• Introduction of Proficium
• Infastructural Projects
• Reliability Analysis
• How PTC Windchill QS helps us
Content
![Page 3: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/3.jpg)
4
Technical consulting agency in the field of infrastructure
• Founded in 2011• Based in Breukelen, Utrecht• Providing services to infrastructural market in the Netherlands• Specialised in Maintenance Engineering, Asset Management and Life
Cycle Management
1. Introduction
![Page 4: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/4.jpg)
Mission• High quality and sustainable advice on asset efficiency;• Stay ahead of new developments;• Providing practical solutions to achieve the goals of the client
Vision• Put proven theories into practice• Distinguish from others: do not react but create.
Goals• To grow to become a prominent consulting agency within the maintenance sector• To optimally support and unburden our clients
5
2. Mission, Vision, and Goals
![Page 5: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/5.jpg)
6
• RCM studies• RAMSHE studies• LCC analyses• FME(C)As• Strategical Maintenance concepts• NEN2767 Condition inspections• Contract/Project Management
3. Services
• Systems Engineering• Advice on Technical Tunnel Installations• Life Cycle Management• Advice on Acceptation and Embedding
processes• Education and Training• Guidance in ISO 55000 Certification process
![Page 7: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/7.jpg)
8
Performance contracts:Design, Build, Finance and Maintain (DBFM)
Contractor responsible for whole life-cycle of assets.
6. Changing Landscape: DBFM
Be in Control of
Assets!
![Page 8: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/8.jpg)
9
Reward for Performance – Fines for unavailability of installations
Insight in performance of assets crucial:Trade-offs in design on Costs vs Availability
7. Performance contracts
![Page 9: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/9.jpg)
10
Function Breakdown Structure (FBS)
7. FBS vs SBS
System Breakdown Structure (SBS)
S.1.1 Sub-system
S.1 Infrasystem
S.1.2 Sub-system
S.1.1.1 Element
S.1.1.2 Element
S.1.1.3 Element
S.1.2.1 Element
S.1.2.2 Element
S.1.2.3 Element
F.1 (Functional) System requirements
Function F.1.1
Requirment F.1.1.1
Function F.1.2
Requirment F.1.1.2
Requirment F.1.1.3
Requirment F.1.2.1
Requirment F.1.2.2
Requirment F.1.2.3
![Page 10: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/10.jpg)
11
Failure Mode, Effect, and Criticality Analysis
8. FMECA
1. Function
2. Function Fulfiller
3. Failure Mechanism
4. Cause of Failure
5. Effect of Failure
6. Critcality of Failure
7. Control Measures
1. Function2. Function Fulfiller3. Failure Mehcanism4. Cause of Failure5. Effect of Failure6. Critcality of Failure7. Control Measures
Qualitative Analysis
![Page 11: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/11.jpg)
12
9. Fault Tree Analysis
Quantitative Analysis
![Page 12: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/12.jpg)
13
(Dutch: Dynamisch Route Informatiepaneel (DRIP))
10. Case: Variable Message Sign
Function: Inform drivers by showing text/images
![Page 13: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/13.jpg)
14
System Tree in PTC Windchill Quality Solutions
![Page 14: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/14.jpg)
15
FMECA in PTC Windchill Quality Solutions
![Page 15: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/15.jpg)
16
Fault Tree Analysis in PTC Windchill Quality Solutions
![Page 16: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/16.jpg)
17
Fault Tree Analysis in PTC Windchill Quality Solutions
Result: Failure Rate= 1.296e-5 /hour
Mean Time to Failure: 77160 hour = 8.8 year
![Page 17: 1. 2 Introduction of Proficium Infastructural Projects Reliability Analysis How PTC Windchill QS helps us Content 3](https://reader035.vdocuments.mx/reader035/viewer/2022062301/5697c00f1a28abf838cca9a6/html5/thumbnails/17.jpg)
Thank you!