doug wood [email protected] the data available to the owner when you have it review design for...
TRANSCRIPT
Building a Smarter Planet
11/7/20142
Doug Wood
BIM Software Architect
IBM Cloud and Smarter
Infrastructure CTO’s Office
Building a Smarter Planet
IBM and BIM?
11/7/20143
IBM supports the facility owner
� Maximo
- Enterprise Asset Management
- Work Management (CAFM)
� TRIRIGA
- Workspace management (IWMS)
- Energy/Environmental Management
- Real estate and capital project management
� IBM sells two industry leading applications for facility owners/operators
IBM Southbank Lab London
Building a Smarter Planet
Maximo Asset Management
MAXIMO ASSET
MANAGEMENT
MAXIMO ASSET
MANAGEMENT
• Asset Management
– Facilities, Operations, IT, Fleet
– Assets, Locations, Failure Reporting, Condition Monitoring, Meters
• Work Management
– Preventive, Corrective, Projects, Emergency, Safety Plans
– Work Hierarchies, Planning, Status, Assignments, Actual Metrics
• Procurement Management
– PR’s, PO’s, Receipts, Invoices
• Materials Management
– Items, Storerooms, Inventory, Reorder, Issues, Returns
• Contract Management
– Master, Purchase, Warranty, Lease/Rental, Labor Rate
• Service Management
– Self Service Requests & Status
– Platform for asset owners, asset managers and service providers
• Next Generation Architecture
– J2EE Platform
– Standards-based
– Service Oriented Architecture (SOA)
11/7/20144
Building a Smarter Planet
Who uses Maximo? Asset Intensive Organizations
11 of the 12 largest PHARMACEUTICALS companies in the world are using Maximo
7 of the 10 largest AUTOMOTIVE companies in the world are using Maximo
8 of the 10 largest OIL & GAS companies in the world are using Maximo
11 of the 20 largest diversified UTILTY companies are using Maximo
11 of the 12 major AEROSPACE & DEFENSE companies in the world are using Maximo
9 of the 15 busiest AIRPORTS in the world are using Maximo
6 of the 10 largest ENERGY companies in the world are using Maximo
11/7/20145
Building a Smarter Planet
IBM TRIRIGA Core Components
Geographies
Locations
Organizations
Vendors
People
Specifications
Assets
Contracts
Customer Self Service
News
Graphics
Document Management
Reporting
WPM Metrics
GIS Mapping
GANTT Schedules
IBM TRIRIGA
Real Estate Manager
Portfolio Planning
Site Selection
Transaction Management
Lease Administration
Lease Accounting
AR Tenant Tracking
Payment Processing
Client Requests
IBM TRIRIGA
Capital Project Manager
Program Management
Fund Management
Scope Management
Cost Management
Schedule Management
Resource Management
Quality Management
Vendor Engagement
Procurement
IBM TRIRIGA
Facilities Manager
Space Management
Space Chargeback
Space Requests
Strategic Planning
Move Management
Reservation Management
Personnel Provisioning
CAD Management
Receiving
Invoicing
Requests
Tasks
Contact Center
Service Management
Warranty Management
Preventive Maintenance
Facility Assessment
Security/Key
Management
Inventory Management
Capital Planning
Resource Planning
CO2 Emission Tracking
Utility Tracking
Waste Disposal
Water Consumption
Green Opportunities
Tracking
LEED/BREEAM
Certification
Energy Star Integration
IBM TRIRIGA
RE Environmental
Sustainability Manager
IBM TRIRIGA
Workplace Operations
Manager
TRIRIGA – Integrated Space Management and Energy Management
Role-based Applications
Building a Smarter Planet
11/7/20147
Why does the owner/operator care about BIM?
Reduced cost and lead
time for renovation
Reduced labor and
improved accuracy in
building commissioning
Architects/ Engineers
gain visibility to actual
building performance
Owner/ operator data
requirements
communicated to design
build process
Integration of CAFM,
IWMS, and building
operational systems
Reduced time to plan
and assign work orders
Consistent data across
build portfolio support
cross portfolio insights
Building a Smarter Planet
BIM reduces cost of hand-over and building commissioning
11/7/20148
NIST Survey (2004)
Inefficiency Costs : $15B/yr 66% borne by Owners$0.23/ existing SF/year
Building a Smarter Planet
BIM increases operational efficiencySandia National Labs “straw man”
survey
Using BIM, if you could get all needed information in 5 minutes, how much time would that save?
