wash sdg program joint financing and monitoring report
TRANSCRIPT
WASH SDG Program
Joint Financing and monitoring report & SDG planning
Process
Workshop report on Validation of rapid joint Financing
and Monitoring report & Launching of SDG planning
(Shashamane & Arsi Negell Woredas)
West Arsi zone of Oromia Regional State
1. Introduction
Amref Flying doctors has signed a program implementation agreement with WASH sector offices of
Oromia regional state. The program is to be implemented in Shashamne and Arsi Negelle woredas of
West Arsi zone by consortium of NGO’s which includes Amref, Wetland International, Bole Biblical
Church and IRC WASH. IRC WASH is tasked with knowledge management & technical support related
to rapid financing and monitoring assessment, SDG planning, document learning activities at woreda,
regional, national and global levels, sustainability compact & provide support to system strengthening
experiments. Among these activities the rapid monitoring and financing assessment was completed
with the participation of woreda WASH government stakeholders.
A two day workshop was organized to validate the assessment report and also launch SDG planning
activities which is one of the activities of 2019 work program.
The workshop was held in Shashamane from 30th to 31st of July 2019 at Framont Hotel and attended
by woreda and zone WASH offices representatives and regional water bureau, consortium members
and NGO’s working on WASH in both Woredas.
An introductory presentation was given by IRC WASH as a warm up about the program followed by
words of blessing from zonal water office head representative to declare the official opening of the
workshop. Following the official opening two consecutive presentations were given on financing &
monitoring with session for question and answer in between each presentation. The first part of the
workshop was concluded with the approval of the joint rapid financing and monitoring report.
The second major agenda of the workshop was SDG planning which aimed at preparing a long term
plan for both woredas to attain 100% WASH coverage in 2030 as agreed by world leaders. This session
started by a presentation on overview of SDG targets by IRC WASH followed by WASH service status
reports of the two woredas. The presenters for the WASH status were representatives of Woreda
WASH Team from both woredas. Day one was concluded with the two consecutive presentations.
Day two commenced with recap of day 1 activities followed by two presentations on SDG planning
process & data requirement of planning tool and introduction to planning tool by IRC WASH. This
session was more interactive supported by live demonstration of similar exercise in 3 woredas of
Amhara region and with questions on the tools and process between the presentation.
Upon completion of the presentations planning teams of both woredas was formed. At the end
participants worked out work plan in groups which was presented, mutually agreed time line set and
finally approved.
The workshop was officially closed by the representative of the zonal office who addressed the
planning team to stick to the time line and give attention to data quality. He also stressed the need to
do regular supervision by the office heads of the woreda WASH sector offices.
2. Workshop participants
The invitation to the government stakeholders was through official letters. Before handing over the
invitation letter office heads or their representatives were given briefing on the overall program
activities, role of IRC WASH, studies conducted and works ahead. Accordingly for Shashamane woreda
WASH office heads were invited to the office head of woreda administrator and briefing was given. In
this meeting the office head of woreda administration, education office head and water office head
representatives were present. The health and finance office heads were not present but invitation
letters were given to their respective offices. For Arsi Negelle woreda meeting was in the woreda
finance office head and attended by woreda water office head representative and finance office head.
The finance office is the chair for the Woreda WASH Team. He promised to hand over invitation letters
and also explain the objective of the workshop to those who didn’t come for the meeting. Both
woredas were also requested to prepare presentation on the status of WASH services in their woreda
boundary. The zonal WASH office stakeholders participants were approached individually as the zonal
WASH Team is not functional. Accordingly water, education and finance office head representatives
were briefed and letters were handed over but health office head was not in office and letter was
dropped to the archive. Both zonal and woreda water, health and education were requested to send
3 participants i.e. office heads, WASH focal persons and planning experts while both zonal and woreda
finance offices were requested to send office heads and planning expert. From the region Water and
Energy Resources Development bureau was requested to send two participants and Planning
commission was requested to send one person.
The consortium members and NGO’s working in the two woredas were invited through telephone
communication.
