Transcript
Page 1: 3 MURRAY ROSE AVENUE - Major Projects

3 MURRAY ROSE AVENUESydney Olympic ParkDrawing Title

Project Title

GA Elevations

11002Status RevDwg No.

Scale Drawn by North

T +61 2 8668 0000F +61 2 8668 0088turnerstudio.com.au

Level 1_410 Crown StreetSurry Hills NSW 2010Australia

Project No.

1:100 @ B1

THIS DRAWING IS THE COPYRIGHT © OF TURNER. NO REPRODUCTION WITHOUT PERMISSION. UNLESS NOTED OTHERWISE THISDRAWING IS NOT FOR CONSTRUCTION. ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE PRIOR TO THE COMMENCEMENTOF WORK. INFORM TURNER OF ANY DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH WORK. DRAWINGS ARE NOT TOBE SCALED. USE ONLY FIGURED DIMENSIONS. REFER TO CONSULTANT DOCUMENTATION FOR FURTHER INFORMATION.

NOTES

DLCS Quality Endorsed Company ISO 9001:2008, Licence Number 4168Nominated Architect: Nicholas Turner 6695, ABN 86 064 084 911

0 25 10050

KEY PLAN

NOTES : Rev. Date Revision NotesApproved byCLIENTThe GPT GroupLevel 52, MLC Centre 19 Martin Place Sydney02 8239 3555--

PROJECT MANAGER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 9236 [email protected]

STRUCTURE - BROWN CONSULTINGGrd Fl, 55 Chandos Street, St Leonards02 9004 [email protected]

VERTICAL TRANSPORT - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

MECHANICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

FACADE - HYDER CONSULTINGL5 141 Walker St North Sydney NSW 206002 [email protected]

FIRE ENGINEER - FIRE ENGINEERINGPROFESSIONALSSuite 201 29 Anderson Street Chatswood NSW 206702 9411 [email protected]

GEOTECH - DOUGLAS PARTNERS96 Hermitage Road West Ryde NSW 211402 9809 [email protected]

PCA - VIC LILLI & PARTNERSSuite 1 L5 56 Railway Parade Burwood NSW 213402 9715 [email protected]

PLANNER - JBA URBAN PLANNINGLevel 7 77 Berry St North Sydney NSW 206002 9956 [email protected]

ELECTRICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

HYDRAULICS - J &M GROUP7/43-51 College St Gladesville NSW 211102 9879 [email protected]

BUILDER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 8016 [email protected]

CIVIL - KR STUBBS & ASSOCIATESSuite 6 33 Ryde Road Pymble NSW 207302 9880 [email protected]

ENVIRONMENTAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 [email protected]

LANDSCAPE - TURF95 The Kingsway Cronulla NSW 223002 9527 [email protected]

ACCESSIBILITY - MORRIS GODINGUnit 1.06 56 Bowman St Pyrmont NSW 200902 9692 [email protected]

ACOUSTIC - ACOUSTIC LOGIC CONSULTANCY9 Sarah St Mascot Sydney NSW 202002 8338 [email protected]

TRAFFIC - TTWPO Box 98 North Ryde NSW 167002 9418 [email protected]

SURVEYOR - LAWRENCE GROUP1/183 Durimbah Road. Mosman NSW 20881300 765 [email protected]

ADB

AMENDMENTS

35103

LEGEND_ELEVATIONS & SECTIONS:Note: Where nominated on drawings or schedules a numerical suffixindicates multiple types i.e BAL1 = Balustrade Type 1, etc. Refer toArchitectural Schedules for further information and detail.

