Transcript
  • 1.

2. 3. 4. SD 5. -- 6. MTO 7. 8. Stella 9. 10. m gapgap gapgap 11. S Gap M Gap D Gap R Gap 12. m lead time(t) = m lead time(t dt) + (m lead time adjustment)*dt m gapAv m gap-WIP(t) = WIP(t dt ) + (Desired Production Rate Production Rate)*dt 13. 14. 15. 16. 17. 18. 19. 20. MTO 21. 22. 23. gap 24. 25. 26. 27. 28.


Top Related