Regarding participation the regional water bureau sent one engineer but there was no participants
from planning commission. From consortium members Wetland, and from WASH partners world
vision that is operating in Shashamane woreda didn’t come for the workshop.
Regarding zone and woreda participants all offices were represented at least for a day. The problem
was some of the woreda/zone participants frequently move in/out. For future it would be good to
conduct such workshops outside Shashamane.
3. Presentations
3.1 Program overview
This presentation was given to brain storm the participants with the overall goals of the program and
to clarify the role of IRC WASH in the program. The presentation touches upon program overview,
program goals, systems approach in WASH service delivery, Systems strengthening and WASH building
blocks.
3.2 Rapid Financing assessment
The rapid financing assessment report presentation summarized the WASH financing background in
Ethiopia, the goal of the study, methodology used, defined life cycle cost analysis, touched upon
components of Life Cycle Cost followed by result of the study which encompasses value of existing
infrastructures, direct and indirect support, drinking water service level, water financing and
conclusion and recommendations. The presentation highlighted the finance allocated to the WASH
sector in relation to other sectors in the woreda, the cost components that needs to be considered
while allocating WASH finance and waste of capital as a result of non-functionality of built WASH
facilities. At the end of the presentation participants reflected on the presentations. The following are
some of the reflections;
a. Waste of capital due to non-functionality is a big concern especially in Shashamane woreda,
b. Shashamane woreda WASH facility management, post construction support and budget
allocation needs reconsideration,
c. The study finding is presented at critical time of the year because this is the time to approve
woreda budget,
d. Water office has to support its budget proposal with site specific information & work closely
with NGO’s operating in its boundary to improve non-functionality,
e. Budget allocated is small but utilization of the allocated budget is also a big concern. We don’t
expect big improvement in budget allocation in the future too,
f. Regional government should enforce woredas to allocate maintenance budget like the
practice in health and education. For health and education woredas are required to indicate
budget line for activities specifically given to woredas,
g. NGO’s should also balance budget allocation as they mostly focus on new construction,
h. Woredas don’t have long term plan or organized information about the WASH systems in their
woredas to guide interventions. There is overlap of implementation e.g. two or more NGO’s
and government plan the same type of activity in the same geographic area,
i. Institutional WASH and sanitation are not included in the study,
j. IRC WASH should support water office in capacitating its human power in training in plumbing,
study & design and
k. There are two multi-village water supply projects in Shashamane but mentioned to be one in
the study.
The major comment related to the assessment is the number of multi-village scheme in Shashamane
woreda which is mentioned to be one in the assessment but the actual quantity is two.
The participants, which are key WASH stakeholders at woreda and zonal level, believed the need to
allocate more resources to the WASH sector as the service is far beyond the target by all stakeholders.
Also they strongly commented the need to balance the budget allocation between the different
components cost components to address issue of sustainability waste of capital.
3.3 Rapid Monitoring assessment
The monitoring presentation introduced how the study emerged, objective of the assessment,
methodology, components of the M&E tool selected for the study, results and recommendations. In
the discussion session the following issues were raised;
a. M&E culture never improved for long time,
b. Number of schemes reported by woreda and zone differs for the same woreda,
c. Woreda WASH Team never conducts regular meeting as WWT but issues are discussed and
decided during woreda project committee meetings which includes wider sector offices in
addition to WASH offices,
d. There is new initiative currently at zonal level to conduct quarterly meeting with NGO’s
operating in the zone but not specific to WASH,
e. Many springs changed flow direction after capping but not picked by monitoring reports and
f. Sanitation facilities are constructed with campaign but no routine monitoring after
construction.
3.4 Overview of SDG targets
This presentation is part of the second major agenda of the workshop. The session began with the
presentation on overview of SDG targets which covers definition of SDG, SDG targets, JMP
interpretation of words used in SDG target 6.1, linkage between SDG 6 and other SDGs, safe water
target indicators, JMP drinking water, sanitation and hygiene ladders, SDG baseline for drinking water
and sanitation at global scale, household level baseline of service levels of drinking water, sanitation
and hygiene for Ethiopia, GTP II targets and relation between SDG and GTPs. The aim of the
presentation was to brainstorm the participants with the targets that the world leaders set and to
start visualizing the situation in their respective woredas against the global targets.
