turbine operation manual qn1 sec g 04 tp 002 - baixardoc
TRANSCRIPT
SEC
QUANG NINH THERMAL POWER JOINT STOCK COMPANY 2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL
QUANG NINH THERMAL POWER JOINT STOCK COMPANY
2 × 300 MW – Anthracite Coal Fired Power Station
Turbine & Auxiliaries
Operation Manual
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
INDEX
1 Scope ........................................................................... 4
2 Specific quoting documents ......................................................... 4
3 Technical Specification ............................................................. 4
3.1 Turbine Technical Specification ................................................... 4
3.2 Auxiliary Equipment Technical Specification......................................... 5
4 Rated Parameter and Interlock Protection of Turbine and Its Auxiliaries. ................. 15
4.1 Turbine Interlock Protection ...................................................... 15
4.2 Interlock Protection of Auxiliary Equipment ......................................... 16
4.3 Rated Parameter ............................................................... 26
5 Turbine Start-up .................................................................. 29
5.1 Basic Regulation ............................................................... 29
5.2 Acceptance after Overhaul....................................................... 30
5.3 Test after Overhauling .......................................................... 31
5.4 Inspection and Preparation before startup ......................................... 36
5.5 Unit Cold Startup ............................................................... 39
5.6 Hot Startup .................................................................... 46
6 Monitoring and Adjusting during Operation ........................................... 51
6.1 Work Scope and Purpose of Operation Adjusting ................................... 51
6.2 Main Parameters and Limitation of Operation Control................................ 51
6.3 Monitoring and Maintenance during Turbine Operation .............................. 56
6.4 Control Mode of Turbine Operation ............................................... 57
7 Turbine Shutdown ................................................................ 58
7.1 Basic Regulation ............................................................... 58
7.2 Preparation before Turbine Shutdown ............................................. 58
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 1 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
7.3 Sliding Parameter Shutdown ..................................................... 59
7.4 Normal Shutdown .............................................................. 62
7.5 Emergency Shutdown ........................................................... 62
7.6 Maintenance after Shutdown ..................................................... 63
8 Turbine Auxiliaries ................................................................ 64
8.1 Basic Regulation of Auxiliaries Operation .......................................... 64
8.2 Motor Operation ................................................................ 67
8.3 Auxiliaries Equipment and System Startup/Shutdown and Operation Maintenance ...... 69
9 Equipment Periodical Test and Shifting ............................................. 109
9.1 Equipment Periodical Test and Shifting ........................................... 110
10 DEH Operating Procedures ...................................................... 112
10.1 The DEH control system for 6 units in this projection is electro-hydraulic control system
which adopts DCS system introduced from Westhouse Process Control Co., ltd; the hydraulic
pressure part adopts high pressure fire-resistant oil; governor valves will be controlled by DEH
through electro-hydraulic converter. ................................................... 112
10.2 Functions of DEH control system include: ........................................ 112
10.3 Working Principle............................................................. 113
10.4 Control Mode ................................................................ 113
10.5 DEH Control and Operation .................................................... 114
11 Accident Disposal .............................................................. 118
11.1 Accident Disposal Principle .................................................... 118
11.2 Turbine Emergency Shutdown ................................................. 119
11.3 Turbine Operation Parameter Abnormity ......................................... 120
11.4 Turbine Water Induction ....................................................... 125
11.5 Axial displacement increasing. ................................................. 126
11.6 Turbine overspeed............................................................ 127
11.7 Abnormity unit vibration. ....................................................... 128
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 2 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
11.8 Condenser Vacuum Decrease ................................................. 130
11.9 Abnormity Working of Lube Oil System .......................................... 133
11.10 EH oil system failure ......................................................... 134
11.11 Turbine Blade Broken ........................................................ 135
11.12 Load change suddenly........................................................ 136
11.13 Plant power cut ............................................................. 138
11.14 Fire Accident................................................................ 140
11.15 Auxiliaries Failure ........................................................... 140
Appendix A Recommendation Value for Speed Maintenance.................................. 155
Appendix B Parameter for Front Main Stop Valve Startup .................................... 157
Appendix C Parameter Requirement of Reheat Steam ....................................... 159
Appendix D Guide of No-load and Low Load Operation ..................................... 161
Appendix E Recommendation Value of Hot Start ........................................... 162
Appendix F Recommendation of Load Change (Fixed Pressure) ............................... 164
Appendix F Recommendation of Load Change (Sliding Pressure) .............................. 166
Appendix H Cooling Time High Pressure Cylinder.......................................... 168
Appendix I Curve of Gland Seal Temperature Difference and Stator Life ........................ 170
Appendix J Circulating Index .......................................................... 172
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 3 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
1 Scope
The turbine operating manual for N300-16.7/538/538 turbine and its auxiliary is herein
prepared to specify the technical standard of the main technical character, equipment specification,
protection and interlock, operating, maintenance and fault disposal.