AC Air ConditioningAD Access DeckAL AluminiumAP Access PanelAWN AwningBAL BalustradeBG Box GutterBH BulkheadBJ Butt JointBKP Bicycle ParkingBKR Bicycle RackBLK BlockworkBL BollardBRWO Balcony Rain Water OutletCAP CappingCBC Cubicle SystemCFC Compressed Fibre CementCGF Concrete Groove FinishCH Ceiling HeightCHE Chamfered EdgeCHS Circular Hollow Section(CI) Cast InCIS CisternCJ Control JointCL ClosingCLD CladdingCLNR Cleaner StoreCONC ConcreteCOF Concrete Off-Form FinishCOL ColumnCOM CommercialCOMS Communications ServicesCOS Check on SiteCPE Car Park ExhaustCVJ Coved JunctionCP Carparking SpaceCPC Concrete PrecastCPL Cover PlateCS Ceiling SuspendedCSF Cementitious Screed FinishCST Concrete Steel Trowel FinishCMR Cement RenderCWF Ceramic Wall FinishCWS Cold Water SupplyDB Distribution BoardDG Drip GrooveDJ Dummy JointDP Down PipeDWF Decorative Wall FinishEJ Expansion JointELEC Electrical Services(EX) ExistingEXJ Express JointEXH ExhaustEP Edge ProtectionF Fire Services(F) FixedFCC Fire Control CentreFCL Finished Ceiling Level FFL Finished Floor LevelFH Fire HydrantFGL Finished Ground LevelFHR Fire Hose ReelFIP Fire Indicator PanelFLS FlashingFP Fixed PanelFEP_01,02… Fire Egress Passage No.1, 2, etc.FRL Fire Resistance LevelFS_01,02… Fire Stair No.1, 2, etc.GBR Garbage RoomGC Glass ClearGD Glass DecorativeGDR Grated DrainGE Grooved EdgeGHR Garbage Holding RoomGL Ground LineGR Grab RailGT Glass, TranslucentGAL GalvanisedGVL GravelH Hydraulic ServicesHD Hand Dryer, ElectricHIR High Impact ResistantHP High PointHMR High Moisture ResistanceHR Hand RailHWS Hot Water ServiceHWU Hot Water UnitIL Invert LevelINS Insulation(INT) Integrated AssemblyIO Inspection OpeningJ_01,02… Joinery Type 01, 02, etc.KB KerbKE Kitchen ExhaustL_01, 02... Lift No. 1, 2, etc.LCB Lift Call ButtonLCL Lift Call LanternLP Low PointLRA Lobby Relief AirLSA Lobby Supply AirLV LouvreM Mechanical ServicesMBX Mail Box AssemblyMJ Mitre JointMDR Metal Deck RoofingMVJ Movement JointMRR Mirror ReverseMSB Main Switch Board Service including Main Distribution Board and FrameMTR MeterMV Mechanical VentNGL Natural Ground LevelNOM Nominal(O) OperableOFS Over Flow SpoutOSR On Site Retention TankPB PlasterboardPCF Powder Coat FinishPD Pivot DoorPDO Planter Drainage OutletPEL PelmetPF Paint FinishPFC Parallel Flange Channel PLD Panel Lift DoorPV PavingPT Parapet(R) RecessedRA Return AirRASS Roof Access Safety SystemsRD Roller DoorRHS Rectangular Hollow SectionRL Relative Level to AHDRU Receptacle UnitRWH Rain Water HeadRWO Rainwater OutletSB Splash BackSCN ScreenSCOL Steel ColumnSD Sliding DoorSDO Spoon Drain OutletSGN SignageSHS Square Hollow SectionSIM SimilarSJ Sawn JointSK SarkingSKT SkirtingSO Structural OpeningSOP Set Out PointSP Stair PressurisationSQE Square EdgeSS Stainless SteelSSL Structural Slab LevelSTL SteelST_01,02... Stair No.1, 2, etc.SWD Stormwater DrainSWF Stone Wall FinishSWP Stormwater Pit(T) ThermalTCE TerraceTD Timber DeckTND TundishTE Tooled EdgeTFW Trade Floor WasteTH ThresholdTOC Top of Capping BeamTOK Top of KerbTOH Top of HobTOW Top of WallTSA Tenant Supply AirTRA Tenant Return AirTWF Timber Wall FinishTYP. TypicalUCT Under CutUNO Unless Noted OtherwiseU/G UndergroundU/S UndersideVP Vent PipeWC WCWC_A WC_AccessibleWC_F WC_FemaleWC_M WC_MaleWC_U WC_UnisexWPM Waterproof Membrane SystemWS Wheel Stop

1 2a 2b 3 4 5 6 7 8

D2.02.07 B1

D2.04.13 PL

D2.03.05 PL

D2.03.06 PL

0136270

10390 4000 6500 10500 10500 10500 10500 10500

LV1

DD35204

136111

236111

336111

136112

236112

136113

136114

236114

0535102

0635104

Interactive digital display to future detail

Line of Plant roof beyond

CLDCLD7CLD7

CLDCLD7 CLD7CLDCLD7 CLD7CLDCLD7 CLD7CLDCLD7

COF

OFS3

Extent of Basement shown dashed

Extent of Basement shown dashed

CLD9 U/S

CLD7 sill

CLD9 U/S

CLD7 sillCLD5 sill

CLD9carpark height bar

G1

G3

G2

G2

G2

G2

G4

G5

SITE

BOU

NDAR

Y

SITE

BOU

NDAR

Y

Refer to Drawing ADB35401for facade Elevation

Refer to Drawing ADB35405for facade Elevation

"THE CHASE"Refer ADB36232 for detail

(Refer to landscape architectsdocumentation for requirements)

CARPARK ENTRYRefer ADB36242 for detail

Refer to Drawing ADB35401for facade Elevation

Refer to Drawing ADB35401for facade Elevation

"THE CUTTING"Refer ADB36212 for detail

(Refer to landscape architectsdocumentation for requirements)

Refer to Drawing ADB35110 for Detail

GL (EX)

GL (EX)

SSL 105.078 Basement 2 - B

SSL 107.878Basement 01 - B

SSL 110.678Lower Ground - B

SSL 115.078Upper Ground

SSL 118.828Level 01

SSL 122.578Level 02

SSL 126.328Level 03

SSL 130.078Level 04

SSL 112.078Lower Ground - A

SSL 109.278Basement 01 - A

SSL 134.028Roof Plant (LP)

SSL 106.478 Basement 2 - A

RL135.148Parapet

RL139.578Top of Roof Plant

2800

2800

4400

3750

3750

3750

3750

3950

1120

4430

D1.01.19 LG

LEGEND_ELEVATIONS & SECTIONS:

LV1 Mechanical LouvresLV2 450mm Extruded Aluminium Section - Refer top Facade Contractors DetailsLV3 600mm Extruded Aluminium Section - Refer top Facade Contractors Details

1. All drawings to Homebush Bay Datum (HBD), unless noted otherwise. HBD 100.078 above AHD (Australian Height Datum). A PRELIMINARY ISSUE

GB

01.10.1324.10.13 PRELIMINARY ISSUEB

PRELIMINARY ISSUEC 13.12.13D GPT issue (in progress)06.02.14E 10.02.14 CC SUBMISSIONF 27.02.14 Issue for Tender South Elevation

GCONSTRUCTION

G Issue for Construction19.05.14

G1 - Stone cladding amendedG2 - References amendedG3 - Door number adjustedG4 - Carpark height bar addedG5 - Signage Display / Glazing amended

samt
Samsung Logo
samt
Rectangle
samt
Rectangle
samt
Polygon
samt
Callout
Samsung Logo 2500h x 5000w Metal frame with perspex.
samt
Samsung Logo
samt
Polygon
samt
Callout
Samsung Logo 900h x 1800w Vinyl Film
Page 2: 3 MURRAY ROSE AVENUE - Major Projects

3 MURRAY ROSE AVENUESydney Olympic ParkDrawing Title

Project Title

GA Elevations

11002Status RevDwg No.