3.5 WASH status of A/Negelle & Shashamane
Both woredas gave presentation on WASH status of their woredas. The Shamshamane presentation
was much better showing the current overall WASH status while that of A/Negelle focused on the
project performance report of the ended Ethiopian budget year, especially related to community
water supply. With respect to institutional WASH the status presented by Arsi Negelle woreda is more
comprehensive because it included WASH status in religious institutions like mosque and churches
3.6 SDG Planning process & data requirement of the planning tools and Introduction to the
planning tool
In this session two presentations were given i.e. planning process and introduction to planning tool
and data requirement of the planning tool. The two presentations were supported with live data
demonstration of similar activity from another program in Amhara region and excel planning tool. The
participants raised questions that needs clarification and was responded by the presenter from IRC
WASH.
At the end of the presentations the participants & moderators from IRC WASH reflected on the
importance of having a long term plan, the need to have a hands on comprehensive training on the
planning tool, the possible source of data for population and growth rate, inflation rate, where to find
operation, direct and indirect support costs of WASH facilities, source of finance to be considered in
the planning, technology options for water supply especially for lowland areas where they have
groundwater problem and water quality issues.
3.7 Planning team composition and time line
The last presentation of the workshop focused on summarizing of activities that needs to be
accomplished in the planning process, planning team composition and time line for the different
activities.
Accordingly the planning team of both woredas agreed to be composed of WASH focal person and
planning experts from water, education and health offices and planning experts from finance offices.
The team of both woredas agreed to be chaired by woreda finance and co-chaired by water office. At
the end the participants were divided into three groups i.e. two separate group for the two woredas
and the third group composed of participants from zonal, regional, consortium members and other
partners. The woreda team were requested to prepare a time line for the different activities in the
planning process with the deadline for submission of planning report set 31st October 2019. The two
woreda came up with closely similar time line and finally agreed as indicated in the table below. The
zonal, regional and others participants were requested to pick out their possible role in the planning
process. Accordingly they proposed to act as facilitator and provide supportive supervision.
No Activity agreed time line Remark 1 Data collection (served vs unserved population by kebele),
identify new construction (technology selection, cost estimate) & rehabilitation and maintenance budgeting, population growth rate, inflation rate, visioning, review by WWT and zone WASH sector offices
25 August 2019 Woreda planning team taking the role and zone and IRC to keep track
2 Evaluation of data collection status, training on use of tool August 26, 2019 IRC to organize workshop
3 Fill data collection gaps & start data entry October 13, 2019 WWT
4 SDG planning review workshop October 14, 2019 IRC to organize
5 Approval of the plan by WWT October 30, 2019 WWT 6 Submission of the planning report 31st October 2019 WWT
7 Validation workshop November 11, 2019 IRC to organize
As part of the presentation of the work plan, the team proposed to visit each water supply and
sanitation facility in their respective kebeles to evaluate status, discuss with kebele stakeholders,
identify potential water source, visit zonal and regional offices and partners to see potential for
financing. In addition they proposed to work overtime as this is additional assignment to their regular
activities. Resource requirements proposed were finance, logistic (vehicles with fuel), computers &
GPS. Explanation was given on the constraints of the project resources and advised to work using
existing data in their respective offices.
4. SDG planning team
The SDG planning team name, office represented from, job title and contact phone address is
summarized in the table below.