The operating manual is applicable for start-up, shut down, maintenance and fault disposal of
2×300MW Unit of Guang Ninh Thermal Power Joint Stock Company Phase 1.
2 Specific quoting documents
The clauses which are stated in the following documents are considered as the clauses of this
manual. The documents which marked with time, its later revised sheet or edition shall not be
applied to this manual; however, the parties who made the agreement are encouraged to study if
the updated edition can be accepted. For the document without marking, the updated edition
document shall be applied.
DL/T 609 - 1996 Guide for 300MW grade steam turbine operation
DL/T 612 - 1996 Inspection code for boiler and pressure vessel of the power industry
DAS(1994)277 Code of Power Safety Construction (Section: thermodynamics and
mechanism)
DL 558-94 Procedures of Power Construction Accident Investigation
DL558-94 – 95 Guides for Chemical Supervision of Water and Steam in Thermal Power
Plants
GB/T 12145-1999 Quality criterion of water and steam for steam power equipment
SD223-87 Guide for lay-up of thermal power equipment in fossil fuel power plant
GB7596-87 Quality criteria of turbine oil in service for power plants
Guodianfa (2000)589 the 25 Key Requirements to Avoid Serious Accident in Power
Construction
As well as the manufacturer’s equipment documents and design documents.
3 Technical Specification
3.1 Turbine Technical Specification
NAME MODEL AND SPECIFICATION
MODEL N300-16.67/538/538
TYPE SUBCRITICAL INTERMEDIATE REHEAT CONDENSING
TURBINE
RATE OUTPUT 300MW
TMCC RATE 315MW
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 4 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
NAME MODEL AND SPECIFICATION
PRESSURE 16.67MPa(a)
TEMPERATURE 538℃
MASS FLOW
RATE
956.7t/h
TMCC REGIME
MAIN STEAM
CONDITION
BAKE
PRESSURE
8.20kPa(a)
RATE SPEED 3000r/min
ROTATION DIRECTION CLOCKWISE SEE FROM TURBINE TO GENERATOR
3.2 Auxiliary Equipment Technical Specification
NUMBER
NUMBER
NAME MODEL AND
SPECIFICATION
UNIT1# 2#
MANUFACTURE
REMARK
1 MAIN LUBE OIL
TANK
V=39m3
VOLUME V=39m3
SET 1 1 SUPPLIED
WITH
STC
SMOKE
EXTRACTOR
EXHAUST
FAN
Type:2FDHB-14-1
MODEL NUMBER:
2FDHB-14-1
EXHAUST DEMAND
14 m3/h
SET 2 2 SUPPLIED
WITH
STC
2 LUBE OIL
PURIFIED
EQUIPMENT
YN-MAB206
MODEL NUMBER:
YN-MAB206
SET 1 1 YANGZHONG
HUANENG
ELECTRIC
POWER
EQUIPMENT
CO.,LTD
JACKING OIL
PUMP SET 2 2 SUPPLIED
WITH
STC
3
MOTOR 15KW 400V
145r/min
SET 2 2 SUPPLIED
WITH
STC
4 LUBE OIL
COOLER
MODEL NUMBER:
NT150L B-10
COOLING WARTER
SET 2 2 SUPPLIED
WITH
STC
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 5 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
NUMBER
NUMBER
NAME MODEL AND
SPECIFICATION
UNIT1# 2#
MANUFACTURE
REMARK
DEMAND: 220t/h
HEAT EXCHANGER
AREA 198.44m2
5 DEH CONTROL
OIL EQUIPMENT
OIL FILLING
VOLUME 1000L
SET 1 1 SUPPLIED
WITH
STC
6 TURBINE
TURNING DEVICE SET 1 1 SUPPLIED
WITH
STC
GLAND STEAM
CONDENSER FAN
CAPACITY: 1080
m3/h
SET 2 2 SUPPLIED
WITH
STC
7
MOTOR 7.5KW 415V
MODEL NUMBER:
YB132S2-2
SUPPLIED
WITH
STC
8 GLAND STEAM
CONDENSER
MODEL NUMBER:
QL-110-2
SET 1 1 SUPPLIED