Scale Drawn by North

T +61 2 8668 0000F +61 2 8668 0088turnerstudio.com.au

Level 1_410 Crown StreetSurry Hills NSW 2010Australia

Project No.

1:100 @ B1

THIS DRAWING IS THE COPYRIGHT © OF TURNER. NO REPRODUCTION WITHOUT PERMISSION. UNLESS NOTED OTHERWISE THISDRAWING IS NOT FOR CONSTRUCTION. ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE PRIOR TO THE COMMENCEMENTOF WORK. INFORM TURNER OF ANY DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH WORK. DRAWINGS ARE NOT TOBE SCALED. USE ONLY FIGURED DIMENSIONS. REFER TO CONSULTANT DOCUMENTATION FOR FURTHER INFORMATION.

NOTES

DLCS Quality Endorsed Company ISO 9001:2008, Licence Number 4168Nominated Architect: Nicholas Turner 6695, ABN 86 064 084 911

0 25 10050

KEY PLAN

NOTES : Rev. Date Revision NotesApproved byCLIENTThe GPT GroupLevel 52, MLC Centre 19 Martin Place Sydney02 8239 3555--

PROJECT MANAGER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 9236 [email protected]

STRUCTURE - BROWN CONSULTINGGrd Fl, 55 Chandos Street, St Leonards02 9004 [email protected]

VERTICAL TRANSPORT - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

MECHANICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

FACADE - HYDER CONSULTINGL5 141 Walker St North Sydney NSW 206002 [email protected]

FIRE ENGINEER - FIRE ENGINEERINGPROFESSIONALSSuite 201 29 Anderson Street Chatswood NSW 206702 9411 [email protected]

GEOTECH - DOUGLAS PARTNERS96 Hermitage Road West Ryde NSW 211402 9809 [email protected]

PCA - VIC LILLI & PARTNERSSuite 1 L5 56 Railway Parade Burwood NSW 213402 9715 [email protected]

PLANNER - JBA URBAN PLANNINGLevel 7 77 Berry St North Sydney NSW 206002 9956 [email protected]

ELECTRICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

HYDRAULICS - J &M GROUP7/43-51 College St Gladesville NSW 211102 9879 [email protected]

BUILDER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 8016 [email protected]

CIVIL - KR STUBBS & ASSOCIATESSuite 6 33 Ryde Road Pymble NSW 207302 9880 [email protected]

ENVIRONMENTAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 [email protected]

LANDSCAPE - TURF95 The Kingsway Cronulla NSW 223002 9527 [email protected]

ACCESSIBILITY - MORRIS GODINGUnit 1.06 56 Bowman St Pyrmont NSW 200902 9692 [email protected]

ACOUSTIC - ACOUSTIC LOGIC CONSULTANCY9 Sarah St Mascot Sydney NSW 202002 8338 [email protected]

TRAFFIC - TTWPO Box 98 North Ryde NSW 167002 9418 [email protected]

SURVEYOR - LAWRENCE GROUP1/183 Durimbah Road. Mosman NSW 20881300 765 [email protected]

ADB

AMENDMENTS

35102

LEGEND_ELEVATIONS & SECTIONS:Note: Where nominated on drawings or schedules a numerical suffixindicates multiple types i.e BAL1 = Balustrade Type 1, etc. Refer toArchitectural Schedules for further information and detail.

