Dosing system specification
1. Usage
Dosing device is a kind of integration of equipment that a including
dosing, mixing liquid, conveying liquid, automatic control. It is
widely used in the powder plant raw water, boiler water, oil groundgathering dehydration processing systems, various petrochemical
dosing system and wastewater treatment systems. Doing including
coagulant, pH solution, phosphate, liquid ammonia, lime, oxidants,
reducing agents, water stabilizer (inhibitor), inhibitor, liquid
insecticides.
:
2. the structure:
the composition of dosing device including the shaft, blender, work
bridges, tanks and motor, etc.
:
1
2
3. Note
a. The user must specify the specifications, technical parameters
and materials and civil engineering diagram when ordering the
equipment.
b. If your water quality is constantly changing, you need notify us in
advance, and we can make the equipment adjustable.
:
-
7/29/2019 Dosing System Spec &Op
5/10
1,,
2,
4. Preparation before installation.
a. check all parts are in set (including valves, fittings, etc.), if there
are some parts damaged during the transportation? You need to
adjust and repair.
b. check the civil dimensions and embedded parts meet the
requirements, and the install location is correct.
:
1,
2,,
3,
4,
5 24 ,
6
5. Installation and commissioning of the equipment
a. Lift the equipment according to the drawings, adjusted to a
proper position and then fixed.
b. Install the inlet and outlet pipe according to the drawings one by
one, and make sure the pipe connection are sealing well and not
leak, the valve can be operated easily.
c. Install the metering device (metering pump) in the right place,
Install the inlet and outlet pipe according to the drawings and makesure they are in the right connection.
d. Inject water to the dissolving tank and check that if there is any
leak in the pipe connection place, and solved in time.
e. Start power motor of the the mixer for test running 2 to 4 hours,
check if is any abnormal, and then put into use.
f. check the motor and gear reducer are overheating or other
anomalies
.
:
1
-
7/29/2019 Dosing System Spec &Op
6/10
,,
,
,,,
2,
3,
4,
,,
5,,
6. Usage and maintenance
a. the liquid configuration:
1.) Put appropriate amount of dosage pharmacy to the dissolving
tank, open valve and inject a certain amount of water, and Maintain
the liquid level in the normal range.
2.) Open the mixer, and make sure the dosage pharmacy and water
are fully dissolved the mixed, then turn off the mixer. Open theoutlet valve of dissolving tank and let the mixed liquid inject to the
storage tank.
b. Adjust the flow speed of the metering pump according to the
needs. Then open the metering pump, you can get the quantitative
dosing liquid as requirements.
c. Check if there is any deposit sediment in the dissolving tank and
storage tank, and take it out in time for preventing block thepipeline.
d. Read the instructions before using the metering pumps. You
should make sure that the pressure gauge has been installed on the
outlet pipe of the metering pump, and make sure the output
pressure of the metering pump at its rated pressure, this will make
the measurement was accurate and reliable.
e. Check the bolts and nuts, piping and valves often, to make sure
there is no loose and leak, and solve them in time.
-
7/29/2019 Dosing System Spec &Op
7/10
Dosing system operating instructions
1
1.11.2
22.12.2
2.3 1/3 2.42.5
Operate Manual of dosing system
1. System Starting
1.1 Check the electrical control cabinet and the pump power is
turned on, and all the devices are in good condition.
1.2 When solution tank running in the low level, the metering pump
should be stopped.
2 Metering pump start and stop.
2.1 There should be clear and no other goods around the pump.2.2 Make sure that the connection screws of the flywheel and
anchor bolts are well fixed, operating the flywheel by hand, it should
be move smoothly.
2.3 The lubricant need to be clear and the height should be 1/3 of
the bearing diameter.
2.4 Make sure the drug are enough in the solution tank.
2.5 Open the inlet and outlet valve of the pump. (Note: Usually,
the valve of the bottom of the solution tank are open,
except pipe system maintenance)
33.1 1
2
3
3.2
3 Metering pump start
3.1 Check the motor power is turned on, and then start the
motor. (WARNING: 1 the motor reverse run will damage the
pump and motor, which does not belongto the scope of warranty. Do not forget to landing the pump
-
7/29/2019 Dosing System Spec &Op
8/10
and equipment.
2 Make sure that the power parameters are in accordance
with the pump motor nameplate parameters, connect the
electric wire according to the electrical wiring diagram and
operation manual3 before running the pump, Check the motor rotation
before running the pump, make sure it is the same direction
with the arrow of motor mounting flange.)
3.2 After the pump is operating normally, you can adjust the pump
output to achieve the required flow.
44.1 4.2
55.1 5.2 5.3
4 Metering pump stop
4.1 Stop the motor.
4.2 When the pump is under repair, close the inlet and outlet of
valves of the pump, and Isolate power supply, hang dangerous
nameplate.
5The standby pump start and stop.
5.1 Open the inlet valve of standby pump, switch to contact of thedosing unit.
5.2 Check the motor power, and start the motor.
5.3 After the standby pump is operating normally, stop the main
pump and you can adjust the pump output to achieve the required
flow.
66.1 1/2 6.2
6 Drug preparation
6.1 Open the water inlet valve of the solution tank, and turn of the
valve when water level achieve to 1/2 of the solution tank.
6.2 Open the drug inlet valve of the solution tank, inject drugs to
the solution tank and start the mixer. And stop running when the
drug is completely dissolved.
-
7/29/2019 Dosing System Spec &Op
9/10
1234
56
System operation and maintenance.
1 Check the system running regularly, and should increase
inspection times if equipment failure happens
2 Closely monitor the dose of the drug, make sure automatic
dosing equipment are in normal operation.
3 Add the drugs timely when the solution tank liquid are in low
level.
4 Before start the dosing pumps, you need to open the inlet and
outlet valve first. Before closing the inlet and outlet valves, you
need to stop the dosing pumps first, this can avoid to damage
dosing pump.
5 Shutdown the pump immediately if it our of order, and start the
standby pump.
6the operator should wear the necessary labor protection supplies
in operation, to prevent splashing into eyes.
-
7/29/2019 Dosing System Spec &Op
10/10
Dosing system failure notices and how to solve it.
No.
Failure
Reason How to solve it
1
Pump start
failure
Wire
connect error
check all the connection of
electric wire
low voltage
check the reason and make the voltage to
the normal level
START/STOP, didnt
press START/STOP
START/STOP, press START/STOP
2 Cant
absorb the
liquid
air in thepipe
, connect the pipe correctly
Valve was
installed wrong
, Re install the valve
The pump
stroke distance is too short
100%
make the pump run under
100% stroke distance
/
the outlet valve was
blocked
apart, inspection and
cleaning
3
Outlet
flow not
stable
/
the outlet valve was
blocked
apart, inspection and
cleaning
,
Bubbles in the pump t
exhaus
Gasket Damage replace the Gasket
4
Liquid leak
Valve an
d the connector is not tight
tight
Pump connecti
on is not tight
tight the pump head
Gasket Damage replace the Gasket