Download - 海力机械 简介2015(英文) v
![Page 1: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/1.jpg)
Zhang jiagang HaiLi Machinery CO., LtdIntroduction
EST.2002
![Page 2: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/2.jpg)
Basic informations:
The total area of our factory:
Main workshop: 132M×48M=6336M2
Auxiliary workshop:132M×30M=3960M2
The new project: 132M×48M=6336M2
Machinery workshop:3000M2
Add: TongFu Road, Leyu Town, Zhangjiagang CityTel : +86(0)512 58119208&+86 15151571625Web: www.haily-m.comZip : 215621
The site of our factory
![Page 3: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/3.jpg)
Manufacture capability
Manufacture platforms:
80M×12M 1pcs40M×12M 1pcs60M×9M 1pcs30M×6M 1pcs12M×6M 8pcs
Lifting capability:
100t/20t×2pcs50t/20t×2pcs32t/10t×4pcs20t/10t×4pcs
Shot blasting rooms:
18M×8M×8M 2pcs
Coating rooms:
18M×8M×8M 2pcs(having baking equipment )
![Page 4: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/4.jpg)
The total staffs:184
The administer: 12
The technical person:10
The person for quality control:9
The total workers:153(including 36 certificated welders)
…
Chairman
Organization Chart:
QC VP
CEO
TECH VPManufacture
VP
Section Chief
Section Chief
Section Chief
QC Team TECH TeamWorking
Teams
![Page 5: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/5.jpg)
One Luoci vacuum-pump machine
One electric pressure-testing pump
Four measuring instruments of coating
Three laser level gauges
One X-ray machine
…
We are able to do every kinds of tests such as PT&UT&MT&RT…
Testing equipment
PT testing for post-joint steel
UT testing
Cutting equipment
Two sets of NC cutting machine(scope:5.5M×14M)
one set of NC high speed plasma cutting
machine(scope:4M×13M)
…
![Page 6: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/6.jpg)
Main welding machines
Medium- style machine of out-in circle and vertical welds: 1 set
Auto metal-arc welding machine: 3 setsauto-fillet welding machine:2 sets
Various of Ar arc-welding and shielding gas welding machine: 52 sets
The baking box of electrode and flux respectively: 3 and 2 sets
…
We can be used for different steel welding such as carbon steel、stainless steel、low-magnetic steel、cast steel carbon steel -stainless steel、carbon steel-low-magnetic steel、cast steel-stainless steel、cast steel-stainless steel and so on
…
![Page 7: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/7.jpg)
Our main machining equipment
Drilling machine Ø5m NC Vertical Lathe
CNC12M×4M CNC NC lather
NC milling machine
We also have many other kinds of equipment for machining…
CA6140 CNC Lathe
![Page 8: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/8.jpg)
Project Plan
Our main quality control procedureTest Methods
Know well with the drawings andtechnology processes then make thetest plan and process.
Inspector training andtechnical conformation
Cutting material according to the
drawings
Check the procedure
Check or re-check the qualifiedmaterial (plate, pipe, forging,welding material etc. )
Manufacture the parts(rolling, welding, machining etc.)
Collecting the qualityinformation, summarize,analyze and make thecorrection measure
Identify the disqualifications
Customer service, feedback etc.
Released documents are correctly and completely
Record and reports arecompletely, correctly andqualified (if need)
AssemblyDimensions, roundness,welding, tolerance etc.
Welding, treatment, dimensionsand visible check etc are OK.Pressure test and leakage testsetc are OK.
The other checked andre-checked parts
Management of quality
document (insect prevention, fireproof, security, borrow,
erase, approval etc)
![Page 9: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/9.jpg)
Production-Machining Productions(SUS):
Cover parts for assembly-a Base parts for assembly-b Slewing Bearing
Machining parts 1 Machining parts 2 Machining parts 3
![Page 10: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/10.jpg)
Agricultural machinery parts Machining frames Shafts
Valve partsPlastic Models Fan flanges
Production-Machining Productions(Others):
![Page 11: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/11.jpg)
Heat exchanger
Pressure Vessel
Assembly frame
Production-Main Stainless Steel Productions:
Dust Tower
![Page 12: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/12.jpg)
Production-Steel frames 1:
Steel frame shipping to Japan in the port of Zhang Jiagang
The extractor was ready for shipping(SUS)
![Page 13: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/13.jpg)
Flue channel Gas turbine frame
Production-Steel frames 2:
![Page 14: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/14.jpg)
The first SF6 gas-insulation transformer tank in ChinaThe biggest volume Rectifier transformer tanks in the world
The SF6 gas-insulation transformer tank in Shanghai EXPO 2010
Production-Transformer tanks:
![Page 15: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/15.jpg)
Our customers:
and others…
![Page 16: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/16.jpg)
Our honor & qualification 1
![Page 17: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/17.jpg)
Our honor & qualification 2
![Page 18: 海力机械 简介2015(英文) v](https://reader034.vdocuments.mx/reader034/viewer/2022050707/58f3899c1a28ab2f0d8b4589/html5/thumbnails/18.jpg)
Thanks for your watching!
The power to manufacture the future!