AC Air ConditioningAD Access DeckAL AluminiumAP Access PanelAWN AwningBAL BalustradeBG Box GutterBH BulkheadBJ Butt JointBKP Bicycle ParkingBKR Bicycle RackBLK BlockworkBL BollardBRWO Balcony Rain Water OutletCAP CappingCBC Cubicle SystemCFC Compressed Fibre CementCGF Concrete Groove FinishCH Ceiling HeightCHE Chamfered EdgeCHS Circular Hollow Section(CI) Cast InCIS CisternCJ Control JointCL ClosingCLD CladdingCLNR Cleaner StoreCONC ConcreteCOF Concrete Off-Form FinishCOL ColumnCOM CommercialCOMS Communications ServicesCOS Check on SiteCPE Car Park ExhaustCVJ Coved JunctionCP Carparking SpaceCPC Concrete PrecastCPL Cover PlateCS Ceiling SuspendedCSF Cementitious Screed FinishCST Concrete Steel Trowel FinishCMR Cement RenderCWF Ceramic Wall FinishCWS Cold Water SupplyDB Distribution BoardDG Drip GrooveDJ Dummy JointDP Down PipeDWF Decorative Wall FinishEJ Expansion JointELEC Electrical Services(EX) ExistingEXJ Express JointEXH ExhaustEP Edge ProtectionF Fire Services(F) FixedFCC Fire Control CentreFCL Finished Ceiling Level FFL Finished Floor LevelFH Fire HydrantFGL Finished Ground LevelFHR Fire Hose ReelFIP Fire Indicator PanelFLS FlashingFP Fixed PanelFEP_01,02… Fire Egress Passage No.1, 2, etc.FRL Fire Resistance LevelFS_01,02… Fire Stair No.1, 2, etc.GBR Garbage RoomGC Glass ClearGD Glass DecorativeGDR Grated DrainGE Grooved EdgeGHR Garbage Holding RoomGL Ground LineGR Grab RailGT Glass, TranslucentGAL GalvanisedGVL GravelH Hydraulic ServicesHD Hand Dryer, ElectricHIR High Impact ResistantHP High PointHMR High Moisture ResistanceHR Hand RailHWS Hot Water ServiceHWU Hot Water UnitIL Invert LevelINS Insulation(INT) Integrated AssemblyIO Inspection OpeningJ_01,02… Joinery Type 01, 02, etc.KB KerbKE Kitchen ExhaustL_01, 02... Lift No. 1, 2, etc.LCB Lift Call ButtonLCL Lift Call LanternLP Low PointLRA Lobby Relief AirLSA Lobby Supply AirLV LouvreM Mechanical ServicesMBX Mail Box AssemblyMJ Mitre JointMDR Metal Deck RoofingMVJ Movement JointMRR Mirror ReverseMSB Main Switch Board Service including Main Distribution Board and FrameMTR MeterMV Mechanical VentNGL Natural Ground LevelNOM Nominal(O) OperableOFS Over Flow SpoutOSR On Site Retention TankPB PlasterboardPCF Powder Coat FinishPD Pivot DoorPDO Planter Drainage OutletPEL PelmetPF Paint FinishPFC Parallel Flange Channel PLD Panel Lift DoorPV PavingPT Parapet(R) RecessedRA Return AirRASS Roof Access Safety SystemsRD Roller DoorRHS Rectangular Hollow SectionRL Relative Level to AHDRU Receptacle UnitRWH Rain Water HeadRWO Rainwater OutletSB Splash BackSCN ScreenSCOL Steel ColumnSD Sliding DoorSDO Spoon Drain OutletSGN SignageSHS Square Hollow SectionSIM SimilarSJ Sawn JointSK SarkingSKT SkirtingSO Structural OpeningSOP Set Out PointSP Stair PressurisationSQE Square EdgeSS Stainless SteelSSL Structural Slab LevelSTL SteelST_01,02... Stair No.1, 2, etc.SWD Stormwater DrainSWF Stone Wall FinishSWP Stormwater Pit(T) ThermalTCE TerraceTD Timber DeckTND TundishTE Tooled EdgeTFW Trade Floor WasteTH ThresholdTOC Top of Capping BeamTOK Top of KerbTOH Top of HobTOW Top of WallTSA Tenant Supply AirTRA Tenant Return AirTWF Timber Wall FinishTYP. TypicalUCT Under CutUNO Unless Noted OtherwiseU/G UndergroundU/S UndersideVP Vent PipeWC WCWC_A WC_AccessibleWC_F WC_FemaleWC_M WC_MaleWC_U WC_UnisexWPM Waterproof Membrane SystemWS Wheel Stop

E D C3 C2 C1 B3 B2 B1 A

D2.01.06 B1

D3.01.07 LG

D11.04.21 B1

D2.04.03 PL

D2.04.12 PL

C2

0236270

12,000 8,575 1,362 3,000 3,000 1,312 8,625 12,000

LV1 LV1 LV1 LV1 LV1

FGL 113.928

AA35201

CC35203

136115

236115

336115

236116

136116

136117

0235103

0235101

CLD7 U/S

OFS3

Extent of Basement shown dashed

CLD7 Sill CLD7 sill

Refer to Drawing ADB35405for facade elevations

Refer to Drawing ADB35405for facade elevations

OFS3 OFS3 OFS3

Slab to basement shown dashed

Line of cladding to be 200mm below FGL

Extent of Basement shown dashedH1

SITE

BOU

NDAR

Y

SITE

BOU

NDAR

Y

Refer to Drawing ADB35402for facade Elevation

"THE CHASE" UPPERRefer ADB36232 for detail

(Refer to landscape architectsdocumentation for requirements)

BRICK PIT PARK

LV8CLD7

Refer to Drawing ADB35110 for Detail

GL (EX)

"THE CHASE" LOWERRefer ADB36232 for detail

(Refer to landscape architectsdocumentation for requirements)

GL (EX)

CLD7LV8 LV8LV8

Detail AA (Similar)

CLD8 CLD8CLD7

CLD7

SSL 105.078 Basement 2 - B

SSL 107.878Basement 01 - B

SSL 110.678Lower Ground - B

SSL 115.078Upper Ground

SSL 118.828Level 01

SSL 122.578Level 02

SSL 126.328Level 03

SSL 130.078Level 04

SSL 112.078Lower Ground - A

SSL 109.278Basement 01 - A

SSL 134.028Roof Plant (LP)

SSL 106.478 Basement 2 - A

RL135.148Parapet

RL139.578Top of Roof Plant

2800

2800

4400

3750

3750

3750

3750

3950

1120

4430

Concrete wall to be min 200mm below FGL

MURRAY ROSEAVENUE

FOOT PATH(PROPOSED)

LEGEND_ELEVATIONS & SECTIONS:

LV1 Mechanical LouvresLV2 450mm Extruded Aluminium Section - Refer top Facade Contractors DetailsLV3 600mm Extruded Aluminium Section - Refer top Facade Contractors Details

1. All drawings to Homebush Bay Datum (HBD), unless noted otherwise. HBD 100.078 above AHD (Australian Height Datum). A PRELIMINARY ISSUE

GB

01.10.1324.10.13 PRELIMINARY ISSUEB

PRELIMINARY ISSUEC 13.12.13D GPT issue (in progress)06.02.14E 10.02.14 CC SUBMISSIONF 27.02.14 Issue for Tender East Elevation

HCONSTRUCTION

G Issue for Construction19.05.14H Revised as noted11.07.14

H1 - 'The Chase' Upper amended

samt
Samsung Logo
samt
Polygon
samt
Callout
Samsung Logo 2500h x 5000w Metal frame with perspex.
Page 3: 3 MURRAY ROSE AVENUE - Major Projects

3 MURRAY ROSE AVENUESydney Olympic ParkDrawing Title

Project Title

GA Elevations

11002Status RevDwg No.