Annex 1 Invitation Letter for workshop participants
Annex 2 Workshop Ajenda
Workshop to validate rapid Financing & Monitoring assessments & Launching of SDG Planning Activity
Venue: Framont Hotel, Shashamane Date: 30 – 31 July 2019
Time Activity Presenter Facilitator/s Day One: Tue 30th July 2019
8:30-9:00 Registration Beti
9:00 – 9:30 Welcome and Introduction Gezahegn Beti
9:30 – 9:45 Opening Remarks W/Arsi WERDB Gezahegn
9:45 – 10:15 Presentation on Financing Assessment Gezahegn Beti
10:15 – 10:45 Coffee/Tea Break
10:45 – 12:00 Discussion Gezahegn Beti 12:00 – 12:30 Presentation on Monitoring assessment Gezahegn Beti
12:30 – 13:30 Lunch Break
13:30 – 14:30 Discussion Gezahegn Beti 14:30 – 15:00 Overview of SDG targets Gezahegn Beti
15:00 – 15:30 Coffee/Tea Break
15:30 – 16:00 Discussion Gezahegn Beti 16:00 – 16:30 WASH services status of Shashamane woreda Shashamane WWT Beti
16:30 – 17:00 WASH services status of A/Negelle woreda A/Negelle WWT Beti
17:00 – 17:30 Discussion Shashamane & A/Negelle WWT
Gezahegn
Day Two: Wed 31st July 2019
8:30 – 8:45 Recap of day 1 Gezahegn Beti
8:45 – 9:45 SDG planning process & data requirement of the planning tool
Beti Gezahegn
9:45 – 10:30 Discussion Gezahegn Beti
10:30 – 11:00 Coffee/Tea Break
11:00 – 12:00 Introduction to SDG planning tool Beti Gezahegn 12:00-12:30 Discussion Gezahegn Beti
12:00 – 13:30 Lunch Break
13:30 – 15:00 Discussion Gezahegn Beti
15:00 – 15:30 Coffee/Tea Break
15:30 – 15:45 Closing W/A WERDB Gezahegn
15:45-17:00 Admin issues Gezahegn & Beti
Annex 3 List of workshop participants
No Name Office Position 1 Abdela Hashim Region water Expert
2 Ayele Tura Zone Finance Expert
4 Gemechu G/Hiwot Zone Finance Expert
5 Mohammed Deme Zone Finance NGO team leader 6 Buna Bedao Zone Education Vice Head
7 Kasim Gemeda Zone Education Focal person
8 Solomon Fekade Zone Education Planning expert
9 Abadir Haji Zone water Office head representative
10 Mustefa Wako Zone Water Planning & budget
11 Mubarik Haji Zone water Engineer 12 Kedir Mude Zone Health M & E expert
13 Assefa Gire Zone Health Team leader
14 Jemal Umer Shashamane finance Expert
15 Isa Kedir Shashamane Finance Planning 16 Mohammed Burka Shahamane Education Expert
17 Safao Edao Shashamane Education Expert
18 Tura Wayu Shashamane Education Head 19 Robe Edassa Shashamane admin Expert
20 Wariso Weyiso Shashamane Admn Expert
21 Kemal Ayano Shashamane Admin Admin office head
22 Mohammed Gemedi Shashamane Health Head 23 Kedir Bekelo Shashamane Health Planning Expert
24 Temame Abdella Shashamane Health Technical Expert
25 Aliyi Haji Shashamane water Head 26 Ibrahim Shugute Shashamne water Expert
27 Feyiso Keranso Shashmane water Expert
28 Abu Teshita A/Negelle Admnin Head
29 Tajure Budemo A/Neglle water Planning & budget 30 Bedaso Kibret A/Neglle water Head
31 Bayisa Imeshu A/Neglle Water Expert
32 Urgessa Geleto A/Negelle Finance Head 33 Niguse Gemechu A/Negelle Finance Planning & Budget head
34 Berisa Bedane A/Negelle Education Expert
35 Tirunesh Zerihun A/Negelle Education Expert
36 Mustefa Sheak A/Negelle Education Head 37 Abdurahaman Tesso A/Negelle Health Expert
38 Kedir Tahir A/Negelle Health Head
39 Fozia Jemal A/Neglle Health Expert
40 Segni Haso BBBC Project coordinator
41 Alemu Teshome ECC Planning expert
42 Desalny Gutema Habitat Engineer