8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
1/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
DESIGN EXAMPLES—SECTION 4
CONTENTS
Section PageDE-
4.0 CASE STUDY—ROCK CREEK .................................................................................................... 50
Figures for Section 4
Figure 1—Flor Storage Facility Plan View.................................................................................................. 53
Figure 2—Typical Pond Edge Adjacent to Community Ditch ..................................................................... 54
Figure 3—Typical Embankment Crest........................................................................................................ 54
Figure 4—Typical Pond Edge Adjacent to Filing No. 13 ............................................................................ 55
Figure 5—Typical Clay Cutoff Trench......................................................................................................... 55
Figure 6—Profile Pond Outlet Works.......................................................................................................... 56
Figure 7—Plan Drop Box............................................................................................................................ 56
Figure 8—Section Drop Box....................................................................................................................... 57
Figure 9—Plan 78" RCP Outlet .................................................................................................................. 58
Figure 10—Section 78” RCP Outlet............................................................................................................ 58
Figure 11—Rock Creek Flor Storage and Landscape Plan ....................................................................... 59
Figure 12—Landscape Plan Construction Notes and Plant Legend .......................................................... 60
Figure 13—Planting and Trail Details......................................................................................................... 61
Figure 14—Grouted Boulder Drop Structures ............................................................................................ 64
Figure 15— LB3 Channel Profile ................................................................................................................ 65
Figure 16—Typical Drop Structure ............................................................................................................. 65
Figure 17—Grout Cutoff Section ................................................................................................................ 66
Figure 18—Drop Structure Profile .............................................................................................................. 66
Figure 19—Typical Drop Basin Section and Sill......................................................................................... 67
Figure 20—Typical Drop Face Section....................................................................................................... 67
Figure 21—Drop Structure Measurement Table ........................................................................................ 68
Figure 22—LB3 Channel Plan.................................................................................................................... 72
Figure 23—Typical Wetland Channel Section and LB3 Channel Profile.................................................... 72
Figure 24—Check Structure Plan............................................................................................................... 73
Figure 25—Check Structure Profile ............................................................................................................ 73
Figure 26—Check Structure Layout Table ................................................................................................. 74
Figure 27—Check Structure Details ........................................................................................................... 75
Figure 28—Stream Stabilization Plan......................................................................................................... 79
Figure 29—Grouted Boulder Check Structure with Low-Water Crossing Site Plan................................... 80
Figure 30—Typical Stream Stabilization Detail .......................................................................................... 81
Figure 31—Stream Stabilization Site Plan ................................................................................................. 81
06/2001 DE-iUrban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
2/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
4.0 CASE STUDY—ROCK CREEK
The purpose of this case study is to demonstrate the following features:
•
Detention facility
• Grouted boulder drop structure
• Grouted boulder check structures and wetland bottom channels
• Stream bank stabilization including grouted boulder check structure with low-water crossing,
slope flattening and revegetation
McLaughlin Water Engineers, Ltd. (MWE) and the Norris/Dullea Company (both based in Denver)
prepared the attached drawings. Photographs are provided for each of the facilities featured in this case
study.
The formal names of these projects are:
1. Tributary LB-3 Channel and Flor Storage Facility
2. Rock Creek Stabilization, Tributary RB-3 Outfall Pipe, and Community Pond East
The client for MWE and Norris/Dullea Company was Superior Metropolitan District No. 1 and the relevant
drawings were prepared in 1994 and 1997.
Public reaction to the facilities shown on the attached pages and to the overall drainage plan has been
extremely positive due to the aesthetic nature of the facilities, the fact that they nicely integrate into the
community, their environmentally-sensitive nature and multi-purpose benefits. There is no question that
the drainage system in Rock Creek substantially enhances community character and the value of
residential properties.
DE-50 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
3/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Detention Facility—Flor Storage Facility
06/2001 DE-51Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
4/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Detention Facility—Flor Storage Facility
and Interpretive Sign
DE-52 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
5/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 1—Flor Storage Facility Plan View
06/2001 DE-53Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
6/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
6”
Figure 2—Typical Pond Edge Adjacent to Community Ditch
Figure 3—Typical Embankment Crest
DE-54 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
7/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 4—Typical Pond Edge Adjacent to Filing No. 13
Figure 5—Typical Clay Cutoff Trench
06/2001 DE-55Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
8/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 6—Profile Pond Outlet Works
Figure 7—Plan Drop Box
DE-56 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
9/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 8—Section Drop Box
06/2001 DE-57Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
10/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 9—Plan 78" RCP Outlet
Figure 10—Section 78” RCP Outlet
DE-58 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
11/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 11—Rock Creek Flor Storage and Landscape Plan
06/2001 DE-59Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
12/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 12—Landscape Plan Construction Notes and Plant Legend
DE-60 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
13/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 13—Planting and Trail Details
06/2001 DE-61Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
14/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Grouted Boulder Drop Structures on Tributary LB-3 Channel
DE-62 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
15/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Grouted Boulder Drop Structures on Tributary LB-3 Channel
06/2001 DE-63Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
16/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 14—Grouted Boulder Drop Structures
DE-64 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
17/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 15— LB3 Channel Profile
Figure 16—Typical Drop Structure
06/2001 DE-65Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
18/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 17—Grout Cutoff Section
Figure 18—Drop Structure Profile
DE-66 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
19/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 19—Typical Drop Basin Section and Sill
Figure 20—Typical Drop Face Section
06/2001 DE-67Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
20/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 21—Drop Struc ture Measurement Table
DE-68 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
21/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Grouted Boulder Check Structures And Wetland Bottom Channels
06/2001 DE-69Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
22/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Grouted Boulder Check Structures And Wetland Bottom Channels
DE-70 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
23/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Wetland Bottom Channel
06/2001 DE-71Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
24/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 22—LB3 Channel Plan
Figure 23—Typical Wetland Channel Section and LB3 Channel Profi le
DE-72 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
25/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 24—Check Structure Plan
Figure 25—Check Structure Profile
06/2001 DE-73Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
26/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 26—Check Structure Layout Table
DE-74 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
27/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 27—Check Structure Details
06/2001 DE-75Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
28/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Stream Bank Stabilization Including Grouted Boulder Check Structure With
Low-Water Crossing, Slope Flattening, And Revegetation
DE-76 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
29/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Stream Bank Stabilization Including Grouted Boulder Check Structure With
Low-Water Crossing, Slope Flattening, And Revegetation
06/2001 DE-77Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
30/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Stream Bank Stabilization Including Grouted Boulder Check Structure With
Low-Water Crossing, Slope Flattening, And Revegetation
DE-78 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
31/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 28—Stream Stabilization Plan
06/2001 DE-79Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
32/33
DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)
Figure 29—Grouted Boulder Check Structure with Low-Water Crossing Site Plan
DE-80 06/2001Urban Drainage and Flood Control District
-
8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf
33/33
DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES
Figure 30—Typical Stream Stabilization Detail
Figure 31—Stream Stabilization Site Plan