Scale Drawn by North

T +61 2 8668 0000F +61 2 8668 0088turnerstudio.com.au

Level 1_410 Crown StreetSurry Hills NSW 2010Australia

Project No.

1:100 @ B1

THIS DRAWING IS THE COPYRIGHT © OF TURNER. NO REPRODUCTION WITHOUT PERMISSION. UNLESS NOTED OTHERWISE THISDRAWING IS NOT FOR CONSTRUCTION. ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE PRIOR TO THE COMMENCEMENTOF WORK. INFORM TURNER OF ANY DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH WORK. DRAWINGS ARE NOT TOBE SCALED. USE ONLY FIGURED DIMENSIONS. REFER TO CONSULTANT DOCUMENTATION FOR FURTHER INFORMATION.

NOTES

DLCS Quality Endorsed Company ISO 9001:2008, Licence Number 4168Nominated Architect: Nicholas Turner 6695, ABN 86 064 084 911

0 25 10050

KEY PLAN

NOTES : Rev. Date Revision NotesApproved byCLIENTThe GPT GroupLevel 52, MLC Centre 19 Martin Place Sydney02 8239 3555--

PROJECT MANAGER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 9236 [email protected]

STRUCTURE - BROWN CONSULTINGGrd Fl, 55 Chandos Street, St Leonards02 9004 [email protected]

VERTICAL TRANSPORT - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

MECHANICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

FACADE - HYDER CONSULTINGL5 141 Walker St North Sydney NSW 206002 [email protected]

FIRE ENGINEER - FIRE ENGINEERINGPROFESSIONALSSuite 201 29 Anderson Street Chatswood NSW 206702 9411 [email protected]

GEOTECH - DOUGLAS PARTNERS96 Hermitage Road West Ryde NSW 211402 9809 [email protected]

PCA - VIC LILLI & PARTNERSSuite 1 L5 56 Railway Parade Burwood NSW 213402 9715 [email protected]

PLANNER - JBA URBAN PLANNINGLevel 7 77 Berry St North Sydney NSW 206002 9956 [email protected]

ELECTRICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

HYDRAULICS - J &M GROUP7/43-51 College St Gladesville NSW 211102 9879 [email protected]

BUILDER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 8016 [email protected]

CIVIL - KR STUBBS & ASSOCIATESSuite 6 33 Ryde Road Pymble NSW 207302 9880 [email protected]

ENVIRONMENTAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 [email protected]

LANDSCAPE - TURF95 The Kingsway Cronulla NSW 223002 9527 [email protected]

ACCESSIBILITY - MORRIS GODINGUnit 1.06 56 Bowman St Pyrmont NSW 200902 9692 [email protected]

ACOUSTIC - ACOUSTIC LOGIC CONSULTANCY9 Sarah St Mascot Sydney NSW 202002 8338 [email protected]

TRAFFIC - TTWPO Box 98 North Ryde NSW 167002 9418 [email protected]

SURVEYOR - LAWRENCE GROUP1/183 Durimbah Road. Mosman NSW 20881300 765 [email protected]

ADB

AMENDMENTS

35101

8 7 6 5 4 3 2b 2a 1

10,500 10,500 10,500 10,500 10,500 6,500 4,000 10,390

LV1

DD35204

136117

236117

336117

0635102

0735104

COF

Line of Plant roof beyond

OFS3

OFS

Extent of Basement shown dashed Extent of Basement shown dashed

CLD8

Line of cladding to be 200mm below FGL

Concrete wall to be min 200mm below FGL

Concrete wall to be min 200mm below FGLConcrete wall to be min 200mm below FGL

Line of cladding to be 200mm below FGL

H1

SITE

BOU

NDAR

Y

SITE

BOU

NDAR

Y

Refer to Drawing ADB35403for facade Elevation

"THE CHASE" UPPERRefer ADB36251 for detail

(Refer to landscape architectsdocumentation for requirements)

"THE CUTTING" UPPERRefer ADB36212 for detail

(Refer to landscape architectsdocumentation for requirements)

Refer to Drawing ADB35110 for Detail

CLD7 CLD8CLD8

Detail AA

CLD8

SSL 105.078 Basement 2 - B

SSL 107.878Basement 01 - B

SSL 110.678Lower Ground - B

SSL 115.078Upper Ground

SSL 118.828Level 01

SSL 122.578Level 02

SSL 126.328Level 03

SSL 130.078Level 04

SSL 112.078Lower Ground - A

SSL 109.278Basement 01 - A

SSL 134.028Roof Plant (LP)

SSL 106.478 Basement 2 - A

RL135.148Parapet

RL139.578Top of Roof Plant

2800

2800

4400

3750

3750

3750

3750

3950

1120

4430

LEGEND_ELEVATIONS & SECTIONS:Note: Where nominated on drawings or schedules a numerical suffixindicates multiple types i.e BAL1 = Balustrade Type 1, etc. Refer toArchitectural Schedules for further information and detail.

