Portland 2009
Washington FACE
![Page 3: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/3.jpg)
Crane Incident Bellevue, WA
Tom Sjostrom CPEA
![Page 4: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/4.jpg)
General Contractor: WashingtonCrane Owner: Oregon
Crane Erected by: WashingtonCrane Operator: Washington
Crane Manufacturer: Liebherr (Germany)
Seattle engineering firm designed the base
![Page 5: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/5.jpg)
![Page 6: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/6.jpg)
![Page 7: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/7.jpg)
Winds may have weakened crane
![Page 8: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/8.jpg)
Bellevue crane appeared to be leaning earlier
![Page 9: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/9.jpg)
Photo from The Westin Bellevue on Oct. 10.
The yellow crane, which would collapse on Nov. 16, appears to be tilting when compared to the white crane in the foreground.
Investigators looked at photos, and said the yellow crane appears to be tilting 2 to 3 feet at the top.
![Page 10: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/10.jpg)
Cranes are allowed to lean somewhat
-- about an inch for every 40 feet of height, according to national standards.
That calculates to 5.25 inches of permissible tilt for the 210-feet high crane that collapsed
-- which is barely noticeable to the eye.
But the Bellevue crane, which heavily damaged three buildings and killed a man in his apartment as it fell,
--appears as if it was leaning more than 3 feet at the top.
![Page 11: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/11.jpg)
The cab of the construction crane that collapsed on can be seen laying against the Civica Office Commons building.
The crane was mounted on an unusual foundation of steel I-beams instead of the customary concrete slab.
The crane’s tower was bent 15 feet above the foundation.
![Page 12: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/12.jpg)
Firefighters and rescue personal clean up debris as they continue searching for victims in the Plaza 305 building.
![Page 13: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/13.jpg)
Crane Accident Bellevue, WA
![Page 14: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/14.jpg)
Dozens of bolts and welds failed where the base of the crane was secured.
The bolts connected the crane to large steel beams and a concrete slab in an underground parking garage at a corner of the construction site.
L&I investigators noted that the crane sat on an unusual base.
It reportedly had been repositioned from a cement foundation that was constructed when the project first began in 2001.
![Page 15: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/15.jpg)
Crane operator control cab. The operator suffered only minor injuries.
![Page 16: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/16.jpg)
GAPS IN SAFETY CONTROLS
No safety inspections at the site prior to the incident.
Cranes must be inspected before each use, but it is usually done by the operator.
A statewide crane-safety organization created after the deadly 1994 Kingdome crane incident was no longer active.
![Page 17: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/17.jpg)
A section of the construction crane that collapsed rests against the front of the Pinnacle Bell Centre.
The victim was in a fourth-floor apartment of the building. \\
![Page 18: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/18.jpg)
High winds earlier in the week may have weakened metal fasteners in the base of the crane .
![Page 19: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/19.jpg)
Investigators also looked into whether the crane was allowed to "weathervane," or swing freely, during windstorms before the collapse.
A failure to do so by the crane operator would have put more stress on the massive structure, experts say.
If the crane is not in weathervane mode, the torque from the wind load on the boom can contribute, at least in part, to failure.
The torque failure is similar to twisting metal until it causes metal stress and break or bend.
![Page 20: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/20.jpg)
![Page 21: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/21.jpg)
![Page 22: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/22.jpg)
Workers remove debris the Pinnacle Bell Centre apartments
![Page 23: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/23.jpg)
![Page 24: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/24.jpg)
A Second Crane in Bellevue has problems December
Crane's cracks blamed on water, iceLabor and Industries agency issues call for statewide inspections
State investigators are blaming water and ice for the long cracks that developed in the 300-foot-high tower construction crane in downtown Bellevue that was suddenly branded a safety hazard and dismantled over the weekend.
![Page 25: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/25.jpg)
Tower Crane employees work to stabilize a damaged construction crane; here, they pull themselves into position to add more clamps to the crane.
![Page 26: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/26.jpg)
Tower Crane employees inspect the damaged crane where cracks were discovered in downtown Bellevue before it is dismantled.
![Page 27: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/27.jpg)
Third Bellevue crane found to have flaw
A 225-foot tower crane in downtown Bellevue was being repaired with welding torches after a 2-foot "hairline" crack was found near the top of the tower.
![Page 28: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/28.jpg)
Fourth Tower Crane Crack Identified
Neglect blamed for rash of crane failuresMaintenance and inspections have been lax, some say
![Page 29: 2009 Face Conference Wa Crane Sjostrom](https://reader033.vdocuments.mx/reader033/viewer/2022052820/54bdc84e4a79593f5e8b461e/html5/thumbnails/29.jpg)