SUBMITTAL REVIEW Submittal: No. 013.00 Spec Section: 03 3000 2.11 Concrete Mix Design - 3500 psi - Review Form Reviewed By: Laura Landon, Comma-Q Architecture Date: May 10, 2012 Project: BPS – Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner
This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following:
NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted
1. 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi Data Sheets GCAN
Notes: 1. See engineer’s comments.
END OF REVIEW
EMAIL TRANSMITTAL
PROJECT: DATE:
JOB#
SUBMITTAL#
TO: Comma-Q ArchitectureADDRESS:
ATTENTION:
PHONE:
FAX:
TRANSMITTED:
ITEM DATE COPIES1 1
TRANSMITVia:
No. Page: 1
REMARKS:
COPY TO:
Bozeman, MT. 59715
PDF - 3500 psi concrete mix design
Matt Miller
Mix Design
Laura Landon
6/6/2012
11011
NM06062012-2
109 N. Rouse Ave., #1
New Belgrade Elementary School
(406) 585-1112
DESCRIPTION
(406) 585-5518
TRANSMITTED BY:
108 West Babcock Street, Bozeman, MT. 59715 Phone: (406) 582-9901 FAX: (406) 582-9992
Prints
Proposal OtherShop Drawings
RFI Response
Field Report
Specifications
CalculationsLetter Sketches
No Exceptions Taken
These are Transmitted as Checked Below:
For Your File
For Your Use
Revise As Noted And Resubmit
Make Corrections Noted
Rejected/Resubmit As Specified
Reviewed For Load To Structure Only
As Requested
Submitted Previously
TRANSMITTAL
May 29, 2012
To: Nishkian Monks Attention: Matt Miller From: Laura Landon Project: BPS – Belgrade Elementary School Location: Bozeman, MT Job Number: 11-03
Copy to: File
we are sending you : Attached
Under separate cover
the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other:
these are transmitted as checked below:
Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment:
date qty description
5/25/2012 1 (elec) Submittal 13.00 - 03 3000 2.11 Concrete Mix Design - 3500 psi
Remarks:
Matt, please review the attached submittal, please return an electronic version to our office with your comments. Thanks
MARTEL CONSTRUCTION, INC. LETTER OF TRANSMITTAL1203 South Church Avenue
Bozeman, MT 59715-5801
Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 05/25/12 JOB NO. 12-001
TRANSMITTAL/SUBMITTAL NO. 13.00
TO: Comma Q Architects RE: Line Pump Concrete Mix Designs
109 North Rouse Ave #1
Bozeman, MT 59715
ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL
We are hand delivering
We are sending via Email
ATTACHED UNDER SEPARATE COVER TheThe following items:
Shop drawings Prints Plans Samples Specifications
Copy of letter Change order X Product Data
COPIES DATE DWG NO. DESCRIPTION
1 Section 03 3000 2.11 Line Pump Concrete Mix Design 3500 psi Slabs5/24/12
THESE ARE TRANSMITTED as checked below:X For approval Approved as Submitted Resubmit Copies for Approval
For your use Approved as Noted Submit Copies for Distribution
As requested Returned for Corrections Return Corrected Prints
For review and comment
FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US
REMARKS:
COPY TO File
Matt -Nishkian SIGNED: Mike Wilkinson - Project Engineer
If enclosures are not as noted, kindly notify us at once.