AC Air ConditioningAD Access DeckAL AluminiumAP Access PanelAWN AwningBAL BalustradeBG Box GutterBH BulkheadBJ Butt JointBKP Bicycle ParkingBKR Bicycle RackBLK BlockworkBL BollardBRWO Balcony Rain Water OutletCAP CappingCBC Cubicle SystemCFC Compressed Fibre CementCGF Concrete Groove FinishCH Ceiling HeightCHE Chamfered EdgeCHS Circular Hollow Section(CI) Cast InCIS CisternCJ Control JointCL ClosingCLD CladdingCLNR Cleaner StoreCONC ConcreteCOF Concrete Off-Form FinishCOL ColumnCOM CommercialCOMS Communications ServicesCOS Check on SiteCPE Car Park ExhaustCVJ Coved JunctionCP Carparking SpaceCPC Concrete PrecastCPL Cover PlateCS Ceiling SuspendedCSF Cementitious Screed FinishCST Concrete Steel Trowel FinishCMR Cement RenderCWF Ceramic Wall FinishCWS Cold Water SupplyDB Distribution BoardDG Drip GrooveDJ Dummy JointDP Down PipeDWF Decorative Wall FinishEJ Expansion JointELEC Electrical Services(EX) ExistingEXJ Express JointEXH ExhaustEP Edge ProtectionF Fire Services(F) FixedFCC Fire Control CentreFCL Finished Ceiling Level FFL Finished Floor LevelFH Fire HydrantFGL Finished Ground LevelFHR Fire Hose ReelFIP Fire Indicator PanelFLS FlashingFP Fixed PanelFEP_01,02… Fire Egress Passage No.1, 2, etc.FRL Fire Resistance LevelFS_01,02… Fire Stair No.1, 2, etc.GBR Garbage RoomGC Glass ClearGD Glass DecorativeGDR Grated DrainGE Grooved EdgeGHR Garbage Holding RoomGL Ground LineGR Grab RailGT Glass, TranslucentGAL GalvanisedGVL GravelH Hydraulic ServicesHD Hand Dryer, ElectricHIR High Impact ResistantHP High PointHMR High Moisture ResistanceHR Hand RailHWS Hot Water ServiceHWU Hot Water UnitIL Invert LevelINS Insulation(INT) Integrated AssemblyIO Inspection OpeningJ_01,02… Joinery Type 01, 02, etc.KB KerbKE Kitchen ExhaustL_01, 02... Lift No. 1, 2, etc.LCB Lift Call ButtonLCL Lift Call LanternLP Low PointLRA Lobby Relief AirLSA Lobby Supply AirLV LouvreM Mechanical ServicesMBX Mail Box AssemblyMJ Mitre JointMDR Metal Deck RoofingMVJ Movement JointMRR Mirror ReverseMSB Main Switch Board Service including Main Distribution Board and FrameMTR MeterMV Mechanical VentNGL Natural Ground LevelNOM Nominal(O) OperableOFS Over Flow SpoutOSR On Site Retention TankPB PlasterboardPCF Powder Coat FinishPD Pivot DoorPDO Planter Drainage OutletPEL PelmetPF Paint FinishPFC Parallel Flange Channel PLD Panel Lift DoorPV PavingPT Parapet(R) RecessedRA Return AirRASS Roof Access Safety SystemsRD Roller DoorRHS Rectangular Hollow SectionRL Relative Level to AHDRU Receptacle UnitRWH Rain Water HeadRWO Rainwater OutletSB Splash BackSCN ScreenSCOL Steel ColumnSD Sliding DoorSDO Spoon Drain OutletSGN SignageSHS Square Hollow SectionSIM SimilarSJ Sawn JointSK SarkingSKT SkirtingSO Structural OpeningSOP Set Out PointSP Stair PressurisationSQE Square EdgeSS Stainless SteelSSL Structural Slab LevelSTL SteelST_01,02... Stair No.1, 2, etc.SWD Stormwater DrainSWF Stone Wall FinishSWP Stormwater Pit(T) ThermalTCE TerraceTD Timber DeckTND TundishTE Tooled EdgeTFW Trade Floor WasteTH ThresholdTOC Top of Capping BeamTOK Top of KerbTOH Top of HobTOW Top of WallTSA Tenant Supply AirTRA Tenant Return AirTWF Timber Wall FinishTYP. TypicalUCT Under CutUNO Unless Noted OtherwiseU/G UndergroundU/S UndersideVP Vent PipeWC WCWC_A WC_AccessibleWC_F WC_FemaleWC_M WC_MaleWC_U WC_UnisexWPM Waterproof Membrane SystemWS Wheel Stop

LEGEND_ELEVATIONS & SECTIONS:

LV1 Mechanical LouvresLV2 450mm Extruded Aluminium Section - Refer top Facade Contractors DetailsLV3 600mm Extruded Aluminium Section - Refer top Facade Contractors Details

1. All drawings to Homebush Bay Datum (HBD), unless noted otherwise. HBD 100.078 above AHD (Australian Height Datum).

GB

A PRELIMINARY ISSUE

CONSTRUCTION

01.10.1324.10.13 PRELIMINARY ISSUEB

PRELIMINARY ISSUEC 13.12.13D GPT issue (in progress)06.02.14E 10.02.14 CC SUBMISSIONF 27.02.14 Issue for Tender North Elevation

H

G Issue for Construction19.05.14H Revised as noted11.07.14

H1 - Ground level amended to Brick pit park / cladding amended

samt
Samsung Logo
samt
Polygon
samt
Callout
Samsung Logo 2500h x 5000w Metal frame with perspex.
Page 4: 3 MURRAY ROSE AVENUE - Major Projects

3 MURRAY ROSE AVENUESydney Olympic ParkDrawing Title

Project Title

GA Elevations

11002Status RevDwg No.

Scale Drawn by North

T +61 2 8668 0000F +61 2 8668 0088turnerstudio.com.au

Level 1_410 Crown StreetSurry Hills NSW 2010Australia

Project No.

