Transcript
  • 8/8/2019 1285661782 355 FT0 Santosh Shetty Resume

    1/5

    SANTOSH KARUNAKAR SHETTYTel. +971561034258

    E-mail: [email protected],[email protected],[email protected]

    JOB TITLE: LOOKING FOR A SUITABLE POST OF PROJECT ENGINEER FOR

    POST-TENSIONING WORKS IN BUILDINGS,BRIDGES,SOIL ANCHORS OR OF

    PROJECT/CIVIL ENGINEER FOR BUILDINGS WORK

    Experience & Expertise:6 years experience in Post-Tensioning Works & 2 years in Building Construction

    As specialist in Post-Tensioning works for various multistoried commercial and

    Residential buildings (Slab Post -Tensioning)

    Supervision and execution of Multi-Strand Post-Tensioning

    Supervision and execution of RCC projects

    Resource planning, Project Progress monitoring and reporting.

    Quantity Surveying for As-Built works

    Inspection for PT Works as well as RCC Works. Materials forecast, field accounting and certification for payment and material

    reconciliation

    Inspect sites to monitor progress and ensure conformance to design specifications

    and safety or sanitation standards. Execute work at site as per drawings and

    specification.

    Perform site inspection, man-material management on site, completing job as per

    drawings, ensure project progress as per set time and budgets maintaining quality.

    Co-ordination with QA/QC Engineer and consultant for approvals.

    Estimate quantities-cost of materials, equipment, or labour to determine project

    feasibility. Direct construction, operations and maintenance activities at site.

    Inspect sites to monitor progress and ensure conformance to design specifications

    and safety.

    Provide technical advice regarding design, construction, or program modifications

    and structural repairs to industrial and managerial personnel.

    Attend meetings with various suppliers for material approval, maintain quality of

    work, prepare and check bill of quantities and day-to-day follow up.

    Conversant with all kinds of building works such as setting out of building,

    shoring , piling, formwork, plastering, brickwork, tiling, RCC works,finishing

    works, Concrete Mix-design, etc.

    1

    mailto:[email protected],[email protected]:[email protected],[email protected]:[email protected]:[email protected],[email protected]:[email protected]
  • 8/8/2019 1285661782 355 FT0 Santosh Shetty Resume

    2/5

    Career History:

    Organisation Position Held Duration

    FreyssinetGulf (L.L.C.),

    Dubai, U.A.E.

    Site Engineer September 2006 to May

    2010

    Middle East Pre-Stressing

    Company (L.L.C.), Dubai,

    U.A.E.

    Site Engineer February 2005 to May

    2006

    Freyssinet India Ltd, Worli,

    Mumbai, India.

    Project Engineer February 2004 to

    January 2005

    Leena InfraTech Engg. Pvt.

    Ltd.A Class govt. contractor

    13-14 Sai Chamber, Ground

    FloorSector 11, C.B.D. Belapur.

    Navi Mumbai- 400614India.

    Site Engineer June 2003 to January

    2004

    Sneha Builders ,

    Silver Blaise Building, Amboli,

    Andheri, Mumbai -400058,

    India.

    Site Engineer January 2002 to May

    2003

    Professional Experience:

    From September 2006 To May 2010 :

    Dubai Technology,Electronic Building(4B+G+44+ROOF) on plot no.:B-001-014,Dubai,

    U.A.E.

    Contractor: The Arab Contractors (L.L.C.).

    Consultant: National Engineering Bureau Architectural & Engineering Consultants.

    Project Status: Work is in progress

    Pier-8 Residential Development (3B+G+41+ROOF) on plot no.:8EE, Dubai Marina,

    U.A.E.

    Contractor: Modern Executive Systems Cont. (L.L.C).

    Consultant: WS Atkins & Partners Overseas.

    Project Status: Project was on hold

    Knowledge & Human Development Authority Head Quarter (B+G+M+3Floors Head

    Quarters Office Building) on plot no.:KV5-001-006, Dubai Academic City, Dubai, U.A.E.

    Contractor: Al Basti & Mukhta Contracting Company (L.L.C.)

    Consultant: Design & Architecture Bureau (DAR).

    Project Status: Completed

    XL Tower (3B+G+4POD+19TYP.+20) on plot no.:BB-A05-010,Business Bay, Dubai,

    U.A.E.Contractor: CSHK Dubai Contracting (L.L.C)

    Group of China State Construction Engineering (HongKong) Ltd.

    Consultant: Conin (Incorporated Consultants)

    2

  • 8/8/2019 1285661782 355 FT0 Santosh Shetty Resume

    3/5

    Project Status: Completed

    Business Tower: (3B+G+4POD+19TYP.) on plot no.:BB-A05-010,Business Bay,

    Dubai,U.A.E.

    Contractor: CSHK Dubai Contracting (L.L.C).

    Group of China State Construction Engineering (HongKong) Ltd.

    Consultant: Archon

    Project Status: Completed

    2Y Residential Tower (3B+G+32+ROOF) on plot no.:392-251 Dubai Marina, U.A.E.

    Contractor: Dubai Contracting Company (L.L.C).

    Consultant: Chawla Architectural & Consulting Engineers

    Project Status: Completed

    Ground+3 Storey+Roofon plot no.:421-735,Al Warqaa First, U.A.E.

    Contractor: Al Arif Cont.(L.L.C.)