WITH
STC
9 SEAL OIL SUPPLY
UNIT SET 1 1 SUPPLIED
WITH
SGC
10 AIR SIDE DRAIN
REGULATOR SET 1 1 SUPPLIED
WITH
SGC
VAPOUR
EXHAUST DEVICE
EXHAUST CAPACITY 0.19~ 0.27 m3/s
SET 1 1 SUPPLIED
WITH
SGC
11
MOTOR 3.0KW 400V 50Hz
MODEL NUMBER:
YB100S-2
SET 1 1 SUPPLIED
WITH
SGC
12 STATOR COOLER
WATER SUPPLY
DEVICE
COOLER WATER
FLOW: 55m3/h
SET 1 1 SUPPLIED
WITH
SGC
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 6 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
NUMBER
NUMBER
NAME MODEL AND
SPECIFICATION
UNIT1# 2#
MANUFACTURE
REMARK
13 HYDRAULIC HP
BY PASS
EQUIPMENT
INLET STEAM
PARAMETER:
17.50MPa 548℃ 300t/h
OUT STEAM
PARAMETER:
4.4MPa 350℃ 334.2t/h
DESUPERHEAT
WATER
PARAMETER:
28MPa 185℃ 105.6t/h
SET 1 1 SHANGHAI CCI
POWER
CONTROL
EQUIPMENT
CO.,LTD
14 HYDRAULIC LP BY
PASS EQUIPMENT
INLET STEAM
PARAMETER:
4.4MPa 548℃ 334.2t/h
OUT STEAM
PARAMETER:
0.8MPa 175℃ 420.9t/h
DESUPERHEAT
WATER
PARAMETER:
3.20MPa 38℃ 233.6t/h
SET 2 2 SHANGHAI CCI
POWER
CONTROL
EQUIPMENT
CO.,LTD
15 HP HYDRAULIC
STATION
SUPPORTED WITH
HP BY PASS
EQUIPMENT
SET 1 1 SUPPLIED
WITH
EQUIPMENT
16 LP HYDRAULIC
STATION
SUPPORTED WITH
LP BY PASS
EQUIPMENT
SET 1 1 SUPPLIED
WITH
EQUIPMENT
17 CONDENSER MODEL
NUMBER:N-18000
SURFACE
CONDENSER
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 7 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
NUMBER
NUMBER
NAME MODEL AND
SPECIFICATION
UNIT1# 2#
MANUFACTURE
REMARK
CONDENSER
VALIDITY HEAT
EXCHANGE AREA:
18000 m2 CIRCULATING WATER FLOW : 42800t/h
18 TURBINE FLASH
TANK I SET 1 1 SUPPLIED
WITH
CONDENSER
19 TURBINE FLASH
TANK II SET 1 1 SUPPLIED
WITH
CONDENSER
20 NO.8 HP HEATER MODEL NUMBER:
JG-1025-3-3
HORIZONTAL
FORM
HEAT EXCHANGE
AREA: 1025m2
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
21 NO.7 HP HEATER MODEL NUMBER:
JG-1110-3-2
HORIZONTAL
FORM
HEAT EXCHANGE
AREA: 1110m2
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
22 NO.6 HP HEATER MODEL NUMBER:
JG-885-3-1
HORIZONTAL
FORM
HEAT EXCHANGE
AREA: 885m2
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
23 DEAERATOR AND
STORAGE TANK
MODEL NUMBER:
GC-1180/GS-120
HORIZONTAL
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 8 Rev.: A
QUANG NINH THERMAL POWER JOINT STOCK COMPANY2×300 MW
TURBINE & AUXILIARIES OPERATION MANUAL SEC
NUMBER
NUMBER
NAME MODEL AND
SPECIFICATION
UNIT1# 2#
MANUFACTURE
REMARK
DEAERATOR
RATE POWER:
1180t/h
RESERVOIR
USEFUL VOLUME:
120 m3
24 NO.4 LP HEATER MODEL NUMBER:
JD-580-9-4
HORIZONTAL
HEAT EXCHANGE
AREA: 580m2
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
25 NO.3 LP HEATER MODEL NUMBER:
JD-530-4-2
HORIZONTAL
FORM
HEAT EXCHANGE
AREA: 430m2
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
26 NO.1 LP HEATER NO.2:MODEL
NUMBER:
JD-840-6-1
HORIZONTAL
FORM
HEAT EXCHANGE
AREA: 840m2
NO.2:MODEL
NUMBER:
JD-740-6-2
HORIZONTAL
HEAT EXCHANGE
AREA: 740m2
SET 1 1 SHANGHAI
POWER
EQUIPMENT
CO.,LTD
27 FEED WATER
PUMP
MODEL NUMBER:
300DCS4M
441.35t/h
19.65MPa(a)
SET 3 3 EBARA
BOSHAN
PUMPS
CO.,LTD
28 BOOSTER PUMP MODEL NUMBER:
300×200KS 63
SET 3 3 EBARA
BOSHAN
Date 2008-09-15 No. : QN1-SEC-G-04-TP-002 Page 9 Rev.: A