Apprentice Centre
Waste Minimisation & Management
1
Key Legislative Drivers Timeline
WEEE Regulations
Into force
Landfill Tax
Increase
2006 2007 2008 2009 2010 2011
EU directive
Landfill Tax
Increase
Landfill Tax
Increase
Targets & Bans
Fiscal Landfill
Tax Increase
WEEE Regulations
RoHS Regulations
Landfill Tax
Increase
Landfill Tax
Increase
UK Law SWMP Regs
SWMP required on projects
over £250,000
SWMP Checklist &
Datasheet to be completed
Waste Strategy for
England 2007
Code for Sustainable
Homes
Code for Sustainable
Buildings
Oct 07 Treatment of non-haz waste
before landfill
Groundwork Merton Landscape Project SWMP
04/08/2013 © NGS 2005 Brian Murphy Waste SWMP 4 04/08/2013 © NGS 2005 Brian Murphy Waste SWMP 6
04/08/2013 © NGS 2005 Brian Murphy Waste SWMP 7
Specification
D10-D19 Earthwork Foundations
Specification
C91 Alteration Resource Recovery Waste minimisation
Specification
Q29 Landscape
Resource Recovery Waste minimisation
Specification
R10- Z31 Services
Reference Sections
Specification
C21- C90 work on existing buildings
Specification
C20 Demolition/ Deconstruction Resource Recovery
Specification
D20 Excavation Resource Recovery Waste minimisation
Specification
D21-Q28 New-build Structure Landscape
Assembly in Project Specification Appendix
MEW Materials Exchange Websites
Appendix
ASR Architectural Salvage Reclaim
Appendix
MRR Materials Recovery & Reuse
Appendix
PDA Pre-Demolition Audits
Appendix
SWMP Site Waste Management Plan
Appendix
EWC European Waste Catalogue
Appendix
FFEI Furniture Fixtures Equipment IT Recovery
Appendix
ROMP Recycling Operations Materials Packaging
Assembly in Project Specification
Title 04/08/2013
© NGS 2009 Brian Murphy 2
Standard Works
General Contacts
Intermediate Works
Minor Works
Packaged Contracts
CM MC Etc.
Waste Package
Waste in each
package
Future Development
General Contracting
Contract Values
CM, MC, DMC, D&B
Procurement
Methods Waste
Sub contract
Waste Sub
contract
Waste Sub
contract
04/08/2013 © NGS 2006 Waste Recycle Icons 11 04/08/2013 © NGS 2006 Waste Recycle Icons 12
04/08/2013 © NGS 2006 Waste Recycle Icons 13 04/08/2013 © NGS 2004-06 Waste Colour Code 14 04/08/2013 © NGS 2004-06 Waste Colour Code 15
04/08/2013 © NGS 2004-06 Waste Colour Code 16 04/08/2013 © NGS 2004-06 Waste Colour Code 17 Colour code Poster Campaign In site offices
Title 04/08/2013
© NGS 2009 Brian Murphy 3
Local to point of creation
Centralised for segregated bulking
Remote for easy vehicle access
Compactable Inert Mixed Timber Packaging Hazard
04/08/2013 © NGS 2004 Brian Murphy Title 20
Specialist Trade or Sub-contractor waste provision
Main Contractor waste provision
Metal Inert Mixed Timber Packaging Hazard
£ £ £ On-site Best Practice: Local + Central + Remote?
Metal
Timber
Hazard
Mixed
Paper
Insulation
Inert
Each sub-contractor responsible for own waste Each generating different waste to each other Isle of Dogs Canary Wharf © NGS
Local Waste Segregation
45% air voids And much outside
of skip volume
Well filled
On-site Best Practice: Filling
On-site Poor Practice: Filling
Waste Chute Segregation days
Inert
Mon PM
Tues PM
Wed PM
Thurs PM
Friday PM
Metal Gypsum Hazard Mixed Timber
Packaging Flat Glass Metal Plasterboard Compostable Green Waste
Asbestos
Biohazard
Mon AM
Tues AM
Wed AM
Thurs AM
Friday AM
04/08/2013 © NGS 2004 Brian Murphy Title 25
Easy Access Drop End Landfill Tax Escalator
Inert
Mixed
Inert
Mixed Mixed
Mixed
Inert Inert Inert Inert
Mixed
£2/tonne
£35/tonne
£11/tonne
£187m £15/tonne
£18/tonne
£2/tonne £2/tonne £2/tonne £2/tonne £2/tonne
2003/4 2004/5 2005/6 2006/7
Mixed
£??/tonne
Long term
£216m
£259m
£???m
£504m
£13/tonne
£6m £6m £6m £6m £6m
Best Good Normal Bad Practice
Mixed waste
Reuse
Hazardous waste
Segregated/Inert
Incinerate to Recover Energy
Reclaim
Recycle Recover Materials
Reduce
Title 04/08/2013
© NGS 2009 Brian Murphy 4
Bad Landfill Practice
Little or no Opportunity to
Recycle and Recover Materials
Mixed waste Hazardous waste And Combustion
Mixed waste Hazardous waste
Mixed waste
Methane created
Leachate released û
Better Landfill Practice
Little or no Opportunity to
Recycle and Recover Materials
Mixed waste
Cap site Bottle the Methane Use for fuel
Collect Leachate Move to hazardous waste landfill
Impervious wall Drained cavity
û Materials Protection: Full hbmpp scheme No absorbent surfaces Corner Protection Stability bracing Moisture control
BedZED Beddington Sutton Architect: Dr Bill Dunster
But: Rain Cover needed Not Remote storage Not off the ground Not JIT but JIC
Excess Materials Storage
Greenwich Millennium Village © NGS
04/08/2013 © NGS 2004-06 Waste Colour Code 35
Decoration Waste Paint Pots Returned
Carillion UoH site © Carillion Discharge Luminaires Purpose made waste collection container
Title 04/08/2013
© NGS 2009 Brian Murphy 5
Centralised Waste Segregation
GMV Phase 2a © NGS 40% Airspace in skips
Any new build site across the country (GMV Phase 2 a) © NGS Remote Waste Segregation
Greenwich Millennium Village Phase 2a © NGS
Brick Waste
Any Building site across the country © BRE Domestic Waste + Skip Fires Close to boundary: invitation to local ASBO residents
04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 43
04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 44 04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 45 04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 46
Title 04/08/2013
© NGS 2009 Brian Murphy 6
04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 47 04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 48 04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 49
04/08/2013 © NGS 2006 Waste Transfer Station WasteCycle Ltd. 50 Rear End Loaders & 4 Wheel bins © North Norfolk
REL Rear End Loaders © North Norfolk
04/08/2013 © NGS 2006 WasteTransferEcoCentre 53 04/08/2013 © NGS 2006 WasteTransferEcoCentre 54