    Consultant: LEO (Local Engineering Office).

    Project Status: Completed.

    Sidra Tower (3B+G+45+LOWER ROOF) on plot no.:B-001-011,TECOM ,Dubai, U.A.E.

    Contractor: Comprehension Contracting EST JV Zelan.

    Consultant: APG Architecture & Planning Group.

    Project Status: Completed.

    Code Tower (3B+G+14+GYM+ROOF) on plot no.:373-1323,Al Barsha-First, Dubai,

    U.A.E.

    Contractor: Dubai Contracting Co.(LLC)

    Consultant: DXB LAB Architecture.

    Project Status: Completed

    Publishing Pavillion Building(3B+G+8+ROOF) on plot no.:PP-001-002, International

    Media Production Zone(IMPZ),Dubai, U.A.E.

    Contractor: ETA Ascon

    Consultant: Archon.

    Project Status: Completed

    Le-Solarium Tower (3B+G+14+ROOF), Dubai Silicon Oasis, U.A.E.

    Contractor: Sun Engineering & Contracting Co.(LLC)

    Consultant: National Engineering Bureau Architectural & Engineering Consultants.

    Project Status: Completed

    Residential Building (2B+G+8+ROOF) on plot no.: 316-571, Al Rafaa, Dubai, U.A.E.

    Contractor: SS LOOTAH Contracting Co.(LLC)

    Consultant: Port Saeed Engineering.

    Project Status: Completed

    Iris Blue Tower (G+2P+CH+36+ROOF), (upto CH), Dubai Marina, Dubai, U.A.E.

    Contractor: Al Ahmadiah Cont. Co., Dubai, U.A.E.

    Consultant: WS Atkins & Partners Overseas.

    Project Status: Completed

    3

  • 8/8/2019 1285661782 355 FT0 Santosh Shetty Resume

    4/5

    From February 2005 To May 2006 :Completed projects:

    Buildings: 9, 10, 11 &12

    Dubai Mall (The Biggest Shopping Mall in the world) at Satwa Dubai.

    Client: EMAAR

    Contractor: CCC, Dutco LLC,

    Consultant: Meinhardt

    Bridges Project:

    4.5 Interchange, 7 Bridges (All together around 2 km) on sheikh Zayed road.

    Client: Dubai Municipality

    Contractor: Wade Adams LLC Consultant: Parsons De Lew cather Overseas

    Middle Bridges On trunk In Palm Jumeirah Project

    Contractor: Larsen & Toubro LTD.

    Client: Al Nakheel

    Consultant: Parsons De Lew cather Overseas

    From February. 2004 To January 2005 :

    Completed projects:

    1) PT Beam & Slab for Goradia Shopping Centre(1B+G+2+ROOF), Santacruz-west.

    2) Rock Anchoring for Jet Airways Hanger, Military camp, Kalina

    3) Rock Anchoring for Neelkanth Mansions Pvt. Ltd.

    4) Rock Anchoring for Deewan Housing Pvt. Ltd.

    5) Rock Anchoring for Matruchayya, Pali Hill, Bandra

    6) Vasai creek bridges for western railway(2 BRIDGES), Thane, Maharashtra

    From June 2003 To January 2004 :Completed Projects:

    Father Agnel multipurpose High School Project at Ambernath (G+3)Building ,Thane

    district, Maharashtra, India.

    From January 2002 To May 2003 :

    Buildings Project Completed:Residential Complex comprising of 3 buildings:

    1) Silver Arch building (G+7)

    2) Silver Mist building (G+7)

    3) Silver Spring building (G+7)

    In-plant training:Worked as a trainee Site Engineer for M/S Kanakia Builders at 749, Business Point, Andheri

    (East), Mumbai, Maharashtra, India.

    B.E. Project:

    Overall study of Bandra-Worli Sea-link project & in depth study of construction techniques used.

    4

  • 8/8/2019 1285661782 355 FT0 Santosh Shetty Resume

    5/5

    Education:

    Qualification Institute/University

    B.E. (Construction) Passed in December 2001

    Institute: Shah & Anchor Kutchhi Engg. College (Mumbai University)

    H.S.C Passed in March 1995

    College:Cosmopolitan College,Andheri ,Mumbai

    Maharashtra State Board of secondary & higher secondary education

    Bombay divisional board

    S.S.C. Passed in March 1993

    School: M.V.M. High School, Andheri, Mumbai

    Maharashtra State Board of secondary & higher secondary education

    Bombay divisional board

    Computer Skills:MS-Office

    Windows 2000 NT & Internet Applications.

    Personal Details:

    Marital status : Married.

    Nationality : Indian.

    Date of Birth : 31/05/1977.

    Passport No : E 8156509 valid up to 2014.

    Languages known : English, Hindi, Marathi, Tulu.

    Permanent Address : 46/944,Azad Nagar no.: 3,Veera Desai Road, Andheri (West),

    Mumbai-400058, Maharashtra, India.

    Driving license No. : (Dubai, U.A.E.) Licence No: 1262698 valid till 26/05/2018

    Indian license, valid till 2016.

    DECLARATION

    I Santosh K. Shetty, here by declare that the information furnished above is correct and

    true to the best of my Knowledge.

    Place: Yours Sincerely,

    Date:

    (SANTOSH KARUNAKAR SHETTY)

    5


Top Related