Response: • Up to 2 hours per work order (WO)
2 hrs x $50/hr = $100/WOWO/yr = ~ 24,000
Potential savings: $2.4 M/year
Copyright 2011 by Birgitta Foster – Used with permission
11/7/20149
Facilities operating costs
� Custodial� Pest control/refuse collection
� Recycling costs
� Roads/Grounds� Landscaping/snow-ice removal
� Utilities � Plant operations and energy
� Reoccurring Maintenance and Repair� Work orders
(source : FRPC Real Property Inventory – Users Guidance FY09)
Building a Smarter Planet
Real-time energy and
efficiency metrics
Building Control
System Integration
Initialize BCS form
As-Built model
BIM Lifecycle
11/7/201410
As Maintained model drive
capital planning and
renovation
Capital Planning
“As
Maintained”
Operations and
energy cost
Condition Based
Assessments
Field dataIntegrated in context
viewer
In-context visualization improves
efficiency of maintenance planning
and execution
Operations
Facilities and Space
Management
Model data in COBie
Format (or IFC) flows into
CAFM and IWMS systems
starting with design intent
Design and Construction
ConstructionEngineeringDesign
Intent
Project
ManagementPlanning
Cost Schedule
“As
Built”
Building a Smarter Planet
“As Built”
Construction
Is this your current data flow?
11/7/201411
Design
Intent
Engineering
CAFM/CMMSBuilding Control
SystemIWMS
FAB Models
Design Model
Bid Model
De
sig
nS
pe
cific
atio
nO
pe
ratio
ns
Unified Clash
Detection Model
Construction
Management
System
Co
ns
truc
tion
Hand-over
Model
??
Inspection and
manual update
Walk through inventory
and manual data entry
?
CAD Export
Product
Documentation
?
Equipment
Schedules
Services
supported
Import
Proprietary data
load by vendor
Building a Smarter Planet
11/7/201412
The goal is to capture date once when it is first
created or encountered and to propagate it to all
systems and stakeholders. This requires:• Business process that allow all stakeholder to articulate data
requirements
• Interconnects software systems that allow data to flow from
point of capture to consumer in digital format.
• Data standards that provide a common language among all
systems and stake holders.
Building a Smarter Planet
Hand-over challenges
� Define what data is required for operations and
how it is to be used
� Provide the organization's data standards
� Get the hand-over data requirements into the
BIM Execution plan
� Capture the required data as its generated not at the end
of the projects
� Make the data available to the owner when you have it
� Review Design for Maintainability
� What equipment has perfumed well in the owners
environment? (From the product catalog)
� Is access to the equipment adequate and safe?
� Is there sufficient space around the equipment to work
� Communicate the capabilities of operational
systems such as CAFM and IWMS
11/7/201413
TIMEPlanning Design Construction OperationsPHASE
ROLE
TOOL
Contractor
OEM
Architect/Engineer
Operator
Design Tools Operational Systems
Operator
INFORMATIO
N
Goal:
Close this gap
Connecting Roles and Tools helps eliminate information loss
• Lack of understanding of the data required for operations• Lack of understanding of the capabilities and needs of
the operational systems (CAFM, IWMS, BCS)• Construction and commissioning information is not
communicated to owner• Portfolio vs project approach
The building operator should have a representative on the BIM team. They should
Building a Smarter Planet
Project vs. Portfolio
11/7/201414
• Owner has a portfolio centric
view• Example:• Major US university has 1800+ building
over 2000 sq ft
• US government agencies have portfolios of
buildings ranging from several hundred to
tens of thousands
• All those building exist together in the owners CAFM and IWMS systems
• The AEC Industry has a project
centric view of buildings• Each project is unique with its own team contract approach, and data standards
• The Owner needs consistency in their
CAFM system across the portfolio• If the owner has established standards for
location/room names, equipment names and
classification, the project should use them
• If not, the project team needs to work with the owner
to establish standards or select acceptable industry
standards,
• Hand-over has to bridge the gap
Building a Smarter Planet
Digital Handover will overwhelm the owner with data
11/7/201415
Hand-over data
before BIM
Hand-over
data After BIM
What the owner wants for hand-over
The model needs to be filtered when hand-over data is
generated. Hand-over data should only include:
• All floors and spaces
• Only assets that have: • Significant capital cost
• Maintenance requirements that require tracking
• Regulatory requirements
• Product data for all included assets
• Attribute meaningful to the FM process
The transition from paper based hand-over to digital hand-over can overwhelm the operator with unfiltered unstructured data.
Building a Smarter Planet
Agreements required for a successful Digital hand-off
� For which asset will data be provided?
� For each class of assets, What set of attributes are
expected?
16
� Is digital product and maintenance documentation
part of the Hand-over package?
- If not, how are these files to be organized and delivered
- What System will the owner use to store and manage
these files?
� How and when are barcodes assigned?
� What classification hierarchy will be used?
� Is hand-over data expected in a standard format
such as COBie
� How is Equipment names?
� When is the data expected?
- If there is to be more than one drop,
- what data is required for each drop?
Building a Smarter Planet
Hand-over becomes a process not an event
� The building operator can bring data into
operational systems as soon as %100 design.
� “Virtually” operate the facility prior to hand-over
to insure that all presses are in place at hand-
over
� Shared data enables shared business
processes and collaboration
� Capture operational activity before hand-over
including:
- System turn-on/Warrantee start date
- Pre hand-over maintenance activities
11/7/201417
Bid Model “As Built”Construction
Construction Management System
CAFM/IWMS SystemsS
hared
Data
Sh
ared
Pro
cess
Building a Smarter Planet
Data exchange during
construction
18
Bid Model• Equipment make and model
Installation• Asset Tag – What item is install at each
location?
