documentation of clinic management system

Upload: wendy-harrison

Post on 03-Jun-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Documentation of Clinic Management System

    1/50

    B.P.H.E SOCIETYS AHMEDNAGAR COLLEGE

    AHMEDNAGAR

    A

    PROJECT REPORT

    ON

    CLINIC MANAGEMENT SYSTEM

    IN PARTIAL FULFILLMENT OF

    BACHELOR OF COMPUTER APPLICATION

    SUBMITTED TO

    UNIVERSITY OF PUNE 2014

    SUBMITTED BY

    Ayaz Pathan S

    Sayyed moshin B

    (T.Y.B.C.A SEM VI!

  • 8/12/2019 Documentation of Clinic Management System

    2/50

    INDE"

    COLLEGE CERTIFICATE

    ACKNOWLEDGEMENT

    COMPANY PROFILE

    PREFACE

    SYSTEM ANALYSIS

    1. NEED FOR COMPUTERIZED SYSTEM

    2. PRELIMINARY INVESTIGATION

    3. FACT FINDING TECHNIQUES

    4. FEASIBILITY STUDY

    5. HARDWARE SOFTWARE REQUIREMENT

    . ENTITY RELATIONSHIP DIAGRAMS

    SYSTEM DESIGN

    1. DATA FLOW DIAGRAMS

    2. DATA DICTIONARY

    INPUT OUTPUT SCREEN

    ADVANTAGE OF SYSTEM

    LIMITATION OF SYSTEM

    BIBLIOGRAPHY

  • 8/12/2019 Documentation of Clinic Management System

    3/50

    AC#NO$LEGMENT

  • 8/12/2019 Documentation of Clinic Management System

    4/50

    AC#NO$LEDGEMENT

    Every orientation work has an imprint of people and it becomesthe duty of the author, designer, etc to express deep gratitude for thesame.

    First of all we express our profound gratitude to the HEAD FDE!A"#$E%# F & $!'#E" (&)E%&E AHE$AD%A*A" & ++E*EAHE$AD%A*A" for granting us the permission to submit our !ro ect"eport on-

    CLINIC MANAGEMENT SYSTEM

    e hereby take the opportunity to express our gratitude to allthose who helped us in the successful completion of our !ro ect.

    e are thankful to the HEAD F DE!A"#$E%#Prof. Sayyed Razzak / Dharmadikari mam for there kindsupport in the completion of the concerned pro ect. +ast but not the

    least we are also thankful to our pro ect guide and teachers whoplayed an important role of the pro ect guide and guided us at variousstages of our pro ect during designing and development.

    e also thank to the &ollege authorities for extending +aboratory and+ibrary facilities.

    SACHITANAND SINGH GYANENDRA SINGH

    SACHIN SHELKE

  • 8/12/2019 Documentation of Clinic Management System

    5/50

    COMPANYPROFILE

  • 8/12/2019 Documentation of Clinic Management System

    6/50

    COMPANY PROFILE

    e have developed a pro ect named &+)%)&$A%A*E$E%# (0(#E$. #his system helps maintainall company system. #he details such as Doctor,patient, bill etc are stored so that the customer /doctor can be seeing the details of the bill on thecomputer.

    #he system also maintains record of customer anddoctor.

    #he software / report has submitted in the partialfulfillment of the re1uirement for degree of 2achelorin &omputer Application 32&A4 university of !une,during academic year 567585679.

  • 8/12/2019 Documentation of Clinic Management System

    7/50

    PREFACE

    PREFACE

  • 8/12/2019 Documentation of Clinic Management System

    8/50

    #he pace of which the technology is being introduction in the

    computing industry smoothing less than astonishing. As

    compete for market share and profits. #hey 1uickly believe

    new invention in hardware that drives forward the overall

    state of information, for example Database management

    system benefits both the companies and their consumers.

    &omputer is used for processing of data less than year. )n

    short time

    (o rapid growth of the computer .today the term data

    processing .%o one living in the field of computers are

    talking place so fast everywhere, and man has to learn him

    with invention in order to complete with co8partner in the

    competitive world.

