21.04.23for DUBAI CARES only
WORLDWIDE
“ FAST RESPONSE SCHOOL CONCEPT ”
(FRS)
SIGEM / DND
Presented to
DUBAI CARES
UAE
CASE STUDY
(GAZZA)
Presented by
SIGEM/DND-FRB Inc
TURKEY
21.04.23for DUBAI CARES only
THE IDEA FAST RESPONSE TO
THE NEEDS OF EDUCATION
SIGEM /DND
21.04.23for DUBAI CARES only
STRATEGIC VISION FOR FRS
Dedicated to delivering safe, secure and comfortable Fast Response School (RFRS) complex for villages through out the world, in the simplest, fastest and most economic way possible.
The concept will make a significant positive impact on society as a whole and particularly those in urgent need of school and basic amenities.
SIGEM / DND
21.04.23for DUBAI CARES only SIGEM / DND
SITE SURVEY & PREPARATION
(1 DAYS)
21.04.23for DUBAI CARES only
SITE PREPARATIO
N1 DAY
SIGEM / DND
21.04.23for DUBAI CARES only
PRODUCTION PHASE (7 DAYS)
SIGEM / DND
21.04.23for DUBAI CARES only
TRANSPORTATION & CUSTOM
SIGEM / DND
TUZ
21.04.23for DUBAI CARES only SIGEM / DND
ASSEMBLING1th DAY
21.04.23for DUBAI CARES only
ASSEMBLING( THE 1st
DAY)
SIGEM / DND
21.04.23for DUBAI CARES only
ASSEMBLING (THE 2nd DAY)
Strong Steel Structure
SIGEM / DND
21.04.23for DUBAI CARES only
ASSEMBLING (THE 3nd DAY)
SIGEM/ DND
21.04.23for DUBAI CARES only
SIGEM / DND
ASSEMBLINGTHE 4 th DAY
21.04.23for DUBAI CARES only
SIGEM / DND
ASSEMLING THE 5th DAY
INTERIOR FINISHING
LOCALS EXCITED TO HAVE A SCHOOL
HDF FLOORING
21.04.23for DUBAI CARES only
SIGEM / DND
TOILET IS PUT UP
PEBBLES ARE ON THE GROUND
ASSEMLING THE 5th DAY
21.04.23for DUBAI CARES only
ASSEMLING THE 5th DAY
SIGEM /DND
WC
WC is set up
21.04.23for DUBAI CARES only
SIGEM / DND
ASSEMLING THE 6 th DAY
IINSPECTION
Classrooms are ready to go in
21.04.23for DUBAI CARES only
SIGEM / DND
ASSEMLING THE 6th DAY
Waiting for students
Waiting for teachers
21.04.23for DUBAI CARES only
SIGEM / DND
THE 7th DAY
21.04.23for DUBAI CARES only
RFRS POINTS OF VALUE
• Fastest possible deployment and decommissioning Fastest possible deployment and decommissioning • Easiest possible construction. Build yourself Easiest possible construction. Build yourself within dayswithin days• VIrtually no ground preparation or slab required – onlyVIrtually no ground preparation or slab required – only
ground clearanceground clearance• Lowest on-site and total project management costLowest on-site and total project management cost• Lowest logistics usage and total costsLowest logistics usage and total costs• High quality components. Will not deteriorate with timeHigh quality components. Will not deteriorate with time• No waste – no local environmental impact No waste – no local environmental impact – Super insulation– Super insulation• All units can be taken down and redeployed All units can be taken down and redeployed • RRe-configured many times overe-configured many times over. .
, , N Nothing is discardedothing is discarded, !00% relocatable, !00% relocatable
SIGEM / DND
21.04.23for DUBAI CARES only
SIGEM /DND
DUBAI CARES
RELOCATABLE FAST RESPONSE SCHOOL CONCEPT
21.04.23for DUBAI CARES only
SIGEM / ACS
DUBAI CARES
RELOCATABLE FAST RESPONSE SCHOOL CONCEPT
21.04.23for DUBAI CARES only
Where we are ?
Accomplished
Project
SIGEM / DND
21.04.23for DUBAI CARES only
FOR MORE INFORMATION
CALL
+90 533 429 8300
+90 534 433 4606
+90 212 259 7859
WRITE
PLEASE
or