1:100 @ B1

THIS DRAWING IS THE COPYRIGHT © OF TURNER. NO REPRODUCTION WITHOUT PERMISSION. UNLESS NOTED OTHERWISE THISDRAWING IS NOT FOR CONSTRUCTION. ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON SITE PRIOR TO THE COMMENCEMENTOF WORK. INFORM TURNER OF ANY DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH WORK. DRAWINGS ARE NOT TOBE SCALED. USE ONLY FIGURED DIMENSIONS. REFER TO CONSULTANT DOCUMENTATION FOR FURTHER INFORMATION.

NOTES

DLCS Quality Endorsed Company ISO 9001:2008, Licence Number 4168Nominated Architect: Nicholas Turner 6695, ABN 86 064 084 911

0 25 10050

KEY PLAN

NOTES : Rev. Date Revision NotesApproved byCLIENTThe GPT GroupLevel 52, MLC Centre 19 Martin Place Sydney02 8239 3555--

PROJECT MANAGER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 9236 [email protected]

STRUCTURE - BROWN CONSULTINGGrd Fl, 55 Chandos Street, St Leonards02 9004 [email protected]

VERTICAL TRANSPORT - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

MECHANICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

FACADE - HYDER CONSULTINGL5 141 Walker St North Sydney NSW 206002 [email protected]

FIRE ENGINEER - FIRE ENGINEERINGPROFESSIONALSSuite 201 29 Anderson Street Chatswood NSW 206702 9411 [email protected]

GEOTECH - DOUGLAS PARTNERS96 Hermitage Road West Ryde NSW 211402 9809 [email protected]

PCA - VIC LILLI & PARTNERSSuite 1 L5 56 Railway Parade Burwood NSW 213402 9715 [email protected]

PLANNER - JBA URBAN PLANNINGLevel 7 77 Berry St North Sydney NSW 206002 9956 [email protected]

ELECTRICAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 9326 [email protected]

HYDRAULICS - J &M GROUP7/43-51 College St Gladesville NSW 211102 9879 [email protected]

BUILDER - LEND LEASEThe Bond. 30 Hickson Road, Millers Point02 8016 [email protected]

CIVIL - KR STUBBS & ASSOCIATESSuite 6 33 Ryde Road Pymble NSW 207302 9880 [email protected]

ENVIRONMENTAL - LEND LEASE DESIGNThe Bond, 30 Hickson Rd Millers Point NSW 201102 [email protected]

LANDSCAPE - TURF95 The Kingsway Cronulla NSW 223002 9527 [email protected]

ACCESSIBILITY - MORRIS GODINGUnit 1.06 56 Bowman St Pyrmont NSW 200902 9692 [email protected]

ACOUSTIC - ACOUSTIC LOGIC CONSULTANCY9 Sarah St Mascot Sydney NSW 202002 8338 [email protected]

TRAFFIC - TTWPO Box 98 North Ryde NSW 167002 9418 [email protected]

SURVEYOR - LAWRENCE GROUP1/183 Durimbah Road. Mosman NSW 20881300 765 [email protected]

ADB

AMENDMENTS

35104

LEGEND_ELEVATIONS & SECTIONS:Note: Where nominated on drawings or schedules a numerical suffixindicates multiple types i.e BAL1 = Balustrade Type 1, etc. Refer toArchitectural Schedules for further information and detail.