    )n every organi:ation computeri:ation of manual work is

    given top most priority information processing has come to

    mean. #he integrate

    perations performed by a computer .)n handling

    mechani:ed system to electronics office system it has

    become desirable mean of laminating

    #he inefficiencies that characteri:ed tradiditional office

    procedure the evolution of data processing grew in to more

    sophisticated office system.

  • 8/12/2019 Documentation of Clinic Management System

    9/50

    SYSTEM ANALYSIS

    SYSTEM ANALYSIS

  • 8/12/2019 Documentation of Clinic Management System

    10/50

    Analysis is very important phase of any software development Analysis

    is the process of gathering and interpreting facts, diagnostics problems

    and using the information to design the system. )t specifies what thesystem should do. Analysis is a procedure in which conducts a study

    identifies activities and ob ective and determines a procedure to

    achieve the ob ectives. Analysis is a management techni1ue .which

    helps us in designing a new system.

    Analysis is a detailed study of the various operation performed by the

    system and their relationship within the outside of the system. A key

    1uestion is 8 what must be done to solve the problem; ne aspects is

    defining the boundaries of the system should consider other related

    system.

    Problem Statement

    #he problem statement is to design software that will serve easy to

    use window based program to handle &D transaction / management.

    #he system must provide facility to it

  • 8/12/2019 Documentation of Clinic Management System

    11/50

    7. 2etter communication between the various divisions of

    &'(# $E"

    5. Ade1uate reporting to each decision.

    9. &entrali:ed management reporting and division support.

    =. Accurate and timely control of program.

    >. #imely reporting of accounting activity.

    ?. Efficient and controlled item handling.

    @. &ost effective system.

    B. )mproved processing speed.

    C. )ncrease volume of activities.

    76. Faster retrieval of information.

    I%&' )*)+, )-' -* N&&% )dentification of need is basic step in software developments. 2efore

    starting to developed software. )t is must to know the need of that

    software. !ro ects are initiated for different reasons.

    #he reasons behind need of development of movie rent master are-8

    (A) Capability :-

    (B) $ovie rent activities are influenced by process transaction 1uickly

    and efficiently. Automation is information system that adds

    capability of &D library in three ways.

    ( ) !mpro"ed processing and speed

    &D library activities improve processing speed in customer

    services / customer care.

    (#) !ncrease "ol$me : provide capacity to perform large

    amount of transaction on large amount of record.

  • 8/12/2019 Documentation of Clinic Management System

    12/50

    (%) Faster information retrie"al : +ocating and retrieving

    information from storage in faster / efficient way.

    (C) Control : #he movie rent provides greater accuracy and

    consistency in performing transaction.

    (&) 'ed$ce Costs : #he &D library, which perform transaction faster

    / easily. $ovie rent reduce manpower re1uirement so ultimate

    effect is reduce cost.

    ( ) Competiti"eness : )n competitive environment, organi:ation

    re1uires perform transaction faster, getting information timely,

    accurately so that management can take decision 1uickly.

    (F) Sharing of !nformation : #he &D library system promotes

    the sharing of information.

    Preliminary Investigation#he First step in the system development life cycle is the

    preliminary investigation to determine the feasibility of the

    system. #he purpose of the preliminary investigation is to

    evaluate pro ect re1uest. )t is not a design study nor does itinclude it include the collection of details to describe the

    system in all respect. "ather, it is the collection of information

    that helps committee members to evaluate the merits of the

    pro ect re1uest and make an informed udgment about the

    feasibility of the proposed pro ect.

    Analysis working on the preliminary investigation should

    accomplish the following ob ectives.

    "e1uest clarification

    Feasibility study

    "e1uest approval

  • 8/12/2019 Documentation of Clinic Management System

    13/50

    Preliminary !n"estigation in context of payroll

    system:-

    'e $est clarification - $anual processing in institute takesmore time in performing task, and in manual system the chance of

    occurrence of errors are high ,and it becomes more costly because a

    single task takes more organi:ation cannot run properly without

    getting accurate information. (o institute also needs to be automated

    by software. 2y using it the institute can work properly, timely /

    accurately.

    Feasibility st$dy : - #he system is operational Feasible,technical feasible, Economical Feasible as shown in feasible study,

    describe in %ext section.

    'e $est Appro"al - 8 2ecause the software development

    re1uest is reasonable employees. And it is technical, economical,

    perational feasible in all respect so the pro ect is improved. And

    the design work can be carried out.

