2
Reasons for Allocating versus Assigning Costs Direct costs can be assigned to cost objects
- example material in a shirt Indirect costs must be allocated to cost
objects – example: part of depreciation on garment factory to be assigned to shirt
Costs must be allocated for GAAP product costing, but for managerial purposes only do when productive
3
Allocation Costs for Product Costing For GAAP financial statements, all costs
associated with production, including fixed and variable overhead, must be captured in inventory.
In order to do this, we use a predetermined overhead application rate to assign costs to production.
4
Allocating for Managerial Accounting Purposes For managerial accounting (internal
reporting) we are not governed by the rules of GAAP so the question is how to use allocations to get the most useful information and/or the best motivation.
A cost may be allocated for one purpose but not for another. For example, you might allocate to evaluate a segment, but not it’s manager.
5
The Allocation Process
Assume that we have $120,000 in building costs that are going to be assigned to the 3 departments in the business building based on number of faculty. The departments have 30, 10, and 20 faculty. How much should each be assigned?
6
Basic Allocation Example
# ofFaculty
TotalFaculty
Propor-tion
TotalCost
CostAssigned
30 60 30/60 $120,000 $60,000
10 60 10/60 $120,000 $20,000
20 60 20/60 $120,000 $40,000
7
Using Actual Rates - the Wrong Way Assume that two departments use power from
the electric generating department. Generating department has a cost formula of
$10,000 + $0.10/KWHr Dept. A’s peak needs are 100,000 hours, and
B’s peak needs are 50,000 hours. During December, A used 40,000 hours, B
used 50,000 and total cost was $21,000.
8
Actual Allocation
How much would each department get charged if the actual charges are assigned to each based on the actual relative usage?
Would you want this number on your performance report - can you control it?
9
Dual Allocation Dual allocation recognizes that the need for
capacity in a given resource drives the fixed costs of the resource, while the utilization of capacity drives the variable costs.
Also believes that charges to managers that will be involved in performance evaluation should be dependent on quantity of resource used by manager (be controllable) and be predictable.
10
Dual Allocation - the fair way
Try to come up with an allocation for A and B that will make what is charged not dependent on what the other uses, will not pass along inefficiency in the power dept. to the operating departments, and will make each department pay the fixed costs associated with its demand for capacity (peak needs).
11
Service Department Cost Allocation In order to get full production costs, the
costs of service departments in factories have to be first assigned to the producing departments, and then assigned to the products.
We use the direct method, where the service department costs are assigned directly to the producing departments.
14
Activity-Based Costing (ABC) Approach
ABC assigns costs to products based on the resource usage of each product.
Volume is one major driver of resource usage, but other drivers may be as or more important.
Accountants today recognize two other major influences on cost, complexity and diversity of operations.
ABC is concerned with resource consumption.
ABC identifies multiple cost pools and drivers for each.
15
Activity-Based Costing Terms
Activities are the processes that organizations undertake that create costs
Cost Drivers are measures of the level of activity.
Cost Pools are groups of activity costs that are able to use the same cost driver.
16
MultiBrick Cost Determination DataTraditional Approach
Total manufacturing overhead $800,000
Total output 10,000,000 bricks Model A-42Model A-88Model C-11
Total production 600,000 400,000 9,000,000
Material cost per brick $0.05 $0.04 $0.03
Direct labor cost per brick$0.06 $0.07 $0.04
Overhead rate = $800,000 / 10,000,000 = $0.08 per brick
17
MultiBrick Cost Determination DataTraditional Approach
Cost calculations: Model A-42Model A-88Model C-11
Material cost per brick $0.05 $0.04 $0.03
Direct labor cost per brick 0.06 0.07 0.04
Overhead cost at $0.08 0.08 0.08 0.08
Total unit cost $0.19 $0.19 $0.15
18
MultiBrick Data for IllustrationABC Approach
Cost Drivers Cost in Pool Level of Driver Rate
Setups $120,000 10,000 setups $12
Baking time 600,000 300,000 hours $2
Customer orders80,000 5,000 orders $16
$800,000
19
MultiBrickActivity Data per Year
Model A-42 Model A-88 Model C-11
Number of setups 1500 1800 6700
baking time, hours 60,000 50,000 190,000
Number of customer orders300 400 4,300
Costs, excluding overhead
Material cost per brick $0.05 $0.04 $0.03
Direct labor cost per brick 0.06 0.07 0.04
20
MultiBrick ABC Analysis of Bricks
Model A-42 Model A-88 Model C-11
Overhead:
Setup-based 18,000 21,600 80,400
Baking time 120,000 100,000 380,000
Customer order based4,800 6,400 68,800
Total OH $142,800 $128,000 $529,200
Material cost $30,000 $16,000 $270,000
Direct labor cost 36,000 28,000 360,000
Total Cost $208,800 $172,000 $1159,200
Divided by annual volume600,000 400,000 9,000,000
Average cost per brick $0.35 $0.43 $0.1288
21
Comparison of Traditional Costs and ABCTraditional Cost Approach:
Model A-42 Model A-88 Model C-11
Material cost per brick $0.05 $0.04 $0.03
Direct labor cost per brick 0.06 0.07 0.04
Overhead cost at $0.08 0.08 0.08 0.08
Total unit cost $0.19 $0.19 $0.15
ABC Cost Approach:
Model A-42 Model A-88 Model C-11
Material cost $0.05 $0.04 $0.03
Direct labor cost per brick 0.06 0.07 0.04
Overhead 0.24 0.32 0.06Total cost 0.35 0.43 0.13
22
Consumption RatiosConsumption ratios is the resource utilized by a given product divided by the total amount of the resource available.
Since MultiBrick is producing a total of 10,000,000 bricks, the consumption ratio of each model is:
Model A-42: 600,000 bricks / 10,000,000 = 6%
Model A-88: 400,000 bricks / 10,000,000 = 4%
Model C-11: 9,000,000 bricks / 10,000,000 = 90%
High volume products use unit based drivers at higher levels than non-unit based drivers.
23
Conclusions about ABC Using ABC will normally lower the cost of the
high volume, easy to manufacture product Using ABC will raise the cost of the low
volume specialty product to show what it really costs the firms to produce
Managers will make better decisions with better information
Managers will manage based on how they are evaluated - you get what you measure!
24
Activity-Based Management (ABM)
Activity-Based Management (ABM)is
using information about activities to manage many aspects of an organization, rather
than simply managing costs.