractor
Orlando City Soccer Stadium
Our scope of work for the project included creation of 3D Plumbing Model for Coordination among various trades, Hanger placement in the Model and Sleeve Drawing preparation.
August 2016
5 Engineers
Stadium
Lexington,Kentucky,USA
300,000 Sq ftMEPContractor
University of Kentucky Research Building
Our scope of work was to provide coordinated 3D models for all the levels with complete construction information as well as shop and sleeve drawings. Moreover, we were responsible for providing hanger placement for HVAC & Mechanical Piping and penetration information for deck.
October2016
2 Engineers
Research Building
Tampa,Florida,USA
700,000 Sq ftMEPContractor
Florida Hospital, Carrollwood
Our scope of work for the project included creation of 3D plumbing models of pipes, pipe fittings and accessories, updation/validation of the model as per client specification, hanger placement, coordination and shop drawing preparation in Revit.
May 2016
4 Engineers
Hospital
New Orleans,Louisiana,USA
927,000 Sq ftMEP Contractor
New Orleans International Airport
Our scope of wok for the project included 1. 3D Model Creation of Sheet metal 2. Coordination based on the clash report provided by the client 3. Shop Drawing/2D Drawings for Sheet Metal 4. As-built Update as per mark-up drawings 5. Facility Management 6. BOQ 7. Trimble drawings 8. CAM drawings 9. Block-out Drawings.
April2016
3 Engineers
Airport
Las Vegas,Nevada,USA
791,700 Sq ftMEPContractor
Monte Carlo Concert Hall
Pinnacle's scope of work for the project included: 1. Mechanical Piping and Plumbing Model Creation 2. Hanger Placement 3. MEP Clash Coordination (Ducting, Fire Protection and Electrical Model provided by client) 4. Preliminary Shop Drawing Creation
March2016
8 Engineers
Concert Hall
VirginiaUSA
756,990 sq ftMain Contractor
Rosslyn Central Place
Creating 3D Models of LOD 300 for Coordination purpose; The architectural scope included exterior walls, interior walls (without individual studs), ceiling and soffit, doors and windows, stairs and railings; the structural scope included beams, columns, structural slabs, metal decks, CMU/precast walls, footing and foundation, metal canopy\trellis.
May2014
7 Engineers
Residential and Retail
Airport
DubaiUAE
MEPContractor
The scope of the work includes 3D BIM Modeling for both ACS and MEP, 2D Shop Drawings, Modeling of the exterior walls & slabs, & Clash coordination. A detailed quantity take off (QTO), incorporating manufacturer's references and a unique asset ID generated from the clash free coordinated model. The scope also includes the As-built shop drawings based on the Redline drawings receiving from construction site.
Dubai International Airport Concourse-4 March2013
167,748 sq m
64 MEP Engineers, 7 Architectural andStructural Engineers
Industrial Plant
South CarolinaUSA
MEPContractor
Bridgestone Aiken ORR Plant September2012
1,320,000 Sq.Ft.
8 MEP EngineersScope included robust determination of Process Piping-3D Model, Coordination, Shop Drawing, Hanger BOQ, Spool, and Hanger-LOD-500Drawing creation.
LOCATIONBIM ENDDATE
PROJECT AREAAVG. TEAM SIZE
PROJECT NAMECLIENTROLE
SECTORSCOPE OF WORK
15
ww
w.p
innacl
eca
d.c
om
Italy Office
Phone: + 39 0341630070Email: [email protected]
Nunki di M.Brossa,Via Calvi, 10 - 23801Calolziocorte, LC - Italy
Jaipur Office
Plot No - IT-A-016-E, Mahindra World City, (Jaipur) LTD, PO - Mahindra World City, Tehsil -Sanganer, Jaipur - 302037
Pinnacle Infotech Solutions
Texas, USA
Dubai, UAE
Lecco, Italy
Kolkata, India
Durgapur, IndiaJaipur, India
London, UK
Pinnacle Infotech Inc.
6161 Savoy Drive #1125,Houston, TX 77036Phone: 713 780 2135Fax: 713 780 8784Email: [email protected]
USA Office
Biswanath TodiOperations ManagerCell: 832 283 6628
International Office Locations
UAE Office
Office No – 307, 3rd Floor, Building No. 7 PO Box - 345869, Dubai Outsource ZoneDubai, UAE
Pinnacle Infotech Technologies FZ-LLC
Kuntal Chakraborty
Phone: +971 55 736 3498Email: [email protected]
Zurich, Switzerland
India Office Locations
Pinnacle Infotech Solutions
S.S.B. Sarani, Bidhannagar, DurgapurWest Bengal, India - 713212Phone: +91 343 6602222 / 6602231–35Fax: +91 343 6602230
Durgapur Office UK Office
TechHub, 4-5 Bonhill Street London EC2A 4 BX
Mathew GomesPhone: +44 20 7096 1664Email: [email protected]
Pinnacle Infotech Limited
Switzerland Office
Transcon InternationalSpirackerstrasse 258044 GockhausenSwitzerland
Kingshuk Gupta
Email: [email protected] [email protected]
Phone: +41 79 599 1888
Kolkata Office
Plot - II/F/11, Block - 4B, 4th Floor, Room No. 402,Ecospace Business Park, New Town, Rajarhat, Kolkata - 700156
Pinnacle Infotech Solutions
Email: [email protected]
Email: [email protected]
Email: [email protected]
Pinnacle Infotech Inc.