Commissioning• Installation data
• Warrantee start data
• Asset Tag
• Commissioning issues
Owner FM teams participates in
commissioning process. CAFM
system is directly updated on site via
mobile
Data: Asset Tag, Install date, issues owner needs to track
Hand-over• Pre hand-over maintenance
• Commissioning issues resolution
• Final documentation
%100 of hand-over data available
Product Data (From manufacturer)• Manufacture, Model number
• Equipment actual specification
• Product documentation (pdf)
• Maintenance Procedures
• Preventive maintenance schedule
• Parts manifest
COBie Tables:• Type, Job, Spare, Resource
%75 of hand-over data available
Design Model• Floors and Spaces (Facility, Floor, Space)
• Equipment Schedule (Component)
• Equipment design specification (Type)
• Definition of building systems (System)
• Definition of space zones (Zone)
%50 of hand-over data available
Building a Smarter Planet
Analytics
Product catalog
19
Product
Catalog
Product Description
Make and Model
Specifications
Product documentation
Maintenance procedures
Parts List
3D model
Warrantee Contracts
maintenance best practices
Aggregated data from Actual Performance
• Energy Usage
• Maintenance Costs
• Actual maintenance performed
• Operational Life
• Total Cost of ownership
• Comparative product performance
• Repair/Replace?
• Maintain/Run to failure?
• Condition based maintenance
thresholds
• Custom Maintenance
Procedures
• Other documentation
The product catalog provide a single repository for all data about products used in the owners building portfolio. It includes both static vendor data and operational experience.The insights gained from a cross portfolio view of product performance drive capital planning, product selection and maintenance decisions.
Building a Smarter Planet
“As Built”
Construction
“As
Maintained
”
Model Evolution
11/7/201420
Design
Intent
Engineering
CAFM/CMMSIWMS
FAB Models
Pro
du
ct C
ata
log
Design Model
Bid Model
De
sig
nS
pe
cific
atio
nR
etro
fit
Op
era
tion
s
Co
ns
truc
tion
COBie
Do
cu
me
nt M
an
ag
em
en
t
Unified Clash
Detection Model
Operations
Model
Construction
Management
System
Building Control
System
The model should evolve from design concepts o operations without an data loss recapture or reentry.
Field
data
Building a Smarter Planet
11/7/201423
Building Information Model Extensions for Maximo
http://www.ibm.com/software/ismlibrary?NavCode=1TW10MA44.Available on the ISM Library ISM Library
What’s Included?
COBie data import
3D BIM Viewer Integration
Maximo extensions for BIM data
Architects/ Engineers
gain visibility to actual
building performance
Reduced cost and
lead time for
renovation
Reduced labor and
improved accuracy in
building commissioning
Reduced time to plan
and assign work
orders
Owner/ operator data
requirements communicated
to design build process
Why BIM for Facilities Management?
Building a Smarter Planet
� An Actress?
� A Spreadsheet
What is COBie?
24 11/7/2014
� An Open Standard managed by
BuildingSmart
� A Relational data model
� A Contract Specification that
allows owners to specify what
data is required at hand-over
Construction
Operations
Building
information
exchange
Building a Smarter Planet
Industry
Foundation
ClassesIFC
ExportAutoDesk Revit
BIM import architecture
11/7/201426
COBie
COBie
Schedule
General IFC Source
COBie source
Maximo
Application
Maximo
server file
system
Web
Upload
COBie Parser
Maximo
DB
Analysis and
Import
Standards• IFC http://www.iai-tech.org/ifc/IFC2x4/beta3/html/index.htm
• gbXML http://www.gbxml.org/
• COBie http://www.wbdg.org/resources/cobie.php
• OMNIClass http://www.omniclass.org/
Publically
available IFC to
COBie
Converters
COBie to Maximo Mapping
COBie Maximo Import location
Facility Location and COBie import project
Floor Location
Space Location
Component Location and Asset
System System (Category configurable)
Zone System (Category configurable)
Type Product (New for COBie support),
Item
Attribute Specifications for: Location, Asset,
Product, Item
Contact Person, Company, Company Contact
Document Attachment
Job Job Plan, InvVendor, PM, ProductJob
(New)
Resource Toolitem, Job Plan Tools
Spare Product parts (New)
COBie Certifiedhttp://buildingsmartalliance.org/index.php/newseve
nts/proceedings/cobie2011challenge
Technical POC
name: Doug Wood
email: [email protected]
Marketing POC
name: Kim Woodbury
phone: (978) 899-2644
email: [email protected]
Building a Smarter Planet
Work order viewer integration
11/7/201427
Tree has list of all assets and
locations associates with the work
order and shows path to top
Many ways to search
and create a selection
list
Add or remove selection
list from work order
Selecting an item in the
tree displays and
highlights it in the viewer
Selecting the facility to
display in the viewer