AC Air ConditioningAD Access DeckAL AluminiumAP Access PanelAWN AwningBAL BalustradeBG Box GutterBH BulkheadBJ Butt JointBKP Bicycle ParkingBKR Bicycle RackBLK BlockworkBL BollardBRWO Balcony Rain Water OutletCAP CappingCBC Cubicle SystemCFC Compressed Fibre CementCGF Concrete Groove FinishCH Ceiling HeightCHE Chamfered EdgeCHS Circular Hollow Section(CI) Cast InCIS CisternCJ Control JointCL ClosingCLD CladdingCLNR Cleaner StoreCONC ConcreteCOF Concrete Off-Form FinishCOL ColumnCOM CommercialCOMS Communications ServicesCOS Check on SiteCPE Car Park ExhaustCVJ Coved JunctionCP Carparking SpaceCPC Concrete PrecastCPL Cover PlateCS Ceiling SuspendedCSF Cementitious Screed FinishCST Concrete Steel Trowel FinishCMR Cement RenderCWF Ceramic Wall FinishCWS Cold Water SupplyDB Distribution BoardDG Drip GrooveDJ Dummy JointDP Down PipeDWF Decorative Wall FinishEJ Expansion JointELEC Electrical Services(EX) ExistingEXJ Express JointEXH ExhaustEP Edge ProtectionF Fire Services(F) FixedFCC Fire Control CentreFCL Finished Ceiling Level FFL Finished Floor LevelFH Fire HydrantFGL Finished Ground LevelFHR Fire Hose ReelFIP Fire Indicator PanelFLS FlashingFP Fixed PanelFEP_01,02… Fire Egress Passage No.1, 2, etc.FRL Fire Resistance LevelFS_01,02… Fire Stair No.1, 2, etc.GBR Garbage RoomGC Glass ClearGD Glass DecorativeGDR Grated DrainGE Grooved EdgeGHR Garbage Holding RoomGL Ground LineGR Grab RailGT Glass, TranslucentGAL GalvanisedGVL GravelH Hydraulic ServicesHD Hand Dryer, ElectricHIR High Impact ResistantHP High PointHMR High Moisture ResistanceHR Hand RailHWS Hot Water ServiceHWU Hot Water UnitIL Invert LevelINS Insulation(INT) Integrated AssemblyIO Inspection OpeningJ_01,02… Joinery Type 01, 02, etc.KB KerbKE Kitchen ExhaustL_01, 02... Lift No. 1, 2, etc.LCB Lift Call ButtonLCL Lift Call LanternLP Low PointLRA Lobby Relief AirLSA Lobby Supply AirLV LouvreM Mechanical ServicesMBX Mail Box AssemblyMJ Mitre JointMDR Metal Deck RoofingMVJ Movement JointMRR Mirror ReverseMSB Main Switch Board Service including Main Distribution Board and FrameMTR MeterMV Mechanical VentNGL Natural Ground LevelNOM Nominal(O) OperableOFS Over Flow SpoutOSR On Site Retention TankPB PlasterboardPCF Powder Coat FinishPD Pivot DoorPDO Planter Drainage OutletPEL PelmetPF Paint FinishPFC Parallel Flange Channel PLD Panel Lift DoorPV PavingPT Parapet(R) RecessedRA Return AirRASS Roof Access Safety SystemsRD Roller DoorRHS Rectangular Hollow SectionRL Relative Level to AHDRU Receptacle UnitRWH Rain Water HeadRWO Rainwater OutletSB Splash BackSCN ScreenSCOL Steel ColumnSD Sliding DoorSDO Spoon Drain OutletSGN SignageSHS Square Hollow SectionSIM SimilarSJ Sawn JointSK SarkingSKT SkirtingSO Structural OpeningSOP Set Out PointSP Stair PressurisationSQE Square EdgeSS Stainless SteelSSL Structural Slab LevelSTL SteelST_01,02... Stair No.1, 2, etc.SWD Stormwater DrainSWF Stone Wall FinishSWP Stormwater Pit(T) ThermalTCE TerraceTD Timber DeckTND TundishTE Tooled EdgeTFW Trade Floor WasteTH ThresholdTOC Top of Capping BeamTOK Top of KerbTOH Top of HobTOW Top of WallTSA Tenant Supply AirTRA Tenant Return AirTWF Timber Wall FinishTYP. TypicalUCT Under CutUNO Unless Noted OtherwiseU/G UndergroundU/S UndersideVP Vent PipeWC WCWC_A WC_AccessibleWC_F WC_FemaleWC_M WC_MaleWC_U WC_UnisexWPM Waterproof Membrane SystemWS Wheel Stop

A B1 B2 B3 C1 C2 C3 D E

D2.04.07 PL

C2

D1.02.01 UG

D1.05.32 UG

D1.05.33 UG

D1.05.34 UG

D1.05.35 UG

D1.05.36 UG

D1.05.37 UG

D1.05.38 UG

D1.05.39 UG

12000 8625 1312 3000 3000 1362 8575

LV1

AA35201

CC35203

136118

236118

136119

236119

136120

236120 3

361204

36120

0335103

0335101

COF COF COF COF COF COF

Interactive digital display to future detail

OF3

CLD7

Extent of Basement shown dashed

Extent of Basement shown dashed

Refer to Drawing ADB35405for facade elevations

Refer to Drawing ADB35405for facade elevations

CLD7

CLD1

CLD1

OF3 OF3

Entry awning to future detail

G1 G1G2

G3

G4

G5G5

G5G5

G6

SITE

BOU

NDAR

Y

SITE

BOU

NDAR

Y

Refer to Drawing ADB35404for facade elevations

"THE CUTTING" UPPERRefer ADB36212 for detail

(Refer to landscape architectsdocumentation for requirements)

MURRAY ROSEAVENUE

BRICK PIT PARK

LV1LV1

"THE CUTTING" LOWERRefer ADB36212 for detail

(Refer to landscape architectsdocumentation for requirements)

GL (EX)

GL (EX)

Refer to Drawing ADB35110 for Detail

SSL 105.078 Basement 2 - B

SSL 107.878Basement 01 - B

SSL 110.678Lower Ground - B

SSL 115.078Upper Ground

SSL 118.828Level 01

SSL 122.578Level 02

SSL 126.328Level 03

SSL 130.078Level 04

SSL 112.078Lower Ground - A

SSL 109.278Basement 01 - A

SSL 134.028Roof Plant (LP)

SSL 106.478 Basement 2 - A

RL135.148Parapet

RL139.578Top of Roof Plant

2800

2800

4400

3750

3750

3750

3750

3950

1120

4430

FOOT PATH(PROPOSED)

LEGEND_ELEVATIONS & SECTIONS:

LV1 Mechanical LouvresLV2 450mm Extruded Aluminium Section - Refer top Facade Contractors DetailsLV3 600mm Extruded Aluminium Section - Refer top Facade Contractors Details

1. All drawings to Homebush Bay Datum (HBD), unless noted otherwise. HBD 100.078 above AHD (Australian Height Datum). A 01.10.13 PRELIMINARY ISSUE

GB

24.10.13 PRELIMINARY ISSUEBPRELIMINARY ISSUEC 13.12.13

D GPT issue (in progress)06.02.14E 10.02.14 CC SUBMISSIONF 27.02.14 Issue for Tender West Elevation

GCONSTRUCTION

G Issue for Construction19.05.14

G1 - Doors addedG2 - Reference amendedG3 - Awning to future detail note addedG4 - Lobby entry doors amendedG5 - References addedG6 - Signage Display / Glazing amended

samt
Samsung Logo
samt
Polygon
samt
Callout
Samsung Logo 1200h x 2400w Vinyl Film
samt
Samsung Logo
samt
Callout
Samsung Logo 900h x 1800w Vinyl Film
samt
Polygon

Top Related