  • 8/12/2019 Documentation of Clinic Management System

    14/50

    FACT FINDINGTECHNI UES

  • 8/12/2019 Documentation of Clinic Management System

    15/50

    FACT FINDING TECHNIQUES

    #he role of a computer in a design revolves round it

  • 8/12/2019 Documentation of Clinic Management System

    16/50

    FEASIBILITY STUDY

    FEASIBILITY

    STUDY

  • 8/12/2019 Documentation of Clinic Management System

    17/50

    Feasibility is the determination of whether of not pro ect is worth doing. #he

    process followed in making this determination is called feasibility study. #he

    contents and recommendation of such study will be used as sound basis for

    deciding whether to proceed, postpone or called cancel the pro ect.

    #he most important feasibility that is study by me about the automation of

    hotel is operational feasibility, technical feasibility, and economic feasibility.

    + ,perational feasibility 'eport :-

    )n operational feasibility we determine that proposed pro ects are

    beneficial only if they can be turned into information system that will

    meet the operating system re1uirements of the organi:ation. #his testof feasibility asks if the system works when it is developed and

    installed. Are the ma or barriers to implementation;

    Following are the some of the important issues of the operational

    feasibility that are in favor of system are given below.

    #he Automation of hotel is operational feasible because it can be

    turned into Automation of hotel work if it is developed and installed.

    #his system does not cause harm and the performance of staff

    members will increase due to fast and reliable transaction service. it

    provides simple and *ood +ooking )nterface 3 *') Environment 4 to

    it

  • 8/12/2019 Documentation of Clinic Management System

    18/50

    Automation of Hotel wills the performance of the staff

    members with fast, reliable services.

    #+ *echnical Feasibility 'eport :-

    #hese are number of technical issue, which are generally raised during

    the feasibility stage of the investigation. Does the proposed

    e1uipments have the technical capacity to hold the data re1uired to

    use the new system; &an the system be upgraded; Etc.

    #he automation of Hotel is technically feasibility because-8

    #he %ecessary #echnology 3Hardware / (oftware like

    communication +ine, $odem, %etwork, &omputer and indows

    Cx4 exist to developed and install Automation of Hotel

    #he proposed e1uipment has the technical capacity to hold the

    data re1uired to the Automation of Hotel.

    )t can be updated if re1uired.

    #he system provides the technical guarantee of accuracy,

    reliability, easy access and data security.

    %+ conomic Feasibility 'eport :-

    Automation of Hotel is Economic feasibility because-

    Automation of Hotel does not re1uired extra hardware to installed it .

    )t can be installed on the hardware that the institute using currently.

    #he cost of development Automation of Hotel is very low comparisonof cost of manual working

    2y using manual method performing each task many entries in

    registers. $ore manpower re1uired, occurrences of errors are high.

    "echecking is re1uired so the high cost incurred in manual system.

  • 8/12/2019 Documentation of Clinic Management System

    19/50

    Automation of Hotel can be developed in existing hardware / software

    o extra cost re1uired.

    COST/BENEFIT ANALYSIS

    #here is a difference between expenditure and investment. e

    spend to get what we need, but we invest to reali:e a return on the

    investment. 2uilding a computer based system is an investment.

    &ost are incurred throughout it

  • 8/12/2019 Documentation of Clinic Management System

    20/50

    7. Hardware cost -8

    A'&.A' C,S* ,F * C,/0 /*!A1 S2S* 3 -

    )n the conventional system the hardware costs include registers,shelves, pen, etc. the cost of these items are not significant in the

    starting, but as the time grows the cost of these items are going high

    and high. (o )n the long run these costs are heavy for the system.

    ardware cost of the new (comp$teri4ed) system -

    )n the new and proposed computeri:ed system the hardware cost

    includes the cost of the full flash computer, printer and other computerrelated devices. #he code of these items are high and high as compare

    to the older system but this investment is only one time investment

    and the rest of life is safe. (o in the long run the computeri:ed system

    is much cheaper than the conventional system.

    #+ !ersonnel costs -8

    Personnel cost of the con"entional system:

    #he personal cost of the conventional system includes

    the staff salaries and benefits. #he problem in the

    system is that we need to have more employees